CN103966939B - Earth shoulder paver - Google Patents

Earth shoulder paver Download PDF

Info

Publication number
CN103966939B
CN103966939B CN201410204774.6A CN201410204774A CN103966939B CN 103966939 B CN103966939 B CN 103966939B CN 201410204774 A CN201410204774 A CN 201410204774A CN 103966939 B CN103966939 B CN 103966939B
Authority
CN
China
Prior art keywords
frame
paver
earth
delivery wheel
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410204774.6A
Other languages
Chinese (zh)
Other versions
CN103966939A (en
Inventor
庞兴才
李周
黄永建
姜海
徐华辉
唐友利
钟兴顺
黄建光
柏兵
胡鹤鸣
宁浩
吴东云
刁丽娜
胡志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NUCLEAR INDUSTRY SOUTH-WEST CONSTRUCTION GROUP Co Ltd
Original Assignee
NUCLEAR INDUSTRY SOUTH-WEST CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NUCLEAR INDUSTRY SOUTH-WEST CONSTRUCTION GROUP Co Ltd filed Critical NUCLEAR INDUSTRY SOUTH-WEST CONSTRUCTION GROUP Co Ltd
Priority to CN201410204774.6A priority Critical patent/CN103966939B/en
Publication of CN103966939A publication Critical patent/CN103966939A/en
Application granted granted Critical
Publication of CN103966939B publication Critical patent/CN103966939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

Earth shoulder paver, is made up of generator and storage bin, it is characterized in that: arrange storage bin at frame inside, arranges multipair triangle damping device and running wheel in the forward and backward side of bottom of frame; On front side of bottom of frame, draw bar is set; On rear side of bottom of frame, generator is installed; At bottom of frame horizontally set one group of conveying roller, cylinder installs delivery wheel, delivery wheel is connected with the variable frequency power motor be arranged on above left end vehicle frame by chain, and described one group of conveying roller arranges earth material conveyer belt; The bottom of frame inside storage bin right-hand member is provided with discharging opening, has the height regulating rod of adjustable flat material baffle plate in described discharging opening arranged outside, be provided with flat material baffle plate in the lower end of described adjusting rod.Use this invention paver to carry out the earth material filling building of earth shoulder and median strip, can effectively improve mechanical frequency of utilization, accelerate earth material filling building speed and fill effect, realize improving working efficiency, reducing the advantage manually dropping into, reduce engineering cost.

Description

Earth shoulder paver
Technical field
The present invention relates to road earth material embankment construction equipment, is exactly a kind of earth shoulder paver.
Background technology
At present, to the newly-built or reconstruction earth shoulder of highway and median strip, fill the method for earth material, all be transported to by dumper the section needing to fill, carload is discharged on the road in this section, form hill heap one by one, arrange digging machine again or manually transfer to the location needing to fill bit by bit, this method not only speed of application is slow, earth material filling building is also uneven, more troublesome is that earth material is in transfer process, meeting severe contamination has just completed the flexible pavement of making, bother very much when the later stage cleans, a lot of unit in charge of construction is helpless, all only before batch turning on the road surface in this section layer overlay geotextiles, so more add working procedure, and mostly be hand labour, cost of labor can roll up.This is to short-range earth shoulder and median strip, and earth material filling building does not also feel there is great difficulty, once there be the earth material filling building of tens kilometers or up to a hundred kilometers, dam filling construction conscientiously will be studied by unit in charge of construction.
Summary of the invention
The object of the invention is to: provide a kind of earth shoulder paver, be mainly used in newly-built or reconstruct the earth shoulder of highway and the earth material filling building of median strip, this invention paver structure is simple, easy to operate, low cost of manufacture; Use this invention paver to carry out the earth material filling building of earth shoulder and median strip, can effectively improve mechanical frequency of utilization, accelerate earth material filling building speed and fill effect, reach raising working efficiency, reduce the object manually dropping into, reduce engineering cost.
The object of the invention is to realize by implementing following technical proposals:
Earth shoulder paver, is made up of generator and storage bin, it is characterized in that: arrange storage bin at frame inside, arranges multipair triangle damping device in the forward and backward side of bottom of frame, installs paver running wheel in described damping device bottom; Draw bar is set on front side of bottom of frame, traction hook is set in draw bar termination; Generator connecting rod is set on rear side of bottom of frame, connecting rod installs generator; At bottom of frame horizontally set one group of conveying roller, the conveying roller of left end termination is installed variable frequency power delivery wheel, described power delivery wheel is connected with the variable frequency power motor be arranged on above left end vehicle frame by chain, action button on described power motor is connected with the power supply on generator, and described one group of conveying roller arranges earth material conveyer belt; The bottom of frame inside storage bin right-hand member is provided with discharging opening, is provided with the height regulating rod I of discharge adjustable mouth in described discharging opening both sides; There is the height regulating rod II of adjustable flat material baffle plate in described discharging opening arranged outside, be provided with flat material baffle plate in the lower end of described adjusting rod II.
Additional technical feature:
1), by one of bottom of frame horizontally set group of conveying roller, be set to two longitudinal delivery wheels, be separately positioned on two ends, bottom of frame left and right, the delivery wheel of left end termination is installed variable frequency power delivery wheel, described power delivery wheel is connected with longitudinal variable frequency power motor be arranged on above left end vehicle frame by chain, at two ends, bottom of frame left and right, the delivery wheel stage casing longitudinally arranged arranges spiral earth material conveying device.
2) the multipair triangle damping device, by forward and backward for bottom of frame side arranged, paver running wheel is installed in bottom, is arranged to cterpillar drive.
Advantage of the present invention is: provide a kind of earth shoulder paver, and be mainly used in newly-built or reconstruct the earth shoulder of highway and the earth material filling building of median strip, this invention paver structure is simple, easy to operate, low cost of manufacture; Use this invention paver to carry out the earth material filling building of earth shoulder and median strip, can effectively improve mechanical frequency of utilization, accelerate earth material filling building speed and fill effect, realize improving working efficiency, reducing the advantage manually dropping into, reduce engineering cost.
Accompanying drawing explanation
Fig. 1 is paver right view of the present invention;
Fig. 2 is paver left view of the present invention;
Fig. 3 is paver front view of the present invention.
Mark in figure: 1 is vehicle frame, and 2 is storage bin, and 3 is discharging opening, 4 is the height regulating rod I, 5 of discharge adjustable mouth be the height regulating rod II, 6 of adjustable flat material baffle plate is generator, 7 is traction hook, and 8 is draw bar, and 9 is triangle damping device, 10 is paver running wheel, and 11 is conveying roller, and 12 is earth material conveyer belt, 13 is flat material baffle plate, and 14 is generator connecting rod, and 15 is variable frequency power motor, 16 is action button, and 17 is variable frequency power delivery wheel.
Detailed description of the invention
Embodiment 1
A type: earth shoulder paver
Be made up of generator and storage bin, it is characterized in that: storage bin 2 is set inside vehicle frame 1, multipair triangle damping device 9 is set in the forward and backward side of bottom of frame, in described damping device bottom, paver running wheel 10 is installed; Draw bar 8 is set on front side of bottom of frame, traction hook 7 is set in draw bar termination; Generator connecting rod 14 is set on rear side of bottom of frame, connecting rod is installed generator 6; At bottom of frame horizontally set one group of conveying roller 11, the conveying roller of left end termination is installed variable frequency power delivery wheel 17, described power delivery wheel is connected with the variable frequency power motor 15 be arranged on above left end vehicle frame by chain, action button 16 on described power motor is connected with the power supply on generator, and described one group of conveying roller arranges earth material conveyer belt 12; The bottom of frame inside storage bin right-hand member is provided with discharging opening 3, is provided with the height regulating rod I 4 of discharge adjustable mouth in described discharging opening both sides; There is the height regulating rod II 5 of adjustable flat material baffle plate in described discharging opening arranged outside, be provided with flat material baffle plate 13 in the lower end of described adjusting rod II 5.
Workflow: be transported to needing the earth material filled the section needing to fill earth material by general tipping truck, by the traction hook on draw bar on front side of this invention earth shoulder paver, buckle on the hook of haul tipping truck afterbody, start the generator on rear side of this invention earth shoulder paver, start the action button on variable frequency power motor, after earth material conveyer belt starts running, while haul tipping truck moves ahead at a slow speed, start slowly discharging.
Site operation personnel, need the quantity according to filling earth material side's amount, the gait of march of commander's haul tipping truck; By controlling the caliber size of discharging opening, grasp the large a small amount of of discharging; By regulating the speed of service of variable frequency power motor, control the speed that earth material transmits.
Embodiment 2:
Type B: earth shoulder paver
This type earth shoulder paver is substantially identical with the structure of embodiment 1, difference is only: by one of bottom of frame horizontally set group of conveying roller 11, be set to two longitudinal delivery wheels, be separately positioned on two ends, bottom of frame left and right, the delivery wheel of left end termination is installed variable frequency power delivery wheel 17, described power delivery wheel is connected with longitudinal variable frequency power motor 15 be arranged on above left end vehicle frame by chain, at two ends, bottom of frame left and right, the delivery wheel stage casing longitudinally arranged arranges spiral earth material conveying device.
Embodiment 3:
C type: earth shoulder paver
This type earth shoulder paver is substantially identical with the structure of embodiment 1, and difference is only: the multipair triangle damping device 9 arranged side forward and backward bottom vehicle frame 1, paver running wheel 10 is installed in bottom, is arranged to cterpillar drive.
Embodiment 4:
D type: earth shoulder paver
This type earth shoulder paver is substantially identical with the structure of embodiment 2, and difference is only: the multipair triangle damping device 9 arranged side forward and backward bottom vehicle frame 1, paver running wheel 10 is installed in bottom, is arranged to cterpillar drive.

Claims (4)

1. earth shoulder paver, be made up of generator and storage bin, it is characterized in that: in vehicle frame (1) inner side, storage bin (2) is set, multipair triangle damping device (9) is set in the forward and backward side of bottom of frame, in described damping device bottom, paver running wheel (10) is installed; Draw bar (8) is set on front side of bottom of frame, traction hook (7) is set in draw bar termination; Generator connecting rod (14) is set on rear side of bottom of frame, connecting rod is installed generator (6); Bottom of frame horizontally set one group of conveying roller (11), the conveying roller of left end termination is installed variable frequency power delivery wheel (17), described power delivery wheel is connected with the variable frequency power motor (15) be arranged on above left end vehicle frame by chain, action button (16) on described power motor is connected with the power supply on generator, and described one group of conveying roller arranges earth material conveyer belt (12); The bottom of frame inside storage bin right-hand member is provided with discharging opening (3), is provided with the height regulating rod I (4) of discharge adjustable mouth in described discharging opening both sides; There is the height regulating rod II (5) of adjustable flat material baffle plate in described discharging opening arranged outside, be provided with flat material baffle plate (13) in the lower end of described adjusting rod II (5).
2. according to earth shoulder paver according to claim 1, it is characterized in that: by one of bottom of frame horizontally set group of conveying roller (11), be set to two longitudinal delivery wheels, be separately positioned on two ends, bottom of frame left and right, the delivery wheel of left end termination is installed variable frequency power delivery wheel (17), described power delivery wheel is connected with longitudinal variable frequency power motor (15) be arranged on above left end vehicle frame by chain, at two ends, bottom of frame left and right, the delivery wheel stage casing longitudinally arranged arranges spiral earth material conveying device.
3. according to earth shoulder paver according to claim 1, it is characterized in that: the multipair triangle damping device (9) arranged forward and backward side, vehicle frame (1) bottom, paver running wheel (10) is installed in bottom, is arranged to cterpillar drive.
4. according to earth shoulder paver according to claim 2, it is characterized in that: the multipair triangle damping device (9) arranged forward and backward side, vehicle frame (1) bottom, paver running wheel (10) is installed in bottom, is arranged to cterpillar drive.
CN201410204774.6A 2014-05-15 2014-05-15 Earth shoulder paver Active CN103966939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410204774.6A CN103966939B (en) 2014-05-15 2014-05-15 Earth shoulder paver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410204774.6A CN103966939B (en) 2014-05-15 2014-05-15 Earth shoulder paver

Publications (2)

Publication Number Publication Date
CN103966939A CN103966939A (en) 2014-08-06
CN103966939B true CN103966939B (en) 2016-03-02

Family

ID=51236908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410204774.6A Active CN103966939B (en) 2014-05-15 2014-05-15 Earth shoulder paver

Country Status (1)

Country Link
CN (1) CN103966939B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012771B (en) * 2016-07-24 2017-11-24 欧美灏 A kind of road-bridge concrete surface paving system
CN108316076A (en) * 2018-01-23 2018-07-24 刘全 A kind of closely knit making construction method of highway earth shoulder sliding formwork pressure
CN108149552B (en) * 2018-02-02 2023-08-11 中建八局第一建设有限公司 Soil shoulder construction device
CN108455818A (en) * 2018-04-08 2018-08-28 湖州南浔亿康机械有限公司 A kind of sludge agitation paver vehicle
CN113073520B (en) * 2021-03-26 2022-05-03 济南市市政工程建设集团有限公司 Paver for municipal engineering construction and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1787765A (en) * 1927-11-14 1931-01-06 George M Schnepf Earth spreader and leveler
US5865563A (en) * 1995-08-22 1999-02-02 Bonds; Larry Russell Method for blending and windrowing asphalt
CN2486593Y (en) * 2001-06-18 2002-04-17 内蒙古振峰实业有限责任公司 Caterpillar unloading spreader
CN2507899Y (en) * 2001-04-26 2002-08-28 南阳市陆德筑路机械制造有限公司 Base couse stable soil spreader
CN203834324U (en) * 2014-05-15 2014-09-17 核工业西南建设集团有限公司 Soil shoulder paver

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1787765A (en) * 1927-11-14 1931-01-06 George M Schnepf Earth spreader and leveler
US5865563A (en) * 1995-08-22 1999-02-02 Bonds; Larry Russell Method for blending and windrowing asphalt
CN2507899Y (en) * 2001-04-26 2002-08-28 南阳市陆德筑路机械制造有限公司 Base couse stable soil spreader
CN2486593Y (en) * 2001-06-18 2002-04-17 内蒙古振峰实业有限责任公司 Caterpillar unloading spreader
CN203834324U (en) * 2014-05-15 2014-09-17 核工业西南建设集团有限公司 Soil shoulder paver

Also Published As

Publication number Publication date
CN103966939A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN103966939B (en) Earth shoulder paver
CN105220602A (en) A kind of curb forming machine
CN103469767A (en) Large channel side slope bed course spreading machine
CN204530400U (en) Combined type cement concrete road paver
CN203834324U (en) Soil shoulder paver
CN106761807B (en) Continuous automatic unearthing method of shield machine
CN205329639U (en) Thick liquid spiral press polish canal lining machine is carried in self -propelled punching press
CN204620367U (en) Self-propelled full automatic sand sieving machine
CN102433853B (en) Trailer type sand elimination machine for railway
CN105715280A (en) Mucking and transporting method and device applied to double-shield tunnel boring machine
CN105350487B (en) Intelligent snow-melting agent truck spreader
CN101864781B (en) Mining machine for dredging
CN203822367U (en) Casting and filling machine for roadway
CN104495424A (en) Deeply-dehydrated sludge homogenizing discharge device for sewage plant plate-frame machines
CN207420580U (en) A kind of urban subway tunnel exploits dregs conveying device
CN205891938U (en) Throw cash conveyer and be used for filling throwing cash transmission system in tunnel
CN102619184A (en) Snow cleaning machine capable of compressing and throwing high-density ice balls
CN216104502U (en) Filling and transporting equipment for coal mining
CN104527609A (en) Anti-self-trapping conveying trolley for engineering construction
CN110005410A (en) A kind of electric drive caterpillar track travelling open continuous miner
CN201647579U (en) Chain plate conveyor
CN204549512U (en) A kind of deep dehydration mud homogeneous device for discharging for Sewage Plant board and frame machine
CN207597197U (en) Environmentally protective curb filling device
CN201407070Y (en) Waste roadway filling walking-type gangue throwing machine
CN102430475A (en) Mine track type dressing equipment and dressing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant