CN203672413U - Two-haulage three-ling laying waling board data monitoring device - Google Patents
Two-haulage three-ling laying waling board data monitoring device Download PDFInfo
- Publication number
- CN203672413U CN203672413U CN201420027237.4U CN201420027237U CN203672413U CN 203672413 U CN203672413 U CN 203672413U CN 201420027237 U CN201420027237 U CN 201420027237U CN 203672413 U CN203672413 U CN 203672413U
- Authority
- CN
- China
- Prior art keywords
- unit
- data
- processing unit
- data center
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012806 monitoring device Methods 0.000 title claims abstract description 8
- 238000012545 processing Methods 0.000 claims abstract description 44
- 238000006243 chemical reaction Methods 0.000 claims abstract description 11
- 238000001514 detection method Methods 0.000 claims abstract description 4
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 11
- 238000012544 monitoring process Methods 0.000 abstract description 6
- 239000004020 conductor Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005055 memory storage Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 210000000352 storage cell Anatomy 0.000 description 1
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model relates to a two-haulage three-ling laying waling board data monitoring device. The device is composed of a battery power supply unit and a data center processing unit. The right end of the source power supply unit is connected with the data center processing unit; a power supply conversion unit and a battery voltage detection unit are arranged between the battery power supply unit and the data center processing unit; and the upper port of the data center processing unit is provided with a photoelectric encoder data interface, a GPS positioning unit and a device state indication unit. The two-haulage three-ling laying waling board data monitoring device has the following advantages: the construction safety is guaranteed by real-time monitoring of the real-time position of a walking board, the bearing of the walking board, the posture of the walking board, and the serial momentum of two haulage ropes.
Description
Technical field
The utility model relates to a kind of monitoring that can be widely used in two of Poling Construction on transmission line of electricity and lead three stringing walking plate data.
Background technology
Electricity Dong Song Huaihe River, the Anhui large overhead crossing engineering in extra-high voltage the Changjiang river of reaching the standard grade is two-circuit, six-multiple conductor, has 36 root wires and two optical cables are crossed over the Changjiang river.Wire laying tension reaches 12 tons, considerably beyond plain conductor laying tension.Simultaneously, because the Changjiang river is golden waterway, current ship is many, and can the navigation ban time short, construction risk be large.Therefore, must have a set of complete Poling Construction scheme, guarantee safety, complete Poling Construction task efficiently, the advance to construction technology, pay-off equipment, Work tool and reliability requirement all significantly improve.
The feature many according to engineering oidiospore wire, if according to traditional unwrapping wire mode, unwrapping wire cycle length, wire just extend the disunity of release, easily cause sub-conductor sag error to exceed standard; Traditional unwrapping wire mode, because split conductor is many, crossing span is large, is easy in work progress produce twisted wire, carry line on the back, causes unwrapping wire difficulty.For these reasons, taken the lead by capital construction portion of Utilities Electric Co. of Anhui Province, Anhui Power Transmission Engineering Co., Ltd. has proposed concrete arrangement and method for construction in conjunction with construct needs and existing equipment and Work tool, take technological innovation as means, carry out the applied research of the large overhead crossing engineering in extra-high voltage the Changjiang river " 2 lead 3 " payingoff construction technique.
According to existing stretching equipment situation, " 2 lead 3 " stringing walking plate load allowable designs according to 360kN, and two traction ropes can free vibration in limp, and string rope amount is considered according to 20m.For guaranteeing construction safety, need to be stressed to the real time position of limp, limp, the attitude of limp, the string quantity of motion of two traction ropes of limp carry out Real-Time Monitoring.
Utility model content
The utility model provide a kind of can be to two leading that real time position, the limp of three stringing walking plates is stressed, the attitude of limp, the string quantity of motion of two traction ropes of limp carry out the stringing walking plate data monitoring device of Real-Time Monitoring.
The utility model principal feature is: battery-powered unit, data center's processing unit form, its Power supply unit right-hand member is connected with data center processing unit, between its battery power supply unit and data center's processing unit, a power conversion unit is set, a battery voltage detection unit; Its data center's processing unit upper port arranges a photoelectric encoder data-interface, a GPS positioning unit, an equipment state indicating member, this photoelectric encoder data-interface and the GPS positioning unit other end are all connected on power conversion unit, one photoelectric encoder data processing unit is set between photoelectric encoder data-interface and data center's processing unit, one gps data processing unit is set between GPS positioning unit and data center's processing unit, and data center's processing unit lower port arranges a data wireless transmission unit, sensing data communication and a power supply interface.
Principal feature of the present utility model is: the one end that is of equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensing data communication and power supply interface is connected on data center's processing unit, and the other end is connected on power conversion unit
The beneficial effects of the utility model are:, the attitude of limp stressed by the real time position to limp, limp, the string quantity of motion of two traction ropes of limp carry out Real-Time Monitoring, have guaranteed construction safety.
Accompanying drawing explanation
Fig. 1 the utility model product structure framework schematic diagram
Embodiment
The utility model is described in further detail by embodiment below in conjunction with accompanying drawing
As shown in Figure 1: two lead three stringing walking plate data monitoring devices, battery-powered unit, data center's processing unit form, its Power supply unit right-hand member is connected with data center processing unit, between its battery power supply unit and data center's processing unit, a power conversion unit is set, a battery voltage detection unit, its data center's processing unit upper port arranges a photoelectric encoder data-interface, one GPS positioning unit, one equipment state indicating member, this photoelectric encoder data-interface and the GPS positioning unit other end are all connected on power conversion unit, one photoelectric encoder data processing unit is set between photoelectric encoder data-interface and data center's processing unit, one gps data processing unit is set between GPS positioning unit and data center's processing unit, data center's processing unit lower port arranges a data wireless transmission unit, one sensing data communication and power supply interface, equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, the one end that is of sensing data communication and power supply interface is connected on data center's processing unit, the other end is connected on power conversion unit.
Adopting powered battery to obtain respectively three output voltages by power conversion unit is sensor, data processing unit power supply, pulling force sensor data processing unit is used for gathering pulling force sensor data, gps data processing unit is used for gathering gps data, wire rope vibration linear measure longimetry unit is for acquisition process wire rope vibration length data, the operational factor of memory storage for data storage cell, photoelectric encoder interface unit is for refuting the monitoring that connects photoelectric encoder and realize wire rope vibration length, centralized data processing unit is for being sent to the acquisition process of above-mentioned data as computing machine.
Claims (2)
1. two lead three stringing walking plate data monitoring devices, battery-powered unit, data center's processing unit form, it is characterized in that: its Power supply unit right-hand member is connected with data center processing unit, between its battery power supply unit and data center's processing unit, a power conversion unit is set, a battery voltage detection unit; Its data center's processing unit upper port arranges a photoelectric encoder data-interface, a GPS positioning unit, an equipment state indicating member, this photoelectric encoder data-interface and the GPS positioning unit other end are all connected on power conversion unit, one photoelectric encoder data processing unit is set between photoelectric encoder data-interface and data center's processing unit, one gps data processing unit is set between GPS positioning unit and data center's processing unit, and data center's processing unit lower port arranges a data wireless transmission unit, sensing data communication and a power supply interface.
2. according to claim 1 two lead three stringing walking plate data monitoring devices, it is characterized in that: the one end that is of equipment state indicating member, photoelectric encoder data processing unit, gps data processing unit, data wireless transmission unit, sensing data communication and power supply interface is connected on data center's processing unit, and the other end is connected on power conversion unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420027237.4U CN203672413U (en) | 2014-01-10 | 2014-01-10 | Two-haulage three-ling laying waling board data monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420027237.4U CN203672413U (en) | 2014-01-10 | 2014-01-10 | Two-haulage three-ling laying waling board data monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203672413U true CN203672413U (en) | 2014-06-25 |
Family
ID=50968699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420027237.4U Expired - Fee Related CN203672413U (en) | 2014-01-10 | 2014-01-10 | Two-haulage three-ling laying waling board data monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203672413U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104006846A (en) * | 2014-01-10 | 2014-08-27 | 国家电网公司 | Two-pull-three pay-off running board data monitoring device |
-
2014
- 2014-01-10 CN CN201420027237.4U patent/CN203672413U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104006846A (en) * | 2014-01-10 | 2014-08-27 | 国家电网公司 | Two-pull-three pay-off running board data monitoring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2536142A (en) | Load carrying bundle intended for use in a power cable or a power umbilical | |
CN209027715U (en) | A kind of cable laying tractive force monitoring device | |
CN203672413U (en) | Two-haulage three-ling laying waling board data monitoring device | |
CN202421409U (en) | Portable polarity tester for mutual inductors | |
CN203594261U (en) | Concrete pole wind-resistant detecting device | |
CN104006846A (en) | Two-pull-three pay-off running board data monitoring device | |
CN203754170U (en) | Hoisting sheave and steel wire rope stress monitoring and controlling device on mine shaft winch and elevator | |
CN203454966U (en) | Cable reeling and length measuring device | |
CN209443804U (en) | A kind of construction discharging platform | |
CN103199463B (en) | A kind of overhead conductor abutting-joint method | |
CN104197822B (en) | A kind of powered diameter measurement chi of electrical lead | |
CN204117656U (en) | A kind of cable wire composite cable | |
CN103308761B (en) | A kind of bridge motor Instantaneous input power wireless sensing device and measuring method | |
CN203508671U (en) | Copper bar bending device | |
CN202678845U (en) | Digitized mobile overhead transmission line wrecking instrument based on electrified wrecking and maintaining technology | |
CN104390581A (en) | Aerial wire outer diameter live measurement tool | |
CN202075399U (en) | Battery pack voltage simulation device | |
CN103558049B (en) | Concrete pole wind resistance detection mechanism and system thereof | |
CN103809074A (en) | Power cable safety identification device and method | |
CN106429635A (en) | Intelligent cable management system | |
CN202978109U (en) | Insulating puncture clamp installation device | |
CN203502027U (en) | Mining-used electromechanical start/stop sensor | |
CN202372845U (en) | Device for achieving changing-over control of automatic channels of dam monitoring instrument line centralizing box | |
CN106931948A (en) | A kind of hydrological telemetry instrument | |
CN202990436U (en) | Numerically controlled jacket stretch system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20150110 |
|
EXPY | Termination of patent right or utility model |