CN103993561A - Pipe assembling device for small-span steel corrugated pipe bridge culvert - Google Patents

Pipe assembling device for small-span steel corrugated pipe bridge culvert Download PDF

Info

Publication number
CN103993561A
CN103993561A CN201410138867.3A CN201410138867A CN103993561A CN 103993561 A CN103993561 A CN 103993561A CN 201410138867 A CN201410138867 A CN 201410138867A CN 103993561 A CN103993561 A CN 103993561A
Authority
CN
China
Prior art keywords
horizontal
hydraulic
upset
arm
sucker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410138867.3A
Other languages
Chinese (zh)
Other versions
CN103993561B (en
Inventor
周世生
孙文龙
薛二平
李文华
陈旭东
叶春琳
苏东青
马瑞
蔡玮
张鹏
李凌宜
郭冬春
孙建波
叶锦华
樊宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Administration Road And Bridge Ltd Co
Beijing Municipal Road and Bridge Co Ltd
Original Assignee
Beijing Municipal Administration Road And Bridge Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Administration Road And Bridge Ltd Co filed Critical Beijing Municipal Administration Road And Bridge Ltd Co
Priority to CN201410138867.3A priority Critical patent/CN103993561B/en
Publication of CN103993561A publication Critical patent/CN103993561A/en
Application granted granted Critical
Publication of CN103993561B publication Critical patent/CN103993561B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a pipe assembling device for a small-span steel corrugated pipe bridge culvert and belongs to the field of installation of a bridge culvert structure. The pipe assembling device comprises a hydraulic sucker telescopic boom system, a 360-degree turnover horizontal telescopic boom system, a vertical lifting system, an intelligent control system and a walking and fixing supporting system. According to the pipe assembling device, a traditional mechanical control mode and an electric control mode are adopted, quick assembling of small-span steel corrugated pipes is achieved, the assembling efficiency is improved, and the pipe assembling device is applicable to upgrading and reconstruction of a newly-built small-span steel corrugated pipe bridge culvert and an old bridge culvert. According to the pipe assembling technology, the automatic control technology is adopted, continuous and automated assembling of the small-span steel corrugated pipes is achieved, the defect that the traditional manual assembling operation is unsafe is overcome, and the safe use performance of the pipe assembling device is greatly promoted. Components used in the pipe assembling device are all finished products in the prior art or finished products which can be purchased in a market and have no special structural requirements.

Description

A kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device
Technical field
The present invention relates to a kind of littlely of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, belong to bridges and culverts structure installing area.
Background technology
Within 1896, the U.S. takes the lead in carrying out corrugated steel pipe passage, the feasibility study of Steel Corrugated Pipe Culvert, nineteen twenty-three, american railway engineering association carried out entity test at the central railway applications corrugated steel pipe passage of Illinois, nineteen twenty-nine, Canada's seat of honour corrugated steel pipe was for a colliery, within 1931, Australia builds up one of 8 meters of corrugated steel pipe automobile passage first, nineteen ninety Japanese expressway design norm-setting corrugated steel pipe designing technique standard, along with increasing corrugated steel pipe installing and using all over the world, proved the versatility of this kind of structure under the various service condition, and its life-span has surpassed projected life.China's metallic steel corrugated culvert is progressively in highway engineering territory, to use after calendar year 2001, by the market development in recent years, now in the highway construction of the provinces, cities and regions such as Hebei, the Inner Mongol, Qinghai, Ningxia, Xinjiang, Tibet, be used widely.
Culvert (foot bridge) the corrugated steel pipe moulding of China's diameter (across footpath) over 3 meters all adopts pipe sheet assembling, and each circumferencial direction approximately has 4-15 blocks of plates to form, and Ban Yu plate lap-joint adopts high-strength bolt fastening.For Steel Corrugated Pipe Culvert main employing mobile crane cooperation in pipe sheet assembling construction of assembled design, manually setting up simple steel pipe scaffold mode at present carries out, the every ring concatenation construction of Performance Test of Corrugated Steel Culvert speed is slower, the operation of piece overlap joint should not be controlled, manually, equipment investment is larger, pipe sheet assembling efficiency is low, and construction safety risk is larger.
Summary of the invention
The problem existing for existing assembling technique, the object of the present invention is to provide a kind of corrugated steel pipe bridges and culverts pipe sheet assembling device, this device is realized the little accurate location across footpath corrugated steel pipe and is freely adjusted by the effect of hydraulic control and control system, realizes the assembled safely and fast of section of jurisdiction.
For achieving the above object, the technical solution used in the present invention is a kind of corrugated steel pipe bridges and culverts pipe sheet assembling device, a kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, this device comprises horizontal rotating chassis, hydraulic pump and fuel tank, vertical telescopic oil cylinder, horizontal fixed frame, upset hydraulic motor, locating cover, telescopic oil cylinder, horizontal fixed arm, 360 ° of upset horizontal extension arms, sucker hydraulically extensible oil cylinder, sucker hydraulic telescopic arm, intelligence control system, running gear, fixed support system, magnechuck, positioning component, fixed support, horizontal support platform, Y shape supports, this device comprises sucker hydraulically extensible arm system, 360 ° of upset horizontal extension arm systems, vertical lifting system, intelligence control system, walking and fixed support systems.
Compared with prior art, the present invention has following beneficial effect.
1, the present invention adopts traditional mechanical type to control and electrical control, has realized the little quick-assembling across footpath corrugated steel pipe, has promoted assembled efficiency, is applicable to newly-built little of footpath corrugated steel pipe bridges and culverts and the old bridges and culverts project of upgrading and rebuilding.
2, this device can adopt automatic control technology, realizes and across the splicing of footpath corrugated steel pipe continuous and automatic, has overcome the unsafe defect of traditional manual concatenation to little, has greatly promoted its safe application performance.
3, the element of system of the present invention is the finished product that can buy on prior art or market, without special construction requirement.
Accompanying drawing explanation
Fig. 1 is system construction drawing of the present invention.
Fig. 2 is HYDRAULIC CONTROL SYSTEM schematic diagram.
In figure: 1, horizontal rotating chassis, 2, hydraulic pump and fuel tank, 3, vertical telescopic oil cylinder, 4, horizontal fixed frame, 5, upset hydraulic motor, 6, locating cover, 7, telescopic oil cylinder, 8, horizontal fixed arm, 9,360 ° of upset horizontal extension arms, 10, sucker hydraulically extensible oil cylinder, 11, sucker hydraulic telescopic arm, 12, intelligence control system, 13, running gear, 14, fixed support system, 15, magnechuck, 16, positioning component, 17, fixed support, 17.1, horizontal support platform, 17.2, Y shape supports, 18, hydraulic electromagnetic change valve; 19, constant pressure valve; 20, overflow valve.
The specific embodiment
As shown in Figure 1, little of a footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, this device comprises that horizontal rotating chassis 1, hydraulic pump and fuel tank 2, vertical telescopic oil cylinder 3, horizontal fixed frame 4, upset hydraulic motor 5, locating cover 6, telescopic oil cylinder 7, horizontal fixed arm 8,360 ° of upset horizontal extension arms 9, sucker hydraulically extensible oil cylinder 10, sucker hydraulic telescopic arm 11, intelligence control system 12, running gear 13, fixed support system 14, magnechuck 15, positioning component 16, fixed support 17, horizontal support platform 17.1, Y shapes support 17.2; This device comprises sucker hydraulically extensible arm system, 360 ° of upset horizontal extension arm systems, vertical lifting system, intelligence control system, walking and fixed support systems.
