CN206667707U - A kind of construction scaffold of installation easy to disassemble - Google Patents
A kind of construction scaffold of installation easy to disassemble Download PDFInfo
- Publication number
- CN206667707U CN206667707U CN201720414575.7U CN201720414575U CN206667707U CN 206667707 U CN206667707 U CN 206667707U CN 201720414575 U CN201720414575 U CN 201720414575U CN 206667707 U CN206667707 U CN 206667707U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- transverse connecting
- transverse
- connecting rod
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Scaffold field is the utility model is related to, more particularly to a kind of construction scaffold of installation easy to disassemble, including several scaffold bodies;Scaffold body is made up of four perpendicular support tubes, four the first transverse connecting rods, four the second transverse connecting rods and several fixtures;Two fixtures are respectively welded in the upper and lower part of each perpendicular support tube;Fixture includes vertical tube set and two transverse tube sets;Two symmetrical middle positions for being arranged on vertical tube set of transverse tube set;The first transverse connecting rod is threaded between relative two transverse tubes set;The both ends of second transverse connecting rod are stuck in corresponding vertical tube set;Connected on vertical direction where between scaffold body by connector;Connector includes limited post and limited block;Perpendicular support tube of the both ends of limited post respectively with two scaffold bodies is connected.The beneficial effect of the utility model is convenient firm install or remove.
Description
Technical field
Scaffold field is the utility model is related to, more particularly to a kind of construction scaffold of installation easy to disassemble.
Background technology
Construction with scaffold refer to job site for operation and solve vertically and horizontally transport set up it is various
Support.The generic term of architecture field, refer to and exterior wall, inside fitting or the higher ground that can not directly construct of floor height are used on construction site
Side.It is exactly plainly to build a framework mainly for workmen works or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc. up and down,
Scaffold making material generally has:Bamboo and wood, steel pipe or synthetic material etc..Some engineerings also with scaffold when template use, in addition
Also used extensively in departments such as advertising, municipal administration, traffic road and bridge, mines., installation be present in current construction scaffold
Dismantle inconvenient, it is impossible to the problem of convenient firm vertical and horizontal to whole scaffold are built.
Utility model content
The utility model provides a kind of construction scaffold of installation easy to disassemble, can solve in the prior art,
, it is inconvenient to there is installing/dismounting in current construction scaffold, it is impossible to the convenient firm longitudinal direction to whole scaffold and
The problem of laterally being built.
The utility model provides a kind of construction scaffold of installation easy to disassemble, including several scaffold sheets
Body;The scaffold body by four perpendicular support tubes, four the first transverse connecting rods, four the second transverse connecting rods and several fix
Part is formed;Two fixtures are respectively welded in the upper and lower part of each perpendicular support tube;The fixture include vertical tube set and
Two transverse tube sets;Two transverse tube sets are symmetrically arranged on the middle position of the vertical tube set;Two relative horizontal strokes
The first transverse connecting rod is threaded between pipe sleeve;The both ends of second transverse connecting rod are stuck in the corresponding vertical tube
In set;Connected on vertical direction where between the scaffold body by connector;The connector include limited post and
Limited block;The limited block is arranged on the middle position of the limited post;The both ends of the limited post respectively with two pin hands
The perpendicular support tube connection of frame body.
It is preferred that the both ends of first transverse connecting rod are respectively arranged with nipple;Be provided with transverse tube set with
The adaptable internal thread of the nipple.
It is preferred that the both ends of second transverse connecting rod are respectively arranged with fixed elbow.
It is preferred that the diameter of the limited post is less than the diameter of the limited block;The diameter of the limited block erects with described
The tube wall diameter of support tube is equal.
It is preferred that the diameter of the limited post is slightly less than the nozzle diameter of the perpendicular support tube.
It is preferred that pass through first transverse connecting rod and described the in horizontal direction where between the scaffold body
Two transverse connecting rods connect.
The utility model provides a kind of construction scaffold of installation easy to disassemble, first by a scaffold body
Put up, take four perpendicular support tubes, four perpendicular support tubes are connected into two pairs with four the first transverse connecting rods, do not have two a pair,
Then two pairs of perpendicular support tubes being connected by four the second transverse connecting rods again so that whole scaffold body is in cube structure,
Part of the vertical tube set being provided with as connection, wherein vertical tube set include vertical tube set and two transverse tube sets so that the first horizontal company
The transverse tube external threading connection corresponding with two of the both ends of extension bar, is first fully screwed into transverse tube by the nipple of first transverse connecting rod one end
In set, then the corresponding transverse tube set of nipple alignment by the first transverse connecting rod other end, its half precession is corresponding
In transverse tube set, ensure in the corresponding transverse tube set of the half difference precession of the nipple at the first transverse connecting rod both ends, easily
The installation to the first transverse connecting rod is realized, the both ends of the second transverse connecting rod therein set fixed elbow respectively, by the second horizontal company
The fixation elbow at extension bar both ends is inserted into vertical tube set respectively, is then struck tightly, is easily realized to the second transverse connecting rod with hammer
Installation;Connected on vertical direction where between scaffold body therein by connector, connector includes limited post and limit
Position block, limited block are arranged on the middle position of limited post, the both ends of limited post therein respectively with two scaffold bodies
Perpendicular support tube connection, realizes longitudinal convenient installation between two adjacent scaffold bodies, when disassembled, otherwise,
So that construction convenient firm can install or remove with scaffold.
Brief description of the drawings
Fig. 1 is structural representation provided by the utility model;
Fig. 2 is scaffold body construction schematic diagram provided by the utility model;
Fig. 3 is anchor structure schematic diagram provided by the utility model;
Fig. 4 is connecting-piece structure schematic diagram provided by the utility model;
Fig. 5 is the second transverse connecting rod structural representation provided by the utility model;
Fig. 6 is the first transverse connecting rod structural representation provided by the utility model.
Description of reference numerals:1- scaffold bodies;2- erects support tube;The transverse connecting rods of 3- first;4- fixtures;41- vertical tubes
Set;Two transverse tube sets of 42-;The transverse connecting rods of 5- second;6- connectors;61- limited posts;62- limited blocks;7- fixes elbow;8- spiral shells
Line joint.
Embodiment
Below in conjunction with the accompanying drawings, an embodiment of the present utility model is described in detail, it is to be understood that this
The protection domain of utility model is not limited by embodiment.
As shown in Figures 1 to 6, the construction pin hand for a kind of installation easy to disassemble that the utility model embodiment provides
Frame, including several scaffold bodies 1;The scaffold body 1 is by four perpendicular 2, four the first transverse connecting rods 3, four of support tube
Individual second transverse connecting rod 5 and several fixtures 4 are formed;The upper and lower part of each perpendicular support tube 2 is respectively welded two
Fixture 4;The fixture 4 includes vertical tube set 41 and two transverse tube sets 42;Two transverse tube sets 42 are symmetrically arranged on institute
State the middle position of vertical tube set 41;The first transverse connecting rod 3 is threaded between two relative transverse tube sets 42;It is described
The both ends of second transverse connecting rod 5 are stuck in corresponding vertical tube set 41;It is perpendicular where between the scaffold body 1
Nogata connects upwardly through connector 6;The connector 6 includes limited post 61 and limited block 62;The limited block 62 is arranged on
The middle position of the limited post 61;Perpendicular support tube 2 of the both ends of the limited post 61 respectively with two scaffold bodies 1 connects
Connect.
It is preferred that the both ends of first transverse connecting rod 3 are respectively arranged with nipple 8;Set in the transverse tube set 42
There is the internal thread being adapted with the nipple 8.The both ends of second transverse connecting rod 5 are respectively arranged with fixed elbow 7.Institute
The diameter for stating limited post 61 is less than the diameter of the limited block 62;The pipe of the diameter of the limited block 62 and the perpendicular support tube 2
Wall diameter is equal.The diameter of the limited post 61 is slightly less than the nozzle diameter of the perpendicular support tube 2.The scaffold body 1 it
Between where horizontal direction on connected by first transverse connecting rod 3 and second transverse connecting rod 5.
A kind of operation principle of the construction scaffold of installation easy to disassemble:The construction of the installation easy to disassemble
With scaffold, a scaffold body 1 is put up first, takes four perpendicular support tubes 2, with four the first transverse connecting rods 3 by four
Individual perpendicular support tube 2 connects into two pairs, do not have two a pair, then two pairs of perpendicular support tubes 2 are connected by four the second transverse connecting rods 5 again
Connect so that whole scaffold body 1 is in cube structure, vertical tube 41 part as connection of set being provided with, wherein vertical tube
Set 41 includes vertical tube set 41 and two transverse tube sets 42 so that the both ends transverse tube corresponding with two of the first transverse connecting rod 3 covers 42 screw threads
Connection, first the nipple 8 of the one end of the first transverse connecting rod 3 is fully screwed into transverse tube set 42, then the first transverse connecting rod 3 is another
The nipple 8 at end is directed at corresponding transverse tube set 42, by the corresponding transverse tube set 42 of its half precession, ensures the first horizontal company
The transverse tube that the half difference precession of the nipple 8 at the both ends of extension bar 3 is corresponding is covered in 42, is easily realized to the first transverse connecting rod
3 installation, the both ends of the second transverse connecting rod 5 therein set fixed elbow 7 respectively, by the fixation at the both ends of the second transverse connecting rod 5
Elbow 7 is inserted into vertical tube set 41 respectively, and the installation tightly, easily realized to the second transverse connecting rod 5 is then struck with hammer;It is therein
Being connected on vertical direction where between scaffold body 1 by connector 6, connector 6 includes limited post 61 and limited block 62,
Limited block 62 is arranged on the middle position of limited post 61, the both ends of limited post 61 therein respectively with two scaffold bodies 1
Perpendicular support tube 2 connect, realize longitudinal convenient installation between two adjacent scaffold bodies 1, when disassembled, otherwise i.e.
Can so that construction convenient firm can install or remove with scaffold.
Disclosed above is only specific embodiment of the utility model, and still, the utility model embodiment is not limited to
This, the changes that any person skilled in the art can think of should all fall into the scope of protection of the utility model.
Claims (6)
- A kind of 1. construction scaffold of installation easy to disassemble, it is characterised in that:Including several scaffold bodies(1); The scaffold body(1)By four perpendicular support tubes(2), four the first transverse connecting rods(3), four the second transverse connecting rods(5)With Several fixtures(4)Form;Each perpendicular support tube(2)Upper and lower part two fixtures are respectively welded(4);It is described Fixture(4)Including vertical tube set(41)With two transverse tube sets(42);Two transverse tube sets(42)Symmetrically it is arranged on described perpendicular Pipe sleeve(41)Middle position;Two relative transverse tube sets(42)Between be threaded with the first transverse connecting rod(3);Institute State the second transverse connecting rod(5)Both ends be stuck in the corresponding vertical tube set(41)It is interior;The scaffold body(1)Between Pass through connector on the vertical direction at place(6)Connection;The connector(6)Including limited post(61)And limited block(62);Institute State limited block(62)It is arranged on the limited post(61)Middle position;The limited post(61)Both ends distinguish two pin hands Frame body(1)Perpendicular support tube(2)Connection.
- 2. a kind of construction scaffold of installation easy to disassemble as claimed in claim 1, it is characterised in that described first Transverse connecting rod(3)Both ends be respectively arranged with nipple(8);The transverse tube set(42)Inside it is provided with and the nipple (8)Adaptable internal thread.
- 3. a kind of construction scaffold of installation easy to disassemble as claimed in claim 1, it is characterised in that described second Transverse connecting rod(5)Both ends be respectively arranged with fixed elbow(7).
- 4. a kind of construction scaffold of installation easy to disassemble as claimed in claim 1, it is characterised in that described spacing Post(61)Diameter be less than the limited block(62)Diameter;The limited block(62)Diameter and the perpendicular support tube(2)'s Tube wall diameter is equal.
- 5. a kind of construction scaffold of installation easy to disassemble as claimed in claim 1, it is characterised in that described spacing Post(61)Diameter be slightly less than the perpendicular support tube(2)Nozzle diameter.
- A kind of 6. construction scaffold of installation easy to disassemble as claimed in claim 1, it is characterised in that the pin hand Frame body(1)Between where horizontal direction on pass through first transverse connecting rod(3)With second transverse connecting rod(5)Even Connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720414575.7U CN206667707U (en) | 2017-04-20 | 2017-04-20 | A kind of construction scaffold of installation easy to disassemble |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720414575.7U CN206667707U (en) | 2017-04-20 | 2017-04-20 | A kind of construction scaffold of installation easy to disassemble |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206667707U true CN206667707U (en) | 2017-11-24 |
Family
ID=60372220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720414575.7U Expired - Fee Related CN206667707U (en) | 2017-04-20 | 2017-04-20 | A kind of construction scaffold of installation easy to disassemble |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206667707U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149920A (en) * | 2018-02-05 | 2018-06-12 | 天津源美脚手架有限公司 | A kind of scaffold and its installation method with the draw |
CN108360729A (en) * | 2018-02-01 | 2018-08-03 | 福建工程学院 | A kind of detachably adjustable assembled suspension and support and its assembly technology |
-
2017
- 2017-04-20 CN CN201720414575.7U patent/CN206667707U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360729A (en) * | 2018-02-01 | 2018-08-03 | 福建工程学院 | A kind of detachably adjustable assembled suspension and support and its assembly technology |
CN108149920A (en) * | 2018-02-05 | 2018-06-12 | 天津源美脚手架有限公司 | A kind of scaffold and its installation method with the draw |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206667707U (en) | A kind of construction scaffold of installation easy to disassemble | |
CN107327097A (en) | A kind of guardrail | |
CN206800988U (en) | A kind of civil engineering scaffold being easily installed | |
CN106829026B (en) | A kind of hexagon binding apparatus of steel pipe | |
CN204960292U (en) | Novel construction scaffold | |
CN207003968U (en) | A kind of dismountable scaffold of architectural engineering | |
CN205875655U (en) | Scaffold | |
CN108729636A (en) | A kind of scaffold | |
CN207110442U (en) | The connector that a kind of scaffold uses | |
CN202718383U (en) | Building scaffold connecting device | |
CN210888048U (en) | Sleeve pipe support module for building | |
CN211815775U (en) | Portable block pole setting support | |
CN208950292U (en) | A kind of building built connection structure | |
CN209261345U (en) | A kind of detachable isolation guardrail | |
CN207110440U (en) | A kind of middle part connection support member on scaffold | |
CN208686201U (en) | It is a kind of for architectural engineering and the modular maintenance railing of road engineering | |
CN206529997U (en) | A kind of building decoration guardrail | |
CN206337883U (en) | A kind of anti-climbing antidetonation steel tube tower | |
CN207079953U (en) | Edge protection rail structure | |
CN104131777A (en) | Upright ladder | |
CN207063676U (en) | Swing suspension column | |
CN210857978U (en) | Scaffold connecting and fixing device | |
CN214573593U (en) | Concatenation formula netted guardrail | |
CN219773583U (en) | Scaffold steel pipe connecting piece | |
CN219196940U (en) | Assembled guard rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171124 Termination date: 20180420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |