CN104020375A - 一种用于检测智能变电站合并单元时间参数的装置和方法 - Google Patents
一种用于检测智能变电站合并单元时间参数的装置和方法 Download PDFInfo
- Publication number
- CN104020375A CN104020375A CN201410257503.7A CN201410257503A CN104020375A CN 104020375 A CN104020375 A CN 104020375A CN 201410257503 A CN201410257503 A CN 201410257503A CN 104020375 A CN104020375 A CN 104020375A
- Authority
- CN
- China
- Prior art keywords
- unit
- time
- merge cells
- message
- intelligent substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Selective Calling Equipment (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410257503.7A CN104020375B (zh) | 2014-06-11 | 2014-06-11 | 一种用于检测智能变电站合并单元时间参数的装置和方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410257503.7A CN104020375B (zh) | 2014-06-11 | 2014-06-11 | 一种用于检测智能变电站合并单元时间参数的装置和方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104020375A true CN104020375A (zh) | 2014-09-03 |
CN104020375B CN104020375B (zh) | 2017-06-16 |
Family
ID=51437236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410257503.7A Active CN104020375B (zh) | 2014-06-11 | 2014-06-11 | 一种用于检测智能变电站合并单元时间参数的装置和方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104020375B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105187150A (zh) * | 2015-09-30 | 2015-12-23 | 南京务本信息科技有限责任公司 | 一种基于sdh网络的时钟同步系统 |
CN106443215A (zh) * | 2016-10-10 | 2017-02-22 | 国网安徽省电力公司电力科学研究院 | 智能变电站变压器保护合并单元同步核相测试装置及方法 |
CN110376433A (zh) * | 2019-08-07 | 2019-10-25 | 国家电网有限公司 | 背靠背直流输电工程换流站能耗监测装置、系统及方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202383278U (zh) * | 2011-12-07 | 2012-08-15 | 重庆市电力公司电力科学研究院 | 一种合并单元采样值延时测量系统 |
WO2013029543A1 (zh) * | 2011-08-30 | 2013-03-07 | 中国电力科学研究院 | 一种用于智能变电站检测的合并单元仿真器 |
CN203259610U (zh) * | 2013-05-07 | 2013-10-30 | 国家电网公司 | 基于模拟量数字化传递的合并单元精确时间测试仪 |
CN103439597A (zh) * | 2013-08-06 | 2013-12-11 | 国家电网公司 | 一种基于模拟量数字化传递的合并单元同步守时测试仪及其方法 |
CN103605023A (zh) * | 2013-11-20 | 2014-02-26 | 国家电网公司 | 一种合并单元时间特性测量方法及测量装置 |
CN203551701U (zh) * | 2013-11-19 | 2014-04-16 | 国家电网公司 | 智能变电站合并单元时间性能评价装置 |
-
2014
- 2014-06-11 CN CN201410257503.7A patent/CN104020375B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013029543A1 (zh) * | 2011-08-30 | 2013-03-07 | 中国电力科学研究院 | 一种用于智能变电站检测的合并单元仿真器 |
CN202383278U (zh) * | 2011-12-07 | 2012-08-15 | 重庆市电力公司电力科学研究院 | 一种合并单元采样值延时测量系统 |
CN203259610U (zh) * | 2013-05-07 | 2013-10-30 | 国家电网公司 | 基于模拟量数字化传递的合并单元精确时间测试仪 |
CN103439597A (zh) * | 2013-08-06 | 2013-12-11 | 国家电网公司 | 一种基于模拟量数字化传递的合并单元同步守时测试仪及其方法 |
CN203551701U (zh) * | 2013-11-19 | 2014-04-16 | 国家电网公司 | 智能变电站合并单元时间性能评价装置 |
CN103605023A (zh) * | 2013-11-20 | 2014-02-26 | 国家电网公司 | 一种合并单元时间特性测量方法及测量装置 |
Non-Patent Citations (2)
Title |
---|
倪兆瑞等: "智能变电站合并单元延时特性现场测试仪的设计", 《电力系统保护与控制》 * |
刘海涛等: "智能变电站合并单元时间性能测试问题的研究", 《华东电力》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105187150A (zh) * | 2015-09-30 | 2015-12-23 | 南京务本信息科技有限责任公司 | 一种基于sdh网络的时钟同步系统 |
CN106443215A (zh) * | 2016-10-10 | 2017-02-22 | 国网安徽省电力公司电力科学研究院 | 智能变电站变压器保护合并单元同步核相测试装置及方法 |
CN110376433A (zh) * | 2019-08-07 | 2019-10-25 | 国家电网有限公司 | 背靠背直流输电工程换流站能耗监测装置、系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104020375B (zh) | 2017-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Song et al. | Smart sensors and standard-based interoperability in smart grids | |
Castello et al. | A new IED with PMU functionalities for electrical substations | |
CN103969526B (zh) | 电能质量采集装置及其在电能质量综合分析系统中的应用 | |
CN203909162U (zh) | 一种电能质量采集装置 | |
CN102621414B (zh) | 一种雷击放电综合同步观测方法及系统 | |
CN101629995A (zh) | 相量测量单元pmu的检测方法 | |
WO2017117482A1 (en) | Time signal manipulation and spoofing detection based on a latency of a communication system | |
CN105391509B (zh) | 基于fpga的网口高精度时间标定方法 | |
CN104076321A (zh) | 一种数字式电能表在线监测与评估系统及方法 | |
CN103076515A (zh) | 合并单元整体检测与评估系统 | |
CN104020375A (zh) | 一种用于检测智能变电站合并单元时间参数的装置和方法 | |
CN102593955B (zh) | 一种综合性智能化时间频率测试系统与测试方法 | |
CN105785402A (zh) | 一种用于gnss信号模拟器时延校准的系统及方法 | |
CN1965270B (zh) | 测量时钟抖动 | |
CN113110370A (zh) | 一种测试系统和方法 | |
CN203909182U (zh) | 一种用于检测智能变电站合并单元时间参数的装置 | |
CN112187560A (zh) | Ntp网络授时评估系统、方法和授时评估装置 | |
Ahmad Khan et al. | PTP‐based time synchronisation of smart meter data for state estimation in power distribution networks | |
CN110062223A (zh) | 一种高精度同步测试相机帧信号的方法及其电路系统 | |
CN104301163B (zh) | 一种goose时标的测试方法与系统 | |
US20150207645A1 (en) | Synchrophasor data management systems and methods | |
CN103051487B (zh) | 基于电力业网络测量和控制系统时钟同步协议的测试方法 | |
Castello et al. | Integration of power quality and fault data into a PMU-based Wide Area Monitoring System | |
CN201887543U (zh) | 采样值时间标定装置 | |
Ponci et al. | Instrumentation and measurement testing in the real-time lab for automation of complex power systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 550005 No. 32, Nanming, Guiyang District, Guizhou, Jiefang Road Co-patentee after: SHANGHAI DIGIGRID INFORMATION TECHNOLOGY CO.,LTD. Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUIZHOU POWER GRID Co.,Ltd. Address before: 550002 No. 251, Jiefang Road, Guizhou, Guiyang Co-patentee before: SHANGHAI DIGIGRID INFORMATION TECHNOLOGY Co.,Ltd. Patentee before: Guizhou Electric Power Test Research Institute |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200330 Address after: 550005 No. 32, Nanming, Guiyang District, Guizhou, Jiefang Road Co-patentee after: SHANGHAI KYLAND YUANJING INDUSTRIAL TECHNOLOGY Co.,Ltd. Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUIZHOU POWER GRID Co.,Ltd. Address before: 550005 No. 32, Nanming, Guiyang District, Guizhou, Jiefang Road Co-patentee before: SHANGHAI DIGIGRID INFORMATION TECHNOLOGY Co.,Ltd. Patentee before: ELECTRIC POWER RESEARCH INSTITUTE, GUIZHOU POWER GRID Co.,Ltd. |