CN103996099A - Method for conducting intelligent evaluation on student operation in training system - Google Patents

Method for conducting intelligent evaluation on student operation in training system Download PDF

Info

Publication number
CN103996099A
CN103996099A CN201410222723.6A CN201410222723A CN103996099A CN 103996099 A CN103996099 A CN 103996099A CN 201410222723 A CN201410222723 A CN 201410222723A CN 103996099 A CN103996099 A CN 103996099A
Authority
CN
China
Prior art keywords
student
equipment
limit
accident
training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410222723.6A
Other languages
Chinese (zh)
Other versions
CN103996099B (en
Inventor
王仲达
陆进军
牛四清
张哲�
钱江峰
谢旭
高宗和
刘健
戴则梅
罗亚洲
张剑
刘之滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Grid Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Grid Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Grid Co Ltd, Nari Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410222723.6A priority Critical patent/CN103996099B/en
Publication of CN103996099A publication Critical patent/CN103996099A/en
Application granted granted Critical
Publication of CN103996099B publication Critical patent/CN103996099B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method for conducting intelligent evaluation on a student operation in a training system. The evaluation modes for training students include the running equipment operation evaluation mode, the power grid operation index evaluation mode and the accident pre-arranged planning analysis and evaluation mode. According to the running equipment operation index evaluation mode, whether equipment operated by a student for enabling the system to run meets electrical equipment operation normalization or not and whether the operation of the student is a mistaken operation or not are evaluated. According to the power grid operation index evaluation mode, whether the safety, reliability and economy of power grid operation meet the requiring level set by a teaching plan or not is evaluated. According to the accident pre-arranged planning analysis and evaluation mode, a power grid accident and accident handling mode in the teaching plan are made in advance; after the training is ended, the student physical fault handling mode and the accident pre-arranged planning making handling mode are analyzed and compared, and therefore pre-arranged planning analysis and evaluation for a power grid accident are achieved. The method for conducting intelligent evaluation on the student operation is high in practicability, has quite high flexibility and feasibility, and can effectively improve the evaluation level of the training system.

Description

Student's operation is carried out the method for intelligent evaluation in training system
Technical field
The present invention relates to Automation of Electric Systems dispatching technique field, be specifically related in training system, student's operation be carried out the method for intelligent evaluation.
Background technology
Along with the raising of user for dispatcher training check requirements, the experienced yardman of simple foundation carries out manual examination to trainee and cannot meet current demand, its reason has: in training process, teacher cannot assert accurately the variation of operation of power networks quality before and after student operates; Student's frequent operation in training process, teacher cannot accomplish correctness and the rationality of real-time follow-up judgement student operation in time; Teacher cannot judge within very short time that whether the scheme of student's handling failure is best, more cannot provide the exact evaluation of student's handling failure.
In order to address the above problem, at present relevant for research and the application of Training Simulation System appraisal procedure.Its basic thought is in conjunction with the out-of-limit situation of grid equipment in teacher's experience and training process, dead electricity situation, student's operational circumstances, in artificial mode, the student that undergoes training is provided to overall assessment.
But, to student's training, examine assessment to be still confined to the prerequisite of artificial experience, more cannot integral body examine student to control the ability of electrical network.
Summary of the invention
In order better to promote the use value of Training Simulation System, make yardman in training process, accumulate more operating experience, the invention provides a kind of method of student's operation being carried out intelligent evaluation in training system.
In order to achieve the above object, adopted technical scheme is as follows:
Student's operation is carried out the method for intelligent evaluation in training system, comprises following three kinds of situations:
A) student's operation is assessed: for investigating that student carries out for grid equipment that instruction issues or during straighforward operation, whether student's operation is maloperation, and investigates the requirement whether student's operation meets grid equipment operation standard;
B) operation of power networks index is assessed: for investigating student, control the ability of operation of power networks quality, described operation of power networks index comprises the economic index of the safety indexes of operation of power networks, the reliability index of operation of power networks and operation of power networks;
C) accident prediction is carried out to analysis and evaluation: for investigating student in the face of in grid equipment generation major accident or abnormal situation, whether can be in official hour with reasonable manner, process due to equipment failure or the consequence that extremely causes.
Aforesaidly a) student's operation is assessed, maloperation comprises that on-load broaching tool lock, on-load close disconnecting link, the charged ground wire that closes.
The aforesaid step of a) student's operation being assessed comprises:
(a-1) generate grid equipment working specification experts database, according to the requirement of grid equipment operations specification, all types in training system traversal transformer substation system, the equipment of all electric pressures, form one by one the various types of working specifications of all devices, and equipment, action type and corresponding working specification are preserved, generate grid equipment working specification experts database;
(a-2) in training process, training system in-service monitoring student's operation information, according to five anti-operation requirements analyses and judge whether student operates is maloperation, if be judged to be maloperation, automatically generate one for the maloperation record of this training, the predefined maloperation score value of training system deduction teaching notes simultaneously, finishes for the examination of these teaching notes; If judge it is not maloperation, proceed to step (a-3);
(a-3) read working specification corresponding in experts database, analyze and judge that whether student's operation is consistent with the working specification that in experts database, this equipment is corresponding, if inconsistent, automatically generate the training record of student's working specification mistake, deduct the deduction of points value of the predefined working specification mistake of teaching notes simultaneously.
(a-4) by teaching notes setting operation class total points, deduct the mark of working specification mistake deduction, obtain student's operation and assess to obtain score value.
Aforesaid grid equipment working specification experts database comprises the be incorporated into the power networks bypass replacement working specification of working specification and equipment of all kinds overhaul of the equipments working specification, all kinds equipment cold standby working specification, all kinds equipment stand-by heat working specification, all kinds equipment.
Aforesaid b) operation of power networks index is assessed to the safety indexes, the reliability index of operation of power networks and the economic index of operation of power networks that comprise operation of power networks and assesses,
First, according to electric pressure, device type and the out-of-limit degree of equipment in net, the artificial safety loading coefficient that defines in batches whole network equipment; According to the distribution situation of network load, artificial batch is set the whole network load type, comprises a type load, two type loads and three type loads, and defines the reliability coefficient of dissimilar load; According to user's requirements definition economy coefficient, and provide the economy examination threshold value of the whole network loss;
Then, the safety indexes of operation of power networks is assessed and is comprised the following steps:
(b-1) each equipment of training system searching loop, reads the trend of each equipment in student training system, comprises that the meritorious measurement of dissimilar equipment, idle measurement, voltage measure and current measurement;
(b-2) read online the operation limit value of each equipment of student training system, and analyze the relatively size of this equipment trend and its limit value, if equipment trend is greater than its limit value, assert that this equipment is out-of-limit, and in the database of training system, increase out-of-limit record that should equipment, add up out-of-limit amount and out-of-limit cumulative time, all out-of-limit records generate security statistical form;
(b-3) after training finishes, read all records of training system security statistical form, calculate the mark of current safety deduction, specific formula for calculation is as follows:
R s = Σ i = 1 n u i * va ci va si * t ci
Wherein, R sfor security deduction of points summation, n is the out-of-limit total quantity of equipment in training process, u ibe i secondary device when out-of-limit, the safety loading coefficient of corresponding out-of-limit equipment, va cibe i secondary device when out-of-limit, the current measuring value of out-of-limit equipment, va sibe i secondary device when out-of-limit, the limit value of out-of-limit equipment, t cibe i secondary device when out-of-limit, the out-of-limit duration of equipment;
Security examination must be divided into: safety evaluation item total points-R s;
The reliability index of operation of power networks is assessed and is comprised the following steps:
(b-4) operation of real time monitoring student in training process, this operation of topological analysis causes load and the size thereof of power-off, and the dead electricity payload of this operational correspondence and dead electricity cumulative time are recorded in the database of training system, all records form reliability statistics table;
(b-5) after training finishes, according to all records in reliability statistics table, calculate the mark of current reliability deduction, specific formula for calculation is as follows:
Wherein, C sfor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process, be the reliability coefficient of the load point of i bar student operation, P ibe the dead electricity load value size of i bar student operation, τ iit is the load dead electricity duration of i bar student operation;
Reliability Check must be divided into: reliability assessment item total points-C s;
The economic index of operation of power networks is assessed and is comprised the following steps:
(b-6) operation of real time monitoring student in training process, the situation of change of the whole network network loss value before and after comparative analysis operation, if the network loss value after student's operation deducts the preoperative network loss value of student and is greater than the economy examination threshold value that teaching notes are set, in the database of training system, increase by one to the record that should operate, and situation of change and the out-of-limit time of network loss of record operation front and back network loss, all out-of-limit operation notes form economy statistical form;
(b-7) after training finishes, according to all records in economy statistical form, calculate the mark of current economy deduction, specific formula for calculation is as follows: E s = Σ i = 1 k φ i * L ci L si * Δ i
Wherein, E sfor electrical network economy deduction of points summation, k is the out-of-limit total quantity of network loss in training process, Δ ibe the i time out-of-limit time of network loss, φ ibe the economy coefficient of the i time out-of-limit electrical network of network loss, L cibe that the i time out-of-limit student of network loss operates rear network loss size, L sibe that the i time out-of-limit student of network loss operates front network loss size;
Economy examination must be divided into: economic evaluation item total points-E s.
Aforesaid c) accident prediction being carried out to analysis and evaluation comprises the following steps:
(c-1) make accident prediction, extract the whole accident teaching notes in teaching notes, and formulate detailed accident treatment prediction scheme according to the concrete accident of teaching notes, and define every kind of given score of processing prediction scheme, the last mode with prediction scheme file and accident teaching notes information bundle preserves;
(c-2) in training process, in-service monitoring student is triggered to all operations in the accident predetermined processing deadline from accident, read the accident teaching notes of current time, and student's operation is analyzed with accident prediction, whether the mode that detects comparison student processing accident meets a kind of in accident prediction, if so, record the given score of this accident pretreating scheme; If do not meet any one accident prediction, this accident treatment assesses to such an extent that be divided into zero;
(c-3) after training finishes, calculate the PTS of accident prediction analysis item, specific formula for calculation is as follows:
Wherein, S sfor teaching notes accident treatment PTS, k is teaching notes total number of accident, S ifor student processes the score of i accident of teaching notes.
The present invention is practical, has extremely strong dirigibility and feasibility, appreciable levels that can effectively enhancement training system.
Accompanying drawing explanation
Fig. 1 is student's operation estimation flow figure of the present invention;
Fig. 2 is typical 110kV bus arrangement figure;
Fig. 3 is circuit L2 inspection operation first step wiring diagram in Fig. 2;
Fig. 4 is circuit L2 inspection operation second step wiring diagram in Fig. 2;
Fig. 5 is circuit L2 inspection operation the 3rd step wiring diagram in Fig. 2;
Fig. 6 is circuit L2 inspection operation the 4th step wiring diagram in Fig. 2;
Fig. 7 is the estimation flow figure of operation of power networks index of the present invention;
Fig. 8 is accident prediction analysis and evaluation process flow diagram of the present invention;
Fig. 9 is the partial electric grid wiring diagram of a specific embodiment of accident prediction analysis of the present invention;
Figure 10 is the wiring diagram that in Fig. 9, circuit L3 breaks down;
The wiring diagram that Figure 11 is the prediction scheme one taked for the line fault of Figure 10;
The wiring diagram that Figure 12 is the prediction scheme two taked for the line fault of Figure 10;
The wiring diagram that Figure 13 is the prediction scheme three taked for the line fault of Figure 10.
Embodiment
For ease of understanding the present invention, below in conjunction with the drawings and specific embodiments, the present invention is further elaborated.
Dispatcher training analogue system (hereinafter to be referred as training system) is a set of computer system, it is by the mathematical model of simulated practical power systems, simulate the system condition after various scheduling operations and fault, and these information are delivered in the model of Power System Control Centers, for yardman provides a Training Environment true to nature, to reach the object that neither affects the operation of practical power systems and training yardman, the functipnal capability of yardman under normal condition and quick-reaction capability (QRC) under accident condition have been trained, also can be used as the instrument that dispatching of power netwoks operations staff analyzes operation of power networks.
The invention provides a kind of method of student's operation being carried out intelligent evaluation in dispatcher training analogue system, comprise following three kinds of situations:
A) student's operation is assessed: for investigating that student carries out for grid equipment that instruction issues or during straighforward operation, whether student's operation is maloperation, and investigates the requirement whether student's operation meets grid equipment operation standard; Wherein maloperation comprises that on-load broaching tool lock, on-load close disconnecting link, the charged ground wire etc. that closes;
B) operation of power networks index is assessed: for investigating student, control the ability of operation of power networks quality, operation of power networks index comprises the economic index of the safety indexes of operation of power networks, the reliability index of operation of power networks and operation of power networks;
C) accident prediction is carried out to analysis and evaluation: for investigating student in the face of in grid equipment generation major accident or abnormal situation, whether can be in official hour with reasonable manner, process due to equipment failure or the consequence that extremely causes.
With the transformer station shown in Fig. 2, student's operation evaluation process is described as an example, student's operation estimation flow is shown in Fig. 1.
Fig. 2 is a typical 110kV transformer station, for convenience of description, only draws 110kV partial wiring diagram here.Suppose that circuit L2 is charged.
Fig. 2 has only drawn the equipment such as inlet wire and the switch connecting, bus.System will generate the working specification of this wiring diagram relevant device automatically, and here, we take the maintenance of circuit L2 equipment is example, illustrates the generative process of working specification.
For the maintenance of circuit L2 equipment, according to overhaul of the equipments standard, first should separate the switch that circuit measures, then separate bus end disconnecting link, then strapping wires trackside disconnecting link, line-to-ground disconnecting link finally closes.Fig. 2 to Fig. 6 shows this this side line of plant stand section operation steps, and plant stand offside equipment operating step is identical with this side plant stand.The maintenance of circuit L2 should be divided into 4 steps, and the first step is separated switch 102, as shown in Figure 3; Second step, separates bus bar side disconnecting link 102-1, as shown in Figure 4; The 3rd step, strapping wires trackside disconnecting link 102-2, as shown in Figure 5; The 4th step, the earthing 102-2-1 that closes, as shown in Figure 6.
More than take exactly the concrete steps of circuit as example devices illustrated inspection operation.
To student's operation evaluation process as shown in Figure 1, in training process, according to the requirement of grid equipment operations specification, training system is by all types in traversal transformer substation system, the equipment of all electric pressures, form one by one the various types of working specifications of all devices, and equipment, action type and working specification are preserved, generate grid equipment working specification experts database.Grid equipment working specification experts database comprises the be incorporated into the power networks bypass replacement working specification of working specification and equipment of all kinds overhaul of the equipments working specification, all kinds equipment cold standby working specification, all kinds equipment stand-by heat working specification, all kinds equipment.
In training process, read this moment as the teaching notes content of the class of operation such as maintenance, and in the time of having stipulated at teaching notes, read in real time and record student's content of operation, according to five anti-operation requirements, judge whether student's operation is maloperation, if judge it is maloperation, automatically generate one for the maloperation record of this training, the maloperation score value that simultaneously training system will deduction teaching notes be set, finishes for the examination of these teaching notes; If judge it is not maloperation, whether the working specification that in contrast judgement student's operation steps and experts database, this equipment is corresponding is consistent, if inconsistent, automatically generate the training record of student's working specification mistake, deduct the deduction of points value of the predefined working specification mistake of teaching notes simultaneously.
Above-mentioned each class of operation teaching notes need the analysis and evaluation through above-mentioned steps, finally by teaching notes setting operation class total points, deduct the mark of working specification mistake deduction, obtain student's operation and assess to obtain score value.If teaching notes setting operation class total points is 20 minutes, student operates accurate words, and this must be divided into full marks 20 minutes, otherwise this must be divided into 20 marks that deduct operation deduction.
For the assessment of operation of power networks index, comprise that safety indexes, the reliability index of operation of power networks and the economic index of operation of power networks to operation of power networks assess three parts.
First should first determine safety loading coefficient, reliability coefficient and the economy coefficient of electrical network various kinds of equipment.The criticality of safety loading coefficient major embodiment equipment when operation of power networks, as Weak Node in Power Grid or the relevant equipment of key node do not allow out-of-limit, so the safety loading coefficient of this kind equipment is just high, on the contrary, safety loading coefficient is just low, according to electric pressure, device type and the out-of-limit degree of equipment in net, the artificial safety loading coefficient that defines in batches whole network equipment; What reliability coefficient embodied is the significance level of load, and according to the distribution situation of network load, load is generally divided into a type load, two type loads and three type loads, one type load is the most important, therefore reliability coefficient is just high, the significance level of three type loads is relatively minimum, therefore reliability coefficient is minimum; Whether the operation of power networks of economy coefficient major embodiment is the most economical, rationally, by user's requirements definition economy coefficient and provide the economy examination threshold value of the whole network loss under can acceptable conditions.
Shown in Fig. 7, before carrying out operation of power networks index evaluation, first want manual maintenance to determine the safety loading coefficient of electrical network various kinds of equipment, reliability coefficient, economy coefficient and economy examination threshold value.
Economic evaluation is relatively easy, in training process, the operation of real time monitoring student in training process, the situation of change of the whole network network loss value before and after comparative analysis operation, if the network loss value after student's operation deducts the preoperative network loss value of student and is greater than the economy examination threshold value that teaching notes are set, in the database of training system, increase by one to the record that should operate, and situation of change and the out-of-limit time of network loss of record operation front and back network loss, all out-of-limit operation notes form economy statistical form;
After training finishes, according to all records in economy statistical form, calculate the mark of current economy deduction, specific formula for calculation is: E s = Σ i = 1 k φ i * L ci L si * Δ i
Wherein, E sfor electrical network economy deduction of points summation, k is the out-of-limit total quantity of network loss in training process, Δ ibe the i time out-of-limit time of network loss, φ ibe the economy coefficient of the i time out-of-limit electrical network of network loss, L cibe that the i time out-of-limit student of network loss operates rear network loss size, L sibe that the i time out-of-limit student of network loss operates front network loss size;
Suppose that economic evaluation item total points is 10 minutes, economy examination must be divided into 10-E s.
Electric network security examination is known according to Fig. 7, in training process, training system, by each equipment of searching loop, reads the trend of each equipment in student training system, comprises that the meritorious measurement of dissimilar equipment, idle measurement, voltage measure and current measurement; Analyze the relatively size of this equipment trend and its operation limit value, if equipment trend is greater than its limit value, assert that this equipment is out-of-limit, and in the database of training system, increase out-of-limit record that should equipment, add up out-of-limit amount and out-of-limit cumulative time, all out-of-limit records generate security statistical form.After training finishes, read all records of training system security statistical form, carry out security scoring.Its evaluate formula is as follows:
R s = Σ i = 1 n u i * va ci va si * t ci
Wherein, R sfor security deduction of points summation, n is the out-of-limit total quantity of equipment in training process, u ibe i secondary device when out-of-limit, the safety loading coefficient of corresponding out-of-limit equipment, va cibe i secondary device when out-of-limit, the current measuring value of out-of-limit equipment, va sibe i secondary device when out-of-limit, the limit value of out-of-limit equipment, t cibe i secondary device when out-of-limit, the out-of-limit duration of equipment.
Suppose that safety evaluation item total points is 10 minutes, security examination must be divided into 10-R s.
Electric network reliability examination is known according to Fig. 7, in training process, training system is by each operation of real time monitoring student, this operation of topological analysis causes load and the size thereof of power-off, and the dead electricity payload of this operational correspondence and dead electricity cumulative time are recorded in the database of training system, all records form reliability statistics table.After training finishes, all records according in reliability statistics table, carry out reliability scoring.Its evaluate formula is as follows:
Wherein, C sfor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process, be the reliability coefficient (type load, two type loads, three type loads) of the load point of i bar student operation, P ibe the dead electricity load value size of i bar student operation, τ iit is the load dead electricity duration of i bar student operation.
Suppose that reliability assessment item total points is 10 minutes, Reliability Check must be divided into 10-C s.
Shown in Fig. 8, the idiographic flow of accident prediction analysis and evaluation is, before training, first extract the whole accident teaching notes in teaching notes, and formulate detailed accident treatment prediction scheme according to the concrete accident of teaching notes, and defining every kind of given score of processing prediction scheme, the last mode with prediction scheme file and accident teaching notes information bundle preserves; In training process, read the accident teaching notes of current time, in-service monitoring student is triggered to all operations in the accident predetermined processing deadline from accident, and be analyzed with accident prediction, whether the mode that detects comparison student processing accident meets a kind of in accident prediction, if so, record the given score of this accident pretreating scheme; If do not meet any one accident prediction, this accident treatment assesses to such an extent that be divided into zero.
After training finishes, calculate the PTS of accident prediction analysis item, specific formula for calculation is as follows:
Wherein, S sfor teaching notes accident treatment PTS, k is teaching notes total number of accident, S ifor student processes the score of i accident of teaching notes.
The process that Fig. 9 to 13 analyzes to the prediction scheme that has an accident.Shown in Fig. 9, partial electric grid comprises 8 buses altogether, three main transformer power supply points and two little unit water power power supply points, and we using circuit L3 fault as training teaching notes, according to the failure condition of this equipment, formulate corresponding accident treatment prediction scheme.
As shown in figure 10, after circuit L3 breaks down, switch 5DL, the 6DL of L3 both sides tripping operation, causes bus M3 and all load power-off of being with thereof.These fault teaching notes are mainly examined student handling failure and ability of restoring electricity in official hour.
Prediction scheme one: as shown in figure 11, the first step, separately the switch of 5DL, 6DL both sides, thoroughly isolates faulty equipment; Second step, the 4DL that closes a switch, restores electricity dead electricity bus; The 3rd step, according to the trend situation after operation, the overload situations of analytical calculation main transformer T1, the overload rate of supposing this scheme T1 is 10%.
Prediction scheme two: as shown in figure 12, the first step, separately the switch of 5DL, 6DL both sides, thoroughly isolates faulty equipment; Second step, the 7DL that closes a switch, restores electricity dead electricity bus; The 3rd step, according to the trend situation after operation, the overload situations of analytical calculation main transformer T2, the overload rate of supposing this scheme T2 is 5%.
Prediction scheme three: as shown in figure 13, the first step, separately the switch of 5DL, 6DL both sides, thoroughly isolates faulty equipment; Second step, close a switch 4DL and 7DL, restore electricity dead electricity bus; The 3rd step, according to the trend situation after operation, the overload situations of analytical calculation main transformer T1, T2, supposes this scheme T1, the equal nonoverload of T2.
The above three kinds of fault handling prediction schemes of comparative analysis, user can be according to the clear and definite the most reasonably accident treatment mode of practical operation situation, and defines to every kind of scheme to obtain score value size.In the present embodiment, we suppose that accident prediction analysis and evaluation phase total points is 40 minutes, the given mark of scheme one 20 minutes, and the given mark of scheme two is 30 minutes, the given mark of scheme three is 40 minutes.
In training process, according to fault, a situation arises and in-service monitoring student's fault handling operation, the processing mode of compare of analysis student reality meets that prediction scheme, and operate score value corresponding to prediction scheme to student, if the prediction scheme not meeting, assert that bus M3 does not restore electricity, this must be divided into 0.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (6)

1. student's operation is carried out the method for intelligent evaluation in training system, it is characterized in that, comprise following three kinds of situations:
A) student's operation is assessed: for investigating that student carries out for grid equipment that instruction issues or during straighforward operation, whether student's operation is maloperation, and investigates the requirement whether student's operation meets grid equipment operation standard;
B) operation of power networks index is assessed: for investigating student, control the ability of operation of power networks quality, described operation of power networks index comprises the economic index of the safety indexes of operation of power networks, the reliability index of operation of power networks and operation of power networks;
C) accident prediction is carried out to analysis and evaluation: for investigating student in the face of in grid equipment generation major accident or abnormal situation, whether can be in official hour with reasonable manner, process due to equipment failure or the consequence that extremely causes.
2. method of student's operation being carried out intelligent evaluation in training system according to claim 1, it is characterized in that, describedly a) student's operation is assessed, maloperation comprises that on-load broaching tool lock, on-load close disconnecting link, the charged ground wire that closes.
3. method of student's operation being carried out intelligent evaluation in training system according to claim 1, is characterized in that, the described step of a) student's operation being assessed comprises:
(a-1) generate grid equipment working specification experts database, according to the requirement of grid equipment operations specification, all types in training system traversal transformer substation system, the equipment of all electric pressures, form one by one the various types of working specifications of all devices, and equipment, action type and corresponding working specification are preserved, generate grid equipment working specification experts database;
(a-2) in training process, training system in-service monitoring student's operation information, according to five anti-operation requirements analyses and judge whether student operates is maloperation, if be judged to be maloperation, automatically generate one for the maloperation record of this training, the predefined maloperation score value of training system deduction teaching notes simultaneously, finishes for the examination of these teaching notes; If judge it is not maloperation, proceed to step (a-3);
(a-3) read working specification corresponding in experts database, analyze and judge that whether student's operation is consistent with the working specification that in experts database, this equipment is corresponding, if inconsistent, automatically generate the training record of student's working specification mistake, deduct the deduction of points value of the predefined working specification mistake of teaching notes simultaneously.
(a-4) by teaching notes setting operation class total points, deduct the mark of working specification mistake deduction, obtain student's operation and assess to obtain score value.
4. method of student's operation being carried out intelligent evaluation in training system according to claim 3, it is characterized in that, described grid equipment working specification experts database comprises the be incorporated into the power networks bypass replacement working specification of working specification and equipment of all kinds overhaul of the equipments working specification, all kinds equipment cold standby working specification, all kinds equipment stand-by heat working specification, all kinds equipment.
5. method of student's operation being carried out intelligent evaluation in training system according to claim 1, it is characterized in that, described b) operation of power networks index being assessed to the safety indexes, the reliability index of operation of power networks and the economic index of operation of power networks that comprise operation of power networks assesses
First, according to electric pressure, device type and the out-of-limit degree of equipment in net, the artificial safety loading coefficient that defines in batches whole network equipment; According to the distribution situation of network load, artificial batch is set the whole network load type, comprises a type load, two type loads and three type loads, and defines the reliability coefficient of dissimilar load; According to user's requirements definition economy coefficient, and provide the economy examination threshold value of the whole network loss;
Then, the safety indexes of operation of power networks is assessed, is comprised the following steps:
(b-1) each equipment of training system searching loop, reads the trend of each equipment in student training system, comprises that the meritorious measurement of dissimilar equipment, idle measurement, voltage measure and current measurement;
(b-2) read online the operation limit value of each equipment of student training system, and analyze the relatively size of this equipment trend and its limit value, if equipment trend is greater than its limit value, assert that this equipment is out-of-limit, and in the database of training system, increase out-of-limit record that should equipment, add up out-of-limit amount and out-of-limit cumulative time, all out-of-limit records generate security statistical form;
(b-3) after training finishes, read all records of training system security statistical form, calculate the mark of current safety deduction, specific formula for calculation is as follows:
R s = Σ i = 1 n u i * va ci va si * t ci
Wherein, R sfor security deduction of points summation, n is the out-of-limit total quantity of equipment in training process, u ibe i secondary device when out-of-limit, the safety loading coefficient of corresponding out-of-limit equipment, va cibe i secondary device when out-of-limit, the current measuring value of out-of-limit equipment, va sibe i secondary device when out-of-limit, the limit value of out-of-limit equipment, t cibe i secondary device when out-of-limit, the out-of-limit duration of equipment;
Security examination must be divided into: safety evaluation item total points-R s;
Reliability index to operation of power networks is assessed, and comprises the following steps:
(b-4) operation of real time monitoring student in training process, this operation of topological analysis causes load and the size thereof of power-off, and the dead electricity payload of this operational correspondence and dead electricity cumulative time are recorded in the database of training system, all records form reliability statistics table;
(b-5) after training finishes, according to all records in reliability statistics table, calculate the mark of current reliability deduction, specific formula for calculation is as follows:
Wherein, C sfor electric network reliability deduction of points summation, m is the total quantity of student's operation in training process, be the reliability coefficient of the load point of i bar student operation, P ibe the dead electricity load value size of i bar student operation, τ iit is the load dead electricity duration of i bar student operation;
Reliability Check must be divided into: reliability assessment item total points-C s;
Economic index to operation of power networks is assessed, and comprises the following steps:
(b-6) operation of real time monitoring student in training process, the situation of change of the whole network network loss value before and after comparative analysis operation, if the network loss value after student's operation deducts the preoperative network loss value of student and is greater than the economy examination threshold value that teaching notes are set, in the database of training system, increase by one to the record that should operate, and situation of change and the out-of-limit time of network loss of record operation front and back network loss, all out-of-limit operation notes form economy statistical form;
(b-7) after training finishes, according to all records in economy statistical form, calculate the mark of current economy deduction, specific formula for calculation is as follows: E s = Σ i = 1 k φ i * L ci L si * Δ i
Wherein, E sfor electrical network economy deduction of points summation, k is the out-of-limit total quantity of network loss in training process, Δ ibe the i time out-of-limit time of network loss, φ ibe the economy coefficient of the i time out-of-limit electrical network of network loss, L cibe that the i time out-of-limit student of network loss operates rear network loss size, L sibe that the i time out-of-limit student of network loss operates front network loss size;
Economy examination must be divided into: economic evaluation item total points-E s.
6. method of student's operation being carried out intelligent evaluation in training system according to claim 1, is characterized in that, described c) accident prediction is carried out to analysis and evaluation comprise the following steps:
(c-1) make accident prediction, extract the whole accident teaching notes in teaching notes, and formulate detailed accident treatment prediction scheme according to the concrete accident of teaching notes, and define every kind of given score of processing prediction scheme, the last mode with prediction scheme file and accident teaching notes information bundle preserves;
(c-2) in training process, in-service monitoring student is triggered to all operations in the accident predetermined processing deadline from accident, read the accident teaching notes of current time, and student's operation is analyzed with accident prediction, whether the mode that detects comparison student processing accident meets a kind of in accident prediction, if so, record the given score of this accident pretreating scheme; If do not meet any one accident prediction, this accident treatment assesses to such an extent that be divided into zero;
(c-3) after training finishes, calculate the PTS of accident prediction analysis item, specific formula for calculation is as follows:
Wherein, S sfor teaching notes accident treatment PTS, k is teaching notes total number of accident, S ifor student processes the score of i accident of teaching notes.
CN201410222723.6A 2014-05-23 2014-05-23 Method for conducting intelligent evaluation on student operation in training system Active CN103996099B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410222723.6A CN103996099B (en) 2014-05-23 2014-05-23 Method for conducting intelligent evaluation on student operation in training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410222723.6A CN103996099B (en) 2014-05-23 2014-05-23 Method for conducting intelligent evaluation on student operation in training system

Publications (2)

Publication Number Publication Date
CN103996099A true CN103996099A (en) 2014-08-20
CN103996099B CN103996099B (en) 2017-04-12

Family

ID=51310258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410222723.6A Active CN103996099B (en) 2014-05-23 2014-05-23 Method for conducting intelligent evaluation on student operation in training system

Country Status (1)

Country Link
CN (1) CN103996099B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105513449A (en) * 2015-12-22 2016-04-20 国家电网公司 Comprehensive evaluation method for power grid regulating and controlling integral simulating training system
CN105814620A (en) * 2014-10-09 2016-07-27 约翰·皮埃尔·科克 A portable electronic test device and a method of using same
CN107293174A (en) * 2017-07-07 2017-10-24 积成电子股份有限公司 Distribution network failure based on track battle array judges training evaluation method
CN107507098A (en) * 2017-07-07 2017-12-22 积成电子股份有限公司 Distribution network load based on track battle array turns for training evaluation method
CN108831228A (en) * 2018-06-01 2018-11-16 王雨杨 Experimental implementation assessment method and system based on DIS
CN109523857A (en) * 2018-12-10 2019-03-26 国网河北省电力有限公司培训中心 The determination method and device of substation's pending operation
CN111369140A (en) * 2020-03-04 2020-07-03 四川宇德中创信息科技有限公司 Teaching evaluation system and method
CN111739373A (en) * 2020-07-09 2020-10-02 国网天津市电力公司 Intelligent evaluation method of regulation and control simulation training system based on regulation and control cloud
CN112216167A (en) * 2020-11-09 2021-01-12 华能国际电力股份有限公司日照电厂 Booster station simulation operation automatic scoring system, method and equipment
CN114421615A (en) * 2021-12-28 2022-04-29 厦门市同耀电器实业有限公司 Control method and system for improving maintenance safety factor of distribution box

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102024091A (en) * 2009-09-17 2011-04-20 上海市电力公司超高压输变电公司 Intelligent evaluation system for simulation training in substation based on terminal logics
CN103136975A (en) * 2011-12-02 2013-06-05 北京清大高科系统控制有限公司 Statistic marking method of power grid interconnection training simulation system
CN103378597A (en) * 2012-04-18 2013-10-30 上海博英信息科技有限公司 Inductive regional power grid accident exercise system
CN103617760A (en) * 2013-09-29 2014-03-05 江苏省电力公司 Power distribution network DTS (Dispatcher Training Simulation) simulation system and simulation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102024091A (en) * 2009-09-17 2011-04-20 上海市电力公司超高压输变电公司 Intelligent evaluation system for simulation training in substation based on terminal logics
CN103136975A (en) * 2011-12-02 2013-06-05 北京清大高科系统控制有限公司 Statistic marking method of power grid interconnection training simulation system
CN103378597A (en) * 2012-04-18 2013-10-30 上海博英信息科技有限公司 Inductive regional power grid accident exercise system
CN103617760A (en) * 2013-09-29 2014-03-05 江苏省电力公司 Power distribution network DTS (Dispatcher Training Simulation) simulation system and simulation method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张巍: "变电站故障处理培训指导系统的研究", 《中国优秀硕士学位论文全文数据库(工程科技II辑)》 *
魏祥禄: "变电仿真培训系统设计及应用", 《中国优秀硕士学位论文全文数据库(工程科技II辑)》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105814620A (en) * 2014-10-09 2016-07-27 约翰·皮埃尔·科克 A portable electronic test device and a method of using same
CN105513449A (en) * 2015-12-22 2016-04-20 国家电网公司 Comprehensive evaluation method for power grid regulating and controlling integral simulating training system
CN107507098B (en) * 2017-07-07 2020-06-09 积成电子股份有限公司 Power distribution network load transfer training evaluation method based on track array
CN107507098A (en) * 2017-07-07 2017-12-22 积成电子股份有限公司 Distribution network load based on track battle array turns for training evaluation method
CN107293174A (en) * 2017-07-07 2017-10-24 积成电子股份有限公司 Distribution network failure based on track battle array judges training evaluation method
CN108831228A (en) * 2018-06-01 2018-11-16 王雨杨 Experimental implementation assessment method and system based on DIS
CN109523857A (en) * 2018-12-10 2019-03-26 国网河北省电力有限公司培训中心 The determination method and device of substation's pending operation
CN111369140A (en) * 2020-03-04 2020-07-03 四川宇德中创信息科技有限公司 Teaching evaluation system and method
CN111369140B (en) * 2020-03-04 2024-02-27 四川宇德中创信息科技有限公司 Teaching evaluation system and method
CN111739373A (en) * 2020-07-09 2020-10-02 国网天津市电力公司 Intelligent evaluation method of regulation and control simulation training system based on regulation and control cloud
CN112216167A (en) * 2020-11-09 2021-01-12 华能国际电力股份有限公司日照电厂 Booster station simulation operation automatic scoring system, method and equipment
CN114421615A (en) * 2021-12-28 2022-04-29 厦门市同耀电器实业有限公司 Control method and system for improving maintenance safety factor of distribution box
CN114421615B (en) * 2021-12-28 2023-11-28 厦门市同耀电器实业有限公司 Control method and system for improving maintenance safety coefficient of distribution box

Also Published As

Publication number Publication date
CN103996099B (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN103996099A (en) Method for conducting intelligent evaluation on student operation in training system
CN105653764A (en) Method for online estimating and pre-warning grid safety accident risk levels
CN103954925B (en) A kind of fault oscillograph dynamic testing method based on RTDS real-time simulation
CN105678469A (en) Risk assessment method for relay protection equipment in intelligent substation
Soltani et al. Simultaneous robust state estimation, topology error processing, and outage detection for unbalanced distribution systems
CN105205244B (en) Loop Closing Operation analogue system based on electromechanics-electromagnetism hybrid simulation technology
CN105606931A (en) Quantum-genetic-algorithm-based fault diagnosis method for medium-voltage distribution network
CN105447774A (en) Power grid safety accident risk grade online evaluation and early warning method and apparatus
CN106093636B (en) The analog quantity check method and device of the secondary device of smart grid
Kincic et al. Bridging the gap between operation and planning models in WECC
CN102930408B (en) A kind of 750kV electric grid secondary equipment state appraisal procedure based on information fusion
Chalishazar et al. Augmenting the traditional bus-branch model for seismic resilience analysis
Dagle Postmortem analysis of power grid blackouts-the role of measurement systems
CN104900109A (en) Power grid anti-accident maneuver process graphic presentation method
Roland et al. Reliability prediction of Port Harcourt electricity distribution network using NEPLAN
CN102968668A (en) Urban power distribution network evaluation system and method
dos Santos et al. Reliability and availability analysis methodology for power system protection schemes
CN206292365U (en) Relay protection operation case actuating of relay characteristic tester and its automatic wire-changing device
Guo et al. Reliable life calculation of circuit breaker based on FTA and reliability function
Huang et al. Extracting substation cyber-physical architecture through intelligent electronic devices' data
Azmi et al. Implementation of advanced real-time simulation platform for testing and validation of pmu-based applications in large-scale power system
CN104899453A (en) State evaluation and risk assessment method of breaker
Wang et al. An application example for on-line DSA systems
Biswas et al. Performance analysis of a new synchrophasor based real time voltage stability monitoring (RT-VSM) tool
Chen et al. Voltage sags frequency assessment considering the coordination of protection system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA

Effective date: 20140808

Owner name: NORTH CHINA BRANCH OF STATE GRID CORPORATION NARI

Free format text: FORMER OWNER: NARI TECHNOLOGY DEVELOPMENT CO., LTD. NORTH CHINA BRANCH OF STATE GRID CORPORATION

Effective date: 20140808

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100031 XICHENG, BEIJING TO: 210061 NANJING, JIANGSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140808

Address after: High road high tech Zone of Nanjing City, Jiangsu Province, No. 20 210061

Applicant after: NARI Technology Development Co., Ltd.

Applicant after: North China Branch of State Grid Corporation

Applicant after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: NARI Technology Development Co., Ltd.

Applicant before: North China Branch of State Grid Corporation

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Zhongda

Inventor after: Luo Yazhou

Inventor after: Zhang Jian

Inventor after: Liu Zhibin

Inventor after: Dai Zemei

Inventor after: Xie Xu

Inventor after: Niu Siqing

Inventor after: Gao Zonghe

Inventor after: Zhang Zhe

Inventor after: Qian Jiangfeng

Inventor after: Liu Jian

Inventor after: Lu Jinjun

Inventor before: Wang Zhongda

Inventor before: Luo Yazhou

Inventor before: Zhang Jian

Inventor before: Liu Zhibin

Inventor before: Lu Jinjun

Inventor before: Niu Siqing

Inventor before: Zhang Zhe

Inventor before: Qian Jiangfeng

Inventor before: Xie Xu

Inventor before: Gao Zonghe

Inventor before: Liu Jian

Inventor before: Dai Zemei

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant