CN1039866A - 空心钻杆连接 - Google Patents
空心钻杆连接 Download PDFInfo
- Publication number
- CN1039866A CN1039866A CN89106121A CN89106121A CN1039866A CN 1039866 A CN1039866 A CN 1039866A CN 89106121 A CN89106121 A CN 89106121A CN 89106121 A CN89106121 A CN 89106121A CN 1039866 A CN1039866 A CN 1039866A
- Authority
- CN
- China
- Prior art keywords
- interlude
- pipe
- connects
- hollow drill
- shaft shoulder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 210000002445 nipple Anatomy 0.000 claims abstract description 18
- 230000008719 thickening Effects 0.000 claims abstract description 4
- 210000000481 breast Anatomy 0.000 claims description 2
- 239000003208 petroleum Substances 0.000 claims 1
- 241001074085 Scophthalmus aquosus Species 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 229910000679 solder Inorganic materials 0.000 abstract description 2
- 238000005553 drilling Methods 0.000 description 5
- 230000014509 gene expression Effects 0.000 description 4
- 230000007704 transition Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- RWSOTUBLDIXVET-UHFFFAOYSA-N Dihydrogen sulfide Chemical compound S RWSOTUBLDIXVET-UHFFFAOYSA-N 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 229910000037 hydrogen sulfide Inorganic materials 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L15/00—Screw-threaded joints; Forms of screw-threads for such joints
- F16L15/001—Screw-threaded joints; Forms of screw-threads for such joints with conical threads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
- E21B17/042—Threaded
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
- Branch Pipes, Bends, And The Like (AREA)
- Non-Disconnectible Joints And Screw-Threaded Joints (AREA)
Abstract
本发明涉及一种空心钻杆连接,采用一个螺纹连接管,其上有一个一定长度的无螺纹的加厚中间段,中间段的两端有外轴肩,左右两侧各有一个带有圆锥形外螺纹的结构相同的螺纹段,可和与之相配合的管子端部的套筒接头的内螺纹段相拧紧。在拧紧时,管子端面密封地贴在中间段的外轴肩上。这种空心钻杆连接适用于钻很深的井,按照标准规定的结构尺寸对它进行了重量优化,其动态性能比相应的采用焊接连接器的标准连接优越,并且制造成本低,使用寿命长。
Description
本发明涉及到按照主要权利要求所阐明的概念而设计的空心钻杆连接。
从美国专利US1,932,427可以了解到一种这样的管子连接。该专利文件阐述了一种采用螺纹连接管的简洁连接。螺纹连接管的管颈接头的螺纹段有两级圆锥螺纹。构成套筒接头的管子端部有一个外轴肩和一个内轴肩,在拧紧时,它们密封地贴在螺纹连接管上与之相配合的轴肩上。这种连接的缺点在于管子的顶锻头部要进行剧烈的径向内部顶锻,这会严重损坏连接的动态性能。因此,这种连接不适用于钻很深的井。另外,在安装时需要在每根管子上拧上一个起重螺纹接管,在送下管子之后再将它拧掉。可选择一种夹具夹在平滑筒洁连接部的外侧,以便在送下管子时把住钻杆,这非常容易造成外表面损坏,减少钻杆的使用寿命。
本发明的任务是:设计一种适用于钻探深井的空心钻杆连接,在结构尺寸完全符合标准规定的前提下对重量进行优化,从而使其动态性能优于相应的采用焊接连接器的标准连接,并且制造成本低,使用寿命长。
这项任务通过主要权利要求中所阐述的特征来完成。其他优点在后续的权利要求中叙述。
我们所推荐的空心钻杆连接的特点是所形成的横截面过渡是动态等值的。采用的方法是由未变形的管子的出口壁厚到顶锻头部加厚的管钳夹紧区的变化只是一小台阶,并具有圆形过渡。在这里,径向内部顶锻很小,小于7%。管子顶锻区外径却仍然是从标称尺寸的初始值倾斜着增加到稍低于标准规定的最大值上。除了径向内部顶锻处又附加的径向外部顶锻增加了在斜轴肩开始的危险区域的壁厚。在该区域内的横截面积至少比未变形的管子的横截面积大30%。
另一优点是,中间段的外径大于相邻管子的套筒接头的外径,从而使由于钻杆和钻井壁的接触所产生的磨损部分处于容易更换的部件上。另外还可以以所熟知的方法在这个表面上生成一耐磨层。采用这种办法进一步有效地避免了更换昂贵的空心钻杆。
采用我们所推荐的空心钻杆连接,可以大大延长钻杆的寿命。正如所知,每送下一根管子的长度之后,将在楔块内夹持一根钻杆。管子上夹楔块的这部分是磨损区段,这是因为每次拧下或再拧上时,都或多或少总是夹在本装置的几乎同一个位置上。由于管子两端结构相同,因此可以转180°。这样,管子表面的一个新位置就与楔块相连。这也适用于在拧下和重新拧上部位的螺纹段的磨损。在磨损到限该更换之前,可将管子转180°,从而使首次使用的螺纹段处于旋开的位置上。
连接装置和管子的螺纹段的螺纹均符合API-标准,从而保证有很高的互换性,这是因为其它的具有符合API-标准的螺纹的管子和附件,都可以和这样的连接装置旋接。
加厚的中间段的轴向延伸应尽可能的短,以便减少重量。但一般它的长度还是要大于钳口的夹持长度的,这样,磨损的螺纹还可以进行重新修整。螺纹连接管的孔的尺寸和外部尺寸均符合API-标准,中间段两端的倒角也符合该标准。
这种新推出的空心钻杆连接的静态负荷能力与焊有连接器的标准的API-连接相同。它的动态性能更为优良,这是因为它较好地确定了横截面的过渡,而且由于取消了焊缝,从而减少了由硫化氢所引起的腐蚀。在制造这种所推荐的空心钻杆连接装置中所具有的优点是:尽管所需螺纹数量加倍,但由于取消了焊缝和所有与此有关的工作,从而显著降低了技术费用。
以一个设计实例图对所发明的空心钻杆连接进行较为详细的说明。
图1所示是所发明的空心钻杆连接的半个纵向剖面图。
图1所示是所发明的空心钻杆连接1的纵向剖面图的一半,它是由螺纹连接管2构成。螺纹连接管2有两个带有圆锥形螺纹的螺纹段3,4,它们可以和与其相配合的两个管子7,8上的螺纹段5,6相互旋接。管子7和8的端部经顶锻处理,构成套筒接头的管子端面9,10在拧紧时密封地贴在螺纹连接管2的中间段13的外轴肩11,12上。未变形的管子8的圆筒形孔14的内径用箭头15表示,该孔段与中间段16相连。中间段16的内径朝螺纹方向是减小的。与此段相连有一个一直到螺纹段6的出口17的圆筒形孔18,它的内径以箭头19表示。从未变形的管子8的圆筒形孔15到中间段16的过渡20成明显的圆形。
以箭头21表示的外径由未变形的管子8朝斜轴肩33方向连续增加,其最大值(这里用箭头22表示)稍低于标准规定允许的最大值。外部区段23的轴向尺寸大于几乎与之相对的内部中间段16。斜轴肩33按标准倾斜18°,该角位置以箭头24表示。构成管颈接头的螺纹连接管2的螺纹段3,4径向向内加厚,端部成小于30°角的斜面,该斜面角的位置以箭头25表示。螺纹连接管2的圆筒形孔27的内径26和中间段13的外径28以及中间段13端部的倒角29,30均符合API-标准。本发明的一个主要点是中间段13的外径28大于套筒接头的外径31,从而使磨损区处于易于更换的部件上。
Claims (9)
1、空心钻杆采用螺纹连接管连接,该螺纹连接管有一个一定长度的、无螺纹的、加厚的中间段,中间段两端带有外轴肩,左右两侧各有一个带有圆锥形外螺纹的结构相同的螺纹段,可和与之相配合的管子端部套筒接头的内螺纹相互拧紧。在拧紧时,管子端面密封地贴在中间段的外轴肩上,
这种连接的特征是:
经顶锻处理的管子端部有一个和未变形的管子(8)的圆筒形孔(14)相连的中间段(16)。中间段(16)的内径朝螺纹连接方向减小,圆筒形孔段(18)与中间段(16)相接,并一直延伸到内螺纹段(5,6)的出口(17)处,从未变形的管子(8)的圆筒形孔(14)到中间段(16)的过渡成明显的圆弧形(20)在斜轴肩(33)区域内的管子的外径等于或大于未变形的管子(8)的外径(21),区段(23)的延伸长度大于内部中间段(16)的延伸长度,螺纹连接管(2)的管颈接头的螺纹段(3,4)是径向向内加厚的,端部有一个向中间倾斜的斜面,螺纹连接管(2)的中间段的外径(28)大于管子(7,8)上的贴在轴肩(10,11)上的套筒部分的外径(31)。
2、按照权利要求1的管螺纹连接,其特征是:
螺纹连接管(2)的中间段(13)的轴向延伸长度等于或大于管钳夹紧所需的最小尺寸。
3、按照权利要求1的螺纹连接,其特征是:管子外径在顶锻区(23)内增大,直到稍小于标准规定的最大值为止。
4、按照权利要求1的空心钻杆连接,其特征是:
螺纹连接管(2)的螺纹段(3,4)和相连接的管子(7,8)的螺纹段(5,6)均是标准的API(美国石油学会)-螺纹。
5、按照权利要求1的空心钻杆连接,其特征是:
从未变形的管子(8)的圆筒形孔(15)到顶锻头部的圆筒形孔(18)的内径突变十分小,小于7%。
6、按照权利要求1的空心钻杆连接,其特征是:
斜轴肩(33)有一个标准的18°倾斜角(24)。
7、按照权利要求1或6的空心钻杆连接,其特征是:
斜轴肩(33)的起始部(32)的横截面积至少要比未变形的管子(8)的横截面积大30%。
8、按照权利要求1的空心钻杆连接,其特征是:
圆筒形孔(26)的内径和外径(28)以及在螺纹连接管(2)的中间段(13)端部的倒角(29,30)均符合API-标准。
9、按照权利要求1的空心钻杆连接,其特征是:
中间段(13)的外面有一耐磨层。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEP3825995.8 | 1988-07-28 | ||
DE3825995A DE3825995C1 (zh) | 1988-07-28 | 1988-07-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1039866A true CN1039866A (zh) | 1990-02-21 |
CN1013783B CN1013783B (zh) | 1991-09-04 |
Family
ID=6359943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN89106121A Expired CN1013783B (zh) | 1988-07-28 | 1989-07-27 | 空心钻杆连接装置 |
Country Status (7)
Country | Link |
---|---|
US (1) | US4955644A (zh) |
EP (1) | EP0353181A3 (zh) |
JP (1) | JPH02140389A (zh) |
CN (1) | CN1013783B (zh) |
AR (1) | AR241278A1 (zh) |
DE (1) | DE3825995C1 (zh) |
NO (1) | NO892911L (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510873A (zh) * | 2013-09-29 | 2014-01-15 | 中国水电顾问集团昆明勘测设计研究院有限公司 | 一种提高金刚石复合钻头使用寿命的连接器 |
CN106089119A (zh) * | 2016-06-03 | 2016-11-09 | 西南石油大学 | 一种高性能油套管特殊螺纹连接接头 |
CN113309919A (zh) * | 2021-06-28 | 2021-08-27 | 康命源(京山)新材料科技发展有限公司 | 一种螺纹连接双壁波纹管 |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5517843A (en) * | 1994-03-16 | 1996-05-21 | Shaw Industries, Ltd. | Method for making upset ends on metal pipe and resulting product |
US6244631B1 (en) | 1999-03-02 | 2001-06-12 | Michael Payne | High efficiency drill pipe |
US6991267B2 (en) * | 1999-12-03 | 2006-01-31 | Siderca S.A.I.C. | Assembly of hollow torque transmitting sucker rods and sealing nipple with improved seal and fluid flow |
US6764108B2 (en) | 1999-12-03 | 2004-07-20 | Siderca S.A.I.C. | Assembly of hollow torque transmitting sucker rods |
US7431347B2 (en) * | 2003-09-24 | 2008-10-07 | Siderca S.A.I.C. | Hollow sucker rod connection with second torque shoulder |
US9643262B2 (en) | 2013-07-25 | 2017-05-09 | Kennametal Inc. | Coupling mechanism for cutting tool |
US9643264B2 (en) | 2013-07-25 | 2017-05-09 | Kennametal Inc. | Coupling mechanism for cutting tool |
US9889509B2 (en) | 2014-05-05 | 2018-02-13 | Kennametal Inc. | Cutter heads with improved coupling |
GB2548101A (en) * | 2016-03-07 | 2017-09-13 | Shanghai Hengxu Mat Co Ltd | Downhole tool |
DK3636873T3 (da) * | 2018-10-08 | 2021-07-26 | Rovalin Ab | Forbindelsessamling til sammenkobling af rør |
NO20211203A1 (en) * | 2019-04-16 | 2021-10-07 | Nexgen Oil Tools Inc | Dissolvable plugs used in downhole completion systems |
JP6930683B1 (ja) * | 2020-01-06 | 2021-09-01 | 日本製鉄株式会社 | 鋼管ねじ継手構造 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1364478A (en) * | 1919-10-11 | 1921-01-04 | Nat Tube Co | Drill-tube |
US1932427A (en) * | 1931-06-15 | 1933-10-31 | Doheny Stone Drill Co | Well pipe joint |
DE1155945B (de) * | 1955-05-12 | 1963-10-17 | Dalmine Spa | Rohrverschraubung fuer unter Druck stehende Fluessigkeiten oder Gase |
GB800348A (en) * | 1955-05-12 | 1958-08-27 | Dalmine Spa | Improvements in or relating to leakproof joints for tubular elements under pressure |
FR1583421A (zh) * | 1968-02-20 | 1969-10-31 | ||
RO67976A2 (fr) * | 1974-08-16 | 1979-01-15 | Inst Cercetare Si Proiectare T | Raccord pour des tiges de sondage |
US4192533A (en) * | 1976-04-22 | 1980-03-11 | Hydril Company | Dovetail connection for pin and box joints |
US4506432A (en) * | 1983-10-03 | 1985-03-26 | Hughes Tool Company | Method of connecting joints of drill pipe |
-
1988
- 1988-07-28 DE DE3825995A patent/DE3825995C1/de not_active Expired
-
1989
- 1989-07-14 NO NO89892911A patent/NO892911L/no unknown
- 1989-07-25 EP EP19890730172 patent/EP0353181A3/de not_active Withdrawn
- 1989-07-26 JP JP1193809A patent/JPH02140389A/ja active Pending
- 1989-07-27 CN CN89106121A patent/CN1013783B/zh not_active Expired
- 1989-07-27 AR AR89314518A patent/AR241278A1/es active
- 1989-07-27 US US07/386,786 patent/US4955644A/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510873A (zh) * | 2013-09-29 | 2014-01-15 | 中国水电顾问集团昆明勘测设计研究院有限公司 | 一种提高金刚石复合钻头使用寿命的连接器 |
CN106089119A (zh) * | 2016-06-03 | 2016-11-09 | 西南石油大学 | 一种高性能油套管特殊螺纹连接接头 |
CN113309919A (zh) * | 2021-06-28 | 2021-08-27 | 康命源(京山)新材料科技发展有限公司 | 一种螺纹连接双壁波纹管 |
Also Published As
Publication number | Publication date |
---|---|
AR241278A1 (es) | 1992-04-30 |
EP0353181A2 (de) | 1990-01-31 |
NO892911D0 (no) | 1989-07-14 |
NO892911L (no) | 1990-01-29 |
JPH02140389A (ja) | 1990-05-30 |
CN1013783B (zh) | 1991-09-04 |
US4955644A (en) | 1990-09-11 |
DE3825995C1 (zh) | 1989-10-19 |
EP0353181A3 (de) | 1991-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1039866A (zh) | 空心钻杆连接 | |
CN102639911B (zh) | 螺纹连接件 | |
CA2338956C (en) | Threaded and coupled connection for improved fatigue resistance | |
CN101319743B (zh) | 螺纹连接件 | |
CN102639912B (zh) | 螺纹连接件 | |
US6789823B2 (en) | Tubular threaded joint with reinforced stop | |
CN1039889A (zh) | 管子螺纹连接部 | |
US4500224A (en) | Coupling for sucker rod assembly | |
CA2128114A1 (en) | Stress Relief Groove for Drill Pipe | |
CN107636250B (zh) | 用于冲击式钻柱构件的螺纹联接端 | |
CN87106907A (zh) | 软管接头 | |
CN112204223B (zh) | 用于连接潜孔管的联接器 | |
CN1039636A (zh) | 空心钻杆 | |
EP1483476A2 (en) | Double shoulder oilfield tubular connection | |
KR930000500B1 (ko) | 유정 배관 연결기 | |
CN1054422C (zh) | 高气密偏梯形螺纹套管连接结构 | |
US20240133245A1 (en) | Coupling for connecting downhole tubulars with improved stress distribution | |
OA21326A (en) | Coupling for connecting downhole tubulars with improved stress distribution. | |
JP2024507382A (ja) | 応力が低減されたダウンホール管を接続する連結具 | |
SU1035183A1 (ru) | Коническое резьбовое соединение бурильных труб | |
RU1793039C (ru) | Соединение бурильной колонны | |
CN113585983A (zh) | 一种铝合金钻杆及其制作工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C13 | Decision | ||
GR02 | Examined patent application | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |