The content of the invention
In order to preferably lift the use value of Training Simulation System, make dispatcher that more fortune are accumulated in training process
Pass through and test, the invention provides a kind of run the method that operation carries out intelligent evaluation in training system to student.
It is as follows to reach the technical scheme that above-mentioned purpose adopted:
The method that intelligent evaluation is carried out to student's operation operation in training system, including following three kinds of situations:
A) student's operation operation is estimated:Issue or remote control for investigating student and carrying out instruction for grid equipment
During operation, whether the operation of student is maloperation, and investigates whether student's operation meets grid equipment operation working specification
Require;
B) operation of power networks index is estimated:For investigating the ability that student controls operation of power networks quality, the electrical network
Operating index includes that the economy of the safety indexes, the reliability index of operation of power networks and operation of power networks of operation of power networks refers to
Mark;
C) assessment is analyzed to accident prediction:There is major accident or exception in the face of grid equipment for investigating student
In the case of, if can be processed due to equipment fault or abnormal caused consequence with most reasonable manner within the time of regulation.
It is aforesaid that a) student's operation operation is estimated, maloperation include on-load broaching tool lock, on-load close disconnecting link,
Powered conjunction ground wire.
Aforesaid a) operation the step of operation is estimated to student includes:
(a-1) grid equipment working specification experts database is generated, according to the requirement of grid equipment operations specification, training system time
All types, the equipment of all electric pressures gone through in transformer substation system, forms one by one the various types of operation rule of all devices
Model, and equipment, action type and corresponding working specification are preserved, generate grid equipment working specification experts database;
(a-2) in training process, the operation information of training system in-service monitoring student requires to divide according to five anti-operations
Analyse and judge whether student's operation is maloperation, if it is decided that for maloperation, then automatically generate a mistake for this training
Operation note, while training system deducts teaching notes maloperation score value set in advance, the examination for the teaching notes terminates;If sentenced
Fixed is not maloperation, proceeds to step (a-3);
(a-3) read corresponding working specification in experts database, analysis judge the operation of student whether with experts database in this set
Standby corresponding working specification is consistent, if it is inconsistent, the training record of student's working specification mistake is automatically generated, while button
Except the deduction of points value of teaching notes working specification mistake set in advance;
(a-4) fraction of working specification mistake deduction is deducted with teaching notes setting operation class total score, student operation behaviour is obtained
Make assessment score value.
Aforesaid grid equipment working specification experts database includes all kinds overhaul of the equipments working specification, all kinds equipment
Cold standby working specification, all kinds equipment stand-by heat working specification, all kinds equipment are incorporated into the power networks and working specification and set
Standby bypass replacement working specification.
It is aforesaid b) operation of power networks index is estimated including the safety indexes to operation of power networks, operation of power networks can
It is estimated by the economic index of property index and operation of power networks,
First, according to the electric pressure of equipment, device type and out-of-limit degree in net, artificial batch defines whole network equipment
Safety loading coefficient;According to the distribution situation of network load, artificial batch setting the whole network load type, including a type load, two classes
Load and three type loads, and define the coefficient of reliability of different type load;Economic factor is defined according to the requirement of user,
And provide the economic examination threshold value of the whole network loss;
Then, the safety indexes of operation of power networks are estimated and are comprised the following steps:
(b-1) each equipment of training system searching loop, reads the trend of each equipment in student training system, bag
Include active measurement, idle measurement, voltage measurement and the current measurement of different type equipment;
(b-2) tide of the operation limit value of online each equipment for reading student training system, and the com-parison and analysis equipment
Stream and the size of its limit value, if the trend of equipment is more than its limit value, assert that the equipment is out-of-limit, and in training system
Increase in database to should equipment out-of-limit record, statistics more limitation and out-of-limit cumulative time, all of out-of-limit record generates
Security statistical form;
(b-3) after training terminates, all records of training system security statistical form are read, calculates current safety and deduct
Fraction, specific formula for calculation is as follows:
Wherein, RsFor security deduction of points summation, n is the out-of-limit total quantity of equipment, u in training processiGet over for i & lt equipment
In limited time, the safety loading coefficient of corresponding out-of-limit equipment, vaciFor i & lt equipment more in limited time, the current measuring value of out-of-limit equipment,
vasiFor i & lt equipment more in limited time, the limit value of out-of-limit equipment, tciFor i & lt equipment more in limited time, the equipment out-of-limit duration;
Security examination must be divided into:Safety evaluation item total score-Rs;
The reliability index of operation of power networks is estimated and is comprised the following steps:
(b-4) in real time operation of the monitoring student in training process, the topological analysis operation cause the load of power-off and its
Size, and the corresponding dead electricity payload of the operation and dead electricity cumulative time are recorded in the database of training system, institute
Some records constitute reliability statistics table;
(b-5) after training terminates, all records in reliability statistics table calculate dividing for current reliability deduction
Number, specific formula for calculation is as follows:
Wherein, CsFor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process,For i-th
The coefficient of reliability of the load point of member's operation, PiFor the dead electricity load value size of i-th student's operation, τiFor i-th student's operation
The load dead electricity duration;
Reliability Check must be divided into:Reliability assessment item total score-Cs;
The economic index of operation of power networks is estimated and is comprised the following steps:
(b-6) operation of the monitoring student in training process in real time, the change of the whole network network loss value before and after comparative analysis operation
Situation, if the network loss value after student's operation deducts economy examination threshold of the preoperative network loss value of student more than teaching notes setting
Value, then increase a record to operating in the database of training system, and records the change feelings of network loss before and after operation
Condition and network loss threshold crossing time, all of out-of-limit operation note constitutes economy statistical form;
(b-7) after training terminates, all records in economy statistical form calculate dividing for current economic deduction
Number, specific formula for calculation is as follows:
Wherein, EsFor economic power system deduction of points summation, k is the out-of-limit total quantity of network loss, Δ in training processiFor i & lt net
Damage threshold crossing time, φiFor the economic factor of the out-of-limit electrical network of i & lt network loss, LciFor network loss after the out-of-limit student's operation of i & lt network loss
Size, LsiFor network loss size before the out-of-limit student's operation of i & lt network loss;
Economy examination must be divided into:Economic evaluation item total score-Es。
It is aforesaid c) assessment to be analyzed to accident prediction and comprise the following steps:
(c-1) accident prediction is made, extracts the whole accident teaching notes in teaching notes, and formulate detailed according to the concrete accident of teaching notes
Thin accident prediction, and define the given score of every kind of accident prediction, finally in the way of prediction scheme file with accident teaching notes information
Bundle and preserved;
(c-2) in training process, in-service monitoring student is triggered to all in the accident predetermined processing deadline from accident
Operation, reads the accident teaching notes at current time, and student's operation is analyzed with accident prediction, and detection is compared at student
Whether the mode of director's event meets the one kind in accident prediction, if it is, recording the given score of the accident prediction;If discontented
Foot any one accident prediction, then assessing for the accident treatment must be divided into zero;
(c-3) after training terminates, the PTS of accident prediction analysis item is calculated, specific formula for calculation is as follows:
Wherein, SsFor teaching notes accident treatment PTS, p is teaching notes total number of accident, SiI-th accident of teaching notes is processed for student
Score.
The present invention is practical, with extremely strong flexibility and feasibility, can effectively improve the appreciable levels of training system.
Specific embodiment
For ease of understanding the present invention, the present invention is further elaborated with reference to the accompanying drawings and detailed description.
Dispatcher training system system (hereinafter referred to as training system) is a set of computer system, and it presses simulated reality
The Mathematical Modeling of power system, simulates various scheduling operations and the system condition after failure, and these information are sent to into power train
In the model of system control centre, a Training Environment true to nature is provided for dispatcher, neither affect practical power systems to reach
Operation and train dispatcher purpose, trained fast under dispatcher's operational capacity and accident condition in normal state
Fast respond, it is also possible to make the instrument that dispatching of power netwoks operations staff analyzes operation of power networks.
The invention provides a kind of operation to student in dispatcher training system system operates the side for carrying out intelligent evaluation
Method, including following three kinds of situations:
A) student's operation operation is estimated:Issue or remote control for investigating student and carrying out instruction for grid equipment
During operation, whether the operation of student is maloperation, and investigates whether student's operation meets grid equipment operation working specification
Require;Wherein maloperation includes that on-load broaching tool lock, on-load close disconnecting link, powered conjunction ground wire etc.;
B) operation of power networks index is estimated:For investigating the ability that student controls operation of power networks quality, operation of power networks
Index includes the economic index of the safety indexes, the reliability index of operation of power networks and operation of power networks of operation of power networks;
C) assessment is analyzed to accident prediction:There is major accident or exception in the face of grid equipment for investigating student
In the case of, if can be processed due to equipment fault or abnormal caused consequence with most reasonable manner within the time of regulation.
Student's operation operation evaluation process, student's operation operation assessment stream are illustrated as an example with the transformer station shown in Fig. 2
Journey is shown in Fig. 1.
Fig. 2 is a typical 110kV transformer station, for the ease of description, 110kV partial wiring diagrams is only drawn here.It is false
L2 is powered on alignment road.
Fig. 2 only depicts the equipment such as inlet wire and the switch, the bus that are connected.It is related that system will automatically generate the wiring diagram
The working specification of equipment, here, we illustrate the generating process of working specification by taking the maintenance of circuit L2 equipment as an example.
For the maintenance of circuit L2 equipment, according to overhaul of the equipments specification, the switch of circuit measurement should be separated first, then
Separate bus end disconnecting link, then separately line side disconnecting link, finally close line-to-ground disconnecting link.Fig. 2 to Fig. 6 shows the plant stand this side line
Section operating procedure, plant stand offside equipment operation step is identical with this side plant stand.The maintenance of circuit L2 should be divided into 4 steps, and first
Step, separately switchs 102, as shown in Figure 3;Second step, separates bus bar side disconnecting link 102-1, as shown in Figure 4;3rd step, separates circuit
Side tool lock 102-2, as shown in Figure 5;4th step, close earthing 102-2-1, as shown in Figure 6.
It is exactly above the concrete steps that overhaul of the equipments operation is illustrated by taking circuit as an example.
To student's operation operation evaluation process as shown in figure 1, in training process, according to grid equipment operations specification will
Ask, all types traveled through in transformer substation system, the equipment of all electric pressures are formed one by one all devices each by training system
The working specification of type, and equipment, action type and working specification are preserved, generate grid equipment working specification special
Family storehouse.Grid equipment working specification experts database includes that all kinds overhaul of the equipments working specification, all kinds equipment cold standby are grasped
Make specification, all kinds equipment stand-by heat working specification, all kinds equipment to be incorporated into the power networks the bypass of working specification and equipment
For working specification.
In training process, the such as teaching notes content of maintenance operation class, and the time for specifying to complete in teaching notes are read this moment
The interior real-time operation content for reading and recording student, requires according to five anti-operations, judges whether student's operation is maloperation, such as
It is maloperation that fruit judges, then a maloperation record for this training is automatically generated, while training system will deduct teaching notes
The maloperation score value of setting, the examination for the teaching notes terminates;If it is determined that not being maloperation, then the operation of contrast judgement student
Whether step is consistent with the corresponding working specification of the equipment in experts database, and student's working specification is automatically generated if inconsistent
The training record of mistake, while deducting the deduction of points value of teaching notes working specification mistake set in advance.
Above-mentioned each operation class teaching notes need the analysis and evaluation through above-mentioned steps, finally with teaching notes setting operation class total score
The fraction of working specification mistake deduction is deducted, student's operation operation assessment score value is obtained.If teaching notes setting operation class is total
It is divided into if 20 points, if student's operation is correct, this must be divided into 20 points of full marks, otherwise this must be divided into 20 and deducts operation
The fraction of deduction.
For the assessment of operation of power networks index includes the safety indexes to operation of power networks, the reliability index of operation of power networks
And the economic index of operation of power networks is estimated three parts.
Safety loading coefficient, coefficient of reliability and the economic factor of electrical network various kinds of equipment should be first determined first.Security
The related equipment of criticality of the coefficient major embodiment equipment in operation of power networks, such as Weak Node in Power Grid or key node is not
Permission is out-of-limit, so the safety loading coefficient of this kind equipment is just high, conversely, safety loading coefficient is just low, and according to the voltage of equipment in net
Grade, device type and out-of-limit degree, artificial batch defines the safety loading coefficient of whole network equipment;What coefficient of reliability embodied is negative
The significance level of lotus, according to the distribution situation of network load, load is generally divided into a type load, two type loads and three classes and bears
Lotus a, type load is mostly important, therefore coefficient of reliability is just high, and the significance level of three type loads is relatively minimum, therefore coefficient of reliability
It is minimum;Whether the operation of power networks of economic factor major embodiment is the most economical, reasonable, and economic factor is defined simultaneously by the requirement of user
Provide the economic examination threshold value that the whole network is lost under the conditions of acceptable.
With reference to shown in Fig. 7, before operation of power networks index evaluation is carried out, first have to manual maintenance and determine electrical network various kinds of equipment
Safety loading coefficient, coefficient of reliability, economic factor and economy examination threshold value.
Economic evaluation is relatively easy, in training process, operation of the monitoring student in training process in real time, to score
The situation of change of the whole network network loss value before and after analysis operation, if to deduct the preoperative network loss value of student big for the network loss value after student's operation
In the economy examination threshold value of teaching notes setting, then increase a record to operating in the database of training system,
And the situation of change and network loss threshold crossing time of network loss before and after operation are recorded, all of out-of-limit operation note constitutes economy statistics
Table;
After training terminates, all records in economy statistical form calculate the fraction that current economic is deducted, specifically
Computing formula is:
Wherein, EsFor economic power system deduction of points summation, k is the out-of-limit total quantity of network loss, Δ in training processiFor i & lt net
Damage threshold crossing time, φiFor the economic factor of the out-of-limit electrical network of i & lt network loss, LciFor network loss after the out-of-limit student's operation of i & lt network loss
Size, LsiFor network loss size before the out-of-limit student's operation of i & lt network loss;
Assume that economic evaluation item total score is 10 points, then economy examination must be divided into 10-Es。
Electric network security is examined it can be seen from Fig. 7, and in training process, training system would cycle through each equipment,
Read the trend of each equipment in student training system, including active measurement, idle measurement, the voltage of different type equipment
Survey and current measurement;The com-parison and analysis equipment trend runs the size of limit value with it, if equipment trend is more than its limit value, recognizes
The fixed equipment is out-of-limit, and increase in the database of training system to should equipment out-of-limit record, statistics more limitation and
Out-of-limit cumulative time, all of out-of-limit record generates security statistical form.After training terminates, training system security system is read
All records of meter table, carry out security scoring.Its scoring formula is as follows:
Wherein, RsFor security deduction of points summation, n is the out-of-limit total quantity of equipment, u in training processiGet over for i & lt equipment
In limited time, the safety loading coefficient of corresponding out-of-limit equipment, vaciFor i & lt equipment more in limited time, the current measuring value of out-of-limit equipment,
vasiFor i & lt equipment more in limited time, the limit value of out-of-limit equipment, tciFor i & lt equipment more in limited time, the equipment out-of-limit duration.
Assume that safety evaluation item total score is 10 points, then security examination must be divided into 10-Rs。
Electric network reliability is examined it can be seen from Fig. 7, and in training process, training system will in real time monitor each behaviour of student
Make, the topological analysis operation causes the load and its size of power-off, and by the corresponding dead electricity payload of the operation and dead electricity
Cumulative time is recorded in the database of training system, and all of record constitutes reliability statistics table.After training terminates, according to
All records in reliability statistics table, carry out reliability scoring.Its scoring formula is as follows:
Wherein, CsFor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process,For i-th
The coefficient of reliability (type load, two type loads, three type loads) of the load point of member's operation, PiFor the mistake of i-th student's operation
Electric load value size, τiFor the load dead electricity duration of i-th student's operation.
Assume that reliability assessment item total score is 10 points, then Reliability Check must be divided into 10-Cs。
With reference to shown in Fig. 8, the idiographic flow of accident prediction analysis and evaluation is, before training, extracts first complete in teaching notes
Portion's accident teaching notes, and detailed accident prediction is formulated according to the concrete accident of teaching notes, and define giving for every kind of accident prediction
Point, finally bundled with accident teaching notes information in the way of prediction scheme file and preserved;In training process, read current
The accident teaching notes at moment, in-service monitoring student is triggered to all operations in the accident predetermined processing deadline from accident, and with
Accident prediction is analyzed, and detection compares the one kind whether mode of student's process accident meets in accident prediction, if
It is then to record the given score of the accident prediction;If being unsatisfactory for any one accident prediction, the assessment score of the accident treatment
It is zero.
After training terminates, the PTS of accident prediction analysis item is calculated, specific formula for calculation is as follows:
Wherein, SsFor teaching notes accident treatment PTS, p is teaching notes total number of accident, SiI-th accident of teaching notes is processed for student
Score.
Fig. 9 to 13 gives the process of accident prediction analysis.According to Fig. 9, partial electric grid altogether include 8 buses, three
Individual main transformer power supply point and two little unit water power power supply points, we train teaching notes using circuit L3 failures as one, according to this
The failure condition of equipment, formulates corresponding accident treatment prediction scheme.
As shown in Figure 10, after circuit L3 breaks down, switch 5DL, 6DL of L3 both sides tripping operation, cause bus M3 and its
The whole load power-off of institute's band.The failure teaching notes mainly examine student handling failure and the energy for restoring electricity within the time of regulation
Power.
Prediction scheme one:As shown in figure 11, the first step, separates the switch of 5DL, 6DL both sides, faulty equipment is thoroughly isolated;The
Two steps, close a switch 4DL, makes dead electricity bus restore electricity;3rd step, according to the flow situations after operation, analytical calculation main transformer
The overload situations of T1, it is assumed that the Overflow RateHT of this scheme T1 is 10%.
Prediction scheme two:As shown in figure 12, the first step, separates the switch of 5DL, 6DL both sides, faulty equipment is thoroughly isolated;The
Two steps, close a switch 7DL, makes dead electricity bus restore electricity;3rd step, according to the flow situations after operation, analytical calculation main transformer
The overload situations of T2, it is assumed that the Overflow RateHT of this scheme T2 is 5%.
Prediction scheme three:As shown in figure 13, the first step, separates the switch of 5DL, 6DL both sides, faulty equipment is thoroughly isolated;The
Two steps, close a switch 4DL and 7DL, makes dead electricity bus restore electricity;3rd step, according to the flow situations after operation, analytical calculation
The overload situations of main transformer T1, T2, it is assumed that the equal nonoverload of this scheme T1, T2.
Comparative analysis three of the above troubleshooting prediction scheme, user can be according to the clear and definite accident the most rational of practical operation situation
Processing mode, and to every kind of schema definition score value size.In the present embodiment, it is assumed that accident prediction analysis and evaluation phase total score
For 40 points, 20 points given of fraction of scheme one, the given fraction of scheme two is 30 points, and the given fraction of scheme three is 40 points.
In training process, according to fault occurrences and the fault handling operation of in-service monitoring student, analysis is compared
The actual processing mode of student meets that prediction scheme, and gives student's prediction scheme corresponding score value, if the prediction scheme not met,
Then assert that bus M3 does not restore electricity, then this must be divided into 0.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, but and
Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the guarantor of the present invention
Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.