CN203259610U - 基于模拟量数字化传递的合并单元精确时间测试仪 - Google Patents

基于模拟量数字化传递的合并单元精确时间测试仪 Download PDF

Info

Publication number
CN203259610U
CN203259610U CN 201320239564 CN201320239564U CN203259610U CN 203259610 U CN203259610 U CN 203259610U CN 201320239564 CN201320239564 CN 201320239564 CN 201320239564 U CN201320239564 U CN 201320239564U CN 203259610 U CN203259610 U CN 203259610U
Authority
CN
China
Prior art keywords
analog signal
merge cells
control module
tester
merging unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320239564
Other languages
English (en)
Inventor
舒展
邹进
熊丽霞
余侃胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201320239564 priority Critical patent/CN203259610U/zh
Application granted granted Critical
Publication of CN203259610U publication Critical patent/CN203259610U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

一种基于模拟量数字化传递的合并单元精确时间测试仪,该测试仪由报文控制模块、报文检测模块、模拟量采集板卡、模拟量转换模块组成;报文检测模块连接报文控制模块的输入端,报文控制模块的接口与上位机接口相联;模拟量转换模块通过模拟量采集板卡与上位机接口相联;被试合并单元联接报文检测模块输入端。所述测试仪报文控制模块及模拟量采集板卡与上位机之间采用以太网通讯连接。所述测试仪报文检测模块与被试合并单元之间通过多模ST-ST光纤连接,测试仪内部也通过相同多模ST-ST光纤连接。该测试仪可以精确地测试合并单元的时间特性,解决了合并单元的同步守时与智能二次设备之间的关系。本实用新型适合应用于智能变电站。

Description

基于模拟量数字化传递的合并单元精确时间测试仪
技术领域    
本实用新型涉及一种基于模拟量数字化传递的合并单元精确时间测试仪,属电力系统智能变电站继电保护校验领域
背景技术    
目前,智能变电站以及数字化变电站的发展已经进入到大面积工程应用阶段,随着电子式互感器、传统互感器+合并单元模式的大量应用,合并单元将正式成为智能变电站以及数字化变电站的智能设备。随着国家电网公司Q/GDW 441-2010《智能变电站继电保护技术规范》的发布,基于时间控制的合并单元也已经在智能变电站中大量应用,其中对合并单元的延时特性以及SMV报文时间抖动特性都已做出比较明确的规范,同步信号已经与保护无关,那么继电保护装置所依赖的采样值特性完全由合并单元的时间特性决定,目前各大模拟量输入的合并单元的设备制造商均实现了合并单元数字量报文输出的时间特性控制,其中延时特性,时间抖动特性基本满足了国家电网公司Q/GDW 441-2010《智能变电站继电保护技术规范》中对于合并单元时间特性的要求。但目前国内还没有形成对于时间特性精确测试的方法以及设备,用以测试模拟量输入合并单元的延时特性、时间抖动特性以及在合并单元在同步切换守时过程中的延时变化情况、时间抖动变化情况。
从目前现状来看,迫切需要一种装置来定量精确测试合并单元数字信号输出的,而不仅仅是测试其秒脉冲的同步精度。其测试方法以及测试手段的实现可以很好地为智能变电站继电保护对于采样值在时间域上的精确要求,也为智能变电站的跨间隔同步实现提供技术上的依据。
发明内容    
本实用新型的目的是,为了解决智能变电站以及数字化变电站对于合并单元在正常情况下或同步异常情况下的延时特性以及时间抖动特性等方面的测试要求,并针对目前现有合并单元应用的技术现状,开发出基于模拟量数字化传递的合并单元精确时间抖动测试仪。
本实用新型的技术方案是,本实用新型基于模拟量数字化传递的合并单元精确时间测试仪由报文控制模块、报文检测模块、模拟量采集板卡、模拟量转换模块组成。报文检测模块连接报文控制模块的输入端,报文控制模块的接口与上位机接口相联;模拟量转换模块通过模拟量采集板卡与上位机接口相联;被试合并单元联接报文检测模块输入端。
报文控制模块是一块主CPU,采用嵌入式操作系统。
上位机与测试仪报文控制模块、模拟量采集板卡之间采用以太网通讯连接。测试仪报文检测模块与被试合并单元之间通过多模ST-ST光纤连接,测试仪内部也通过相同多模ST-ST光纤连接。
本实用新型的工作原理是,基于模拟量数字化传递的合并单元精确时间特性测试仪依赖高精度的采集板卡采集与被试合并单元接收的相同的模拟信号,依托FPGA的精确时间测量以获得模拟量合并单元的延时值,以及报文发送的延时抖动数据。同时采用录波技术在延时抖动的突然变化过程中来测试合并单元的模拟量变化情况,以期获得模拟量输入合并单元在同步正常与异常等各种极端工况下的时间变化特性与模拟量之间的关系。
本实用新型的有益效果是,本测试仪测试精度高,采用高精度板卡作为模拟量采集,让模拟量精度对时间精度的影响降到最低;本测试仪实时性强,因为采用强大的嵌入式操作系统以及FPGA作为测试系统的终端测试设备,所以具有很好的实时性测试,快速响应,满足智能变电站过程层报文的实时性要求,时间分辨率可以达到20ns;自适应性好,不用导入CID文件格式,直接按照报文里的配置信息来实现合并单元校验工作。该测试仪可以精确地测试合并单元的时间特性,解决了合并单元的同步守时与智能二次设备之间的关系,为同步信号进入智能变电站体系建立理论依据。为智能变电站的大面积推广提供检测依据。
本实用新型适合应用于智能变电站。
附图说明    
    图1是本实用新型基于模拟量数字化传递的合并单元精确时间测试仪的结构框图。
具体实施方式
本实用新型的具体实施方式如图1所示。
本实施例基于模拟量数字化传递的合并单元精确时间测试仪由报文控制模块、报文检测模块、模拟量采集板卡、模拟量转换模块组成。报文检测模块连接报文控制模块的输入端,报文控制模块的接口与上位机接口相联;模拟量转换模块通过模拟量采集板卡与上位机接口相联;被试合并单元联接报文检测模块输入端。
本实施例中报文控制模块为主CPU,采用嵌入式操作系统。本实施例测试仪通过测试合并单元基波相位角来反应合并单元的额定延时。
基于模拟量数字化传递的合并单元精确时间测试仪通过继电保护测试仪外加模拟量,测试仪与合并单元同时接入模拟信号,高精度板卡采集模拟信号,FPGA控制的报文检测模块接收来自被试合并单元的9-2报文信号,通过计算板卡接收数据与被试合并单元数字量之间的相位角差计算出合并单元的额定延时,并通过锁相环计算出被试合并单元延时发送抖动度。利用FPGA硬件高可靠性以及分辨率实时计算出合并单元发送报文的延时抖动度。

