CN103994752B - Automatic measurement and guidance system and automatic measurement and guidance method related to pipe pushing construction - Google Patents
Automatic measurement and guidance system and automatic measurement and guidance method related to pipe pushing construction Download PDFInfo
- Publication number
- CN103994752B CN103994752B CN201410246863.7A CN201410246863A CN103994752B CN 103994752 B CN103994752 B CN 103994752B CN 201410246863 A CN201410246863 A CN 201410246863A CN 103994752 B CN103994752 B CN 103994752B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- pipe
- prism
- measurement
- push
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C1/00—Measuring angles
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410246863.7A CN103994752B (en) | 2014-06-05 | 2014-06-05 | Automatic measurement and guidance system and automatic measurement and guidance method related to pipe pushing construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410246863.7A CN103994752B (en) | 2014-06-05 | 2014-06-05 | Automatic measurement and guidance system and automatic measurement and guidance method related to pipe pushing construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103994752A CN103994752A (en) | 2014-08-20 |
CN103994752B true CN103994752B (en) | 2017-04-26 |
Family
ID=51308984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410246863.7A Active CN103994752B (en) | 2014-06-05 | 2014-06-05 | Automatic measurement and guidance system and automatic measurement and guidance method related to pipe pushing construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103994752B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104251688B (en) * | 2014-09-25 | 2016-08-24 | 陕西华山路桥工程有限公司 | Pipe-jacking project utilizes laser straight line orientation survey engineering method |
CN105202261A (en) * | 2015-11-04 | 2015-12-30 | 上海十三冶建设有限公司 | Device for measuring and controlling jacking direction during pipe jacking and usage method of device |
CN106123776B (en) * | 2016-07-08 | 2019-03-01 | 上海市政建设有限公司 | A kind of push pipe intelligence jacking measuring system and measurement method |
CN108334689B (en) * | 2018-01-29 | 2021-11-09 | 四川科宏石油天然气工程有限公司 | Method for automatically realizing longitudinal design of pipeline |
CN108625302B (en) * | 2018-05-11 | 2020-06-02 | 东南大学 | Adjusting device for box culvert jacking longitudinal gradient and monitoring control method thereof |
CN110397789B (en) * | 2019-07-08 | 2020-12-25 | 中铁创通建设集团有限公司 | Guide rod auxiliary device for artificial pipe jacking and use method thereof |
CN111197486A (en) * | 2020-01-18 | 2020-05-26 | 广州鑫唐夏信息科技有限公司 | Push bench guiding method based on machine vision |
CN112902845B (en) * | 2021-03-04 | 2022-07-08 | 黄河勘测规划设计研究院有限公司 | Track type pipe jacking automatic guiding method |
CN114061650B (en) * | 2021-09-22 | 2023-01-17 | 中国地质大学(武汉) | Intelligent monitoring system and method for pipe jacking construction |
CN114111759A (en) * | 2021-11-04 | 2022-03-01 | 中国煤炭科工集团太原研究院有限公司 | Mine positioning robot and positioning method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100504029C (en) * | 2004-02-18 | 2009-06-24 | 华中科技大学 | Electronic laser target of tunnel digging construction guiding system |
CN102937437A (en) * | 2012-11-21 | 2013-02-20 | 中国铁建重工集团有限公司 | Total station prism group, tube push bench guide system for tunnel construction and guide method of tube push bench guide system |
CN203422091U (en) * | 2013-06-06 | 2014-02-05 | 上海米度测量技术有限公司 | Device for dynamically measuring positions and attitudes of push bench in real time |
CN103322989A (en) * | 2013-06-06 | 2013-09-25 | 上海米度测量技术有限公司 | Measuring device and method of dynamic real-time measurement of position and posture of pipe pushing jack |
CN204007587U (en) * | 2014-06-05 | 2014-12-10 | 中铁上海工程局集团有限公司 | A kind of automatic measurement guidance system about jacking construction |
-
2014
- 2014-06-05 CN CN201410246863.7A patent/CN103994752B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103994752A (en) | 2014-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103994752B (en) | Automatic measurement and guidance system and automatic measurement and guidance method related to pipe pushing construction | |
CN204007587U (en) | A kind of automatic measurement guidance system about jacking construction | |
CN107300369B (en) | Shield/TBM hob abrasion measurement device and measurement method | |
CN104878701B (en) | Underneath pass existing railway bridge and culvert jacking horizontal guiding and deviation correcting system | |
CN102953304B (en) | Precision measurement control method of metro track structure construction | |
CN106123776B (en) | A kind of push pipe intelligence jacking measuring system and measurement method | |
CN108444432B (en) | Existing railway line control network and track line shape synchronous measurement method | |
CN102937437A (en) | Total station prism group, tube push bench guide system for tunnel construction and guide method of tube push bench guide system | |
CN102778226B (en) | Calibration method for waist line of underground long-distance tunnel | |
CN109931958B (en) | UWB-based coal mining machine working face end calibration device and method | |
CN110017817B (en) | Coal mine roadway navigation positioning method and device based on roof characteristics | |
CN104762883A (en) | Matching measurement method used during bridge precasting with stud matching method | |
CN205300569U (en) | Tunnel deformation monitoring device and system | |
CN102095401A (en) | Long-distance shield tunnel breakthrough survey method | |
CN109115176B (en) | Movable three-dimensional laser scanning system | |
CN105973141A (en) | Device and method of measuring shield tunnel segment dislocation | |
CN111089542A (en) | Landslide surface and deep displacement combined monitoring system and method | |
CN103884324B (en) | The orientation measurement method of underground pipeline jacking crossing construction | |
CN105628000A (en) | Mine shaft coordinate transmitting and measuring method | |
CN102518013A (en) | Method for construction of measurement and pavement of GRP (ground reference point) of ballastless track reference network | |
CN106066177A (en) | Shield automatic guiding system measures manual review's method | |
CN203893840U (en) | High-precision fixed composite level gauge | |
CN107644119B (en) | Automatic half-porosity calculation method based on three-dimensional scanning point cloud | |
CN105652866A (en) | Automatic measurement and error correcting system for heading machine | |
CN105627985A (en) | Mine shaft elevation transmission method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200436, No. three, 278 Road, Zhabei District, Shanghai Co-patentee after: China Railway Municipal Environmental Construction Co.,Ltd. Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC Address before: 200436, No. three, 278 Road, Zhabei District, Shanghai Co-patentee before: China Railway Shanghai Engineering Bureau Group Municipal Engineering Co.,Ltd. Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200527 Address after: 200331 A District, building 88, Lane 3, Wuwei Road, Shanghai, Putuo District, China Patentee after: China Railway Municipal Environmental Construction Co.,Ltd. Address before: 200436, No. three, 278 Road, Zhabei District, Shanghai Co-patentee before: China Railway Municipal Environmental Construction Co.,Ltd. Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC |
|
TR01 | Transfer of patent right |