CN103967131A - Indoor broken line suspension bridge structure - Google Patents

Indoor broken line suspension bridge structure Download PDF

Info

Publication number
CN103967131A
CN103967131A CN201410215451.7A CN201410215451A CN103967131A CN 103967131 A CN103967131 A CN 103967131A CN 201410215451 A CN201410215451 A CN 201410215451A CN 103967131 A CN103967131 A CN 103967131A
Authority
CN
China
Prior art keywords
bridge
suspension
rod
bridge plate
holder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410215451.7A
Other languages
Chinese (zh)
Other versions
CN103967131B (en
Inventor
彭万军
陈洪根
施旭光
邬勇军
白建勇
王少乾
张道贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd filed Critical Bengbu Construction Engineering Co Ltd of China Construction Fifth Engineering Co Ltd
Priority to CN201410215451.7A priority Critical patent/CN103967131B/en
Publication of CN103967131A publication Critical patent/CN103967131A/en
Application granted granted Critical
Publication of CN103967131B publication Critical patent/CN103967131B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention provides an indoor broken line suspension bridge structure which comprises a bridge body connected between indoor floor passages, wherein the bridge body comprises a plurality of suspension stairways, each suspension stairway is provided with an inlet and an outlet, two adjacent suspension stairways are mutually connected, and the inlet positions or the outlet positions of the suspension stairways and the floor passages are fixed through a first connecting component; hang the ladder way include a plurality of bridge plate, interconnect between two adjacent bridge plates, there is the contained angle between every bridge plate and the horizontal plane, every bridge plate outside is provided with a plurality of and outside fixed second coupling assembling. The bridge body of the indoor broken line suspension bridge structure is suspended at the upper side of the atrium, and an inlet and an outlet of the suspension ladder way are respectively communicated with the floor passageways, so that visitors can conveniently enter the bridge body; the hanging ladder way comprises a plurality of bridge plates, and the positions of different bridge plates are set, so that visitors can obtain more observation angles. The beneficial technical effects are as follows: reasonable structure, safety, reliability and reasonable utilization of space.

Description

Indoor broken line suspension bridge structure
Technical field
The present invention relates to a kind of indoor broken line suspension bridge structure.
Background technology
The atrium of large-scale exhibition pipe is furnished with landscape design, Zhongting roof generally adopts the lattice supporting framework of steel, exhibition circumference of cannon bone is around the convenient floor passageway of observing of having of Zhongting, but visitor cannot bow and see landscape design in floor passageway, and the space of Zhongting is larger, rationally do not utilize.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of rational in infrastructure, safe and reliable indoor broken line suspension bridge structure, and this indoor broken line suspension bridge structure can provide the best visual angle of overlooking to visitor, and farthest rationally utilizes Atrium Space.
For solving the problems of the technologies described above, the invention provides a kind of indoor broken line suspension bridge structure, comprise the pontic between floor passageway in junction chamber, described pontic comprises that several hang ladder access, each suspension ladder access is provided with import and outlet, between adjacent two suspension ladder accesses, interconnect, between the entrance location of described suspension ladder access or exit position and floor passageway, fix by the first coupling assembling;
Described suspension ladder access comprises several bridge plates, between adjacent two bridge plates, interconnects, and between each bridge plate and horizontal plane, has angle, and each bridge plate arranged outside has the second coupling assembling of several and external stability.
Adopt after such structure, the pontic of this indoor broken line suspension bridge structure is suspended in the upside of Zhongting, and import and the outlet of hanging ladder access are communicated with respectively and between floor passageway, facilitate visitor to enter pontic; Hang ladder access and comprise several bridge plates, make pontic length lengthen, set the position of different bridge plates, make visitor can obtain more viewing angle.
Useful technique effect of the present invention is: rational in infrastructure, safe and reliable, rationally utilize space.
Technology contents for a better understanding of the present invention, below by this indoor broken line suspension bridge structure referred to as this structure.
First coupling assembling of this structure comprises several contiguous blocks, several are fixed on fixed head and some connecting bolts on floor passageway, described contiguous block is fixedly connected with in the bridge plate of entrance location or exit position with suspension ladder access, on each contiguous block, have at least one waist through hole, the waist through hole position of the corresponding contiguous block of described fixed head has at least one fixing hole, and described connecting bolt coordinates with waist through hole and fixing hole respectively.
Adopt after such structure, the more reasonable structure of the first coupling assembling, connecting bolt coordinates with waist through hole and fixing hole respectively, in the time that suspension ladder access has Liquid sloshing, the contiguous block bolt that is connected slightly moves at waist through hole length direction, and then drives the small size movement of contiguous block, and the first coupling assembling can change according to self structure the relative position of self, reach the object of bradyseism and decompression, greatly increase the safety of this structure.
Second coupling assembling of this structure comprises the first holder, the second holder and gag lever post, and the first holder is fixedly connected on corresponding bridge plate, and one end of gag lever post and the first holder are hinged, and the other end of gag lever post and the second holder are hinged; Adopt after such structure, facilitate each bridge plate by fixing between the second coupling assembling and sidewall, floor passageway, top truss or the ground of building, and gag lever post respectively and hinged between the first holder and the second holder, in the time of this structure Liquid sloshing, the second coupling assembling can change according to self structure the relative position of self, reaches the object of bradyseism and decompression.
The gag lever post of this structure comprises first body of rod, second body of rod and adapter sleeve, adapter sleeve inwall is provided with internal thread, one end of first body of rod is provided with the external screw thread with adapter sleeve screw-internal thread fit, the other end of first body of rod and the first holder are hinged, second body of rod one end is provided with the external screw thread with adapter sleeve screw-internal thread fit, the other end of second body of rod and the second holder are hinged, gapped between first body of rod coordinating with adapter sleeve and second body of rod; Adopt after such structure, when first body of rod and second body of rod are affected by the external environment while expanding with heat and contract with cold, there is deformation in first body of rod and second body of rod self, changes the gap length between first body of rod and second body of rod, reduces the impact of the stability of gag lever post on this structural entity.
On the bridge plate of this structure, be provided with step; Adopt after such structure, facilitate visitor to walk.
Brief description of the drawings
Fig. 1 is the structural representation of this structure embodiment.
Fig. 2 is the top view of this structure embodiment.
Fig. 3 is the A portion enlarged drawing of Fig. 1.
Fig. 4 is the B portion enlarged drawing of Fig. 1.
Fig. 5 is the structural representation of this structure embodiment pontic.
Fig. 6 is the structural representation of this structure embodiment gag lever post.
Fig. 7 is the structural representation of this structure embodiment the first coupling assembling.
Fig. 8 is the structural representation of this structure embodiment contiguous block.
Fig. 9 is the structural representation of this structure embodiment fixed head.
Detailed description of the invention
As shown in Figure 1 to 9
This structural entity is arranged on atrium top, around the convenient floor passageway of observing of having of Zhongting, the pontic of this structure comprises that two are hung ladder access, and two suspension ladder accesses are respectively between the first suspension ladder access 1 and the second suspension ladder access 2, the first suspension ladder accesses 1 and the second suspension ladder access 2 and interconnect.
First hangs ladder access 1 comprises the first bridge plate 11 and second axle plate 12, one end of the first bridge plate 11 is the first import 13 of the first suspension ladder access 1, the other end of the first bridge plate 11 is connected with one end of second axle plate 12, the first bridge plate 11 and second axle plate 12 are acute angle at horizontal plane projection angulation, the other end of second axle plate 12 is the first outlet 14 of the first suspension ladder access 1, the first import 13 positions of the first bridge plate 11 are communicated with fixing with second layer floor passageway by the first coupling assembling 3, the first outlet 14 positions of second axle plate 12 are communicated with fixing with the 3rd floor layer passageway by the first coupling assembling 3.
The first bridge plate 11 is connected and fixed by seven group of second coupling assembling 4 and top of building truss, the first bridge plate 11 is connected and fixed by two group of second coupling assembling 4 and the floor passageway of building, and the first bridge plate 11 is connected and fixed by one group of second coupling assembling 4 and the bottom surface of building;
Second axle plate 12 is connected and fixed by nine group of second coupling assembling 4 and top of building truss, second axle plate 12 is connected and fixed by two group of second coupling assembling 4 and the floor passageway of building, the first bridge plate 11 is connected and fixed by one group of second coupling assembling 4 and the bottom surface of building, between the first bridge plate 11 and second axle plate 12 by one group of second relative being connected and fixed of coupling assembling 4.
Second hangs ladder access 2 comprises the 3rd bridge plate 21, the 4th bridge plate 22 and the 5th bridge plate 23, one end of the 3rd bridge plate 21 is the second import 24 of the second suspension ladder access 2, between the first import 13 of the second import 24 and the first suspension ladder access 1, be connected, and the second second import 24 of hanging ladder access 2 is communicated with fixing with the 3rd floor layer passageway by the first coupling assembling 3, the other end of the 3rd bridge plate 21 is connected with the 4th bridge plate 22 one end, the 4th bridge plate 22 other ends are connected with the 5th bridge plate 23 one end, the other end of the 5th bridge plate 23 is the second outlet 25 of the second suspension ladder access 2, the second outlet 25 positions of the 5th bridge plate 23 are communicated with fixing with layer 5 floor passageway by the first coupling assembling 3, the 3rd bridge plate 21 and the 4th bridge plate 22 are acute angle at horizontal plane projection angulation, the 5th bridge plate 23 and the 4th bridge plate 22 are acute angle at horizontal plane projection angulation.
The 3rd bridge plate 21 is connected and fixed by six group of second coupling assembling 4 and top of building truss, and the 3rd bridge plate 21 is connected and fixed by two group of second coupling assembling 4 and the floor passageway of building;
The 4th bridge plate 22 is connected and fixed by seven group of second coupling assembling 4 and top of building truss, and the 4th bridge plate 22 is connected and fixed by eight group of second coupling assembling 4 and the floor passageway of building;
The 5th bridge plate 23 is connected and fixed by seven group of second coupling assembling 4 and top of building truss, the 5th bridge plate 23 is connected and fixed by four group of second coupling assembling 4 and the floor passageway of building, between the 4th bridge plate 22 and the 3rd bridge plate 21 by one group of second relative being connected and fixed of coupling assembling 4, between the 4th bridge plate 22 and the 5th bridge plate 23 by one group of second relative being connected and fixed of coupling assembling 4.
The first coupling assembling 3 comprises that four contiguous blocks 31, eight are fixed on fixed head 32 and eight connecting bolts 33 on floor passageway, four contiguous blocks 31 are vertically welded on corresponding bridge plate sidewall, on each contiguous block 31, have two waist through hole 31a, the waist through hole 31a position of the corresponding contiguous block 31 of fixed head 32 has two fixing hole 32a, each connecting bolt 33 coordinates respectively at waist through hole 31a and fixing hole 32a, and bridge plate can move by the movement locus in waist through hole 31a along connecting bolt 33.
The second coupling assembling 4 comprises the first holder 41, the second holder 42 and gag lever post 43, gag lever post 43 comprises the first body of rod 43a, the second body of rod 43b and adapter sleeve 43c, adapter sleeve 43c inwall is provided with internal thread, one end of the first body of rod 43a is provided with the external screw thread with adapter sleeve 43c screw-internal thread fit, the other end of the first body of rod 43a and the first holder 41 are fixed by bearing pin, second body of rod 43b one end is provided with the external screw thread with adapter sleeve 43c screw-internal thread fit, the other end of the second body of rod 43b and the second holder 42 are fixed by bearing pin, gapped 43d between the first body of rod 43a coordinating with adapter sleeve 43c and the second body of rod 43b, the first holder 41 is welded on corresponding bridge plate sidewall, the second 42 of holders are fixed on the floor passageway of corresponding building, on ground or truss.
The first bridge plate 11, second axle plate 12, the 3rd bridge plate 21, the 4th bridge plate 22 and the 5th bridge plate 23 respectively all and between horizontal plane, have angle, make each bridge plate keep the inclination of certain angle; And be all provided with step and fence on the first bridge plate 11, second axle plate 12, the 3rd bridge plate 21, the 4th bridge plate 22 and the 5th bridge plate 23.
Above-described is only one embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, under the premise without departing from the principles of the invention, can also make some modification and improvement, and these also should be considered as belonging to protection scope of the present invention.

Claims (5)

1. an indoor broken line suspension bridge structure, comprise the pontic between floor passageway in junction chamber, it is characterized by: described pontic comprises that several hang ladder access, each suspension ladder access is provided with import and outlet, between adjacent two suspension ladder accesses, interconnect, between the entrance location of described suspension ladder access or exit position and floor passageway, fix by the first coupling assembling;
Described suspension ladder access comprises several bridge plates, between adjacent two bridge plates, interconnects, and between each bridge plate and horizontal plane, has angle, and each bridge plate arranged outside has the second coupling assembling of several and external stability.
2. indoor broken line suspension bridge structure according to claim 1, it is characterized in that: the first described coupling assembling comprises several contiguous blocks, several are fixed on fixed head and some connecting bolts on floor passageway, described contiguous block is fixedly connected with in the bridge plate of entrance location or exit position with suspension ladder access, on each contiguous block, have at least one waist through hole, the waist through hole position of the corresponding contiguous block of described fixed head has at least one fixing hole, and described connecting bolt coordinates with waist through hole and fixing hole respectively.
3. indoor broken line suspension bridge structure according to claim 1, it is characterized in that: the second described coupling assembling comprises the first holder, the second holder and gag lever post, the first holder is fixedly connected on corresponding bridge plate, one end of gag lever post and the first holder are hinged, and the other end of gag lever post and the second holder are hinged.
4. indoor broken line suspension bridge structure according to claim 3, it is characterized in that: described gag lever post comprises first body of rod, second body of rod and adapter sleeve, adapter sleeve inwall is provided with internal thread, one end of first body of rod is provided with the external screw thread with adapter sleeve screw-internal thread fit, the other end of first body of rod and the first holder are hinged, second body of rod one end is provided with the external screw thread with adapter sleeve screw-internal thread fit, the other end of second body of rod and the second holder are hinged, gapped between first body of rod coordinating with adapter sleeve and second body of rod.
5. indoor broken line suspension bridge structure according to claim 1, is characterized in that: on described bridge plate, be provided with step.
CN201410215451.7A 2014-05-21 2014-05-21 Indoor broken line suspension bridge structure Expired - Fee Related CN103967131B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410215451.7A CN103967131B (en) 2014-05-21 2014-05-21 Indoor broken line suspension bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410215451.7A CN103967131B (en) 2014-05-21 2014-05-21 Indoor broken line suspension bridge structure

Publications (2)

Publication Number Publication Date
CN103967131A true CN103967131A (en) 2014-08-06
CN103967131B CN103967131B (en) 2016-05-18

Family

ID=51237096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410215451.7A Expired - Fee Related CN103967131B (en) 2014-05-21 2014-05-21 Indoor broken line suspension bridge structure

Country Status (1)

Country Link
CN (1) CN103967131B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087697A (en) * 1993-10-27 1994-06-08 温小才 Stair and handrail that industry and civilian construction are used
JPH10238048A (en) * 1997-02-28 1998-09-08 Kazuo Fujita Staircase device
CN1664270A (en) * 2005-04-08 2005-09-07 贵州大学 Integrally assembling staircase and method for fabricating same
CN102251631A (en) * 2011-05-13 2011-11-23 天津大学 Hanging integrated type stair with steel structure and manufacturing method thereof
CN102733562A (en) * 2012-06-28 2012-10-17 苏州工业园区设计研究院股份有限公司 Folded plate cantilever stair
CN203222949U (en) * 2013-05-16 2013-10-02 孙银花 Hanging indoor stair
CN203924340U (en) * 2014-05-21 2014-11-05 中建五局蚌埠建筑工程有限公司 Indoor broken line suspension bridge structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087697A (en) * 1993-10-27 1994-06-08 温小才 Stair and handrail that industry and civilian construction are used
JPH10238048A (en) * 1997-02-28 1998-09-08 Kazuo Fujita Staircase device
CN1664270A (en) * 2005-04-08 2005-09-07 贵州大学 Integrally assembling staircase and method for fabricating same
CN102251631A (en) * 2011-05-13 2011-11-23 天津大学 Hanging integrated type stair with steel structure and manufacturing method thereof
CN102733562A (en) * 2012-06-28 2012-10-17 苏州工业园区设计研究院股份有限公司 Folded plate cantilever stair
CN203222949U (en) * 2013-05-16 2013-10-02 孙银花 Hanging indoor stair
CN203924340U (en) * 2014-05-21 2014-11-05 中建五局蚌埠建筑工程有限公司 Indoor broken line suspension bridge structure

Also Published As

Publication number Publication date
CN103967131B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN102839812B (en) Intelligent construction platform for construction of super high-rise building
CN206569235U (en) A kind of ship hanger bracket and boat scaffold
CN102383588A (en) Lifting platform for protecting safety of high-level construction
CN103276886B (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN106759863A (en) A kind of modularization steel house frame structure
CN209103099U (en) Spherical screen projection system
CN203924340U (en) Indoor broken line suspension bridge structure
CN201665992U (en) Whole lifting platform of large steel net frame
CN103967131B (en) Indoor broken line suspension bridge structure
CN205475731U (en) Integrated house combination mosaic structure's building node
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN103011031A (en) Stand column type 360-degree rotary oil tank maintenance platform
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN104278782B (en) Spherical suspended-dome structure applicable to non-circular buildings
CN110565928B (en) Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN201786012U (en) Chimney suspension bracket
CN206667707U (en) A kind of construction scaffold of installation easy to disassemble
CN203924530U (en) Suspension spiral ramp
CN102817464B (en) Construction device for painting anti-corrosion and fireproof paint of building
CN106760530B (en) A kind of operating platform and its construction method for the dismounting of tower crane wall attaching rod
CN103643790B (en) It is applicable to the self-crawling type operating platform of colossal column
CN203584352U (en) Drift diameter gauge capable of dredging whole-well drill strings in one time
CN202139008U (en) Spatial triangular chimney hanger bracket
CN206110674U (en) Transit platform is measured to a superelevation layer core section of thick bamboo

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170413

Address after: 410116 Changsha Yuhua District, Hunan Zhongyi Road, No. 158

Patentee after: China Construction Fifth Engineering Division Co., Ltd.

Address before: Anhui city of Bengbu Province on the 233099 century iron building homes six four unit 10

Patentee before: In build Bangbu construction work Co., Ltd five innings

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20170521

CF01 Termination of patent right due to non-payment of annual fee