Claims (3)

1.一种基于模拟量数字化传递的合并单元精确时间测试仪,其特征在于,所述测试仪由报文控制模块、报文检测模块、模拟量采集板卡、模拟量转换模块组成;报文检测模块连接报文控制模块的输入端,报文控制模块的接口与上位机接口相联;模拟量转换模块通过模拟量采集板卡与上位机接口相联;被试合并单元联接报文检测模块输入端。
2.根据权利要求1所述的一种基于模拟量数字化传递的合并单元精确时间测试仪,其特征在于,所述测试仪报文控制模块及模拟量采集板卡与上位机之间采用以太网通讯连接。
3.根据权利要求1所述的一种基于模拟量数字化传递的合并单元精确时间测试仪,其特征在于,所述测试仪报文检测模块与被试合并单元之间通过多模ST-ST光纤连接,测试仪内部也通过相同多模ST-ST光纤连接。
CN 201320239564 2013-05-07 2013-05-07 基于模拟量数字化传递的合并单元精确时间测试仪 Expired - Fee Related CN203259610U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320239564 CN203259610U (zh) 2013-05-07 2013-05-07 基于模拟量数字化传递的合并单元精确时间测试仪

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320239564 CN203259610U (zh) 2013-05-07 2013-05-07 基于模拟量数字化传递的合并单元精确时间测试仪

Publications (1)

Publication Number Publication Date
CN203259610U true CN203259610U (zh) 2013-10-30

Family

ID=49472161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320239564 Expired - Fee Related CN203259610U (zh) 2013-05-07 2013-05-07 基于模拟量数字化传递的合并单元精确时间测试仪

Country Status (1)

