CN104006846B - Two lead three stringing walking plate data monitoring devices - Google Patents
Two lead three stringing walking plate data monitoring devices Download PDFInfo
- Publication number
- CN104006846B CN104006846B CN201410020181.4A CN201410020181A CN104006846B CN 104006846 B CN104006846 B CN 104006846B CN 201410020181 A CN201410020181 A CN 201410020181A CN 104006846 B CN104006846 B CN 104006846B
- Authority
- CN
- China
- Prior art keywords
- data
- unit
- processing units
- data center
- center processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012806 monitoring device Methods 0.000 title claims abstract description 6
- 238000012545 processing Methods 0.000 claims abstract description 50
- 238000006243 chemical reaction Methods 0.000 claims abstract description 11
- 238000001514 detection method Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 7
- 238000004891 communication Methods 0.000 claims description 5
- 210000004027 cell Anatomy 0.000 claims description 3
- 238000013500 data storage Methods 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 3
- 210000000352 storage cell Anatomy 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 2
- 230000005622 photoelectricity Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 11
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 239000004020 conductor Substances 0.000 description 5
- 230000005611 electricity Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 1
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Three stringing walking plate data monitoring devices are led the present invention relates to two, unit, data center processing units are battery powered to constitute, its power supply power supply unit right-hand member is connected with data center processing units, one power conversion unit, a cell voltage detection unit are set between its battery power supply unit and data center processing units;Its data center processing units upper port sets a photoelectric encoder data-interface, a GPS positioning unit, an equipment state indicating member, and beneficial effects of the present invention are:Monitored in real time by the string quantity of motion of the real time position to limp, limp stress, the posture of limp, two pull ropes of limp, it is ensured that construction safety.
Description
Technical field
The present invention relates to the prison that the two of a kind of Poling Construction that can be widely used on transmission line of electricity lead three stringing walking plate data
Survey.
Background technology
Extra-high voltage the Changjiang river large crossing projects are reached the standard grade for double loop, six-multiple conductor in electricity Dong Song Huaihe River, Anhui, have 36 root wires
The Changjiang river is crossed over two optical cables.Wire laying tension reaches 12 tons, considerably beyond plain conductor laying tension.Simultaneously because the Changjiang river
For golden waterway, the ship that passes through is more, can the navigation ban time it is short, construction risk is big.Therefore, it is necessary to there is a set of complete Poling Construction side
Case, it is ensured that complete Poling Construction task safe efficiently, to construction technology, pay-off equipment, Work tool advance and reliability
It is required that greatly improving.
The characteristics of sub-conductor is more are divided according to engineering, if according to traditional unwrapping wire mode, unwrapping wire cycle length, wire primary elongation
The disunity of release, easily causes sub-conductor sag error exceeded;Traditional unwrapping wire mode is because split conductor is more, crossing span
Greatly, it is easy to produce twisted wire in work progress, carries line on the back, causes unwrapping wire difficult.For these reasons, by Anhui Electric Power Corporation's base
The portion of building takes the lead, and Anhui Power Transmission Engineering Co., Ltd. combines construction needs and existing equipment and Work tool proposes specific construction party
Case, using technological innovation as means, carries out the application study of extra-high voltage the Changjiang river large crossing projects " 2 lead 3 " payingoff construction technique.
According to existing stretching equipment situation, " 2 lead 3 " stringing walking plate load allowable is designed according to 360kN, and two pull ropes exist
In limp can free vibration, string rope amount consider according to 20m.For ensure construction safety, it is necessary to real time position, limp to limp by
Power, the posture of limp, the string quantity of motion of two pull ropes of limp are monitored in real time.
The content of the invention
The present invention provides a kind of real time position that three stringing walking plates can be led to two, limp stress, the posture of limp, limp two
The stringing walking plate data monitoring device that the string quantity of motion of root pull rope is monitored in real time.
The present invention is mainly characterized by:It is battery powered unit, data center processing units to constitute, its power supply power supply unit
Right-hand member is connected with data center processing units, and a Power convert is set between its battery power supply unit and data center processing units
Unit, a cell voltage detection unit;Its data center processing units upper port sets a photoelectric encoder data-interface, one
GPS positioning unit, an equipment state indicating member, the photoelectric encoder data-interface are all connected with the GPS positioning unit other end
On power conversion unit, a photoelectric encoder data are set between photoelectric encoder data-interface and data center processing units
Processing unit, sets a gps data processing unit, data center's processing between GPS positioning unit and data center processing units
Unit lower port sets a data wireless transmission unit, a sensing data to communicate and power supply interface, equipment state indicating member,
Photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensing data communication and power supply
Interface is that one end is connected on data center processing units, and the other end is connected on power conversion unit;Supplied using battery
Electricity respectively obtains three output voltages by power conversion unit and powered for sensor, data processing unit, pulling force sensor number
It is long for gathering gps data, steel wire rope vibration for gathering pulling force sensor data, gps data processing unit according to processing unit
Spending measuring unit is used for acquisition process steel wire rope vibration length data, the operational factor of data storage cell storage device, light
Photoelectric coder interface unit realizes that the monitoring of steel wire rope vibration length, Data Centralized Processing unit are used for docking photoelectric encoder
Host computer is sent in the acquisition process to pulling force sensor data, gps data, steel wire rope vibration length data.
The beneficial effects of the present invention are:Pass through the real time position to limp, limp stress, the posture of limp, limp two
The string quantity of motion of root pull rope is monitored in real time, it is ensured that construction safety.
Brief description of the drawings
Fig. 1 product structure block schematic illustrations of the present invention
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings
As shown in Figure 1:Two lead three stringing walking plate data monitoring devices, are battery powered unit, data center processing units
Constitute, its power supply power supply unit right-hand member is connected with data center processing units, its battery power supply unit handles single with data center
One power conversion unit, a cell voltage detection unit are set between member;Its data center processing units upper port sets a light
Photoelectric coder data-interface, a GPS positioning unit, an equipment state indicating member, the photoelectric encoder data-interface are determined with GPS
The bit location other end is both connected on power conversion unit, is set between photoelectric encoder data-interface and data center processing units
A photoelectric encoder data processing unit is put, sets a gps data to handle between GPS positioning unit and data center processing units
Unit, data center processing units lower port sets a data wireless transmission unit, sensing data communication and power supply interface,
Equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensing
Device data communication and power supply interface are that one end is connected on data center processing units, and the other end is connected to Power convert list
In member, use battery to power by power conversion unit and respectively obtain three output voltages for sensor, data processing unit confession
Electricity, pulling force sensor data processing unit is used to gather pulling force sensor data, gps data processing unit for gathering GPS numbers
It is used to acquisition process steel wire rope vibration length data, data storage cell according to, steel wire rope vibration length measurement unit be filled with storage
The operational factor put, photoelectric encoder interface unit are used for docking photoelectric encoder and realize the monitoring of steel wire rope vibration length, number
It is used to be sent to the acquisition process of pulling force sensor data, gps data, steel wire rope vibration length data according to centralized processing unit
Host computer.
