CN203672413U - Two-haulage three-ling laying waling board data monitoring device - Google Patents

Two-haulage three-ling laying waling board data monitoring device Download PDF

Info

Publication number
CN203672413U
CN203672413U CN201420027237.4U CN201420027237U CN203672413U CN 203672413 U CN203672413 U CN 203672413U CN 201420027237 U CN201420027237 U CN 201420027237U CN 203672413 U CN203672413 U CN 203672413U
Authority
CN
China
Prior art keywords
unit
data
processing unit
data center
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420027237.4U
Other languages
Chinese (zh)
Inventor
桂和怀
李凯
朱冠旻
陆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420027237.4U priority Critical patent/CN203672413U/en
Application granted granted Critical
Publication of CN203672413U publication Critical patent/CN203672413U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model relates to a two-haulage three-ling laying waling board data monitoring device. The device is composed of a battery power supply unit and a data center processing unit. The right end of the source power supply unit is connected with the data center processing unit; a power supply conversion unit and a battery voltage detection unit are arranged between the battery power supply unit and the data center processing unit; and the upper port of the data center processing unit is provided with a photoelectric encoder data interface, a GPS positioning unit and a device state indication unit. The two-haulage three-ling laying waling board data monitoring device has the following advantages: the construction safety is guaranteed by real-time monitoring of the real-time position of a walking board, the bearing of the walking board, the posture of the walking board, and the serial momentum of two haulage ropes.

Description

Two lead three stringing walking plate data monitoring devices
Technical field
The utility model relates to a kind of monitoring that can be widely used in two of Poling Construction on transmission line of electricity and lead three stringing walking plate data.
Background technology
Electricity Dong Song Huaihe River, the Anhui large overhead crossing engineering in extra-high voltage the Changjiang river of reaching the standard grade is two-circuit, six-multiple conductor, has 36 root wires and two optical cables are crossed over the Changjiang river.Wire laying tension reaches 12 tons, considerably beyond plain conductor laying tension.Simultaneously, because the Changjiang river is golden waterway, current ship is many, and can the navigation ban time short, construction risk be large.Therefore, must have a set of complete Poling Construction scheme, guarantee safety, complete Poling Construction task efficiently, the advance to construction technology, pay-off equipment, Work tool and reliability requirement all significantly improve.
The feature many according to engineering oidiospore wire, if according to traditional unwrapping wire mode, unwrapping wire cycle length, wire just extend the disunity of release, easily cause sub-conductor sag error to exceed standard; Traditional unwrapping wire mode, because split conductor is many, crossing span is large, is easy in work progress produce twisted wire, carry line on the back, causes unwrapping wire difficulty.For these reasons, taken the lead by capital construction portion of Utilities Electric Co. of Anhui Province, Anhui Power Transmission Engineering Co., Ltd. has proposed concrete arrangement and method for construction in conjunction with construct needs and existing equipment and Work tool, take technological innovation as means, carry out the applied research of the large overhead crossing engineering in extra-high voltage the Changjiang river " 2 lead 3 " payingoff construction technique.
According to existing stretching equipment situation, " 2 lead 3 " stringing walking plate load allowable designs according to 360kN, and two traction ropes can free vibration in limp, and string rope amount is considered according to 20m.For guaranteeing construction safety, need to be stressed to the real time position of limp, limp, the attitude of limp, the string quantity of motion of two traction ropes of limp carry out Real-Time Monitoring.
Utility model content
The utility model provide a kind of can be to two leading that real time position, the limp of three stringing walking plates is stressed, the attitude of limp, the string quantity of motion of two traction ropes of limp carry out the stringing walking plate data monitoring device of Real-Time Monitoring.
The utility model principal feature is: battery-powered unit, data center's processing unit form, its Power supply unit right-hand member is connected with data center processing unit, between its battery power supply unit and data center's processing unit, a power conversion unit is set, a battery voltage detection unit; Its data center's processing unit upper port arranges a photoelectric encoder data-interface, a GPS positioning unit, an equipment state indicating member, this photoelectric encoder data-interface and the GPS positioning unit other end are all connected on power conversion unit, one photoelectric encoder data processing unit is set between photoelectric encoder data-interface and data center's processing unit, one gps data processing unit is set between GPS positioning unit and data center's processing unit, and data center's processing unit lower port arranges a data wireless transmission unit, sensing data communication and a power supply interface.
Principal feature of the present utility model is: the one end that is of equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensing data communication and power supply interface is connected on data center's processing unit, and the other end is connected on power conversion unit
The beneficial effects of the utility model are:, the attitude of limp stressed by the real time position to limp, limp, the string quantity of motion of two traction ropes of limp carry out Real-Time Monitoring, have guaranteed construction safety.
Accompanying drawing explanation
Fig. 1 the utility model product structure framework schematic diagram
Embodiment
The utility model is described in further detail by embodiment below in conjunction with accompanying drawing
As shown in Figure 1: two lead three stringing walking plate data monitoring devices, battery-powered unit, data center's processing unit form, its Power supply unit right-hand member is connected with data center processing unit, between its battery power supply unit and data center's processing unit, a power conversion unit is set, a battery voltage detection unit, its data center's processing unit upper port arranges a photoelectric encoder data-interface, one GPS positioning unit, one equipment state indicating member, this photoelectric encoder data-interface and the GPS positioning unit other end are all connected on power conversion unit, one photoelectric encoder data processing unit is set between photoelectric encoder data-interface and data center's processing unit, one gps data processing unit is set between GPS positioning unit and data center's processing unit, data center's processing unit lower port arranges a data wireless transmission unit, one sensing data communication and power supply interface, equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, the one end that is of sensing data communication and power supply interface is connected on data center's processing unit, the other end is connected on power conversion unit.
Adopting powered battery to obtain respectively three output voltages by power conversion unit is sensor, data processing unit power supply, pulling force sensor data processing unit is used for gathering pulling force sensor data, gps data processing unit is used for gathering gps data, wire rope vibration linear measure longimetry unit is for acquisition process wire rope vibration length data, the operational factor of memory storage for data storage cell, photoelectric encoder interface unit is for refuting the monitoring that connects photoelectric encoder and realize wire rope vibration length, centralized data processing unit is for being sent to the acquisition process of above-mentioned data as computing machine.

Claims (2)

1. two lead three stringing walking plate data monitoring devices, battery-powered unit, data center's processing unit form, it is characterized in that: its Power supply unit right-hand member is connected with data center processing unit, between its battery power supply unit and data center's processing unit, a power conversion unit is set, a battery voltage detection unit; Its data center's processing unit upper port arranges a photoelectric encoder data-interface, a GPS positioning unit, an equipment state indicating member, this photoelectric encoder data-interface and the GPS positioning unit other end are all connected on power conversion unit, one photoelectric encoder data processing unit is set between photoelectric encoder data-interface and data center's processing unit, one gps data processing unit is set between GPS positioning unit and data center's processing unit, and data center's processing unit lower port arranges a data wireless transmission unit, sensing data communication and a power supply interface.
2. according to claim 1 two lead three stringing walking plate data monitoring devices, it is characterized in that: the one end that is of equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensing data communication and power supply interface is connected on data center's processing unit, and the other end is connected on power conversion unit.
CN201420027237.4U 2014-01-10 2014-01-10 Two-haulage three-ling laying waling board data monitoring device Expired - Fee Related CN203672413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420027237.4U CN203672413U (en) 2014-01-10 2014-01-10 Two-haulage three-ling laying waling board data monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420027237.4U CN203672413U (en) 2014-01-10 2014-01-10 Two-haulage three-ling laying waling board data monitoring device

Publications (1)

Publication Number Publication Date
CN203672413U true CN203672413U (en) 2014-06-25

Family

ID=50968699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420027237.4U Expired - Fee Related CN203672413U (en) 2014-01-10 2014-01-10 Two-haulage three-ling laying waling board data monitoring device

Country Status (1)

Country Link
CN (1) CN203672413U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104006846A (en) * 2014-01-10 2014-08-27 国家电网公司 Two-pull-three pay-off running board data monitoring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104006846A (en) * 2014-01-10 2014-08-27 国家电网公司 Two-pull-three pay-off running board data monitoring device

Similar Documents

Publication Publication Date Title
GB2536142A (en) Load carrying bundle intended for use in a power cable or a power umbilical
CN209027715U (en) A kind of cable laying tractive force monitoring device
CN203672413U (en) Two-haulage three-ling laying waling board data monitoring device
CN202421409U (en) Portable polarity tester for mutual inductors
CN203594261U (en) Concrete pole wind-resistant detecting device
CN104006846A (en) Two-pull-three pay-off running board data monitoring device
CN203754170U (en) Hoisting sheave and steel wire rope stress monitoring and controlling device on mine shaft winch and elevator
CN203454966U (en) Cable reeling and length measuring device
CN209443804U (en) A kind of construction discharging platform
CN103199463B (en) A kind of overhead conductor abutting-joint method
CN104197822B (en) A kind of powered diameter measurement chi of electrical lead
CN204117656U (en) A kind of cable wire composite cable
CN103308761B (en) A kind of bridge motor Instantaneous input power wireless sensing device and measuring method
CN203508671U (en) Copper bar bending device
CN202678845U (en) Digitized mobile overhead transmission line wrecking instrument based on electrified wrecking and maintaining technology
CN104390581A (en) Aerial wire outer diameter live measurement tool
CN202075399U (en) Battery pack voltage simulation device
CN103558049B (en) Concrete pole wind resistance detection mechanism and system thereof
CN103809074A (en) Power cable safety identification device and method
CN106429635A (en) Intelligent cable management system
CN202978109U (en) Insulating puncture clamp installation device
CN203502027U (en) Mining-used electromechanical start/stop sensor
CN202372845U (en) Device for achieving changing-over control of automatic channels of dam monitoring instrument line centralizing box
CN106931948A (en) A kind of hydrological telemetry instrument
CN202990436U (en) Numerically controlled jacket stretch system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

Termination date: 20150110

EXPY Termination of patent right or utility model