Country Link
CN (1) CN203259610U (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103560486A (zh) * 2013-11-07 2014-02-05 贵州电力试验研究院 适用于变压器差动保护的电压锁相同步网络化采样方法
CN103605023A (zh) * 2013-11-20 2014-02-26 国家电网公司 一种合并单元时间特性测量方法及测量装置
CN103869182A (zh) * 2013-12-20 2014-06-18 国家电网公司 基于精确离散时间控制的合并单元暂态测试系统
CN103869187A (zh) * 2014-03-11 2014-06-18 国家电网公司 一种便携式合并单元时间特性测试仪
CN103969524A (zh) * 2014-04-18 2014-08-06 国家电网公司 基于反馈的智能扫描电子式互感器合并单元特性测试方法
CN103983878A (zh) * 2014-06-05 2014-08-13 贵州电力试验研究院 基于随机离散时域的继电保护同步性能测试系统及方法
CN104020375A (zh) * 2014-06-11 2014-09-03 贵州电力试验研究院 一种用于检测智能变电站合并单元时间参数的装置和方法
CN104316799A (zh) * 2014-10-30 2015-01-28 国家电网公司 一种计量用合并单元校验装置及其方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103560486A (zh) * 2013-11-07 2014-02-05 贵州电力试验研究院 适用于变压器差动保护的电压锁相同步网络化采样方法
CN103560486B (zh) * 2013-11-07 2016-02-24 贵州电力试验研究院 适用于变压器差动保护的电压锁相同步网络化采样方法
CN103605023A (zh) * 2013-11-20 2014-02-26 国家电网公司 一种合并单元时间特性测量方法及测量装置
CN103869182A (zh) * 2013-12-20 2014-06-18 国家电网公司 基于精确离散时间控制的合并单元暂态测试系统
CN103869182B (zh) * 2013-12-20 2016-08-17 国家电网公司 基于精确离散时间控制的合并单元暂态测试系统
CN103869187A (zh) * 2014-03-11 2014-06-18 国家电网公司 一种便携式合并单元时间特性测试仪
CN103969524A (zh) * 2014-04-18 2014-08-06 国家电网公司 基于反馈的智能扫描电子式互感器合并单元特性测试方法
CN103969524B (zh) * 2014-04-18 2016-11-02 国家电网公司 基于反馈的智能扫描电子式互感器合并单元特性测试方法
CN103983878A (zh) * 2014-06-05 2014-08-13 贵州电力试验研究院 基于随机离散时域的继电保护同步性能测试系统及方法
CN103983878B (zh) * 2014-06-05 2016-09-14 贵州电力试验研究院 基于随机离散时域的继电保护同步性能测试系统及方法
CN104020375A (zh) * 2014-06-11 2014-09-03 贵州电力试验研究院 一种用于检测智能变电站合并单元时间参数的装置和方法
CN104316799A (zh) * 2014-10-30 2015-01-28 国家电网公司 一种计量用合并单元校验装置及其方法

Similar Documents

Publication Publication Date Title
CN203259610U (zh) 基于模拟量数字化传递的合并单元精确时间测试仪
CN103869182B (zh) 基于精确离散时间控制的合并单元暂态测试系统
CN103605023B (zh) 一种合并单元时间特性测量方法及测量装置
CN102590619B (zh) 基于定时变量的实时测量设备的时间同步能力检测方法
CN202443082U (zh) 具有通用性的模拟量输入合并单元测试系统
CN102608450A (zh) 适用于智能变电站的测试校验系统及校验方法
CN204666727U (zh) 基于gps的大型地网接地阻抗测量装置
CN105319529B (zh) 一种电能表误差校验系统及校验方法
CN104360298A (zh) 一种合并单元测试仪的性能测试系统及方法
CN201402286Y (zh) 电压互感器二次回路压降检测装置
CN201425704Y (zh) 卫星同步主时钟装置
CN205176248U (zh) 智能变电站电子式互感器测量准确性仿真测试比对系统
CN102621512B (zh) 一种合并单元守时性能的动态模拟测试方法
CN103869187A (zh) 一种便携式合并单元时间特性测试仪
CN103995198A (zh) 一种模拟量输入合并单元计量性能检测装置及其检测方法
CN104297593B (zh) 一种用于智能变电站合并单元的守时误差检测方法
CN203658453U (zh) 一种具备无线同步通信功能的无线二次压降及负荷测试仪
CN102035261A (zh) 一种用于智能电网的监测系统
CN105548769A (zh) 一种继电保护动作延时分级测试系统及方法
CN103439597A (zh) 一种基于模拟量数字化传递的合并单元同步守时测试仪及其方法
CN204256149U (zh) 一种合并单元测试仪的性能测试系统
CN103812731A (zh) 一种数字化采样延时变频测量方法及测量系统
CN103823200A (zh) 一种分布式pmu检测方法
CN102591211B (zh) 同步仿真控制系统
CN105866576A (zh) 智能变电站二次侧电能计量误差影响的模拟检测系统及其检测分析方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131030