Long-distance shield structure method tunnel holing through measuring method
Technical field
The present invention is the construction survey technology in a kind of shield tunnel, relates to the accurate holing-through survey method of a kind of speciality shield tunnel based on the sagging steel wire in vertical jacking hole.
Background technology
Shield tunnel is to be tunneled in the soil body by shield machine to finish construction; shield machine be one by the knife cutting soil body; provide the workplace protection by cylindric box hat; relying on the section of jurisdiction that is assembled into ring in the box hat awards the lifting jack group that is circle-shaped layout and provides support; promote forward by lifting jack then, thereby be implemented in the large-scale machine that advances in the soil body.In the process of underground work, the movement locus of shield machine will basically form the actual axis of subterranean tunnel trend, the actual axis in engine request tunnel should be tried one's best approaching or be fitted like a glove design axis (DTA), with the quality of assurance Tunnel Engineering, thus the safety after guarantee road tunnel tunnel builds up.Simultaneously, shield tunnel must enter into accurately in the default steel portal circle, otherwise can shine into huge risk and loss when finally arriving received well.Therefore the real time position of shield machine must be accurately controlled in the shield tunnel construction in strict accordance with the design axis, guarantees that the tunnel after the follow-up moulding adheres to specification, and finally instructs shield machine accurately to pass steel portal circle and enters received well.
Instruct the shield machine working direction, need the shield-tunneling construction measuring technique, prior art is that ground coordinate is delivered in the tunnel by shaft connection survey, and in the tunnel, lay open traverse, utilize the DATA REASONING shield machine of open traverse to be laid in survey mark on the shield structure y direction, last relation according to survey mark and shield machine rostral-caudal center, calculate the head of shield machine, the three-dimensional coordinate at afterbody center, relatively they with Tunnel Design axis (DTA) between deviation, thereby instruct shield machine well to advance along designing axis.
But, because the existence of measuring error, tunnel for overlength, after open traverse length reaches certain-length, measuring error will slowly be accumulated to and exceed the Tunnel Design requirement, thereby can not enter received well smoothly, according to becoming engineering great risk and loss, perhaps can only adopt expensive high accuracy gyroscope instrument and this instrument can not guarantee the deficiency that the tunnel absolutely connects fully because domestic application is few, prior art cost height, efficient are low, can't be applicable to the over distance shield tunnel.
Summary of the invention
Fundamental purpose of the present invention is: a kind of low cost is provided, and high-level efficiency, visual results is applicable to the accurate holing-through survey method in ultra long haul shield method tunnel.
For achieving the above object, the invention provides a kind of long-distance shield structure method tunnel holing through measuring method, may further comprise the steps:
1) vertical jacking hole construction;
2) hang the steel wire plumb bob: hang in a steel wire to tunnel bottom from ground by starting well and vertical jacking hole respectively, and insert in the oil drum of tunnel bottom sinking behind the colligation iron plumb bob until steadily;
3) measure actual range and true bearing angle between two steel wires: the actual cities coordinate of two steel wires in ground observation starting well and vertical jacking hole, and calculate two actual range and true bearing angles between the steel wire;
4) carrying out underground conducting wire measures: the Construction control lead is set in the tunnel, and on described lead, get a plurality of measurement points, with starting well and two steel wires in the vertical jacking hole is starting point and the terminal point of measuring lead, measures the position angle and the distance of each measurement point of whole tunnel internal Construction control lead;
5) measuring achievement calculates: the position angle of suppose the interior steel wire of starting well first measurement point of Construction control lead in the tunnel is 90 °, the position angle and the distance of each measurement point of the tunnel inside conductor that records according to step 4, calculate the city increment of coordinate of each measurement point of lead and vertical jacking hole place steel wire, inverse goes out in the tunnel distance and bearing angle of two steel wires in the starting well and vertical jacking hole;
6) the attitude of shield machine data before revise connecting according to calculating achievement: the difference value of measuring the distance and bearing angle between two steel wires that the ground actual measurement calculates in the calculating of achievement and the step 3 according to tunnel internal in the step 5, by calculating adjustment, the final optimization data of determining Construction control lead in the tunnel, remeasure shield attitude according to these data then, draw shield attitude more accurately, finally instruct shield machine accurately to arrive the received well or the predetermined area;
Described step 6 further may further comprise the steps:
In the tunnel that inverse goes out in distance in starting well that draws according to the actual cities coordinate Calculation in the definition step 3 and the vertical jacking hole between two steel wires and the step 5 in starting well and the vertical jacking hole ratio of the distance of two steel wires be R; And the starting well that draws according to the actual cities coordinate Calculation in the position angle of two steel wires and the step 3 in starting well and the vertical jacking hole in the tunnel that inverse goes out in the step 5 and vertically in the jacking hole the azimuthal difference between two steel wires be △ A;
The position angle of measurement point in the tunnel lead is deducted △ A, and according to carrying out distance correction, the distance and bearing angle between each measurement point of the lead that must make new advances between R each measurement point to the tunnel inside conductor;
By calculating, draw the increment of coordinate value and the coordinate of each measurement point of the Construction control lead tunnel in again, draw shield attitude more accurately, when making construction to vertical jacking hole, the coordinate of its cable wire is consistent with the ground actual measured value.
The present invention has low cost, efficient height, advantage effective and applied widely, can optimize Control Survey for Construction lead in the tunnel fast accurately, reach the effect of obtaining shield attitude more accurately, guaranteeing the Tunnel Engineering quality, be applicable to improve and satisfy all types of shield method length of vertical jack-up construction condition apart from the tunnel holing through precision.
Description of drawings
Fig. 1 is the overall schematic of tunnel vertical jacking hole measurement method; And
Fig. 2 is the synoptic diagram of measuring steel wire coordinate.
Embodiment
Present embodiment has adopted technical method of the present invention to construct, and provided detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
This specific embodiment is an example with certain shield tunnel construction, and this project adopts the shield-tunneling construction of diameter phi 7.5m, and shield structure main frame length overall is a 9m rice, tunneling shield driving total length 7.5km; And use vertical jacking measuring method of the present invention and realize accurately connecting (in the example, calculate, change 7.5km into 750 m) for simplifying.This instrumentation plan as depicted in figs. 1 and 2, particular content is as follows:
1) vertical jacking hole construction;
2) hang the steel wire plumb bob: hang in a Φ 0.3 mm steel wire 11,21 to tunnel bottom from ground by starting well 10 and vertical jacking hole 20 respectively, and insert in the oil drum of tunnel bottom sinking behind the colligation 30kg iron plumb bob 12,22 until steadily;
3) actual range and the true bearing angle between two steel wires of measurement: utilize tunnel terrestrial net data, adopt the surveying instrument actual cities coordinate of two steel wires in ground observation starting well and vertical jacking hole respectively, and calculate two actual range and true bearing angles between the steel wire; Present embodiment obtains steel wire coordinate in the starting well by this step: X1=+1230.880, Y1=+674.350; Steel wire coordinate in the vertical jacking hole: X2=+1845.690, Y2=+1039.980; Calculate the actual range between steel wire 11 and 21: S=+715.78, true bearing angle A=30 ° 48 ' 07 ";
4) carrying out underground conducting wire measures: the Construction control lead is set in the tunnel, and on described lead, get a plurality of measurement points 30,40,50,60, serves as starting point and the terminal point of measuring lead with starting well 10 with vertical jacking hole 20 interior two steel wires 11,21, measure the position angle and the distance of each measurement point of whole tunnel internal Construction control lead, obtain data as described in Table 1;
Table 1
5) measuring achievement calculates: the position angle of suppose the interior steel wire 11 of starting well 10 first measurement point 30 of Construction control lead in the tunnel is 90 °, the position angle and the distance of each measurement point of the tunnel inside conductor that records according to step 4, calculate city increment of coordinate (the △ X of each measurement point of lead and vertical jacking hole 20 place's steel wires 21, △ Y), inverse go out starting well 10 and vertical jacking hole 20 interior two steel wires 11,21 in the tunnel apart from S '=715.79 m and position angle A '=77 ° 44 ' 08 ", obtain data as shown in table 2;
Table 2
6) the attitude of shield machine data before revise connecting according to calculating achievement: in the tunnel that inverse goes out in the distance in starting well that draws according to the actual cities coordinate Calculation in the definition step 3 and the vertical jacking hole between two steel wires and the step 5 in starting well and the vertical jacking hole ratio of the distance of two steel wires be R, R=S ÷ S '=0.999986; And the starting well that draws according to the actual cities coordinate Calculation in the position angle of two steel wires and the step 3 in starting well and the vertical jacking hole in the tunnel that inverse goes out in the step 5 and vertically in the jacking hole the azimuthal difference between two steel wires be △ A, △ A=A '-A=46 ° 56 ' 01 "; The position angle of measurement point in the tunnel lead 30,40,50,60 is deducted △ A, and according to carrying out distance correction, the distance and bearing angle between each measurement point of the lead that must make new advances between R each measurement point to the tunnel inside conductor; By calculating, again draw the increment of coordinate value and the coordinate of each measurement point of Construction control lead in the tunnel, as shown in table 3, draw shield attitude more accurately, remeasure shield attitude according to these data then, draw shield attitude more accurately, finally instruct shield machine accurately to arrive the received well or the predetermined area.
Table 3
In sum, the accurate holing-through survey method of speciality shield tunnel based on vertical jacking hole of the present invention, reach Construction control tracerse survey error in the accurate correction tunnel, accurately definite shield attitude is guaranteed the good result that the tunnel connects smoothly, and having overcome application high accuracy gyroscope instrument increase construction cost and achievement is not absolutely desirable shortcoming, thereby the present invention has efficient height, advantage effective and applied widely, can guarantee that ultra long haul shield method tunnel connects smoothly.