CN103982055A - Support device for steel-structure building construction - Google Patents

Support device for steel-structure building construction Download PDF

Info

Publication number
CN103982055A
CN103982055A CN201410151119.9A CN201410151119A CN103982055A CN 103982055 A CN103982055 A CN 103982055A CN 201410151119 A CN201410151119 A CN 201410151119A CN 103982055 A CN103982055 A CN 103982055A
Authority
CN
China
Prior art keywords
truss
steel
conversion
support device
structure building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410151119.9A
Other languages
Chinese (zh)
Inventor
沈万玉
王肖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fuhuang Steel Structure Co Ltd
Original Assignee
Anhui Fuhuang Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fuhuang Steel Structure Co Ltd filed Critical Anhui Fuhuang Steel Structure Co Ltd
Priority to CN201410151119.9A priority Critical patent/CN103982055A/en
Publication of CN103982055A publication Critical patent/CN103982055A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a support device for a steel-structure building construction. The support device comprises a left truss and a right truss which are arranged on two sides of a steel-structure building, wherein the opposite ends of the left truss and the right truss incline upwards and are provided with a connecting truss; the connecting truss is of a broken line shape with an upward-bent middle; a cross beam is arranged between the steel-structure buildings; two ends and middle of the upper end surface of the cross beam are provided with conversion support structures; the upper ends of the conversion support structures are sequentially provided with jig frames and jacks; the upper ends of the jacks positioned on two ends respectively prop against the left truss and the right truss; the upper end of the jack positioned in the middle props against the bent part of the connecting truss. The support device is novel in structural design; the trusses, the cross beams, the conversion support structures, the jig frames and the jacks are matched for use, so that the construction of a steel-structure building roof with large span can be well finished, the cost is reduced, the benefits are improved, the safety problem is eliminated, and a favorable effect is achieved.

Description

A kind of steel house construction bracing or strutting arrangement
technical field:
The present invention relates to steel house construction, relate in particular to a kind of steel house construction bracing or strutting arrangement.
background technology:
Being arranged in steel house construction of the steel roof system of large span has certain difficulty, installs loaded down with trivial detailsly, and member kind, model, quantity are many, connect complex structure, work high above the ground, and operation is many, and installation dimension required precision is strict, and stability requirement is high.Affected by field working conditions, because span is large, hoisting machine tool is difficult to meet whole lifting requirements, therefore needs segmental hoisting, and segmental hoisting needs to arrange moulding bed, because roofing truss height is higher, sets up moulding bed height high from ground, and safety can not be guaranteed.
summary of the invention:
In order to make up prior art problem, the object of this invention is to provide a kind of steel house construction bracing or strutting arrangement, break through traditional approach, both saved cost, improved benefit, eliminated again safety problem, played good effect.
Technical scheme of the present invention is as follows:
Steel house construction bracing or strutting arrangement, it is characterized in that: comprise the left truss that is installed on steel house both sides, right truss, left truss, the opposite end of right truss is all tilted to, left truss, right truss opposite end is provided with truss frame for connecting, truss frame for connecting is the make progress fold-line-shaped of bending of middle part, between described steel house, be provided with crossbeam, two ends, upper surface and the middle part of crossbeam are equipped with conversion braced structures, conversion braced structures upper end is provided with moulding bed successively, jack, described left truss is withstood respectively in the jack upper end that is positioned at two ends, right truss, the bending part of described truss frame for connecting is withstood in the jack upper end that is positioned at middle part.
Described steel house construction bracing or strutting arrangement, is characterized in that: described conversion braced structures is " H " shape girder steel keeping flat.
Advantage of the present invention is:
Structure design of the present invention is novel, by being used in conjunction with of truss, crossbeam, conversion braced structures, moulding bed, jack, can finely complete the construction of the steel house roof system that span is large, both saved cost, improve benefit, eliminated again safety problem, played good effect.
accompanying drawing explanation:
Fig. 1 is structural representation of the present invention.
the specific embodiment:
Referring to accompanying drawing:
Steel house construction bracing or strutting arrangement, comprise the left truss 1 that is installed on steel house both sides, right truss 2, left truss 1, the opposite end of right truss 2 is all tilted to, left truss 1, right truss 2 opposite ends are provided with truss frame for connecting 3, truss frame for connecting 3 is the make progress fold-line-shaped of bending of middle part, between steel house, be provided with crossbeam 4, the two ends, upper surface of crossbeam 4 and middle part are equipped with conversion braced structures 5, conversion braced structures 5 upper ends are provided with moulding bed 6 successively, jack 7, left truss 1 is withstood respectively in the jack upper end that is positioned at two ends, right truss 2, the bending part of truss frame for connecting 3 is withstood in the jack upper end that is positioned at middle part.
" H " shape girder steel of conversion braced structures 5 for keeping flat, structural strength is high, good stability.
The present invention can finely complete the construction of the steel house roof system that span is large, both saved cost, by being used in conjunction with of truss, crossbeam, conversion braced structures, moulding bed, jack, overall construction intensity and stability are improved, eliminated safety problem, practical.

Claims (2)

1. a steel house construction bracing or strutting arrangement, it is characterized in that: comprise the left truss that is installed on steel house both sides, right truss, left truss, the opposite end of right truss is all tilted to, left truss, right truss opposite end is provided with truss frame for connecting, truss frame for connecting is the make progress fold-line-shaped of bending of middle part, between described steel house, be provided with crossbeam, two ends, upper surface and the middle part of crossbeam are equipped with conversion braced structures, conversion braced structures upper end is provided with moulding bed successively, jack, described left truss is withstood respectively in the jack upper end that is positioned at two ends, right truss, the bending part of described truss frame for connecting is withstood in the jack upper end that is positioned at middle part.
2. steel house construction bracing or strutting arrangement according to claim 1, is characterized in that: described conversion braced structures is " H " shape girder steel keeping flat.
CN201410151119.9A 2014-04-15 2014-04-15 Support device for steel-structure building construction Pending CN103982055A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410151119.9A CN103982055A (en) 2014-04-15 2014-04-15 Support device for steel-structure building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410151119.9A CN103982055A (en) 2014-04-15 2014-04-15 Support device for steel-structure building construction

Publications (1)

Publication Number Publication Date
CN103982055A true CN103982055A (en) 2014-08-13

Family

ID=51274202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410151119.9A Pending CN103982055A (en) 2014-04-15 2014-04-15 Support device for steel-structure building construction

Country Status (1)

Country Link
CN (1) CN103982055A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3925547A1 (en) * 1989-08-02 1991-02-07 Dieter Knauer Erecting permanent building structure - by use of temporary support structure which is subsequently removed
CN2554275Y (en) * 2002-07-16 2003-06-04 王福昌 Large conrete portal single-story building rigid frame brouing frame
CN102235092A (en) * 2010-04-22 2011-11-09 上海市机械施工有限公司 Layered hoisting construction process for suspended steel structure
CN203430059U (en) * 2013-08-22 2014-02-12 中国十七冶集团有限公司 Temporary fixing device used for installing large-span steel structure roof primary truss

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3925547A1 (en) * 1989-08-02 1991-02-07 Dieter Knauer Erecting permanent building structure - by use of temporary support structure which is subsequently removed
CN2554275Y (en) * 2002-07-16 2003-06-04 王福昌 Large conrete portal single-story building rigid frame brouing frame
CN102235092A (en) * 2010-04-22 2011-11-09 上海市机械施工有限公司 Layered hoisting construction process for suspended steel structure
CN203430059U (en) * 2013-08-22 2014-02-12 中国十七冶集团有限公司 Temporary fixing device used for installing large-span steel structure roof primary truss

Similar Documents

Publication Publication Date Title
CN105544984A (en) Large-span steel structure jig frame integrity slip construction process
CN204298742U (en) For the supporting and protection structure of Bridge High-pier construction
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN205444975U (en) Large -scale room lid steel construction construction braced system with view platform
CN202000644U (en) Movable bearing bracket platform
CN104060841A (en) Large-span steel girder installation construction method
CN103758342A (en) Tool-type top form for buildings
CN204040437U (en) Cantilever tripod and single protective frame system of encorbelmenting
CN103982055A (en) Support device for steel-structure building construction
CN204024010U (en) The flat sliding platform of a kind of high long cornice construction water
CN203756209U (en) Longitudinal-girder staggered temporary support for heading face
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN204174848U (en) A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients
CN103821360A (en) Construction method for high-altitude long-span cantilever formwork
CN204663027U (en) For the bracing or strutting arrangement that rack is installed
CN203904848U (en) Temporary fixing jig for buttress anchorage top
CN202529753U (en) Wall-attaching structure of tower crane for high-rise building
CN202707093U (en) Temporary support system for tunnel construction
CN203008375U (en) Conversion beam stanchion
CN202865750U (en) Load-bearing device of concrete bent cap
CN204826636U (en) Ear design support is chosen to plain type roof beam
CN105649317A (en) Fixing mechanism for cantilever I-beam
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN204919364U (en) A supplementary mobile device that is used for bridge top to push away construction
CN204609292U (en) A kind of movable air bellows integral elevating floor scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140813