Claims (1)
1. two lead three stringing walking plate data monitoring devices, it is battery powered unit, data center processing units and constitutes, its feature exists
In:Its power supply power supply unit right-hand member is connected with data center processing units, its battery power supply unit and data center processing units
Between a power conversion unit, a cell voltage detection unit are set;Its data center processing units upper port sets a photoelectricity
Encoder data interface, a GPS positioning unit, an equipment state indicating member, the photoelectric encoder data-interface and GPS location
The unit other end is both connected on power conversion unit, is set between photoelectric encoder data-interface and data center processing units
One photoelectric encoder data processing unit, sets gps data processing single between GPS positioning unit and data center processing units
Member, data center processing units lower port sets a data wireless transmission unit, sensing data communication and power supply interface, if
Standby state indication unit, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensor
Data communication and power supply interface are that one end is connected on data center processing units, and the other end is connected to power conversion unit
On;Use battery to power to respectively obtain three output voltages by power conversion unit and power for sensor, data processing unit,
Pulling force sensor data processing unit be used for gather pulling force sensor data, gps data processing unit be used for gather gps data,
Steel wire rope vibration length measurement unit is used for acquisition process steel wire rope vibration length data, data storage cell storage device
Operational factor, photoelectric encoder interface unit realize the monitoring of steel wire rope vibration length, data set for docking photoelectric encoder
Middle processing unit be used for pulling force sensor data, gps data, steel wire rope vibration length data acquisition process be sent to it is upper
Computer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410020181.4A CN104006846B (en) | 2014-01-10 | 2014-01-10 | Two lead three stringing walking plate data monitoring devices |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410020181.4A CN104006846B (en) | 2014-01-10 | 2014-01-10 | Two lead three stringing walking plate data monitoring devices |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104006846A CN104006846A (en) | 2014-08-27 |
CN104006846B true CN104006846B (en) | 2017-09-26 |
Family
ID=51367616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410020181.4A Active CN104006846B (en) | 2014-01-10 | 2014-01-10 | Two lead three stringing walking plate data monitoring devices |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104006846B (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI896219A0 (en) * | 1989-04-28 | 1989-12-22 | Antti Aarne Ilmari Lange | ANALYZING AND FOUNDATION CALIBRATION AV DETEKTORSYSTEM. |
CN1912560B (en) * | 2005-08-10 | 2010-10-13 | 北京机械工业自动化研究所 | Tyre pressure monitoring method and real-time monitoring system |
CN202617474U (en) * | 2011-12-28 | 2012-12-19 | 安徽送变电工程公司 | Paying-off walking board capable of monitoring transmission line state |
CN202395385U (en) * | 2012-01-10 | 2012-08-22 | 安徽送变电工程公司 | Sag observation remote control travelling trolley based on global positioning system (GPS) positioning technique |
CN102818590A (en) * | 2012-07-29 | 2012-12-12 | 江苏大学 | Wireless sensor network-based transmission lines icing on-line monitoring system |
CN203672413U (en) * | 2014-01-10 | 2014-06-25 | 国家电网公司 | Two-haulage three-ling laying waling board data monitoring device |
-
2014
- 2014-01-10 CN CN201410020181.4A patent/CN104006846B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104006846A (en) | 2014-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2536142A (en) | Load carrying bundle intended for use in a power cable or a power umbilical | |
CN202533209U (en) | Tension and length detection system for winch cable of marine towing machine | |
CN209027715U (en) | A kind of cable laying tractive force monitoring device | |
CN103683088A (en) | Line bracing tool | |
CN104406559A (en) | Vertical distribution sensor assembly for horizontal displacement of landslide and application method | |
CN202731891U (en) | Device for measuring well depth while drilling | |
CN104006846B (en) | Two lead three stringing walking plate data monitoring devices | |
CN103954206A (en) | Power cable bending radius measuring scale | |
CN203672413U (en) | Two-haulage three-ling laying waling board data monitoring device | |
CN203754170U (en) | Hoisting sheave and steel wire rope stress monitoring and controlling device on mine shaft winch and elevator | |
CN203201515U (en) | Underground fishing tool | |
CN102820076A (en) | Sensor cable for underwater monitoring | |
CN202817603U (en) | Wire-supporting tool | |
CN103199463B (en) | A kind of overhead conductor abutting-joint method | |
CN203798295U (en) | Power cable bending radius measuring ruler | |
CN103822612A (en) | Automatic sliding inclinometer based on bluetooth transmission | |
CN209372282U (en) | A kind of acquisition of real-time stress and remote supervision system suitable for ocean engineering experiment | |
CN103558049B (en) | Concrete pole wind resistance detection mechanism and system thereof | |
CN202678845U (en) | Digitized mobile overhead transmission line wrecking instrument based on electrified wrecking and maintaining technology | |
CN203657948U (en) | Force bearing tool load capacity real-time monitoring device | |
CN204571323U (en) | A kind of large span steel structure is synchronously shifted and constructs and monitoring system | |
CN201383211Y (en) | Wireless visual meter-reading device | |
CN203396334U (en) | Device for accurate measurement of electric-pole burial depth | |
CN203894932U (en) | Mine pressure monitoring system based on internet of things | |
CN104897337A (en) | Surface wind pressure gauge for transmission conductor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |