CN103953348A - 一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法 - Google Patents

一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法 Download PDF

Info

Publication number
CN103953348A
CN103953348A CN201410200750.3A CN201410200750A CN103953348A CN 103953348 A CN103953348 A CN 103953348A CN 201410200750 A CN201410200750 A CN 201410200750A CN 103953348 A CN103953348 A CN 103953348A
Authority
CN
China
Prior art keywords
goaf
work plane
coal
working surface
lower curtate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410200750.3A
Other languages
English (en)
Inventor
马立强
郭金帅
梁继猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410200750.3A priority Critical patent/CN103953348A/zh
Publication of CN103953348A publication Critical patent/CN103953348A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法。通过在上区段工作面运输平巷和下区段工作面回风平巷之间留设区段隔离煤柱,待上区段工作面按常规采煤工艺开采完毕后,在下区段工作面开采过程中,在工作面后方下区段回风平巷内打通留设的区段隔离煤柱,迫使上区段工作面采空区堆积的冒落矸石滑落充填到下区段工作面采空区上部。解决了大倾角/急倾斜煤层开采工作面沿倾向充填不均匀,上部采空区充填不实顶板“悬空”的难题。保障了大倾角/急倾斜工作面的上部顶板安全。其方法操作简单,成本低廉,安全高效。

Description

一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法
技术领域
本发明涉及一种煤层采空区矸石协同利用控制顶板方法,尤其是一种适用于井下煤炭开采的大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法。
背景技术
大倾角/急倾斜煤层至今在学术界和工程界还没有统一的定义。一般认为采空区冒落矸石的自然安息角≥35°时为大倾角/急倾斜煤层。当煤层的倾角≥35°时,冒落矸石滑(滚)落形成采空区的下部填满上部悬空,从而形成不同于35°以下煤层的矿压显现规律。因为倾角太大,底板稍有扰动,矸石就很容易失去稳定,一旦破坏,由于煤层倾角大于冒落矸石的自然安息角,也会向下滑移,而且破坏滑移区还可能向上蔓延,工作面的设备也随之向下滑移。由于煤层倾角较大,大倾角/急倾斜工作面在开采过程中会出现不同于缓倾斜走向长壁工作面的矿压显现规律和技术问题。
目前,大倾角/急倾斜煤层开采中通常不处理区段隔离煤柱,采空区顶板自行冒落堆积。这种处理方法存在以下问题:
(1)由于煤层角度大于冒落矸石的自然安息角,因此大倾角/急倾斜工作面在开采过程中,顶板冒落矸石不能像缓倾斜工作面那样在原地停留堆积,而是沿工作面向下滚(滑),导致了工作面沿倾斜方向形成不均匀充填带(上部悬空,中部填满,下部填实),影响沿工作面倾斜方向的矿山压力分布和顶板及上覆岩层的移动。
(2)大倾角/急倾斜工作面冒落矸石形成上虚下实的状态,工作面下部对顶板的支撑作用大于上部,使周期来压布步距沿工作面倾斜方向有明显的分段特征表现为:中部来压步距最小,动载系数最大,两侧顶板来压步距较大,动载系数较小。
由于煤层倾角较大,采用传统的不处理区段隔离煤柱方法易造成大倾角/急倾斜工作面倾向方向充填不均匀,工作面上部充填不实,工作面上部顶板“悬空”,顶板较难控制。
发明内容
技术问题:本发明的目的是针对已有技术中存在的的问题,提供一种方法简单、解决顶板“悬空”不易控制的煤层采空区矸石协同利用控制顶板方法。
技术方案:本发明的大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法,包括按常规采煤工艺对区段煤层进行开采,步骤如下:
a.在上区段工作面运输平巷和下区段回风平巷之间留设区段隔离煤柱;
b.按常规采煤工艺开采上区段工作面,采用全部垮落法处理采空区,使冒落的矸石自行垮落堆积在上区段采空区的下部,待上区段工作面开采完毕后进行下区段工作面的开采;
c.下区段工作面开采过程中,先不对区段隔离煤柱进行处理,使冒落的矸石自行垮落堆积在下区段工作面采空区的下部,之后再在下区段工作面的后方下区段回风平巷内打通留设的区段隔离煤柱,迫使上区段工作面内采空区堆积的冒落矸石滑落充填到下区段工作面采空区上部,与下区段工作面采空区的下部的冒落矸石一并形成对采空区顶板的支撑体;
d重复步骤1、2、3,直至完成所有区段采煤工作面的开采。
所述区段隔离煤柱的宽度不大于2倍的下区段工作面机采高度,且不小于5m。
有益效果:本发明的通过在上区段工作面运输平巷和下区段工作面回风平巷之间留设区段隔离煤柱,待上区段工作面开采完毕后,在下区段工作面开采过程中,在工作面后方下区段回风平巷内打通留设的区段隔离煤柱,迫使上区段工作面采空区堆积的冒落矸石滑落充填到下区段工作面采空区上部,打通过程中下区段工作面正常开采,不影响生产。通过打通留设的区段隔离煤柱,释放上区段工作面采空区堆积的矸石充填到下区段工作面采空区上部,解决了大倾角/急倾斜煤层开采工作面沿倾向充填不均匀,上部采空区充填不实顶板“悬空”的难题。对顶板条件相对较差的大倾角/急倾斜煤层开采极为有利,适用范围广。其方法操作简单,成本低廉,安全高效,具有广泛的实用性。
附图说明
图1是本发明上区段工作面开采后采空区矸石堆积示意图;
图2是本发明下区段工作面开采后采空区矸石堆积示意图;
图3是本发明打通区段隔离煤柱后采空区矸石堆积示意图。
图中:1-下区段运输平巷,2-下区段工作面,3-下区段回风平巷,4-区段隔离煤柱,5-上区段运输平巷,6-上区段工作面,7-上区段回风平巷,8-区冒落矸石。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的描述:
本发明的大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法,具体步骤如下:
a.按已有技术常规采煤工艺对区段煤层进行开采,在上区段工作面运输平巷5和下区段回风平巷3之间留设区段隔离煤柱4,所述区段隔离煤柱4的宽度不大于2倍的下区段工作面机采高度,且不小于5m,如图1所示;
b.按已有技术常规采煤工艺开采上区段工作面6,采用全部垮落法处理采空区,使冒落的矸石自行垮落堆积在上区段6采空区的下部,待上区段工作面6开采完毕后进行下区段工作面2的开采,如图2所示;
c.在下区段工作面2开采过程中,先不对区段隔离煤柱4进行处理,使冒落的矸石自行垮落堆积在下区段工作面2采空区的下部,之后再在下区段工作面2的后方下区段回风平巷3内打通留设的区段隔离煤柱4,迫使上区段工作面6内采空区堆积的冒落矸石8滑落充填到下区段工作面2采空区上部,形成对采空区顶板的支撑体,解决了大倾角/急倾斜煤层开采工作面沿倾向充填不均匀,上部采空区充填不实顶板“悬空”的难题,如图3所示;
d.重复步骤1、2、3,直至完成所有区段采煤工作面的开采。

Claims (2)

1.一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法,包括按常规采煤工艺对区段煤层进行开采,其特征在于:
a.在上区段工作面运输平巷(5)和下区段回风平巷(3)之间留设区段隔离煤柱(4);
b.按常规采煤工艺开采上区段工作面(6),采用全部垮落法处理采空区,使冒落的矸石自行垮落堆积在上区段(6)采空区的下部,待上区段工作面(6)开采完毕后进行下区段工作面(2)的开采;
c.下区段工作面(2)开采过程中,先不对区段隔离煤柱(4)进行处理,使冒落的矸石自行垮落堆积在下区段工作面(2)采空区的下部。之后再在下区段工作面(2)的后方打通留设的区段隔离煤柱(4),迫使上区段工作面(6)内采空区堆积的冒落矸石(8)滑落充填到下区段工作面(2)采空区上部,与下区段工作面(2)采空区的下部的冒落矸石一并形成对采空区顶板的支撑体;
d重复步骤1、2、3,直至完成所有区段采煤工作面的开采。
2.根据权利1要求的大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法,其特征在于:所述区段隔离煤柱(4)的宽度不大于2倍的下区段工作面(2)机采高度,且不小于5m。
CN201410200750.3A 2014-05-13 2014-05-13 一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法 Pending CN103953348A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410200750.3A CN103953348A (zh) 2014-05-13 2014-05-13 一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410200750.3A CN103953348A (zh) 2014-05-13 2014-05-13 一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法

Publications (1)

Publication Number Publication Date
CN103953348A true CN103953348A (zh) 2014-07-30

Family

ID=51330678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410200750.3A Pending CN103953348A (zh) 2014-05-13 2014-05-13 一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法

Country Status (1)

Country Link
CN (1) CN103953348A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134215A (zh) * 2015-09-25 2015-12-09 西安科技大学 大倾角煤层走向长壁工作面局部充填开采方法
CN105240012A (zh) * 2015-09-02 2016-01-13 中国矿业大学(北京) 一种实现煤柱同采的f型区段采煤方法
CN107701188A (zh) * 2017-10-25 2018-02-16 太原理工大学 一种用于沿空掘巷窄煤柱采空侧静态胀裂切顶卸压法
CN109763822A (zh) * 2019-01-21 2019-05-17 西安科技大学 大倾角厚煤层多区段无煤柱错层护巷及段间煤柱充填方法
CN112824651A (zh) * 2019-11-21 2021-05-21 辽宁工程技术大学 一种急倾斜煤层采空区之间用于防火的隔离煤柱留设方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101169039A (zh) * 2007-11-30 2008-04-30 西安科技大学 大倾角煤层综采放顶煤顶板多区段控制开采方法
RU2355885C1 (ru) * 2007-11-19 2009-05-20 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Способ разработки крутонаклонных угольных пластов средней мощности между нарушениями
CN101876253A (zh) * 2009-04-29 2010-11-03 宝钢集团新疆八一钢铁有限公司 大倾角煤层开采工作面布置方法
CN101942999A (zh) * 2010-08-20 2011-01-12 天地科技股份有限公司 一种急倾斜薄煤层采煤方法
CN103397905A (zh) * 2013-04-17 2013-11-20 唐建新 煤层自然跨落充填、柔性护巷、完全沿空留巷系统及方法
CN103742148A (zh) * 2014-01-14 2014-04-23 山东科技大学 一种急倾斜煤层柔掩支护下行矸石充填的采煤法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2355885C1 (ru) * 2007-11-19 2009-05-20 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Способ разработки крутонаклонных угольных пластов средней мощности между нарушениями
CN101169039A (zh) * 2007-11-30 2008-04-30 西安科技大学 大倾角煤层综采放顶煤顶板多区段控制开采方法
CN101876253A (zh) * 2009-04-29 2010-11-03 宝钢集团新疆八一钢铁有限公司 大倾角煤层开采工作面布置方法
CN101942999A (zh) * 2010-08-20 2011-01-12 天地科技股份有限公司 一种急倾斜薄煤层采煤方法
CN103397905A (zh) * 2013-04-17 2013-11-20 唐建新 煤层自然跨落充填、柔性护巷、完全沿空留巷系统及方法
CN103742148A (zh) * 2014-01-14 2014-04-23 山东科技大学 一种急倾斜煤层柔掩支护下行矸石充填的采煤法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105240012A (zh) * 2015-09-02 2016-01-13 中国矿业大学(北京) 一种实现煤柱同采的f型区段采煤方法
CN105240012B (zh) * 2015-09-02 2017-05-03 中国矿业大学(北京) 一种实现煤柱同采的f型区段采煤方法
CN105134215A (zh) * 2015-09-25 2015-12-09 西安科技大学 大倾角煤层走向长壁工作面局部充填开采方法
CN107701188A (zh) * 2017-10-25 2018-02-16 太原理工大学 一种用于沿空掘巷窄煤柱采空侧静态胀裂切顶卸压法
CN107701188B (zh) * 2017-10-25 2019-02-26 太原理工大学 一种用于沿空掘巷窄煤柱采空侧静态胀裂切顶卸压法
CN109763822A (zh) * 2019-01-21 2019-05-17 西安科技大学 大倾角厚煤层多区段无煤柱错层护巷及段间煤柱充填方法
CN112824651A (zh) * 2019-11-21 2021-05-21 辽宁工程技术大学 一种急倾斜煤层采空区之间用于防火的隔离煤柱留设方法

Similar Documents

Publication Publication Date Title
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN104806244B (zh) 一种倾斜中厚矿体充填采矿方法
CN102493806B (zh) 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN101586460B (zh) 一种采煤固体物充填方法
CN102704934B (zh) 适于大型地下矿山开采的嗣后充填采矿方法
CN102155260B (zh) 一种急倾斜煤层采空区充填方法
CN103967493B (zh) 一种缓倾斜薄矿体矿柱采矿法
CN103016053B (zh) 一种采空区局部充填控制地表沉陷的方法
CN103953348A (zh) 一种大倾角/急倾斜煤层采空区矸石协同利用控制顶板方法
CN103114855B (zh) 露天转地下开采中的矿柱回收和垫层成形一体化技术
CN106869933A (zh) 一种砌充结合减小特厚煤层停采煤柱宽度的方法
CN104533416A (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN105019904A (zh) 基于采矿机的缓倾斜薄矿脉机械化连续开采方法
CN104500070B (zh) 一种连续采煤机膏体充填开采方法
CN107829742A (zh) 一种崩落‑充填‑空场‑崩落采矿方法
CA2986062A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN109630112B (zh) 一种切顶充填的n00采矿法
CN106761750B (zh) 急倾斜煤层纵向长壁刨铣建槽式开采方法
CN106194186A (zh) 长壁工作面回采巷道超前支护段变形的钻采卸压控制方法
CN109899070B (zh) 基于椭球体放矿结构的缓倾斜中厚矿体无固废充填采矿法
CN105822305A (zh) 一种用于煤矿开采的覆岩隔离柱将充填减沉方法
CN108331580B (zh) 一种清洁高效的采煤方法
CN110284883A (zh) 一种露天煤矿端帮采排充开采方法
CN104343453A (zh) 一种缓倾斜中厚矿床充填采矿方法
CN106939788B (zh) 卡车协同出矿分段凿岩阶段矿房法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140730

RJ01 Rejection of invention patent application after publication