CN103953390B - 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 - Google Patents
控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 Download PDFInfo
- Publication number
- CN103953390B CN103953390B CN201410193757.7A CN201410193757A CN103953390B CN 103953390 B CN103953390 B CN 103953390B CN 201410193757 A CN201410193757 A CN 201410193757A CN 103953390 B CN103953390 B CN 103953390B
- Authority
- CN
- China
- Prior art keywords
- goaf
- filling
- pipeline
- exhaust pipe
- subsidence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000005065 mining Methods 0.000 title claims abstract description 17
- 239000011435 rock Substances 0.000 title claims abstract description 11
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 10
- 239000003245 coal Substances 0.000 claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 7
- 238000007569 slipcasting Methods 0.000 claims description 8
- 238000012856 packing Methods 0.000 claims description 6
- 239000011449 brick Substances 0.000 claims description 3
- 210000004911 serous fluid Anatomy 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 abstract description 6
- 230000001681 protective effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract 1
- 230000001737 promoting effect Effects 0.000 abstract 1
- 239000000463 material Substances 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 230000008093 supporting effect Effects 0.000 description 2
- 208000036119 Frailty Diseases 0.000 description 1
- 206010003549 asthenia Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007850 degeneration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000010881 fly ash Substances 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000000246 remedial effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Steroid Compounds (AREA)
- Lining And Supports For Tunnels (AREA)
- Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
Abstract
本发明公开的一种控制覆岩裂隙和地表沉陷的保水开采充填接顶方法,尤其适用于煤矿保水开采覆岩裂隙和地表沉陷的控制。通过在实施保水开采的充填工作面采空区顶部安装传感器,通过应力显示装置监测充填后的充填体,判断是采空区是否接顶或离层;当充填体接顶之后出现离层时,对采空区进行二次充填,保证采空区充分接顶,达到控制覆岩裂隙和地表沉陷的目的,最终实现煤矿水资源保护性开采。该方法简单,针对性强,操作性强,效率高,具有广泛的实用性和推广价值。
Description
技术领域
本发明涉及一种充填接顶方法,尤其适用于煤矿巷柱式充填的控制覆岩裂隙和地表沉陷的保水开采充填接顶方法。
背景技术
我国西北广泛赋存着煤层厚且煤质优良的浅埋煤田,但地处干旱半干旱大陆气候区,区内水资源普遍贫乏、植被覆盖率较低、生态环境脆弱。多年的开采实践表明,以传统方式进行大规模机械化开采,采动裂隙发育必将引起矿区大范围水土资源流失,带来一系列矿山环境地质效应,进一步加剧原本脆弱的生态环境的退化。
目前,煤矿保水开采控制覆岩裂隙和地表沉陷的方法主要包括房柱式开采、条带开采、覆岩离层注浆和充填开采等方法。条带开采和房柱式开采法以留设永久煤柱代价实现地表沉陷控制,其采出率一般在50%左右,资源浪费严重。覆岩离层注浆法通过钻孔注浆方式充填覆岩离层空间,减缓地表沉陷,该方法只适用于覆岩中存在上硬下软岩层的条件,且一般情况下地表减沉率不超过40%。充填开采法以充填体置换煤炭为特点,是控制地表沉陷最为有效的方法,其中膏体充填是最为理想的方法之一。
膏体充填是把煤矿就近的煤矸石、粉煤灰、工业炉、城市固体垃圾等在地面加工成胶结性或非胶结性膏状浆液,然后用充填泵或自溜通过管道输送到井下,部分或全部充填回采工作面采空区,形成以膏体充填体为主体的必要的覆岩支撑体系,有效控制覆岩裂隙和地表沉陷,实现煤矿水资源保护性开采。
对于膏体充填来说,充填体主要起支撑顶板作用,如果充填体固化后不接顶,就会在关键时间内丧失主动支撑顶板的作用,同时会加剧地表沉陷,引起灾害,因此,保证采空区接顶是关键。而目前,判断膏体充填采空区接顶的依据主要是采空区标高最高点处的排气管出浆,这只能说明采空区暂时充满,但出浆并不能完全表明采空区接顶,这是因为如果充填材料配比不科学或者采场围岩裂隙发育造成漏浆,都会造成充填体固化后体积变小,而这种情况采用常规方法是无法监测到的;另一方面,以往当发现采空区不接顶时,未采取过有效的补救措施,这对控制地表沉陷是不利的。
发明内容
技术问题:本发明的目的是克服已有技术的不足之处,提供一种方法简单、安全可靠、可操作性强、能动态监测膏体充填工作面充填过程采空区接顶情况和通过复充实现采空区接顶的膏体充填采空区接顶方法。
技术方案:本发明的膏体充填采空区接顶方法包括如下步骤:
a、对开采充填工作面采空区进行探测,确定顶板标高最高点位置;
b、在采空区顶板标高最高点安装应力传感器,保证应力传感器底面处于采空区标高最高点,通过数据线与设在采空区外的数显装置相连接;
c、沿充填区域的采空区顶板铺设充填管路、排气管、复充管路和复充排气管路,且使各管路终端均位于采空区顶板标高最高点,各管路的终端均向上倾斜,所述复充管路终端口上设有复充管路塞子,复充排气管路终端口上设有复充排气管塞子;
d、在工作面端口砌筑密闭墙封闭采空区充填区域,通过注浆泵连接充填管路向封闭的采空区内进行注浆,直至排气管出浆,当注浆浆液至采空区顶板标高最高点时,应力传感器通过数据线将充填过程中引起的应力变化数据传输到采空区外的数显装置上;
当数显装置显示有读数时,表明注浆接顶,当排气管溢出浆液1-2分钟后,停止注浆,完成充填作业;
当完成充填作业一周后,如果数显装置的读数逐渐变为零,则表明充填体与顶板分离导致采空区不接顶,则需进行二次充填;
e、进行二次充填时,利用煤矿井下供水或供风管路的水压或气压将复充排气管塞子顶出,同时向复充管路里注入充填体,靠复充管路终端的出浆压力将复充管路塞子顶出,对采空区实施二次充填,最终实现采空区接顶。
所述复充管路与复充管路塞子之间的摩擦力应小于复充管路终端的出浆压力;所述复充排气管与复充排气管塞子之间的摩擦力应小于顶出复充排气管塞子所需的水压或风压。
有益效果:本发明的膏体充填采空区接顶动态监测方法,在采空区标高最高点顶板上安装应力传感器,通过应力显示装置监测充填后充填体是否接顶;当监测到充填体不接顶的情况下,通过复充管路进行二次充填,使充填体接顶,解决了现有膏体充填采空区接顶方法中存在的膏体充填工作面采空区离层不接顶的问题。该方法简单,操作性强,效率高,具有广泛的实用性和推广性。
附图说明
图1是本发明的膏体充填采空区接顶监测及充填管路布置剖面示意图。
图2是本发明的膏体充填采空区接顶监测及充填管路布置平面示意图。
图中:1-应力传感器,2-数据线,3-应力显示装置,4-充填管路,5-排气管,6-复充管路,7-复充排气管,8-密闭墙,9-复充管路塞子,10-复充排气管塞子,11-顶板,12-充填体。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的描述:
本发明的控制覆岩裂隙和地表沉陷的保水开采充填接顶方法,具体步骤如下:
a、对开采充填工作面采空区进行探测,确定顶板标高最高点位置;
b、在采空区顶板11标高最高点安装应力传感器1,保证应力传感器1底面处于采空区标高最高点,通过数据线2与设在采空区外的数显装置3相连接;所述应力传感器1型号为矿用充填体应力传感器;
c、沿充填区域的采空区顶板铺设一趟充填管路4、一趟排气管5、一趟复充管路6和一趟复充排气管路7,且使各管路终端均位于采空区顶板标高最高点,各管路的终端均向上倾斜,即充填管路4、排气管5、复充管路6和复充排气管路7的终端均有使终端位于采空区顶板标高最高点的向上倾角;所述复充管路6终端口上设有复充管路塞子9,复充排气管路7终端口上设有复充排气管塞子10;所述复充管路6与复充管路塞子9之间的摩擦力应小于复充管路6终端的出浆压力;所述复充排气管7与复充排气管塞子10之间的摩擦力应小于顶出复充排气管塞子10所需的水压或风压;
d、在工作面端口砌筑密闭墙8封闭采空区充填区域,并在密闭墙8上设置应力显示装置3,通过注浆泵连接充填管路4向封闭的采空区内进行注浆充填,直至排气管5出充填体12,当注浆浆液至采空区顶板标高最高点时,应力传感器1通过数据线2将充填过程中引起的应力变化数据传输到采空区外的数显装置3上,由应力显示装置3将应力传感信号转换为数据显示出来;
当数显装置3显示有读数时,表明注浆接顶,在排气管5溢出浆液1-2分钟后,停止注浆,完成充填作业;
当完成充填作业一周后,如果数显装置3的读数逐渐变为零,说明由于充填体固化过程中体积缩小或裂隙渗流等原因,表明充填体与顶板分离导致采空区不接顶,则需进行二次充填;
e、进行二次充填时,利用煤矿井下供水或供风管路的水压或气压将复充排气管塞子10顶出,同时向复充管路6里注入充填体12,靠复充管路6终端的出浆压力将复充管路塞子9顶出,对采空区实施二次充填,最终实现采空区接顶。
Claims (2)
1.一种控制覆岩裂隙和地表沉陷的保水开采充填接顶方法,其特征在于,包括如下步骤:
a、对开采充填工作面采空区进行探测,确定顶板标高最高点位置;
b、在采空区顶板(11)标高最高点安装应力传感器(1),保证应力传感器(1)底面处于采空区标高最高点,通过数据线(2)与设在采空区外的数显装置(3)相连接;
c、沿充填区域的采空区顶板铺设充填管路(4)、排气管(5)、复充管路(6)和复充排气管路(7),且使各管路终端均位于采空区顶板标高最高点,各管路的终端均向上倾斜,所述复充管路(6)终端口上设有复充管路塞子(9),复充排气管路(7)终端口上设有复充排气管塞子(10);
d、在工作面端口砌筑密闭墙(8)封闭采空区充填区域,通过注浆泵连接充填管路(4)向封闭的采空区内进行注浆,直至排气管(5)出浆,当注浆浆液至采空区顶板标高最高点时,应力传感器(1)通过数据线(2)将充填过程中引起的应力变化数据传输到采空区外的数显装置(3)上;
当数显装置(3)显示有读数时,表明注浆接顶,当排气管(5)溢出浆液1-2分钟后,停止注浆,完成充填作业;
当完成充填作业一周后,如果数显装置(3)的读数逐渐变为零,则表明充填体与顶板分离导致采空区不接顶,则需进行二次充填;
e、进行二次充填时,利用煤矿井下供水或供风管路的水压或气压将复充排气管塞子(10)顶出,同时向复充管路(6)里注入充填体(12),靠复充管路(6)终端的出浆压力将复充管路塞子(9)顶出,对采空区实施二次充填,最终实现采空区接顶。
2.根据权利要求1所述的控制覆岩裂隙和地表沉陷的保水开采充填接顶方法,其特征在于:所述复充管路(6)与复充管路塞子(9)之间的摩擦力应小于复充管路(6)终端的出浆压力;所述复充排气管路(7)与复充排气管塞子(10)之间的摩擦力应小于顶出复充排气管塞子(10)所需的水压或风压。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410193757.7A CN103953390B (zh) | 2014-05-08 | 2014-05-08 | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 |
RU2016120683A RU2630833C1 (ru) | 2014-05-08 | 2014-11-19 | Способ горной разработки с закладкой с установлением контакта с кровлей и сохранением воды для контроля трещин перекрывающего слоя и проседания поверхности |
PCT/CN2014/091497 WO2015169080A1 (zh) | 2014-05-08 | 2014-11-19 | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 |
US15/108,727 US9689258B2 (en) | 2014-05-08 | 2014-11-19 | Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence |
AU2014393124A AU2014393124B2 (en) | 2014-05-08 | 2014-11-19 | Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410193757.7A CN103953390B (zh) | 2014-05-08 | 2014-05-08 | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103953390A CN103953390A (zh) | 2014-07-30 |
CN103953390B true CN103953390B (zh) | 2016-02-10 |
Family
ID=51330720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410193757.7A Active CN103953390B (zh) | 2014-05-08 | 2014-05-08 | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 |
Country Status (5)
Country | Link |
---|---|
US (1) | US9689258B2 (zh) |
CN (1) | CN103953390B (zh) |
AU (1) | AU2014393124B2 (zh) |
RU (1) | RU2630833C1 (zh) |
WO (1) | WO2015169080A1 (zh) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953390B (zh) * | 2014-05-08 | 2016-02-10 | 中国矿业大学 | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 |
CN105443155B (zh) * | 2015-12-16 | 2017-11-21 | 榆林学院 | 一种利用烟气和生石灰填补地表坍塌的装置 |
CN107313744B (zh) * | 2017-07-18 | 2023-05-05 | 山西晋城无烟煤矿业集团有限责任公司 | 一种小导孔注浆加固煤层气井穿越采空区的施工方法 |
CN107328385B (zh) * | 2017-08-15 | 2023-04-18 | 山东科技大学 | 采空区顶底板变形与充填体应力监测一体化装置及方法 |
CN108829636B (zh) * | 2018-04-20 | 2022-04-12 | 河南理工大学 | 一种采空区侧向煤层内动载应力强度的预测方法 |
CN109610622B (zh) * | 2018-11-05 | 2021-04-06 | 太原理工大学 | 一种采煤矿区条带式构造充填保-储水系统 |
CN111794803B (zh) * | 2020-06-10 | 2021-12-21 | 新汶矿业集团设计研究院有限公司 | 一种充填开采沿空留巷充填效果监测与稳定性评价方法 |
CN112897963A (zh) * | 2021-01-27 | 2021-06-04 | 河北充填采矿技术有限公司 | 工业固废基无机膏体充填材料、制备方法及快速填充方法 |
CN113494311A (zh) * | 2021-07-08 | 2021-10-12 | 中煤科工集团北京土地整治与生态修复科技研究院有限公司 | 井上采坑的回填方法 |
CN113833467A (zh) * | 2021-10-19 | 2021-12-24 | 中勘资源勘探科技股份有限公司 | 一种注浆充填解决煤田采动区冲击地压的方法 |
CN114033483B (zh) * | 2021-11-24 | 2023-07-18 | 安徽马钢矿业资源集团姑山矿业有限公司 | 一种适用于塌陷坑尾砂充填工艺的施工方法 |
CN114278301A (zh) * | 2021-12-23 | 2022-04-05 | 扬州中矿建筑新材料科技有限公司 | 一种基于水力致裂切顶动态控制地表沉陷方法 |
CN114198143B (zh) * | 2021-12-27 | 2024-03-12 | 徐州格润矿山技术开发有限公司 | 一种煤矸石注浆充填减少应力集中的方法 |
CN114278368A (zh) * | 2022-01-07 | 2022-04-05 | 安徽铜冠(庐江)矿业有限公司 | 一种基于钢纤维混凝土的填充保护层及施工方法 |
CN114575848B (zh) * | 2022-03-15 | 2023-03-24 | 中国矿业大学(北京) | 一种浅埋煤层高强度开采下地表损伤控制方法 |
CN114607379B (zh) * | 2022-03-28 | 2022-12-13 | 中国矿业大学 | 覆岩压实注浆充填连续开采方法 |
CN114562330B (zh) * | 2022-04-02 | 2022-11-08 | 中国矿业大学 | 覆岩隔离注浆充填浆液扩散范围控制方法 |
CN116988831B (zh) * | 2023-09-27 | 2023-12-12 | 太原理工大学 | 基于顶板破断形态的煤矿初采期工字型充填方法 |
CN117090550B (zh) * | 2023-10-17 | 2024-02-02 | 太原理工大学 | 基于过热蒸汽及超临界水原位复合开采遗煤的装置及方法 |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1364747A1 (ru) * | 1986-07-14 | 1988-01-07 | Пермский политехнический институт | Устройство дл гидравлической закладки |
CN101586460B (zh) * | 2009-06-02 | 2011-03-30 | 中国矿业大学 | 一种采煤固体物充填方法 |
RU2423612C1 (ru) * | 2010-02-15 | 2011-07-10 | Государственное образовательное учреждение высшего профессионального образования "Белгородский государственный университет" | Способ и устройство для дозакладки отработанных камер |
WO2011103620A1 (en) * | 2010-02-26 | 2011-09-01 | Subsidence Control International Pty Ltd | A method of reducing subsidence or windblast impacts from longwall mining |
CN102061938A (zh) * | 2010-12-10 | 2011-05-18 | 天地科技股份有限公司 | 一种采用膏体充填采空区回收煤柱的充填工艺 |
CN102116174A (zh) * | 2010-12-27 | 2011-07-06 | 淄博矿业集团有限责任公司 | 膏体充填管道压力在线监测系统 |
CN102155262B (zh) * | 2011-03-11 | 2012-11-14 | 中国矿业大学 | 煤矿沿空留巷巷旁气体充填方法 |
CN102262148A (zh) * | 2011-04-19 | 2011-11-30 | 中国矿业大学(北京) | 煤矿固体充填开采三维模拟实验平台 |
WO2012162720A1 (en) * | 2011-05-31 | 2012-12-06 | Yancoal Australia Ltd | Coal saver |
CN102444419A (zh) * | 2011-12-31 | 2012-05-09 | 山东科技大学 | 一种薄煤层破碎顶板拖管式充填系统 |
RU2498078C1 (ru) * | 2012-06-13 | 2013-11-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" | Способ гидравлической закладки |
CN203022808U (zh) * | 2012-12-07 | 2013-06-26 | 金川集团股份有限公司 | 一种充填接顶导流装置 |
CN103046955A (zh) * | 2012-12-24 | 2013-04-17 | 河北钢铁集团矿业有限公司 | 一种大范围采空区群充填处理方法 |
CN103244184B (zh) * | 2013-05-07 | 2016-01-13 | 西南石油大学 | 一种井下综采工作面矿压实时监控系统 |
CN103233771B (zh) * | 2013-05-13 | 2014-12-31 | 河北钢铁集团矿业有限公司 | 一种采空区充填处理过程中的接顶工艺 |
CN103397906B (zh) * | 2013-08-05 | 2016-01-20 | 北京科技大学 | 注浆式充填挡墙、构建方法以及空区充填系统、充填方法 |
CN103758567B (zh) * | 2014-01-26 | 2016-02-03 | 山东科技大学 | 一种破碎顶板冒落区注浆充填方法 |
CN103953390B (zh) * | 2014-05-08 | 2016-02-10 | 中国矿业大学 | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 |
-
2014
- 2014-05-08 CN CN201410193757.7A patent/CN103953390B/zh active Active
- 2014-11-19 WO PCT/CN2014/091497 patent/WO2015169080A1/zh active Application Filing
- 2014-11-19 RU RU2016120683A patent/RU2630833C1/ru not_active IP Right Cessation
- 2014-11-19 US US15/108,727 patent/US9689258B2/en active Active
- 2014-11-19 AU AU2014393124A patent/AU2014393124B2/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
WO2015169080A8 (zh) | 2016-04-07 |
US9689258B2 (en) | 2017-06-27 |
RU2630833C1 (ru) | 2017-09-13 |
CN103953390A (zh) | 2014-07-30 |
AU2014393124A1 (en) | 2016-05-05 |
US20160348507A1 (en) | 2016-12-01 |
WO2015169080A1 (zh) | 2015-11-12 |
AU2014393124B2 (en) | 2016-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103953390B (zh) | 控制覆岩裂隙和地表沉陷的保水开采充填接顶方法 | |
CA2986062C (en) | Fully mechanized mining-filling mixed mining working face filling section length determination method | |
CN103075149B (zh) | 下行超深钻孔快速测定煤层瓦斯压力的方法及其装置 | |
CN103899351B (zh) | 一种处理复杂采空区的充填加固方法 | |
CN102392644A (zh) | 中厚以下煤层的条带式流体膨胀充填开采方法 | |
CN103808633B (zh) | 一种采动破碎岩体水砂运移试验系统及监测方法 | |
CN105240047A (zh) | 一种治理露天矿地下采空区的充填加固方法 | |
CN102966111B (zh) | 一种在深水急流无覆盖层陡峭裸岩上的钢管桩锚固施工方法 | |
CN103195390A (zh) | 一种本煤层近水平瓦斯抽采钻孔密封方法 | |
CN103075148A (zh) | 上向远距离钻孔快速测定煤层瓦斯压力的方法及其装置 | |
CN102944906B (zh) | 煤矿顶板裂隙形态及其演化过程的精密搜索观测方法 | |
CN103498687B (zh) | 一种注浆锚杆的封孔装置及方法 | |
CN103291313A (zh) | 土压盾构开挖拱顶压力支护系统及其施工方法 | |
CN104330107A (zh) | 一种固体充填采煤工作面充填质量评价方法 | |
CN102444419A (zh) | 一种薄煤层破碎顶板拖管式充填系统 | |
CN103290827B (zh) | 一种多点位移计安装埋设注浆方法 | |
CN203285444U (zh) | 土压盾构开挖拱顶压力支护系统 | |
CN202467921U (zh) | 一种薄煤层破碎顶板拖管式充填系统 | |
CN105298494A (zh) | 固体与胶结体复合充填采煤方法 | |
CN107191218B (zh) | 一种悬渣水封爆破增透与抽采瓦斯的方法 | |
CN217681857U (zh) | 一种用于煤层顶板岩层变形监测的压水装置 | |
CN103758569B (zh) | 一种破碎顶板冒落区注浆充填系统 | |
CN105781606A (zh) | 一种大倾角下向穿层瓦斯抽放钻孔封孔方法 | |
CN203658204U (zh) | 一种采动破碎岩体水砂运移试验系统 | |
CN102444420B (zh) | 一种薄煤层破碎顶板拖管式充填方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |