CN103966986A - 涡流洞室施工石渣转运起吊系统及方法 - Google Patents
涡流洞室施工石渣转运起吊系统及方法 Download PDFInfo
- Publication number
- CN103966986A CN103966986A CN201410214244.XA CN201410214244A CN103966986A CN 103966986 A CN103966986 A CN 103966986A CN 201410214244 A CN201410214244 A CN 201410214244A CN 103966986 A CN103966986 A CN 103966986A
- Authority
- CN
- China
- Prior art keywords
- cavern
- material containing
- containing car
- rock ballast
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
涡流洞室施工石渣转运起吊系统及方法,包括洞室行车、载料车和竖井顶部行车,洞室行车安装在位于洞室竖直段顶部洞室桁架的行车运行导轨上,载料车安装在位于洞室平直段的载料车运行导轨上,载料车一端通过牵引绳与载料车牵引装置相连,载料车还设有液压自卸装置,竖井顶部行车设置在竖井顶部外侧,竖井底部设有卸料坑。本发明提供的涡流洞室施工石渣转运起吊系统,通过在洞室内设置行车,与带有牵引装置的载料车配合使用,将涡流洞室内施工的石渣转运起吊至洞外。本发明构造简单、操作方便、省时省力,极大地提高了涡流洞室狭小施工空间开挖石渣外运效率,保证了作业人员安全。
Description
技术领域
本发明涉及一种转运起吊系统及方法,特别是一种用于涡流洞室开挖施工中石渣转运起吊系统及方法。
背景技术
水利水电涡流洞室往往为回旋式或折线设计,其开挖施工过程中产生的石渣外运速度快慢决定了涡流洞室开挖施工效率。外运起吊装置往往为在折线洞室末端安装悬臂吊机,通过人工转运的方式来完成石渣转运,其效率低下且安装悬臂吊机会使原本狭小的洞室更加拥挤,施工作业存在极大地安全隐患。
发明内容
本发明所要解决的技术问题是提供一种涡流洞室施工石渣转运起吊系统及方法,通过在洞室内设置行车,与带有牵引装置的载料车配合,将涡流洞室内施工的石渣转运起吊至洞外,极大地提高了涡流洞室狭小施工空间开挖石渣外运效率,保证了作业人员安全。
为解决上述技术问题,本发明所采用的技术方案是:涡流洞室施工石渣转运起吊系统,包括洞室行车、载料车和竖井顶部行车,洞室行车安装在位于洞室竖直段顶部洞室桁架的行车运行导轨上,载料车安装在位于洞室平直段的载料车运行导轨上,载料车一端通过牵引绳与载料车牵引装置相连,载料车还设有液压自卸装置,竖井顶部行车设置在竖井顶部外侧,竖井底部设有卸料坑。
洞室桁架由贝雷片或军用梁拼装而成,通过预埋在洞顶岩壁中的支撑牛腿支撑固定,支撑牛腿设置在洞室桁架两端。
所述的支撑牛腿为型钢。
所述的载料车运行导轨设有一定坡度,坡度大小为载料车在卸料坑卸料完成后可自行滑行至装料点,载料车运行导轨两端设有载料车限位器。
所述的行车运行导轨两端设有行车限位器。
一种采用上述转运起吊系统进行涡流洞室施工石渣转运起吊的方法,包括以下步骤:
一、将涡流洞室内施工石渣装入第一吊篮内;
二、洞室行车上的洞室吊机将涡流洞室底部装有施工石渣的第一吊篮垂直吊起后,沿行车运行导轨将施工石渣水平运送至位于洞室平直段内的载料车上;
三、载料车通过载料车牵引装置沿载料车运行导轨运送至竖井底部卸料坑附近的载料车限位器时停车,并通过液压自卸装置卸料至第二吊篮内,卸料完成后载料车牵引装置松驰,载料车自行沿载料车运行导轨的坡度下滑至装料点;
四、竖井顶部行车上的竖井顶部吊车将卸料坑内装有施工石渣的第二吊篮重直吊起运送至洞外。
本发明提供的涡流洞室施工石渣转运起吊系统,通过在洞室内设置行车,与带有牵引装置的载料车配合,将涡流洞室内施工的石渣转运起吊至洞外。本发明构造简单、操作方便、省时省力,极大地提高了涡流洞室狭小施工空间开挖石渣外运效率,保证了作业人员安全。
附图说明
下面结合附图和实施例对本发明作进一步说明:
图1为本发明整体示意图。
图2 为本发明A-A剖示图。
图1-2中:洞室行车1,行车限位器2,洞室吊机3,行车运行导轨4,第一吊篮5,载料车6,载料车限位器7,载料车运行导轨8,卸料坑9,第二吊篮10,载料车牵引装置11,竖井顶部行车12,竖井顶部吊机13,施工竖井14,洞室平直段15,洞室竖直段16、施工石渣17、支撑牛腿18、洞室桁架19。
具体实施方式
实施例1:
如图1-2中所示,一种涡流洞室施工石渣转运起吊系统及方法,包括洞室行车1、载料车6和竖井顶部行车12,洞室行车1安装在位于洞室竖直段16顶部洞室桁架19的行车运行导轨4上,载料车6安装在位于洞室平直段15的载料车运行导轨8上,载料车6一端通过牵引绳与载料车牵引装置11相连,载料车6还设有液压自卸装置,竖井顶部行车12设置在竖井顶部外侧,竖井底部设有卸料坑9。
由此结构,即可通过设置在洞室竖直段16顶部的洞室行车1将涡流洞室内施工石渣17垂直起吊至安装在洞室平直段15内的载料车6内,再通过载料车牵引装置11将载料车水平移动至竖井底部的卸料坑9处,载料车6的液压自卸装置可将施工石渣17卸至卸料坑9内,最后通过设置在竖井顶部外侧的竖井顶部行车12将施工石渣17垂直吊起至洞外,最终在涡流洞室内形成一条石渣起吊转运至洞外的流水作业。
优选的,洞室桁架19由贝雷片或军用梁拼装而成,通过预埋在洞顶岩壁中的支撑牛腿18支撑固定,支撑牛腿18设置在洞室桁架19两端。洞室桁架19使用贝雷片或军用梁拼装便于洞室桁架19在洞室内安装和拆卸,同时通过预埋在洞顶岩壁内的支撑牛腿18可使洞室桁架19牢固的固定在洞内,便于支撑和固定安装在洞室桁架上的洞室行车1。
所述的支撑牛腿18为型钢。
进一步优选的方案如图1中所示,所述的载料车运行导轨8设有一定坡度,坡度大小为载料车6在卸料坑9卸料完成后可自行滑行至装料点,载料车运行导轨8两端设有载料车限位器7。载料车运行导轨8的坡度设计可使载料车6在无牵引力的作用下依靠自身重力自行下滑至装料点;载料车限位器7可防止载料车6在移动过程中跑出载料车运行导轨8,保证载料车6停车点准确。
所述的行车运行导轨4两端设有行车限位器2。行车限位器2可防止洞室行车1在运行过程中跑出行车运行导轨4,保证洞室行车1在准确位置停车。
实施例2:
使用实施例1中所涉及的转运起吊系统进行涡流洞室施工石渣转运起吊的方法,步骤为:
一、将涡流洞室内施工石渣17装入第一吊篮5内;
二、洞室行车1上的洞室吊机3将涡流洞室底部装有施工石渣17的第一吊篮5垂直吊起后,沿行车运行导轨4将施工石渣17水平运送至位于洞室平直段15内的载料车6上;
三、载料车6通过载料车牵引装置11沿载料车运行导轨8移动到竖井底部卸料坑9附近的载料车限位器7时停车,并通过液压自卸装置卸料至第二吊篮10内,卸料完成后载料车牵引装置11松驰,载料车6自行沿载料车运行导轨8的坡度下滑至装料点;
四、竖井顶部行车12上的竖井顶部吊车13将卸料坑9内装有施工石渣17的第二吊篮10重直吊起运送至洞外。
重复上述四个步骤即可实现涡流洞室施工石渣转运起吊的流水作业。
Claims (6)
1.涡流洞室施工石渣转运起吊系统,包括洞室行车(1)、载料车(6)和竖井顶部行车(12),其特征在于:洞室行车(1)安装在位于洞室竖直段(16)顶部洞室桁架(19)的行车运行导轨(4)上,载料车(6)安装在位于洞室平直段(15)载料车运行导轨(8)上,载料车(6)一端通过牵引绳与载料车牵引装置(11)相连,载料车(6)还设有液压自卸装置,竖井顶部行车(12)设置在竖井顶部外侧,竖井底部设有卸料坑(9)。
2.根据权利要求1所述的涡流洞室施工石渣转运起吊系统,其特征在于:洞室桁架(19)由贝雷片或军用梁拼装而成,通过预埋在洞顶岩壁中的支撑牛腿(18)支撑固定,支撑牛腿(18)设置在洞室桁架(19)两端。
3.根据权利要求2所述的涡流洞室施工石渣转运起吊系统,其特征在于:所述的支撑牛腿(18)为型钢。
4.根据权利要求1所述的涡流洞室施工石渣转运起吊系统,其特征在于:所述的载料车运行导轨(8)设有一定坡度,坡度大小为载料车(6)在卸料坑(9)卸料完成后可自行滑行至装料点,载料车运行导轨(8)两端设有载料车限位器(7)。
5.根据权利要求1所述的涡流洞室施工石渣转运起吊系统,其特征在于:所述的吊运运行导轨(4)两端设有行车限位器(2)。
6.一种采用权利要求1所述的转运起吊系统进行涡流洞室施工石渣转运起吊的方法,其特征是包括以下步骤:
一、将涡流洞室内施工石渣(17)装入第一吊篮(5)内;
二、洞室行车(1)上的洞室吊机(3)将涡流洞室底部装有施工石渣(17)的第一吊篮(5)垂直吊起后,沿行车运行导轨(4)将施工石渣(17)水平运送至位于洞室平直段(15)内的载料车(6)上;
三、载料车(6)通过载料车牵引装置(11)沿载料车运行导轨(8)运行至竖井底部卸料坑(9)附近的载料车限位器(7)时停车,并通过液压自卸装置卸料至第二吊篮(10)内,卸料完成后载料车牵引装置(11)松驰,载料车(6)自行沿载料车运行导轨(8)的坡度下滑至装料点;
四、竖井顶部行车(12)上的竖井顶部吊车(13)将卸料坑(9)内装有施工石渣(17)的第二吊篮(10)重直吊起运送至洞外。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410214244.XA CN103966986B (zh) | 2014-05-21 | 2014-05-21 | 涡流洞室施工石渣转运起吊系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410214244.XA CN103966986B (zh) | 2014-05-21 | 2014-05-21 | 涡流洞室施工石渣转运起吊系统及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103966986A true CN103966986A (zh) | 2014-08-06 |
CN103966986B CN103966986B (zh) | 2015-09-30 |
Family
ID=51236955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410214244.XA Expired - Fee Related CN103966986B (zh) | 2014-05-21 | 2014-05-21 | 涡流洞室施工石渣转运起吊系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103966986B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374443A (zh) * | 2018-05-07 | 2018-08-07 | 中国水利水电第五工程局有限公司 | 一种小硐室大断面集水井开挖装置及开挖方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1244610A (zh) * | 1999-06-28 | 2000-02-16 | 贺永安 | 全程封闭巨型浮动平台运输系统 |
KR100727853B1 (ko) * | 2006-02-17 | 2007-06-14 | 주식회사 삼안 | 조력발전소용 수문구조물 |
CN203834438U (zh) * | 2014-05-21 | 2014-09-17 | 葛洲坝集团第五工程有限公司 | 涡流洞室施工石渣转运起吊系统 |
-
2014
- 2014-05-21 CN CN201410214244.XA patent/CN103966986B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1244610A (zh) * | 1999-06-28 | 2000-02-16 | 贺永安 | 全程封闭巨型浮动平台运输系统 |
KR100727853B1 (ko) * | 2006-02-17 | 2007-06-14 | 주식회사 삼안 | 조력발전소용 수문구조물 |
CN203834438U (zh) * | 2014-05-21 | 2014-09-17 | 葛洲坝集团第五工程有限公司 | 涡流洞室施工石渣转运起吊系统 |
Non-Patent Citations (1)
Title |
---|
高忠诚: "二滩水电站地下厂房洞室的施工特点", 《四川水力发电》, vol. 17, no. 4, 31 December 1998 (1998-12-31) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374443A (zh) * | 2018-05-07 | 2018-08-07 | 中国水利水电第五工程局有限公司 | 一种小硐室大断面集水井开挖装置及开挖方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103966986B (zh) | 2015-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203794089U (zh) | 一种链斗式连续提升机系统 | |
CN108190738B (zh) | 一种矿用单轨吊机起重运输装置 | |
CN102913260A (zh) | 一种用于地铁盾构隧道施工的管片快速倒运机构 | |
CN204098952U (zh) | 一种煤矿巷道中悬挂式集装箱输送装置 | |
CN203820331U (zh) | 内置式钢丝绳物料升降机 | |
CN205973518U (zh) | 轨道龙门吊车 | |
CN203922509U (zh) | 一种船体钢板的吊运装置 | |
CN201990928U (zh) | 浮码头钢引桥升降装置 | |
CN213738231U (zh) | 一种钢结构生产用搬运装置 | |
CN203834438U (zh) | 涡流洞室施工石渣转运起吊系统 | |
CN103966986A (zh) | 涡流洞室施工石渣转运起吊系统及方法 | |
CN204609308U (zh) | 一种通道受限部位混凝土有轨转运装置 | |
CN203667819U (zh) | 大倾角巷道单轨吊运输装置 | |
CN203318561U (zh) | 一种报废汽车拆解线的圆盘式运输线 | |
CN202937278U (zh) | 一种用于地铁盾构隧道施工的管片快速倒运机构 | |
CN214879623U (zh) | 一种串联式轨上行走预制件吊运系统 | |
CN200988740Y (zh) | 一种环型悬臂集装箱起重机 | |
CN202897405U (zh) | 带感应的皮带输送机车式拉紧装置 | |
CN107253672A (zh) | 一种岸桥及货物运输方法 | |
CN204958229U (zh) | 自行式起重机 | |
CN207747906U (zh) | 一种小型预制盖板安装小车 | |
CN205855760U (zh) | 一种氧枪起降运输工具 | |
CN205346714U (zh) | 一种预制件吊装小车 | |
CN204173816U (zh) | 内置钢索简易起重装置 | |
CN210214591U (zh) | 一种用于掘进机上管路延伸的装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150930 Termination date: 20190521 |