Described vertical lifting system comprises fixed support 17, vertical telescopic oil cylinder 3, hydraulic pump and fuel tank 2; Fixed support 17 and the fixing welding of horizontal rotating chassis 1, fixed support 17 is the hydraulic telescopic arm of two joint structures, and is controlled by the vertical telescopic oil cylinder 3 of its inside; Hydraulic pump and fuel tank 2 are fixed on horizontal rotating chassis 1, for hydraulic system provides hydraulic power;
Described fixed support 17 is Y-shaped structure, and the node of described two joint hydraulic telescopic arms is positioned at horizontal support platform 17.1 places, and Y shape supports 17.2 and is fixedly connected with horizontal fixed frame 4; In the time need to regulating the height of horizontal fixed frame 4, hydraulic pump and fuel tank 2 pump into hydraulic oil for system, vertical telescopic oil cylinder 3 promotes Y shape support 17.2 and moves upward, thereby the horizontal fixed frame 4 of promotion moves upward, and realizes the position adjustments of vertical lifting system vertical direction.
Described 360 ° of upset horizontal extension arm systems comprise horizontal fixed frame 4,8,360 ° of upset horizontal extension arms 9 of horizontal fixed arm, telescopic oil cylinder 7, upset hydraulic motor 5, locating cover 6; These 360 ° upset horizontal extension arm systems are three joint hydraulically extensible arm configurations, horizontal fixed frame 4 is a sub-level fixed structure of this three joints hydraulic telescopic arm, horizontal fixed arm 8 and 360 ° upset horizontal extension arm 9 is respectively other two joints of these 360 ° upset horizontal extension arm systems, and the horizontal level that can realize this system regulates, turn over function; Telescopic oil cylinder 7 is located at horizontal fixed frame 4 inside, can regulate the horizontal level of 360 ° of upset horizontal extension arms 9; Upset hydraulic motor 5 can drive 9 rotations of 360 ° of upset horizontal extension arms; One end of horizontal fixed frame 4 is provided with locating cover 6, and upset hydraulic motor 5 is connected with 8,360 ° of upset horizontal extension arms 9 of horizontal fixed arm of horizontal fixed frame 4 inside by locating cover 6; Described horizontal fixed arm 8 is the secondary levels fixed structure of these 360 ° upset horizontal extension arm systems, when preventing 360 ° of upset horizontal extension arm 9 courses of work, because load is uneven, ruptures, mechanical property failure conditions; When these 360 ° upset horizontal extension arm systems need to regulate, hydraulic pump and fuel tank 2 pump into hydraulic oil for system, telescopic oil cylinder 7 promotes 360 ° of upset horizontal extension arms 9 and extends along horizontal level, realizes the horizontal level regulatory function of these 360 ° upset horizontal extension arm systems; In addition, upset hydraulic motor 5 can drive 9 rotations of 360 ° of upset horizontal extension arms, realizes the turn over function of these 360 ° upset horizontal extension arm systems.
Described sucker hydraulically extensible arm system comprises magnechuck 15, sucker hydraulic telescopic arm 11, sucker hydraulically extensible oil cylinder 10, positioning component 16; This sucker hydraulic telescopic arm 11 is two joint hydraulic telescopic arms; Described 360 ° of upset horizontal extension arms 9 are installed fixing with sucker hydraulic telescopic arm 11 by positioning component 16; Sucker hydraulically extensible oil cylinder 10 is placed in sucker hydraulic telescopic arm 11; Magnechuck 15 is connected and fixed with sucker hydraulic telescopic arm 11 one end; In the time need to regulating magnechuck 15 along the position of sucker hydraulic telescopic arm 11 directions, hydraulic pump and fuel tank 2 pump into hydraulic oil for system, sucker hydraulically extensible oil cylinder 10 drives 11 motions of sucker hydraulic telescopic arm, thereby realizes magnechuck 15 along the movement of sucker hydraulic telescopic arm 11; Magnechuck 15 is connected across corrugated steel pipe bridges and culverts section of jurisdiction, footpath with little by electromagnetic attraction effect, realizes the little splicing work across corrugated steel pipe bridges and culverts section of jurisdiction, footpath.
Described walking and fixed support system comprise horizontal rotating chassis 1, running gear 13, fixed support system 14; The fastening devices that described horizontal rotating chassis 1 is whole regulation and control system; Horizontal rotating chassis 1 is connected and fixed with running gear 13, and running gear 13 is connected and fixed with fixed support system 14; Described running gear 13 comprises paralell, wheel, in order to realize support and the movement of this assembled device; Fixed support system 14 comprises four group platform pin, and the duty that is this device by this four group platforms pin provides support, and prevents from toppling, ensure construction safety in this device busy process.
Described control system 12 comprises and horizontally rotates the vertical upset of control module, vertical lifting control module, horizontal extension control module, 360 ° control module, sucking disc arm extension and contraction control modules; This control system can be controlled for PLC, to realize the control to this device circuit, hydraulic valve.
Described magnechuck 15 is realized fixing to section of jurisdiction by control system 12, to guarantee safety.
Described sucker hydraulic telescopic arm 11 can adapt to the bellows of 4-8m diameter.
As shown in Figure 2, be the control principle drawing of hydraulic system.Described hydraulic system comprises hydraulic electromagnetic change valve 18, constant pressure valve 19, overflow valve 20; The hydraulic electromagnetic change valve 18 of 12 pairs of hydraulic systems of control system, constant pressure valve 19, overflow valve 20 are controlled, thereby realize the control to hydraulic system, realize the installation of pipe culvert, control.

Claims (5)

1. one kind little across footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, it is characterized in that: this device comprises horizontal rotating chassis (1), hydraulic pump and fuel tank (2), vertical telescopic oil cylinder (3), horizontal fixed frame (4), upset hydraulic motor (5), locating cover (6), telescopic oil cylinder (7), horizontal fixed arm (8), 360 ° of upset horizontal extension arms (9), sucker hydraulically extensible oil cylinder (10), sucker hydraulic telescopic arm (11), intelligence control system (12), running gear (13), fixed support system (14), magnechuck (15), positioning component (16), fixed support (17), horizontal support platform (17.1), Y shape supports (17.2), this device comprises sucker hydraulically extensible arm system, 360 ° of upset horizontal extension arm systems, vertical lifting system, intelligence control system, walking and fixed support systems,
Described vertical lifting system comprises fixed support (17), vertical telescopic oil cylinder (3), hydraulic pump and fuel tank (2); Fixed support (17) and the fixing welding of horizontal rotating chassis (1), fixed support (17) is the hydraulic telescopic arm of two joint structures, and is controlled by the vertical telescopic oil cylinder (3) of its inside; It is upper that hydraulic pump and fuel tank (2) are fixed on horizontal rotating chassis (1), for hydraulic system provides hydraulic power;
Described fixed support (17) is Y-shaped structure, and the node of described two joint hydraulic telescopic arms is positioned at horizontal support platform (17.1) to be located, and Y shape supports (17.2) and is fixedly connected with horizontal fixed frame (4); In the time need to regulating the height of horizontal fixed frame (4), hydraulic pump and fuel tank (2) pump into hydraulic oil for system, vertical telescopic oil cylinder (3) promotes Y shape support (17.2) and moves upward, thereby promote horizontal fixed frame (4), move upward, realize the position adjustments of vertical lifting system vertical direction;
Described 360 ° of upset horizontal extension arm systems comprise horizontal fixed frame (4), horizontal fixed arm (8), 360 ° of upset horizontal extension arms (9), telescopic oil cylinder (7), upset hydraulic motor (5), locating cover (6); These 360 ° upset horizontal extension arm systems are three joint hydraulically extensible arm configurations, horizontal fixed frame (4) is a sub-level fixed structure of this three joints hydraulic telescopic arm, horizontal fixed arm (8) and 360 ° of upset horizontal extension arms (9) are respectively other two joints of these 360 ° upset horizontal extension arm systems, and the horizontal level that can realize this system regulates, turn over function; Telescopic oil cylinder (7) is located at horizontal fixed frame 4 inside, can regulate the horizontal level of 360 ° of upset horizontal extension arms (9); Upset hydraulic motor (5) can drive 360 ° of upset horizontal extension arms (9) rotation; One end of horizontal fixed frame (4) is provided with locating cover (6), and upset hydraulic motor (5) is connected by locating cover (6) the horizontal fixed arm (8) inner with horizontal fixed frame (4), 360 ° of upset horizontal extension arms (9); Described horizontal fixed arm (8) is the secondary levels fixed structure of these 360 ° upset horizontal extension arm systems, when preventing 360 ° of upset horizontal extension arm (9) courses of work, because load is uneven, ruptures, mechanical property failure conditions; When these 360 ° upset horizontal extension arm systems need to regulate, hydraulic pump and fuel tank (2) pump into hydraulic oil for system, telescopic oil cylinder (7) promotes 360 ° of upset horizontal extension arms (9) and extends along horizontal level, realizes the horizontal level regulatory function of these 360 ° upset horizontal extension arm systems; In addition, upset hydraulic motor (5) can drive 360 ° of upset horizontal extension arms (9) rotation, realizes the turn over function of these 360 ° upset horizontal extension arm systems;
Described sucker hydraulically extensible arm system comprises magnechuck (15), sucker hydraulic telescopic arm (11), sucker hydraulically extensible oil cylinder (10), positioning component (16); This sucker hydraulic telescopic arm (11) is two joint hydraulic telescopic arms; Described 360 ° of upset horizontal extension arms (9) are installed fixing with sucker hydraulic telescopic arm (11) by positioning component (16); Sucker hydraulically extensible oil cylinder (10) is placed in sucker hydraulic telescopic arm (11); Magnechuck (15) is connected and fixed with sucker hydraulic telescopic arm (11) one end; In the time need to regulating magnechuck (15) along the position of sucker hydraulic telescopic arm (11) direction, hydraulic pump and fuel tank (2) pump into hydraulic oil for system, sucker hydraulically extensible oil cylinder (10) drives sucker hydraulic telescopic arm (11) motion, thereby realizes magnechuck (15) along the movement of sucker hydraulic telescopic arm (11); Magnechuck (15) is connected across corrugated steel pipe bridges and culverts section of jurisdiction, footpath with little by electromagnetic attraction effect, realizes the little splicing work across corrugated steel pipe bridges and culverts section of jurisdiction, footpath;
Described walking and fixed support system comprise horizontal rotating chassis (1), running gear (13), fixed support system (14); The fastening devices that described horizontal rotating chassis (1) is whole regulation and control system; Horizontal rotating chassis (1) is connected and fixed with running gear (13), and running gear (13) is connected and fixed with fixed support system (14); Described running gear (13) comprises paralell, wheel, in order to realize support and the movement of this assembled device; Fixed support system (14) comprises four group platform pin, and the duty that is this device by this four group platforms pin provides support, and prevents from toppling, ensure construction safety in this device busy process.
2. according to claim 1 a kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, it is characterized in that: described control system (12) comprises and horizontally rotates the vertical upset of control module, vertical lifting control module, horizontal extension control module, 360 ° control module, sucking disc arm extension and contraction control modules; This control system can be controlled or Based Intelligent Control for PLC, in order to realize the control to this device circuit, hydraulic valve.
3. according to claim 1 a kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, it is characterized in that: described magnechuck (15) is realized fixing to section of jurisdiction by control system (12), to guarantee safety.
4. according to claim 1 a kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, it is characterized in that: described sucker hydraulic telescopic arm (11) can adapt to the bellows of 4-8m diameter.
5. according to claim 1 a kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device, it is characterized in that: described hydraulic system comprises hydraulic electromagnetic change valve (18), constant pressure valve (19), overflow valve (20); Control system (12) is controlled the hydraulic electromagnetic change valve of hydraulic system (18), constant pressure valve (19), overflow valve (20), thereby realizes the control to hydraulic system, realizes the installation of pipe culvert, control.
CN201410138867.3A 2014-04-08 2014-04-08 A kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device Active CN103993561B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410138867.3A CN103993561B (en) 2014-04-08 2014-04-08 A kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410138867.3A CN103993561B (en) 2014-04-08 2014-04-08 A kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device

Publications (2)

Publication Number Publication Date
CN103993561A true CN103993561A (en) 2014-08-20
CN103993561B CN103993561B (en) 2016-06-08

Family

ID=51307877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410138867.3A Active CN103993561B (en) 2014-04-08 2014-04-08 A kind of little of footpath corrugated steel pipe bridges and culverts pipe sheet assembling device

Country Status (1)

Country Link
CN (1) CN103993561B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002837A (en) * 2015-07-24 2015-10-28 中交第一公路勘察设计研究院有限公司 Corrugated steel pipe bridge-culvert segment assembling bracket
CN111365041A (en) * 2020-03-27 2020-07-03 山东建筑大学 Suspension self-moving type full-circumference rotary mounting machine and using method
CN111425216A (en) * 2020-04-09 2020-07-17 山东建筑大学 Composite supporting structure, construction system and method
CN112942110A (en) * 2021-01-21 2021-06-11 北京市政路桥股份有限公司 Convenient and fast movable type bridge centralized drainage pipeline installation operation platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190904441A (en) * 1909-02-23 1909-08-05 George Henry Pedlar Improvements in Corrugated Culvert or Pipe Sections.
US6447206B1 (en) * 2001-06-19 2002-09-10 Faune-Experts Inc. Beaver control screen for culvert pipe
CN102102344A (en) * 2011-01-28 2011-06-22 中铁十七局集团第四工程有限公司 Method for quickly assembling assembled corrugated culvert
CN201952745U (en) * 2011-01-28 2011-08-31 中铁十七局集团第四工程有限公司 Vertical assembling tooling for corrugated pipe culvert unit sheets
CN202247719U (en) * 2011-08-31 2012-05-30 衡水长江预应力有限公司 Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN203890903U (en) * 2014-04-08 2014-10-22 北京市政路桥股份有限公司 Duct piece assembly device of small-span steel corrugated pipe bridges and culverts

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201459614U (en) * 2009-07-22 2010-05-12 张峰 Split type steel corrugated culvert pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190904441A (en) * 1909-02-23 1909-08-05 George Henry Pedlar Improvements in Corrugated Culvert or Pipe Sections.
US6447206B1 (en) * 2001-06-19 2002-09-10 Faune-Experts Inc. Beaver control screen for culvert pipe
CN102102344A (en) * 2011-01-28 2011-06-22 中铁十七局集团第四工程有限公司 Method for quickly assembling assembled corrugated culvert
CN201952745U (en) * 2011-01-28 2011-08-31 中铁十七局集团第四工程有限公司 Vertical assembling tooling for corrugated pipe culvert unit sheets
CN202247719U (en) * 2011-08-31 2012-05-30 衡水长江预应力有限公司 Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN203890903U (en) * 2014-04-08 2014-10-22 北京市政路桥股份有限公司 Duct piece assembly device of small-span steel corrugated pipe bridges and culverts

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002837A (en) * 2015-07-24 2015-10-28 中交第一公路勘察设计研究院有限公司 Corrugated steel pipe bridge-culvert segment assembling bracket
CN105002837B (en) * 2015-07-24 2017-04-19 中交第一公路勘察设计研究院有限公司 Corrugated steel pipe bridge-culvert segment assembling bracket
CN111365041A (en) * 2020-03-27 2020-07-03 山东建筑大学 Suspension self-moving type full-circumference rotary mounting machine and using method
CN111425216A (en) * 2020-04-09 2020-07-17 山东建筑大学 Composite supporting structure, construction system and method
CN111425216B (en) * 2020-04-09 2021-07-30 山东建筑大学 Composite supporting structure, construction system and method
US11739639B2 (en) 2020-04-09 2023-08-29 Shandong Jianzhu University Composite support structure, construction system, and method
CN112942110A (en) * 2021-01-21 2021-06-11 北京市政路桥股份有限公司 Convenient and fast movable type bridge centralized drainage pipeline installation operation platform
CN112942110B (en) * 2021-01-21 2022-10-04 北京市政路桥股份有限公司 Convenient and fast movable type bridge centralized drainage pipeline installation operation platform

Also Published As

Publication number Publication date
CN103993561B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN103993561A (en) Pipe assembling device for small-span steel corrugated pipe bridge culvert
CN203890903U (en) Duct piece assembly device of small-span steel corrugated pipe bridges and culverts
CN102561217A (en) Old bridge transformation construction control method based on modular hydraulic lifting power flat car
CN103835365B (en) Movable type is controlled flood and drained flooded fields, fire services installations
CN106012864A (en) Method for lifting and installing whole bridge arch rib
CN103981808A (en) Large steel tank beam depth bed position assembly walking-type pushing construction method and walking-type pushing equipment
CN113152294B (en) Method for hoisting overwater bridge by using large-scale component conveying platform device
CN103774856A (en) Method for glidingly constructing large-span special-shaped heavy steel girder on super high-rise roof
CN105544397A (en) High concrete pier construction formwork device
CN205112085U (en) Hydraulic pressure centre form construction system
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN203890904U (en) Assembly construction platform equipment for steel pipe sheets of large-diameter corrugated steel pipe culvert
CN105155418A (en) Construction method for bridge horizontal movement
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN205205683U (en) High mound construction formwork device of concrete
CN103835497A (en) Bolt opposite-pulling type track sliding formwork
CN203393619U (en) Multifunctional construction platform for constructing cross beams between twin-deck bridges through cast-in-place
CN110282557A (en) Assist mounting platform and the method with high vacant duct in bridge crane installation workshop
CN202925471U (en) Hydraulic formwork system for high pier construction
CN202208494U (en) Trolley for transporting, assembling and disassembling runners of impulse turbine
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN204148500U (en) A kind of walk by table frame
CN202627473U (en) Steel tripod support device in reinforced concrete hyperbolic curve cooling tower construction
CN110863956B (en) Novel ultrahigh tower structure, mounting structure and mounting method of large wind turbine generator
CN207727945U (en) A kind of Intelligent Installation engineering frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant