CN104002923B - A kind of knockdown half latent ships that transport and method of work thereof - Google Patents
A kind of knockdown half latent ships that transport and method of work thereof Download PDFInfo
- Publication number
- CN104002923B CN104002923B CN201410222374.8A CN201410222374A CN104002923B CN 104002923 B CN104002923 B CN 104002923B CN 201410222374 A CN201410222374 A CN 201410222374A CN 104002923 B CN104002923 B CN 104002923B
- Authority
- CN
- China
- Prior art keywords
- kickboard
- dive
- loading
- hulls
- ships
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of novel half latent ships that transport, particularly relate to a kind of knockdown ships that transport and method of work thereof of partly diving, belong to half latent ships that transport technical field。A kind of knockdown half latent ships that transport, it is characterised in that: including loading kickboard in the middle of two end hulls and, two end hulls are connected between the two ends of loading kickboard, and detachable;Two end hulls can independently navigate by water, and possesses i in dive, and middle loading kickboard possesses independent dive performance capacity, and can be carried out dive operation by end hull remote control。The invention solves the latent cargo ship of tradition half problem of stability and reserve buoyancy deficiency in dive process, solve boats and ships in dive process and acutely rock the problem easily producing error so that operator。
Description
Technical field
The present invention relates to a kind of novel half latent ships that transport, particularly relate to a kind of knockdown ships that transport and method of work thereof of partly diving, belong to half latent ships that transport technical field。
Background technology
Half cargo ship of diving is a kind of to have huge deck-cargo space, has part dive ability, can transport and load and unload the special engineered ship of overlength, overweight and inseparable super large special cargo, particularly ocean engineering platform。Its hull overwhelming majority when handling operation can be dived beneath the water, and is then in normal load draught state when navigating by water。Semi-submerged ship utilizes the ballasting system of self, makes the cargo deck dive of hull submerge in water, and loading of entertaining is dragged to after above deck, makes hull float again through ballasting system, carrier is lifted out the water surface and is solid;After carrier transports to destination, sinking with carrier, solve open system solid, after loading of entertaining floats and separates with semi-submerged ship, semi-submerged ship is withdrawn and floats voluntarily, and namely hauling operation has accused。The semi-submerged ship important equipment that still salvage engineering is indispensable under water, coordinates large-scale crane ship to carry out lifting salvaging, has the advantages such as more rapid, safe than conventional raising with salvage pontoons。
But the half dive operation diving cargo ship, is the high operation process of risk that sea-freight circle generally acknowledges。Minority has the company of half latent ships that transport in the world at present, even if having done a large amount of checking computations in advance, also cannot assure the perfectly safe of job safety。Its risk occurs mainly with, and main deck soaks in an instant, and Water Plane reduces suddenly, thus brings the stability bust of boats and ships。Therefore this kind of operation is often after having paid great number insurance premium, selects to carry out operation under splendid meteorological condition。Even so, also still occurred semi-submerged ship before this in dive operation process, the serious accident toppled because of above-mentioned reason and sink。
Therefore, half current latent cargo ship, it is common to there is the problem of stability and reserve buoyancy deficiency in dive process。Within the short time of main deck immersion, due to strongly reducing and the dual function of wave motion on deck plane of Water Plane, cause that the stability of boats and ships sharply worsens。Simultaneously because the ballast pump delivery of half latent cargo ship is very big, in dive process, any operational error all can cause violent the rocking of boats and ships, makes follow-up dive operation be difficult to carry out。
Additionally, half current latent cargo ship is often all based on specific goods and is customized, cargo collection flexibility ratio is relatively low, and economy is poor。In turn result in freight charges to remain high, constrain the process of ocean development cause in a way。
For problem above, currently common method, one is arrange some buoyancy tanks at afterbody, to provide extra Water Plane in the process of dive, thus providing buoyancy reserve for full ship, improves stability。Two is the richness by increasing foreship line style, reaches to increase the purpose of Area of Water Plan, and then improves full ship stability。There is techniques below problem in this countermeasure:
Although 1, afterbody buoyancy tank can increase water plane area, but compares the Area of Water Plan anticlimax produced after main deck soaks, ratio is still only small, so the effect that can play is extremely limited。If additionally, buoyancy tank yardstick is excessive, can have adverse effect on again for handling goods;
Even if 2, foreship line style flare, the effect that the Water Plane that it brings increases is also very limited。Meanwhile, if stem line style is excessively plentiful, resistance can be increased during navigation greatly, and then reduce the speed of a ship or plane, unfavorable simultaneously for operation of casting anchor;
3, half currently existing latent cargo ship, is all the piece rigid hull adopted, mostly adopts fore-body to add (including building place, machinery space) layout pattern of rear portion loading platform (mainly including ballast tank) formula。Its yardstick is all carry out custom-made by size according to extra large work goods yardstick set in advance, and therefore the cargo collection flexibility ratio of boats and ships is relatively low, and the transport task being able to carry out every year is extremely limited, is also a kind of wasting of resources to a certain extent;
Above-mentioned unfavorable factor considerably increases the operations risks of shipowner, also leads to insurance company simultaneously and insurance premium to this type of boats and ships is greatly improved。Simultaneously as customization is excessively strong, flexibility ratio is relatively low, increases the early investment cost of shipowner and the cost of upkeep in later stage
Summary of the invention
The technical issues that need to address of the present invention are:
Half current latent cargo ship, it is common to there is the problem of stability and reserve buoyancy deficiency in dive process, existing counter-measure can bring again various unfavorable factor;Meanwhile, half current latent cargo ship is often all based on specific goods and is customized, and cargo collection flexibility ratio is relatively low, and economy is poor, in turn results in freight charges and remains high, constrains the process of ocean development cause in a way。
The present invention is directed to problem above, the invention provides a kind of novel knockdown semi-submerged ship hull pattern, concrete scheme is as follows:
Half latent ships that transport of a kind of novel combination type, including loading kickboard in the middle of two end hulls and, two end hulls are connected between the two ends of loading kickboard, and detachable;Two end hulls can independently navigate by water, and possesses i in dive, and middle loading kickboard possesses independent dive performance capacity, and can be carried out dive operation by end hull remote control。
Being characterized in that of the technical program: being a kind of half latent cargo ship with combination type hull, two end hulls can separate with middle part loading kickboard。Middle loading kickboard can under the remotely control of end hull, complete independently dive operation, during dive operation, middle loading kickboard is without crewman, avoid the security consequences that half latent work accident is likely to bring, solve boats and ships in dive process and acutely rock the problem easily producing error so that operator;Meanwhile, the utilization rate of middle loading kickboard loading end is high, and overall stability is higher。
Further, said two end hull is attached by standardized bindiny mechanism peculiar to vessel with middle loading kickboard。
Further, the both ends of described middle loading kickboard are provided with buoyancy tank 1, improve stability further, handling goods will not be produced impact simultaneously。
Further, described middle loading kickboard is rectangular。
Method that ships that transport carries out block stowage that a kind of above-mentioned half dives, middle loading kickboard alongside harbour, to transfer to after on middle loading kickboard until goods, two or one of them end hull are mated with again, carry out navigating by water front preparation。
Further, two end hulls connect as one with middle loading kickboard, after arriving operation marine site, have following two work pattern:
1) two end hulls and middle loading kickboard keep connecting, common dive, now the ballasting system of three hulls works simultaneously, common dive, the electric power of the ballasting system of middle loading kickboard is supplied by the power station of two end hulls, an end hull serve as dive control axis, be uniformly controlled the common dive of each hull, when the measurement of cargo weight of salvage operation under water is less, it is possible to adopt this work pattern;
2) two end hulls disengage with middle loading kickboard, after keeping certain safe distance each other, loading kickboard dive/rising alone in the middle of remote control, after middle loading kickboard completes half latent loading, two end hulls dock with the two ends of middle loading kickboard more respectively, when the measurement of cargo weight of salvage operation under water is bigger, it is possible to adopt this work pattern;
Further, the 2nd) to plant under work pattern, two end hulls, by wireless power transmission, provide electric power for half latent loading kickboard simultaneously;One of them end hull serves as dive control axis, by transmission of wireless signals, loading kickboard dive/rising in the middle of manipulation。So, middle loading kickboard only needs the control needed for arranging the dive of acceptable remote control and pumping station system, and without configuration power system, in the middle of simplifying, the configuration structure of the non-dive operation of loading kickboard, is conducive to improving the reliability of its dive operation。Owing to Power Systems is relatively big, adopting two end hulls to provide wireless power for middle loading kickboard, owing to space, sea is wide, the radiation that wireless power produces does not result in harmful effect simultaneously。
The beneficial effects of the present invention is:
1) half stability diving in cargo ship dive process and reserve buoyancy is substantially increased。
2) half latent cargo ship is extensive to the subject range of goods, it is not necessary to specific goods is customized, and cargo collection flexibility ratio is high, also improves economical simultaneously, reduces freight charges, has promoted the development of ocean development cause。
3) safety and reliability of crewman's salvage operation is greatly improved, and can reduce the insurance premium of the half latent disaster relief simultaneously, save cost for shipowner。
4) greatly improve the water surface curve of dive hull, thus improving stability, not increasing ship resistance simultaneously, making the best of both worlds。
5) energy, control signal transmission are all optimized。
6) when middle loading kickboard alongside carries out dress unloading operation at harbour, two end hulls can perform other assigned tasks, thus greatly strengthen motility, improves the earning rate of shipowner。
Accompanying drawing explanation
Fig. 1 is the structural representation of the knockdown half latent ships that transport of the present invention。
In figure, 1. buoyancy tank。
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further described。
The present invention is a kind of novel half latent cargo ship adopting combination type hull。Including loading kickboard in the middle of two end hulls and, two end hulls all can independently navigate by water, and possesses i in dive, and middle loading kickboard possesses independent dive performance capacity, it is possible to when being remotely-controlled, complete dive operation。Three parts realize connecting by standardized bindiny mechanism。Two end hulls are equipped with from the required control of boat and power unit, and control needed for dive and pumping station system。Middle loading kickboard is equipped with the control needed for the dive of acceptable remote control and pumping station system。
When harbour is freighted, it is possible to loading kickboard alongside harbour in the middle of only having, transferring to after on middle loading kickboard until goods, two end hulls are mated with again, carry out navigating by water front preparation。
In transport navigation process, three hulls are linked together by bindiny mechanism。After arriving operation marine site, novel half latent cargo ship has two kinds of dive patterns:
1, two end hulls and middle loading kickboard keep connecting, common dive, and in such cases, the ballasting system of three hulls works simultaneously, dive simultaneously。The electric power of the ballasting system of middle loading kickboard is supplied by the power station of two end hulls。Being served as dive control axis by an end hull, unified operation is to coordinate the common dive of each hull。
2, two end hulls disengage with middle loading kickboard, after keeping certain safe distance each other, and loading kickboard dive alone in the middle of remote control。In such cases, two end hulls, by wireless power transmission, provide electric power for half latent loading kickboard simultaneously。One of them end hull serves as dive control axis, by transmission of wireless signals, loading kickboard dive in the middle of manipulation。
If the transhipment task of goods, it is not necessary to half latent operation, then only can also be come by an end hull and middle loading kickboard is docked, then carry out navigation and transport。
The present invention has the cargo ship of partly diving of combination type hull, solves the latent cargo ship of tradition half problem of stability and reserve buoyancy deficiency in dive process, solves boats and ships in dive process and acutely rock the problem easily producing error so that operator。Make in dive operation process whether goods or the safety guarantee of personnel is greatly enhanced, it is possible to reduce insurance company's insurance premium to operation。Meanwhile, the hull pattern that can be combined so that when middle loading kickboard alongside carries out dress unloading operation at harbour, two end hulls can perform other assigned tasks, thus greatly strengthen motility, improves the earning rate of shipowner。
Claims (7)
1. one kind knockdown half ships that transport of diving, it is characterised in that:
Including loading kickboard in the middle of two end hulls and, two end hulls are connected between the two ends of loading kickboard, and detachable;
Two end hulls can independently navigate by water, and possesses i in dive, and middle loading kickboard possesses independent dive performance capacity, and can be carried out dive operation by end hull remote control。
2. knockdown half dive ships that transport as claimed in claim 1, it is characterised in that: said two end hull is attached by standardized bindiny mechanism peculiar to vessel with middle loading kickboard。
3. knockdown half dive ships that transport as claimed in claim 1, it is characterised in that: the both ends of described middle loading kickboard are provided with buoyancy tank (1)。
4. knockdown half dive ships that transport as claimed in claim 1, it is characterised in that: described middle loading kickboard is rectangular。
5. the method that the knockdown half latent ships that transport described in a claim 1 carries out block stowage, it is characterized in that: middle loading kickboard alongside harbour, transferring to after on middle loading kickboard until goods, two or one of them end hull are mated with again, carry out navigating by water front preparation。
6. the knockdown half latent ships that transport described in a claim 1 carries out the half latent method loaded, it is characterised in that:
Two end hulls connect as one with middle loading kickboard, after arriving operation marine site, have following two work pattern:
1) two end hulls and middle loading kickboard keep connecting, common dive, now the ballasting system of three parts works simultaneously, common dive, the electric power of the ballasting system of middle loading kickboard is supplied by the power station of two end hulls, served as dive control axis by an end hull, be uniformly controlled the common dive of each several part;
2) two end hulls disengage with middle loading kickboard, after keeping certain safe distance each other, loading kickboard dive/rising alone in the middle of remote control, after middle loading kickboard completes half latent loading, two end hulls dock with the two ends of middle loading kickboard more respectively。
7. method as claimed in claim 6, it is characterised in that: the 2nd) plant under work pattern, two end hulls, by wireless power transmission, provide electric power for middle loading kickboard simultaneously;One of them end hull serves as dive control axis, by transmission of wireless signals, loading kickboard dive/rising in the middle of manipulation。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410222374.8A CN104002923B (en) | 2014-05-23 | 2014-05-23 | A kind of knockdown half latent ships that transport and method of work thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410222374.8A CN104002923B (en) | 2014-05-23 | 2014-05-23 | A kind of knockdown half latent ships that transport and method of work thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104002923A CN104002923A (en) | 2014-08-27 |
CN104002923B true CN104002923B (en) | 2016-06-22 |
Family
ID=51363888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410222374.8A Active CN104002923B (en) | 2014-05-23 | 2014-05-23 | A kind of knockdown half latent ships that transport and method of work thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104002923B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105216973A (en) * | 2015-10-27 | 2016-01-06 | 上海船舶研究设计院 | A kind of loading kickboard being applicable to half latent carrier |
CN105539749B (en) * | 2015-12-15 | 2017-08-25 | 上海船舶研究设计院 | A kind of liftable floating box device of partly latent cargo ship |
CN107161284B (en) * | 2017-05-25 | 2019-02-26 | 广船国际有限公司 | A kind of buoyancy tank of semi-submersible ship above-water hoisting localization method |
CN111874179B (en) * | 2020-07-27 | 2022-02-18 | 中船邮轮科技发展有限公司 | Combined passenger ship building method |
CN112249217B (en) * | 2020-10-26 | 2021-10-15 | 广船国际有限公司 | Ship-shaped structure |
CN115042928A (en) * | 2022-07-08 | 2022-09-13 | 中国船舶工业集团公司第七0八研究所 | Semi-submersible mother ship capable of safely and quickly deploying cluster type unmanned submersible vehicle |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3922993A (en) * | 1973-10-31 | 1975-12-02 | Robert A Bludworth | Flexible coupled articulated vessel |
US4013032A (en) * | 1971-12-16 | 1977-03-22 | Bludworth Robert A | Ocean going push-towing combination |
CN1854016A (en) * | 2005-04-18 | 2006-11-01 | 湖北华舟有限责任公司 | Assembled engineering ship |
CN101691132A (en) * | 2009-08-04 | 2010-04-07 | 骆恩浩 | Fastening device of fabricated ship |
CN103496428A (en) * | 2013-09-23 | 2014-01-08 | 浙江海洋学院 | Multipurpose ship |
CN203958536U (en) * | 2014-05-23 | 2014-11-26 | 上海船舶研究设计院 | A kind of knockdown half latent ships that transport |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6035686A (en) * | 1983-08-06 | 1985-02-23 | Mitsubishi Heavy Ind Ltd | Vessel guiding method and tugboat having fore recess |
-
2014
- 2014-05-23 CN CN201410222374.8A patent/CN104002923B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4013032A (en) * | 1971-12-16 | 1977-03-22 | Bludworth Robert A | Ocean going push-towing combination |
US3922993A (en) * | 1973-10-31 | 1975-12-02 | Robert A Bludworth | Flexible coupled articulated vessel |
CN1854016A (en) * | 2005-04-18 | 2006-11-01 | 湖北华舟有限责任公司 | Assembled engineering ship |
CN101691132A (en) * | 2009-08-04 | 2010-04-07 | 骆恩浩 | Fastening device of fabricated ship |
CN103496428A (en) * | 2013-09-23 | 2014-01-08 | 浙江海洋学院 | Multipurpose ship |
CN203958536U (en) * | 2014-05-23 | 2014-11-26 | 上海船舶研究设计院 | A kind of knockdown half latent ships that transport |
Also Published As
Publication number | Publication date |
---|---|
CN104002923A (en) | 2014-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104002923B (en) | A kind of knockdown half latent ships that transport and method of work thereof | |
CN105813938A (en) | Ship-shaped structure | |
CN104029798B (en) | Self installation production platform | |
CN101544272A (en) | Liquid underwater storage, loading and ex-unloading device | |
CN104619583A (en) | Semi-submersible integrated port | |
CN108860481B (en) | Omnibearing floating fuel oil supply system and operation method thereof | |
CN203958536U (en) | A kind of knockdown half latent ships that transport | |
CN103407554B (en) | The ship type of semisubmersible pipe laying crane ship | |
CN104002931A (en) | U-shaped ocean engineering installation ship and method for installing module on upper portion of conduit frame | |
CN204432979U (en) | Ton horizontal launching building berth | |
CN106428429B (en) | The method of floating production storage offloading's long pull | |
NO20171263A1 (en) | Method and assembly for transferring fluids between a first vessel and a second vessel | |
CN105216973A (en) | A kind of loading kickboard being applicable to half latent carrier | |
CN205203291U (en) | Kickboard of carrying cargo suitable for semi -submerged transport ship | |
CN107618626A (en) | Improved deep water semi-submersible pipe laying crane ship | |
CN207737469U (en) | A kind of small-sized FPSO of dynamic positioning for marginal oil field | |
CN205837138U (en) | A kind of marine oil and gas stimulation work ship | |
CN205499276U (en) | From lift -type liquefied natural gas platform | |
CN105775042B (en) | A kind of mooring arrangement of small-sized LNG ship | |
CN203864955U (en) | Device for improving stability of semi-submersible transport ship | |
CN204473073U (en) | Box ship | |
CN108583811B (en) | A kind of floating and transportation method | |
CN104802925B (en) | The method for dismounting of ocean platform propeller | |
CN101486375B (en) | Primary and secondary sailing vessel with mobile secondary hull | |
CN105059484B (en) | It goes ashore on a kind of Large Offshore Structures operating type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |