CN103966942A - Structure system used for controlling longitudinal response of girder of cable-stayed bridge with three towers and pylon - Google Patents

Structure system used for controlling longitudinal response of girder of cable-stayed bridge with three towers and pylon Download PDF

Info

Publication number
CN103966942A
CN103966942A CN201310027571.XA CN201310027571A CN103966942A CN 103966942 A CN103966942 A CN 103966942A CN 201310027571 A CN201310027571 A CN 201310027571A CN 103966942 A CN103966942 A CN 103966942A
Authority
CN
China
Prior art keywords
tower
girder
bridge
middle tower
described multiple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310027571.XA
Other languages
Chinese (zh)
Other versions
CN103966942B (en
Inventor
张喜刚
刘高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Consultants Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
CCCC Highway Consultants Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Highway Consultants Co Ltd, CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd filed Critical CCCC Highway Consultants Co Ltd
Priority to CN201310027571.XA priority Critical patent/CN103966942B/en
Publication of CN103966942A publication Critical patent/CN103966942A/en
Application granted granted Critical
Publication of CN103966942B publication Critical patent/CN103966942B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a structure system used for controlling longitudinal response of a girder of a cable-stayed bridge with three towers and a pylon. The cable-stayed bridge with the three towers comprises the girder, a middle tower, and a first side tower and a second side tower located on two sides of the middle tower; the structure system comprises a middle tower elastic support and a middle tower power damping device which are arranged between the middle tower and the girder in the longitudinal direction, a first power damping device which is arranged between the first side tower and the girder in the longitudinal direction, and a second power damping device which is arranged between the second side tower and the girder in the longitudinal direction; a threshold value is set in the middle tower elastic support; the threshold value ensures that the middle tower elastic support works normally under actions of a static force, automobile braking, wind, small and medium-sized earthquake lower than 7 magnitude, and the like, but stops working under the action of a violent earthquake with magnitude equal to or higher than 7, under which condition the middle tower power damping device starts to work to control the longitudinal earthquake response between the girder and the middle tower. The structure system provided by the invention can effectively control the longitudinal response of the girder of the cable-stayed bridge with three towers and the pylon.

Description

A kind of for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response
Technical field
The present invention relates to technical field of bridge engineering, be specifically related to a kind of for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response.
Background technology
Cable stayed bridge is a kind of modern bridge type, good economy performance, wide adaptability, the present main flow bridge type that has developed into Loads of Long-span Bridges.In the face of the complicated construction condition such as deep water, soft base, many Navigation in Navigables, multi pylon cable stayed bridge has very strong competitiveness.At present, three pylon cable-stayed bridges are widely applied in engineering, as spit of fland, Hong Kong nine bridges, Yueyang Dongting Lake Bridge, smooth mound, the Hubei Yangtze Bridge, Wuhan two or seven Yangtze Bridge etc.
The realization of general arrangement, structural safety and the function of the structural system direct relation bridge of three pylon cable-stayed bridges.Compared with double pylon cable stayed bridge, the Zhong Ta both sides of three pylon cable-stayed bridges lack effective longitudinal restraint, make that structural flexibility is larger, damping is lower, more responsive to the static(al)s such as automobile, temperature, wind and earthquake and dynamic action, at the bottom of girder length travel, girder vertical deflection, suspension cable Fatigue Stress Amplitude and tower, internal force geometric ratio double pylon cable stayed bridge is much bigger.
Three pylon cable-stayed bridges have in longitudinal structural system: the complete fixed system of (1) girder and bridge tower; (2) the full float system of girder and bridge tower; (3) fixed, the girder of girder and middle tower and limit tower float system; (4) the damping system of damper is set between girder and bridge tower; (5) cable system etc. of putting more energy into is set between middle column overhead and limit column overhead, or between middle column overhead and limit tower lower king-post strut.
Between girder and bridge tower, adopt complete fixed system, the rigidity of structure is large, is conducive to the installation of bridge tower district girder.But bridge tower and girder produce very large moment of flexure under temperature and geological process.
Between girder and bridge tower, adopt full float system, can release temperature effect under the internal force of structure.But under longitudinal wind effect, girder beam-ends causes generation over-large displacement beam section stretching device to maximize, and bridge tower top displacement also can be very large simultaneously.In addition,, because bridge longitudinal damping is very little, under geological process, the interior force-responsive of girder and bridge tower is larger.
Girder and middle tower are fixed, girder and limit tower float system can be controlled structure under temperature action displacement and interior force-responsive, but under geological process, displacement and the interior force-responsive of girder and bridge tower is larger.
Between girder and bridge tower, arrange the damping system of damper can release temperature effect under the internal force of structure, and displacement and the interior force-responsive of structure under Earthquake occurrence control effect effectively.But moment of flexure is excessive simultaneously at the bottom of longitudinally can producing over-large displacement and cause beam section stretching device to maximize at girder beam-ends under wind effect, also can causing bridge tower top displacement and tower.
Between middle column overhead and limit column overhead, or the cable system of putting more energy into is set between middle column overhead and limit tower lower king-post strut can effectively controls the longitudinal quiet dynamic response of bridge, but this class system causes the view poor-performing of bridge, and vibration problem, the fatigue durability problem etc. of the drag-line itself of putting more energy into are more outstanding, need further investigation.
Summary of the invention
(1) technical problem that will solve
In view of this, main purpose of the present invention is for the vertical response problem of three pylon cable-stayed bridges girder and bridge tower under the effect such as temperature, automobile brake, wind and earthquake, provides a kind of for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response.
(2) technical scheme
For achieving the above object, the invention provides a kind of for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, this three pylon cable-stayed bridge has girder 1, middle tower 2 and is arranged in first side tower 3 and the Second Edge tower 4 of tower 1 both sides, and this structural system comprises:
The multiple middle tower resiliency supported 5 and the multiple middle tower dynamic damping devices 6 that between girder 1 and middle tower 2, longitudinally arrange;
Multiple the first dynamic damping devices 7 that longitudinally arrange between girder 1 and first side tower 3; And
Multiple the second dynamic damping devices 8 that longitudinally arrange between girder 1 and Second Edge tower 4.
In such scheme, described multiple middle tower resiliency supported 5 are longitudinal static(al) and dynamic responses of controlling girder 1 and middle tower 2 with described multiple middle tower dynamic damping devices 6.
In such scheme, described multiple middle tower resiliency supported 5 are steel, marmem, rubber, polymer composite or this four kinds of elastic devices that combination of materials is made.
In such scheme, described multiple middle tower dynamic damping devices 6, multiple the first dynamic damping device 7 and multiple the first dynamic damping device 8 are metal damper, polymer composite damper, frcition damper, viscous damper, viscoelastic damper or composite damper.In such scheme, described multiple middle tower resiliency supported 5 are all equipped with a tension or compressive strength threshold values K Pascal (Pa), and K is natural number; Under the effect of static(al), automobile braking force, wind and 7 grades of following small earthquakes, the force intensity that is subject to of described multiple middle tower resiliency supported 5 is less than this tension or compressive strength threshold values K Pascal (Pa), and described multiple middle tower resiliency supported 5 are normally worked; More than 7 grades and 7 grades under violent earthquake effect, the force intensity that is subject to of described multiple middle tower resiliency supported 5 is greater than this tension or compressive strength threshold values K Pascal (Pa), described multiple middle tower resiliency supported 5 is deactivated, now, described multiple middle tower dynamic damping device 6 startup work, control the Longitudinal response of girder 1 and middle tower 2.
In such scheme, described multiple the first dynamic damping devices 7 are Longitudinal responses of controlling girder 1 and first side tower 3.
In such scheme, described multiple the second dynamic damping devices 8 are Longitudinal responses of controlling girder 1 and Second Edge tower 4.
(3) beneficial effect
Can find out from technique scheme, the present invention has following beneficial effect:
1, provided by the invention this for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, by multiple middle tower resiliency supported 5, multiple middle tower dynamic damping device 6, multiple the first dynamic damping device 7, multiple the second dynamic damping device 8 are rationally set, so can effectively increase vertical structure rigidity and the structural damping of three pylon cable-stayed bridges, thereby can effectively control three pylon cable-stayed bridge girders and bridge tower displacement and the interior force-responsive under static(al) and dynamic action, ensure structural safety and the functional requirement of bridge, reduced the construction cost of bridge.
2, provided by the invention this for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, because installation, inspection, maintenance, the replacing of multiple middle tower resiliency supported 5, multiple middle tower dynamic damping device 6, multiple the first dynamic damping devices 7 and multiple the second dynamic damping devices 8 are convenient, good economy performance, can promote the use of other bridge types such as three tower suspension bridges.
Brief description of the drawings
Fig. 1 is provided by the invention for controlling the structural representation of structural system of three pylon cable-stayed bridge girders and bridge tower vertical response.
Reference numeral:
Girder 1; Middle tower 2; First side tower 3; Second Edge tower 4; Middle tower resiliency supported 5; Middle tower dynamic damping device 6; The first dynamic damping device 7; The second dynamic damping device 8.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with specific embodiment, and with reference to accompanying drawing, the present invention is described in more detail.
As shown in Figure 1, Fig. 1 is provided by the invention for controlling the structural representation of structural system of three pylon cable-stayed bridge girders and bridge tower vertical response.Three pylon cable-stayed bridges shown in Fig. 1 have girder 1, middle tower 2 and are arranged in first side tower 3 and the Second Edge tower 4 of tower 1 both sides, and this structural system that is used for controlling three pylon cable-stayed bridge girders and bridge tower vertical response comprises:
The multiple middle tower resiliency supported 5 and the multiple middle tower dynamic damping devices 6 that between girder 1 and middle tower 2, longitudinally arrange; Multiple the first dynamic damping devices 7 that longitudinally arrange between first side tower 3 and girder 1; And multiple the second dynamic damping devices 8 that longitudinally arrange between Second Edge tower 4 and girder 1.Described multiple middle tower resiliency supported 5 is steel, marmem, rubber, polymer composite or this four kinds of elastic devices that combination of materials is made; Described multiple middle tower dynamic damping device 6, multiple the first dynamic damping device 7 and multiple the first dynamic damping device 8 are metal damper, polymer composite damper, frcition damper, viscous damper, viscoelastic damper or composite damper.
Wherein, described multiple middle tower resiliency supported 5 is longitudinal static(al) and dynamic responses of controlling girder 1 and middle tower 2 with described multiple middle tower dynamic damping devices 6.Described multiple middle tower resiliency supported 5 is all equipped with a tension or compressive strength threshold values K Pascal (Pa), and K is natural number.Under the effect of static(al), automobile braking force, wind and 7 grades of following small earthquakes etc., the force intensity that is subject to of described multiple middle tower resiliency supported 5 is less than this tension or compressive strength threshold values K Pascal (Pa), and described multiple middle tower resiliency supported 5 are normally worked; More than 7 grades and 7 grades under violent earthquake effect, the force intensity that is subject to of described multiple middle tower resiliency supported 5 is greater than this tension or compressive strength threshold values K Pascal (Pa), described multiple middle tower resiliency supported 5 is deactivated, now, described multiple middle tower dynamic damping device 6 startup work, control the Longitudinal response of girder 1 and middle tower 2.
Described multiple the first dynamic damping device 7 is Longitudinal responses of controlling girder 1 and first side tower 3, and described multiple the second dynamic damping devices 8 are Longitudinal responses of controlling girder 1 and Second Edge tower 4.
Provided by the invention this for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, by multiple middle tower resiliency supported 5, multiple middle tower dynamic damping device 6, multiple the first dynamic damping device 7, multiple the second dynamic damping device 8 are rationally set, can effectively increase vertical structure rigidity and the structural damping of three pylon cable-stayed bridges, thereby can effectively control three pylon cable-stayed bridge girders and bridge tower displacement and the interior force-responsive under static(al) and dynamic action, ensure structural safety and the functional requirement of bridge, reduced the construction cost of bridge.
Provided by the invention this for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, because installation, inspection, maintenance, the replacing of multiple middle tower resiliency supported 5, multiple middle tower dynamic damping device 6, multiple the first dynamic damping devices 7 and multiple the second dynamic damping devices 8 are convenient, good economy performance, can promote the use of other bridge types such as three tower suspension bridges.
In addition, provided by the invention this for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, also can be called as a kind ofly for controlling system, equipment or the device of three pylon cable-stayed bridge girders and bridge tower vertical response, " structural system " is equal to " system, equipment or device " here.
Above-described specific embodiment; object of the present invention, technical scheme and beneficial effect are further described; institute is understood that; the foregoing is only specific embodiments of the invention; be not limited to the present invention; within the spirit and principles in the present invention all, any amendment of making, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (7)

1. one kind for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, this three pylon cable-stayed bridge has girder (1), middle tower (2) and is arranged in first side tower (3) and the Second Edge tower (4) of tower (1) both sides, it is characterized in that, this structural system comprises:
The multiple middle tower resiliency supported (5) longitudinally arranging between girder (1) and middle tower (2) and multiple middle tower dynamic damping devices (6);
Multiple the first dynamic damping devices (7) that longitudinally arrange between girder (1) and first side tower (3); And
Multiple the second dynamic damping devices (8) that longitudinally arrange between girder (1) and Second Edge tower (4).
2. according to claim 1 for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, it is characterized in that, described multiple middle tower resiliency supported (5) are steel, marmem, rubber, polymer composite or this four kinds of elastic devices that combination of materials is made.
3. according to claim 1 for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, it is characterized in that, described multiple middle tower dynamic damping devices (6), multiple the first dynamic damping device (7) and multiple the first dynamic damping device (8) are metal damper, polymer composite damper, frcition damper, viscous damper, viscoelastic damper or composite damper.
4. according to claim 1 for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, it is characterized in that, described multiple middle tower resiliency supported (5) are longitudinal static(al) and the dynamic responses of controlling girder (1) He Zhongta (2) with described multiple middle tower dynamic damping devices (6).
5. according to claim 4 for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, it is characterized in that, described multiple middle tower resiliency supported (5) are all equipped with a tension or compressive strength threshold values K Pascal (Pa), and K is natural number; Under the effect of static(al), automobile braking force, wind and 7 grades of following small earthquakes, the force intensity that is subject to of described multiple middle tower resiliency supported (5) is less than this tension or compressive strength threshold values K Pascal (Pa), and described multiple middle tower resiliency supported (5) are normally worked; More than 7 grades and 7 grades under violent earthquake effect, the force intensity that is subject to of described multiple middle tower resiliency supported (5) is greater than this tension or compressive strength threshold values K Pascal (Pa), described multiple middle tower resiliency supported (5) are deactivated, now, described multiple middle tower dynamic damping devices (6) startup work, controls the Longitudinal response of girder (1) He Zhongta (2).
6. according to claim 1 for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, it is characterized in that, described multiple the first dynamic damping devices (7) are the Longitudinal responses of controlling girder (1) and first side tower (3).
7. according to claim 1 for controlling the structural system of three pylon cable-stayed bridge girders and bridge tower vertical response, it is characterized in that, described multiple the second dynamic damping devices (8) are the Longitudinal responses of controlling girder (1) and Second Edge tower (4).
CN201310027571.XA 2013-01-24 2013-01-24 A kind of structural system for controlling three pylon cable-stayed bridge girders and bridge tower vertical response Active CN103966942B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310027571.XA CN103966942B (en) 2013-01-24 2013-01-24 A kind of structural system for controlling three pylon cable-stayed bridge girders and bridge tower vertical response

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310027571.XA CN103966942B (en) 2013-01-24 2013-01-24 A kind of structural system for controlling three pylon cable-stayed bridge girders and bridge tower vertical response

Publications (2)

Publication Number Publication Date
CN103966942A true CN103966942A (en) 2014-08-06
CN103966942B CN103966942B (en) 2016-03-02

Family

ID=51236911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310027571.XA Active CN103966942B (en) 2013-01-24 2013-01-24 A kind of structural system for controlling three pylon cable-stayed bridge girders and bridge tower vertical response

Country Status (1)

Country Link
CN (1) CN103966942B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677739A (en) * 2018-07-20 2018-10-19 长沙理工大学 Temperature deformation correction method and system for cable-stayed bridge and suspension bridge cable tower construction process
CN110219234A (en) * 2019-06-20 2019-09-10 中铁大桥勘测设计院集团有限公司 Temperature self-adaptation tower Liang Shunqiao is to constant temperature reinforcing pull rod constrained procedure and system
CN111778839A (en) * 2020-07-16 2020-10-16 福州大学 Composite material filled O-shaped metal plate damper and arrangement and parameter optimization method thereof
CN112948921A (en) * 2021-02-02 2021-06-11 中铁大桥勘测设计院集团有限公司 Method for determining longitudinal constraint rigidity of tower beam of three-tower cable-stayed bridge and optimizing foundation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0539606A (en) * 1991-08-07 1993-02-19 Mitsubishi Heavy Ind Ltd Vibration control device of main tower
CN101424071A (en) * 2008-12-03 2009-05-06 中交公路规划设计院有限公司 Supporting system of long span stayed-cable bridge
CN202164534U (en) * 2011-07-13 2012-03-14 东南大学 Viscous damper installing device on bridge tower beam
CN102505625A (en) * 2011-12-19 2012-06-20 同济大学 Limiting method for preventing main tower system of stayed-cable bridge of floating system from being damaged through arranging stay wire below beam end
CN102720124A (en) * 2012-07-05 2012-10-10 大连理工大学 Fluid viscous damper with working switch
CN102747685A (en) * 2011-04-19 2012-10-24 中交公路规划设计院有限公司 Multifunctional comprehensive restraint device for whole construction and operation process of long-span hybrid-beam cable-stayed bridge
CN203238528U (en) * 2013-01-24 2013-10-16 中交公路规划设计院有限公司 Structural system used for controlling longitudinal response of three-tower cable-stayed bridge girder and bridge tower

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0539606A (en) * 1991-08-07 1993-02-19 Mitsubishi Heavy Ind Ltd Vibration control device of main tower
CN101424071A (en) * 2008-12-03 2009-05-06 中交公路规划设计院有限公司 Supporting system of long span stayed-cable bridge
CN102747685A (en) * 2011-04-19 2012-10-24 中交公路规划设计院有限公司 Multifunctional comprehensive restraint device for whole construction and operation process of long-span hybrid-beam cable-stayed bridge
CN202164534U (en) * 2011-07-13 2012-03-14 东南大学 Viscous damper installing device on bridge tower beam
CN102505625A (en) * 2011-12-19 2012-06-20 同济大学 Limiting method for preventing main tower system of stayed-cable bridge of floating system from being damaged through arranging stay wire below beam end
CN102720124A (en) * 2012-07-05 2012-10-10 大连理工大学 Fluid viscous damper with working switch
CN203238528U (en) * 2013-01-24 2013-10-16 中交公路规划设计院有限公司 Structural system used for controlling longitudinal response of three-tower cable-stayed bridge girder and bridge tower

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘金龙: ""地震作用下多塔斜拉桥失效模式控制研究"", 《中国博士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677739A (en) * 2018-07-20 2018-10-19 长沙理工大学 Temperature deformation correction method and system for cable-stayed bridge and suspension bridge cable tower construction process
CN110219234A (en) * 2019-06-20 2019-09-10 中铁大桥勘测设计院集团有限公司 Temperature self-adaptation tower Liang Shunqiao is to constant temperature reinforcing pull rod constrained procedure and system
CN111778839A (en) * 2020-07-16 2020-10-16 福州大学 Composite material filled O-shaped metal plate damper and arrangement and parameter optimization method thereof
CN112948921A (en) * 2021-02-02 2021-06-11 中铁大桥勘测设计院集团有限公司 Method for determining longitudinal constraint rigidity of tower beam of three-tower cable-stayed bridge and optimizing foundation
WO2022165983A1 (en) * 2021-02-02 2022-08-11 中铁大桥勘测设计院集团有限公司 Method for determining longitudinal restraint stiffness between tower beams of three-tower cable-stayed bridge and for optimizing foundation

Also Published As

Publication number Publication date
CN103966942B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN110175426B (en) Design method of railway bridge elastic-plastic metal limiting, damping and energy-consuming device
WO2018036519A1 (en) Method for improving anti-seismic performance of bridge by means of girder body, and energy-consumption and vibration-reduction bridge bearing
CN101424071B (en) Supporting system of long span stayed-cable bridge
CN103966943B (en) Control the structural system of cable-stayed bridge main-beam, auxiliary pier and transition pier transverse response
CN103966942B (en) A kind of structural system for controlling three pylon cable-stayed bridge girders and bridge tower vertical response
CN102635176A (en) Shearing and bending combined type staged yield mild steel damper
CN203834341U (en) System for controlling longitudinal and torsional static-dynamic response of suspension bridge
CN203891238U (en) Energy-dissipating shock-absorbing support of aseismic wall
CN107587417A (en) Hybrid combining beam three stride continuous suspension bridge
CN104805764A (en) Bidirectional-limiting unidirectional-movement basin-type rubber support
CN101769015A (en) Tensile mechanism for stack rubber shock-insulating support seats
CN104452572A (en) Outer-side span stay cable-free stay bridge with horizontal stress performance improved
CN204455790U (en) Improve the cable stayed bridge of outer end bay without suspension cable of lateral dynamics stress performance
CN104594180B (en) A kind of multi-tower continuous across cable stayed bridge
CN103850173B (en) A kind of for controlling the system that suspension bridge longitudinally responds with torsion force model
CN203238528U (en) Structural system used for controlling longitudinal response of three-tower cable-stayed bridge girder and bridge tower
CN203238529U (en) Structural system used for controlling transverse response of girder, auxiliary pier and transitional pier of cable-stayed bridge
CN203160423U (en) Wind-resistant building support with elastomer
CN204455791U (en) A kind of multi-tower continuous across cable stayed bridge
CN209703276U (en) A kind of steel column girder steel connector
CN202390949U (en) Bidirectional metal yielding energy consumption combined support
CN204676412U (en) A kind of bidirectionally limited one-way movable basin type rubber
Pourzeynali et al. Optimization of the TMD parameters to suppress the vertical vibrations of suspension bridges subjected to earthquake excitations
CN205839965U (en) A kind of steel structure support
CN205022825U (en) Extra -large -size floating structure thing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant