Summary of the invention
In order better to promote the use value of Training Simulation System, make yardman in training process, accumulate more operating experience, the invention provides a kind of method of student's operation being carried out intelligent evaluation in training system.
In order to achieve the above object, adopted technical scheme is as follows:
Student's operation is carried out the method for intelligent evaluation in training system, comprises following three kinds of situations:
A) student's operation is assessed: for investigating that student carries out for grid equipment that instruction issues or during straighforward operation, whether student's operation is maloperation, and investigates the requirement whether student's operation meets grid equipment operation standard;
B) operation of power networks index is assessed: for investigating student, control the ability of operation of power networks quality, described operation of power networks index comprises the economic index of the safety indexes of operation of power networks, the reliability index of operation of power networks and operation of power networks;
C) accident prediction is carried out to analysis and evaluation: for investigating student in the face of in grid equipment generation major accident or abnormal situation, whether can be in official hour with reasonable manner, process due to equipment failure or the consequence that extremely causes.
Aforesaidly a) student's operation is assessed, maloperation comprises that on-load broaching tool lock, on-load close disconnecting link, the charged ground wire that closes.
The aforesaid step of a) student's operation being assessed comprises:
(a-1) generate grid equipment working specification experts database, according to the requirement of grid equipment operations specification, all types in training system traversal transformer substation system, the equipment of all electric pressures, form one by one the various types of working specifications of all devices, and equipment, action type and corresponding working specification are preserved, generate grid equipment working specification experts database;
(a-2) in training process, training system in-service monitoring student's operation information, according to five anti-operation requirements analyses and judge whether student operates is maloperation, if be judged to be maloperation, automatically generate one for the maloperation record of this training, the predefined maloperation score value of training system deduction teaching notes simultaneously, finishes for the examination of these teaching notes; If judge it is not maloperation, proceed to step (a-3);
(a-3) read working specification corresponding in experts database, analyze and judge that whether student's operation is consistent with the working specification that in experts database, this equipment is corresponding, if inconsistent, automatically generate the training record of student's working specification mistake, deduct the deduction of points value of the predefined working specification mistake of teaching notes simultaneously.
(a-4) by teaching notes setting operation class total points, deduct the mark of working specification mistake deduction, obtain student's operation and assess to obtain score value.
Aforesaid grid equipment working specification experts database comprises the be incorporated into the power networks bypass replacement working specification of working specification and equipment of all kinds overhaul of the equipments working specification, all kinds equipment cold standby working specification, all kinds equipment stand-by heat working specification, all kinds equipment.
Aforesaid b) operation of power networks index is assessed to the safety indexes, the reliability index of operation of power networks and the economic index of operation of power networks that comprise operation of power networks and assesses,
First, according to electric pressure, device type and the out-of-limit degree of equipment in net, the artificial safety loading coefficient that defines in batches whole network equipment; According to the distribution situation of network load, artificial batch is set the whole network load type, comprises a type load, two type loads and three type loads, and defines the reliability coefficient of dissimilar load; According to user's requirements definition economy coefficient, and provide the economy examination threshold value of the whole network loss;
Then, the safety indexes of operation of power networks is assessed and is comprised the following steps:
(b-1) each equipment of training system searching loop, reads the trend of each equipment in student training system, comprises that the meritorious measurement of dissimilar equipment, idle measurement, voltage measure and current measurement;
(b-2) read online the operation limit value of each equipment of student training system, and analyze the relatively size of this equipment trend and its limit value, if equipment trend is greater than its limit value, assert that this equipment is out-of-limit, and in the database of training system, increase out-of-limit record that should equipment, add up out-of-limit amount and out-of-limit cumulative time, all out-of-limit records generate security statistical form;
(b-3) after training finishes, read all records of training system security statistical form, calculate the mark of current safety deduction, specific formula for calculation is as follows:
Wherein, R
sfor security deduction of points summation, n is the out-of-limit total quantity of equipment in training process, u
ibe i secondary device when out-of-limit, the safety loading coefficient of corresponding out-of-limit equipment, va
cibe i secondary device when out-of-limit, the current measuring value of out-of-limit equipment, va
sibe i secondary device when out-of-limit, the limit value of out-of-limit equipment, t
cibe i secondary device when out-of-limit, the out-of-limit duration of equipment;
Security examination must be divided into: safety evaluation item total points-R
s;
The reliability index of operation of power networks is assessed and is comprised the following steps:
(b-4) operation of real time monitoring student in training process, this operation of topological analysis causes load and the size thereof of power-off, and the dead electricity payload of this operational correspondence and dead electricity cumulative time are recorded in the database of training system, all records form reliability statistics table;
(b-5) after training finishes, according to all records in reliability statistics table, calculate the mark of current reliability deduction, specific formula for calculation is as follows:
Wherein, C
sfor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process,
be the reliability coefficient of the load point of i bar student operation, P
ibe the dead electricity load value size of i bar student operation, τ
iit is the load dead electricity duration of i bar student operation;
Reliability Check must be divided into: reliability assessment item total points-C
s;
The economic index of operation of power networks is assessed and is comprised the following steps:
(b-6) operation of real time monitoring student in training process, the situation of change of the whole network network loss value before and after comparative analysis operation, if the network loss value after student's operation deducts the preoperative network loss value of student and is greater than the economy examination threshold value that teaching notes are set, in the database of training system, increase by one to the record that should operate, and situation of change and the out-of-limit time of network loss of record operation front and back network loss, all out-of-limit operation notes form economy statistical form;
(b-7) after training finishes, according to all records in economy statistical form, calculate the mark of current economy deduction, specific formula for calculation is as follows:
Wherein, E
sfor electrical network economy deduction of points summation, k is the out-of-limit total quantity of network loss in training process, Δ
ibe the i time out-of-limit time of network loss, φ
ibe the economy coefficient of the i time out-of-limit electrical network of network loss, L
cibe that the i time out-of-limit student of network loss operates rear network loss size, L
sibe that the i time out-of-limit student of network loss operates front network loss size;
Economy examination must be divided into: economic evaluation item total points-E
s.
Aforesaid c) accident prediction being carried out to analysis and evaluation comprises the following steps:
(c-1) make accident prediction, extract the whole accident teaching notes in teaching notes, and formulate detailed accident treatment prediction scheme according to the concrete accident of teaching notes, and define every kind of given score of processing prediction scheme, the last mode with prediction scheme file and accident teaching notes information bundle preserves;
(c-2) in training process, in-service monitoring student is triggered to all operations in the accident predetermined processing deadline from accident, read the accident teaching notes of current time, and student's operation is analyzed with accident prediction, whether the mode that detects comparison student processing accident meets a kind of in accident prediction, if so, record the given score of this accident pretreating scheme; If do not meet any one accident prediction, this accident treatment assesses to such an extent that be divided into zero;
(c-3) after training finishes, calculate the PTS of accident prediction analysis item, specific formula for calculation is as follows:
Wherein, S
sfor teaching notes accident treatment PTS, k is teaching notes total number of accident, S
ifor student processes the score of i accident of teaching notes.
The present invention is practical, has extremely strong dirigibility and feasibility, appreciable levels that can effectively enhancement training system.
Embodiment
For ease of understanding the present invention, below in conjunction with the drawings and specific embodiments, the present invention is further elaborated.
Dispatcher training analogue system (hereinafter to be referred as training system) is a set of computer system, it is by the mathematical model of simulated practical power systems, simulate the system condition after various scheduling operations and fault, and these information are delivered in the model of Power System Control Centers, for yardman provides a Training Environment true to nature, to reach the object that neither affects the operation of practical power systems and training yardman, the functipnal capability of yardman under normal condition and quick-reaction capability (QRC) under accident condition have been trained, also can be used as the instrument that dispatching of power netwoks operations staff analyzes operation of power networks.
The invention provides a kind of method of student's operation being carried out intelligent evaluation in dispatcher training analogue system, comprise following three kinds of situations:
A) student's operation is assessed: for investigating that student carries out for grid equipment that instruction issues or during straighforward operation, whether student's operation is maloperation, and investigates the requirement whether student's operation meets grid equipment operation standard; Wherein maloperation comprises that on-load broaching tool lock, on-load close disconnecting link, the charged ground wire etc. that closes;
B) operation of power networks index is assessed: for investigating student, control the ability of operation of power networks quality, operation of power networks index comprises the economic index of the safety indexes of operation of power networks, the reliability index of operation of power networks and operation of power networks;
C) accident prediction is carried out to analysis and evaluation: for investigating student in the face of in grid equipment generation major accident or abnormal situation, whether can be in official hour with reasonable manner, process due to equipment failure or the consequence that extremely causes.
With the transformer station shown in Fig. 2, student's operation evaluation process is described as an example, student's operation estimation flow is shown in Fig. 1.
Fig. 2 is a typical 110kV transformer station, for convenience of description, only draws 110kV partial wiring diagram here.Suppose that circuit L2 is charged.
Fig. 2 has only drawn the equipment such as inlet wire and the switch connecting, bus.System will generate the working specification of this wiring diagram relevant device automatically, and here, we take the maintenance of circuit L2 equipment is example, illustrates the generative process of working specification.
For the maintenance of circuit L2 equipment, according to overhaul of the equipments standard, first should separate the switch that circuit measures, then separate bus end disconnecting link, then strapping wires trackside disconnecting link, line-to-ground disconnecting link finally closes.Fig. 2 to Fig. 6 shows this this side line of plant stand section operation steps, and plant stand offside equipment operating step is identical with this side plant stand.The maintenance of circuit L2 should be divided into 4 steps, and the first step is separated switch 102, as shown in Figure 3; Second step, separates bus bar side disconnecting link 102-1, as shown in Figure 4; The 3rd step, strapping wires trackside disconnecting link 102-2, as shown in Figure 5; The 4th step, the earthing 102-2-1 that closes, as shown in Figure 6.
More than take exactly the concrete steps of circuit as example devices illustrated inspection operation.
To student's operation evaluation process as shown in Figure 1, in training process, according to the requirement of grid equipment operations specification, training system is by all types in traversal transformer substation system, the equipment of all electric pressures, form one by one the various types of working specifications of all devices, and equipment, action type and working specification are preserved, generate grid equipment working specification experts database.Grid equipment working specification experts database comprises the be incorporated into the power networks bypass replacement working specification of working specification and equipment of all kinds overhaul of the equipments working specification, all kinds equipment cold standby working specification, all kinds equipment stand-by heat working specification, all kinds equipment.
In training process, read this moment as the teaching notes content of the class of operation such as maintenance, and in the time of having stipulated at teaching notes, read in real time and record student's content of operation, according to five anti-operation requirements, judge whether student's operation is maloperation, if judge it is maloperation, automatically generate one for the maloperation record of this training, the maloperation score value that simultaneously training system will deduction teaching notes be set, finishes for the examination of these teaching notes; If judge it is not maloperation, whether the working specification that in contrast judgement student's operation steps and experts database, this equipment is corresponding is consistent, if inconsistent, automatically generate the training record of student's working specification mistake, deduct the deduction of points value of the predefined working specification mistake of teaching notes simultaneously.
Above-mentioned each class of operation teaching notes need the analysis and evaluation through above-mentioned steps, finally by teaching notes setting operation class total points, deduct the mark of working specification mistake deduction, obtain student's operation and assess to obtain score value.If teaching notes setting operation class total points is 20 minutes, student operates accurate words, and this must be divided into full marks 20 minutes, otherwise this must be divided into 20 marks that deduct operation deduction.
For the assessment of operation of power networks index, comprise that safety indexes, the reliability index of operation of power networks and the economic index of operation of power networks to operation of power networks assess three parts.
First should first determine safety loading coefficient, reliability coefficient and the economy coefficient of electrical network various kinds of equipment.The criticality of safety loading coefficient major embodiment equipment when operation of power networks, as Weak Node in Power Grid or the relevant equipment of key node do not allow out-of-limit, so the safety loading coefficient of this kind equipment is just high, on the contrary, safety loading coefficient is just low, according to electric pressure, device type and the out-of-limit degree of equipment in net, the artificial safety loading coefficient that defines in batches whole network equipment; What reliability coefficient embodied is the significance level of load, and according to the distribution situation of network load, load is generally divided into a type load, two type loads and three type loads, one type load is the most important, therefore reliability coefficient is just high, the significance level of three type loads is relatively minimum, therefore reliability coefficient is minimum; Whether the operation of power networks of economy coefficient major embodiment is the most economical, rationally, by user's requirements definition economy coefficient and provide the economy examination threshold value of the whole network loss under can acceptable conditions.
Shown in Fig. 7, before carrying out operation of power networks index evaluation, first want manual maintenance to determine the safety loading coefficient of electrical network various kinds of equipment, reliability coefficient, economy coefficient and economy examination threshold value.
Economic evaluation is relatively easy, in training process, the operation of real time monitoring student in training process, the situation of change of the whole network network loss value before and after comparative analysis operation, if the network loss value after student's operation deducts the preoperative network loss value of student and is greater than the economy examination threshold value that teaching notes are set, in the database of training system, increase by one to the record that should operate, and situation of change and the out-of-limit time of network loss of record operation front and back network loss, all out-of-limit operation notes form economy statistical form;
After training finishes, according to all records in economy statistical form, calculate the mark of current economy deduction, specific formula for calculation is:
Wherein, E
sfor electrical network economy deduction of points summation, k is the out-of-limit total quantity of network loss in training process, Δ
ibe the i time out-of-limit time of network loss, φ
ibe the economy coefficient of the i time out-of-limit electrical network of network loss, L
cibe that the i time out-of-limit student of network loss operates rear network loss size, L
sibe that the i time out-of-limit student of network loss operates front network loss size;
Suppose that economic evaluation item total points is 10 minutes, economy examination must be divided into 10-E
s.
Electric network security examination is known according to Fig. 7, in training process, training system, by each equipment of searching loop, reads the trend of each equipment in student training system, comprises that the meritorious measurement of dissimilar equipment, idle measurement, voltage measure and current measurement; Analyze the relatively size of this equipment trend and its operation limit value, if equipment trend is greater than its limit value, assert that this equipment is out-of-limit, and in the database of training system, increase out-of-limit record that should equipment, add up out-of-limit amount and out-of-limit cumulative time, all out-of-limit records generate security statistical form.After training finishes, read all records of training system security statistical form, carry out security scoring.Its evaluate formula is as follows:
Wherein, R
sfor security deduction of points summation, n is the out-of-limit total quantity of equipment in training process, u
ibe i secondary device when out-of-limit, the safety loading coefficient of corresponding out-of-limit equipment, va
cibe i secondary device when out-of-limit, the current measuring value of out-of-limit equipment, va
sibe i secondary device when out-of-limit, the limit value of out-of-limit equipment, t
cibe i secondary device when out-of-limit, the out-of-limit duration of equipment.
Suppose that safety evaluation item total points is 10 minutes, security examination must be divided into 10-R
s.
Electric network reliability examination is known according to Fig. 7, in training process, training system is by each operation of real time monitoring student, this operation of topological analysis causes load and the size thereof of power-off, and the dead electricity payload of this operational correspondence and dead electricity cumulative time are recorded in the database of training system, all records form reliability statistics table.After training finishes, all records according in reliability statistics table, carry out reliability scoring.Its evaluate formula is as follows:
Wherein, C
sfor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process,
be the reliability coefficient (type load, two type loads, three type loads) of the load point of i bar student operation, P
ibe the dead electricity load value size of i bar student operation, τ
iit is the load dead electricity duration of i bar student operation.
Suppose that reliability assessment item total points is 10 minutes, Reliability Check must be divided into 10-C
s.
Shown in Fig. 8, the idiographic flow of accident prediction analysis and evaluation is, before training, first extract the whole accident teaching notes in teaching notes, and formulate detailed accident treatment prediction scheme according to the concrete accident of teaching notes, and defining every kind of given score of processing prediction scheme, the last mode with prediction scheme file and accident teaching notes information bundle preserves; In training process, read the accident teaching notes of current time, in-service monitoring student is triggered to all operations in the accident predetermined processing deadline from accident, and be analyzed with accident prediction, whether the mode that detects comparison student processing accident meets a kind of in accident prediction, if so, record the given score of this accident pretreating scheme; If do not meet any one accident prediction, this accident treatment assesses to such an extent that be divided into zero.
After training finishes, calculate the PTS of accident prediction analysis item, specific formula for calculation is as follows:
Wherein, S
sfor teaching notes accident treatment PTS, k is teaching notes total number of accident, S
ifor student processes the score of i accident of teaching notes.
The process that Fig. 9 to 13 analyzes to the prediction scheme that has an accident.Shown in Fig. 9, partial electric grid comprises 8 buses altogether, three main transformer power supply points and two little unit water power power supply points, and we using circuit L3 fault as training teaching notes, according to the failure condition of this equipment, formulate corresponding accident treatment prediction scheme.
As shown in figure 10, after circuit L3 breaks down, switch 5DL, the 6DL of L3 both sides tripping operation, causes bus M3 and all load power-off of being with thereof.These fault teaching notes are mainly examined student handling failure and ability of restoring electricity in official hour.
Prediction scheme one: as shown in figure 11, the first step, separately the switch of 5DL, 6DL both sides, thoroughly isolates faulty equipment; Second step, the 4DL that closes a switch, restores electricity dead electricity bus; The 3rd step, according to the trend situation after operation, the overload situations of analytical calculation main transformer T1, the overload rate of supposing this scheme T1 is 10%.
Prediction scheme two: as shown in figure 12, the first step, separately the switch of 5DL, 6DL both sides, thoroughly isolates faulty equipment; Second step, the 7DL that closes a switch, restores electricity dead electricity bus; The 3rd step, according to the trend situation after operation, the overload situations of analytical calculation main transformer T2, the overload rate of supposing this scheme T2 is 5%.
Prediction scheme three: as shown in figure 13, the first step, separately the switch of 5DL, 6DL both sides, thoroughly isolates faulty equipment; Second step, close a switch 4DL and 7DL, restore electricity dead electricity bus; The 3rd step, according to the trend situation after operation, the overload situations of analytical calculation main transformer T1, T2, supposes this scheme T1, the equal nonoverload of T2.
The above three kinds of fault handling prediction schemes of comparative analysis, user can be according to the clear and definite the most reasonably accident treatment mode of practical operation situation, and defines to every kind of scheme to obtain score value size.In the present embodiment, we suppose that accident prediction analysis and evaluation phase total points is 40 minutes, the given mark of scheme one 20 minutes, and the given mark of scheme two is 30 minutes, the given mark of scheme three is 40 minutes.
In training process, according to fault, a situation arises and in-service monitoring student's fault handling operation, the processing mode of compare of analysis student reality meets that prediction scheme, and operate score value corresponding to prediction scheme to student, if the prediction scheme not meeting, assert that bus M3 does not restore electricity, this must be divided into 0.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.