CN106869933A - 一种砌充结合减小特厚煤层停采煤柱宽度的方法 - Google Patents

一种砌充结合减小特厚煤层停采煤柱宽度的方法 Download PDF

Info

Publication number
CN106869933A
CN106869933A CN201710171268.5A CN201710171268A CN106869933A CN 106869933 A CN106869933 A CN 106869933A CN 201710171268 A CN201710171268 A CN 201710171268A CN 106869933 A CN106869933 A CN 106869933A
Authority
CN
China
Prior art keywords
coal
super high
caving
pillar width
high seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710171268.5A
Other languages
English (en)
Other versions
CN106869933B (zh
Inventor
冯国瑞
郭军
王贵文
申辰
任玉琦
闫勇敢
李振
张玉江
白锦文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201710171268.5A priority Critical patent/CN106869933B/zh
Publication of CN106869933A publication Critical patent/CN106869933A/zh
Application granted granted Critical
Publication of CN106869933B publication Critical patent/CN106869933B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种砌充结合减小特厚煤层停采煤柱宽度的方法,利用浆体充填作为主要手段,配合采煤机不放顶采煤和放顶采煤交错的采煤工序,提高煤炭资源采出率。包括以下步骤:首先布置注浆管道;当特厚煤层采煤工作面进行到原设计停采线位置时,输送机开始工作,将输送机铲板伸开,关闭放煤口,由前部刮板输送机运煤,后部刮板输送机不运煤,进入不放煤工序;随着采煤移架工序的向前推进,在后部刮板输送机后方开始砌墙,随移随砌;采煤工作面继续推进,缩回铲板,进入放煤工序;输送机随着工作面移架推进距离为直接顶垮落步距的2/3时,又进入不放煤工序;工作面后方形成一个封闭区域,向内注浆,注满为止;重复以上工序完成工作面的充填。

Description

一种砌充结合减小特厚煤层停采煤柱宽度的方法
技术领域
本发明涉及一种砌充结合减小特厚煤层停采煤柱宽度的方法,属于煤矿开采技术领域。
背景技术
采煤工作面因地质条件、巷道布置、生产系统等原因沿煤层走向无限制地开采下去。为了保证矿井生产安全,这时人为设置有一个停采线,限制它向前回采,工作面推进到此位置就停止采煤,回撤设备,封闭采空区。这时停采线与大巷之间的煤柱就被丢弃,造成煤炭资源的浪费。以塔山矿8105工作面为例,停采煤柱达到230m,造成煤炭资源的极大浪费。
煤炭资源是现今社会最为重要的一项资源,对我国各行业发展的资源供应具有重要的作用。在获得广泛需求的同时,煤炭也是一种不可再生资源,这就需要我们在煤炭开采的过程中能够尽可能的提升煤炭回采率,从而能够保证煤炭资源的良好、持续应用。停采线煤柱宽度留设的大小直接关系到巷道使用期间的安全可靠、煤炭资源回收率和企业经济效益。
目前学者研究最多的是合理确定停采线的位置,即从理论上提高支护阻力、优化支护参数、加大采空侧对煤柱的侧向约束力从而达到提高巷道围岩和煤柱整体承载能力保证巷道围岩整体稳定,现场更多的是采用经验公式对停采线进行确定。从现有的专利公布情况来看,关于减小停采煤柱的技术措施相对较少,从相关内容来看主要有通过超前工作面分段填充老巷来降低采动应力的影响,但是对于特厚煤层这种特殊条件的涉及甚少。随着工作面的推进,采空区上部岩层重量将向采空区周围新的支承点转移,从而在采空区四周形成支承压力带,工作面前方形成超前支承压力,超前支承压力直接影响到停采线的位置,根据这一理论,如果采空区范围减小,那么超前支承压力的效应就会减弱,从而可以达到适当外延停采线、减小停采煤柱的目的。
发明内容
本发明旨在提供一种砌充结合减小特厚煤层停采煤柱宽度的方法,利用浆体充填作为主要手段,配合采煤机不放顶采煤和放顶采煤交错开采的采煤工序,来降低工作面的采动影响范围,从而减小停采煤柱的宽度,达到提高煤炭资源采出率的目的,实现煤炭资源的高效利用。
本发明提供了一种砌充结合减小特厚煤层停采煤柱宽度的方法,包括以下步骤:
(1)首先结合矿区的实际地质条件,在特厚煤层上部的软岩层开通一条平行于工作面方向的巷道,作为后序注浆管道;
(2)当特厚煤层开采工作面进行到原设计停采线位置时,低位放煤插板式双输送机开始工作,将输送机铲板伸开,关闭放煤口,由前部刮板输送机运煤,后部刮板输送机不运煤,进入不放煤工序;
(3)随着采煤移架工序的向前推进,直接顶变为较软的不放顶煤层,在后部刮板输送机后方开始砌墙,采空区落煤及矸石会慢慢挤入工作面,遇到墙体停止挤入;
(4)采煤工作面继续推进,缩回铲板,后部刮板输送机开始运煤,进入放煤工序;
(5)双输送机随工作面推进移架推进距离为直接顶垮落步距的2/3时,重复步骤(2),又进入不放煤工序;
(6)工作面后方形成一个由墙体、不放顶煤、顶板和底板组成的封闭区域,此时从上部的注浆管道向此区域钻孔,并开始注浆,注满为止;
(7)重复以上放煤工序、不放煤工序以及注浆的步骤,完成工作面的充填。
上述方案中,步骤(2)为了达到提高煤炭采出率的目的,工作面应该在原停采线位置附近实施工序,当然此时超前支承压力还远远没有影响到大巷稳定。
上述方案中,步骤(3)由于移架后可能容易掉煤,因而必须在采煤机割煤1刀后移架,并且立即砌墙,“随移随砌”。墙体材料可由采空区煤矸石或者砖块代替。
上述方案中,步骤(3)砌墙的墙体高度为采煤工作面高度,墙体的长度应不小于不放顶煤工序上部煤层的垮落步距,实际中为了达到充填效果的稳定性,不放顶煤工序开采推进的长度h为不放顶煤煤层垮落步距的2倍以上,墙体长度h为1.4~1.8倍不放顶煤煤层垮落步距。
上述方案中,步骤(5)进入放顶煤的开采长度应不小于直接顶(岩层)的垮落步距L,为了充填的稳定可设置为2/3L-3/4L。
上述方案中,步骤(6)钻孔宽度可根据采空区范围和充填效率合理设定。鉴于特厚煤层开采厚度大,充填空间较大,因而充填材料建议采用膨胀性充填材料,强度应不低于煤体强度。为了节省材料可以先在采空区用放煤时产生的矸石在下部充填,然后在矸石上面进行注浆。
通过实施本发明,可从一个工作面的停采煤柱中多采出煤炭的重量大约为:
式中ρ─煤的密度;b─原停采煤柱宽度;a─充填后停采煤柱宽度;
c─工作面宽度;H─煤层厚度;h─墙体长度;L─直接顶跨落步距。
本发明利用充填手段配合采煤机放顶煤开采和不放顶煤开采交错开采的采煤工序,利用充填后的浆体支承采空区,减小采空区对工作面的采动影响,采煤机就可以开采理论停采线与大巷之间的煤柱,即停采煤柱。
本发明的有益效果:
1、充填工序不会影响采煤工作面的推进,采用这种“边采边充”的工艺可有效地保证采空区由充填体充实,减小采空区对直接顶及工作面超前支撑压力的影响;
2、工序简单,施工容易,材料可随采随用,有效降低事故率;
3、本发明可减小停采煤柱的宽度,采煤工作面沿走向推进长度更大,提高煤炭采出率,极大程度地减少了煤炭资源的浪费;
4、采用充填采空区,对岩层矿压控制、地表沉陷的控制、巷道稳定及相邻工作面的开采也有积极效果。
附图说明
图1为低位放煤插板式双输送机的结构示意图。
图2为煤矿充填后的效果图。
图中:1─低位放煤插板式双输送机,2─放煤铲板,3-前部刮板输送机,4-后部刮板输送机,5─墙体,6─钻孔,7─注浆管道巷道,8─不放顶煤,9─放顶煤,10─注浆管路,h为不放煤长度,L为直接顶跨落步距。
具体实施方式
下面通过实施例来进一步说明本发明,但不局限于以下实施例。
实施例1:
低位放煤插板式双输送机的结构示意图见图1,包括铲板2、前部刮板输送机3、后部刮板输送机4。放煤工序、不放煤工序双输送机的工作状态一样,区别就是后部放煤铲板是否收回,从而控制是否采收顶煤。
下面以安家岭煤矿为例,通过本发明提供的砌充结合方法减小特厚煤层停采煤柱宽度,具体包括以下步骤:
(1)安家岭某工作面开采特厚煤达14m左右,首先在特厚煤层上部10m左右较软弱岩层粉砂岩层开通一条平行于工作面方向的巷道,即注浆管道巷道7,以便后面注浆的管道系统管路的铺设。
(2)当特厚煤层开采工作面进行到原设计停采线位置时,当然此时超前支承压力还远远没有影响到大巷稳定。将输送机铲板2伸开,关闭放煤口,只由前部刮板输送机3运煤,后部刮板输送机4不运煤,进入不放煤工序。
(3)由于此时直接顶变为较软的不放顶煤层,移架后可能容易掉煤,因而须在采煤机割煤1刀后移架,并且立即砌墙,“随移随砌”。墙体高度为采煤工作面高度3.46m,墙体长度理论上应不能小于不放顶煤的跨落步距,实际中为了达到充填效果的稳定性,不放顶煤的长度可在2倍不放顶煤跨落步距之上,为5.3m,墙体长度可适当小些为4m。墙体材料可由采空区煤矸石或者砖块代替。
(4)随着采煤移架工序的继续前进,在前部刮板输送机3后方开始砌墙,采空区落煤及矸石会慢慢挤入工作面,遇到墙体5时停止挤入。
(5)采煤工作面继续推进,缩回铲板,后部刮板输送机开始运煤,进入放煤工序。
(6)采煤机推进一段距离后,放顶煤的开采长度理论上应不能超过直接顶(岩层)的垮跨落步距L,为了充填的稳定可设置为2/3L-3/4L。重复步骤(1)、(2),又进入不放煤工序。
(7)经过步骤(1)-(4),工作面后方形成一个由墙体、不放煤、顶板和底板组成的封闭区域,此时从上部注浆管路10向此区域钻孔6,钻孔大小可由技术人员根据采空区范围及所需注浆速度合理确定,并开始注浆,注满为止。
(8)重复以上步骤,形成如图2效果。充填完成后,形成了放顶煤9、不放顶煤8交叉排列的效果,大大减小了停采煤柱。
因为工作面后方被充填体充实,不放顶煤下方为墙体,起到支撑充填体的作用,顶板不会垮落。但实际中为了保护巷道不受工作面采动影响还是要留一定宽度的煤柱作支撑。

Claims (8)

1.一种砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于包括以下步骤:
(1)首先结合矿区的实际地质条件,在特厚煤层上部的软岩层开通一条平行于工作面方向的巷道,作为注浆管道;
(2)当特厚煤层采煤工作面进行到原设计停采线位置时,低位放煤插板式双输送机开始工作,将输送机铲板伸开,关闭放煤口,由前部刮板输送机运煤,后部刮板输送机不运煤,进入不放煤工序;
(3)随着采煤移架工序的向前推进,直接顶变为软的不放顶煤层,在后部刮板输送机后方开始砌墙,采空区落煤及矸石慢慢挤入工作面,遇到墙体停止挤入;
(4)采煤工作面继续推进,缩回铲板,后部刮板输送机开始运煤,进入放煤工序;
(5)双输送机随着工作面移架推进距离为直接顶垮落步距的2/3时,重复步骤(2),又进入不放煤工序;
(6)工作面后方形成一个由墙体、不放顶煤、顶板和底板组成的封闭区域,此时从上部的注浆管道向此区域钻孔,并开始注浆,注满为止;
(7)重复以上(2)-(6)放煤工序、不放煤工序以及注浆的步骤,完成工作面的充填。
2.根据权利要求1所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:步骤(3)中,在采煤机割煤1刀后移架,并且立即砌墙,随移随砌。
3.根据权利要求1所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:步骤(3)中,砌墙的墙体高度为采煤工作面高度,墙体长度h应不小于不放顶煤工序上部煤层的垮落步距。
4.根据权利要求3所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:所述墙体长度h为上部煤层垮落步距L的1.4~1.8倍。
5.根据权利要求1所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:步骤(5)中,放顶煤的开采长度应不小于直接顶的垮落步距L。
6.根据权利要求5所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:所述放顶煤的开采长度为2/3L-3/4L。
7.根据权利要求1所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:步骤(6)中,注浆时,墙体充填材料为采空区煤矸石或者砖块,强度应不低于煤体强度。
8.根据权利要求1所述的砌充结合减小特厚煤层停采煤柱宽度的方法,其特征在于:从一个工作面的停采煤柱可多采出煤炭的重量为:
M = 2 3 L h + 2 3 L ρ ( b - a ) c H
式中ρ─煤的密度;b─原停采煤柱宽度;a─充填后停采煤柱宽度;
c─工作面宽度;H─煤层厚度;h─墙体长度;L─直接顶垮落步距。
CN201710171268.5A 2017-03-21 2017-03-21 一种砌充结合减小特厚煤层停采煤柱宽度的方法 Active CN106869933B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710171268.5A CN106869933B (zh) 2017-03-21 2017-03-21 一种砌充结合减小特厚煤层停采煤柱宽度的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710171268.5A CN106869933B (zh) 2017-03-21 2017-03-21 一种砌充结合减小特厚煤层停采煤柱宽度的方法

Publications (2)

Publication Number Publication Date
CN106869933A true CN106869933A (zh) 2017-06-20
CN106869933B CN106869933B (zh) 2018-11-13

Family

ID=59172499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710171268.5A Active CN106869933B (zh) 2017-03-21 2017-03-21 一种砌充结合减小特厚煤层停采煤柱宽度的方法

Country Status (1)

Country Link
CN (1) CN106869933B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930763A (zh) * 2017-03-21 2017-07-07 太原理工大学 一种充填复采特厚煤层残采区护巷煤柱的方法
CN107313778A (zh) * 2017-08-11 2017-11-03 太原理工大学 一种复采特厚煤层停采线煤柱的方法
CN108518222A (zh) * 2018-03-14 2018-09-11 太原理工大学 膏体充填结合顶板预裂复采特厚煤层停采线煤柱的方法
CN108661643A (zh) * 2018-04-25 2018-10-16 太原理工大学 一种采煤工作面末采回撤通道切顶卸压护巷方法
CN109025997A (zh) * 2018-07-27 2018-12-18 太原理工大学 一种放顶煤工作面分段交错切割循环放煤方法
CN109209490A (zh) * 2018-09-05 2019-01-15 太原理工大学 一种矸石充填辅助末采阶段工作面回撤方法
CN109209484A (zh) * 2018-10-24 2019-01-15 太原理工大学 一种回撤通道结合膏体预制块辅助工作面回撤方法
CN110145363A (zh) * 2019-04-30 2019-08-20 中国矿业大学(北京) 一种实现综采面垮落到充填开采过渡的顶板控制方法
CN110671146A (zh) * 2019-10-25 2020-01-10 中冶长天国际工程有限责任公司 一种胶结充填体宽度确定方法
CN111594168A (zh) * 2020-05-26 2020-08-28 山东科技大学 一种岩矸配合成形的伪采空层支护限沉回采方法
CN111878170A (zh) * 2020-07-03 2020-11-03 太原理工大学 基于超声波强度测试的放顶煤放煤作业控制的装置与方法
CN112302654A (zh) * 2020-10-12 2021-02-02 天地科技股份有限公司 特厚煤层快速放煤参数实测确定方法
CN113482711A (zh) * 2021-08-16 2021-10-08 中国矿业大学(北京) 一种减小末采煤柱的预充填方法
CN113513345A (zh) * 2021-08-16 2021-10-19 中国矿业大学(北京) 一种随支架撤出进行充填加固实现减小保护煤柱的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122235A (zh) * 2007-10-31 2008-02-13 中国矿业大学 一种控制综放面采空区侧煤层巷道的围岩方法
CN104533419A (zh) * 2014-12-16 2015-04-22 湖南科技大学 一种部分回收大煤柱残煤的方法
CN104963715A (zh) * 2015-05-11 2015-10-07 山东科技大学 高瓦斯易自燃综放采空区耦合灾害的动态隔离防治方法
CN105909295A (zh) * 2015-09-30 2016-08-31 北京中矿创新联盟能源环境科学研究院 无巷道无煤柱自留巷开采工法的快速回撤支架及装备系统
CN106930763A (zh) * 2017-03-21 2017-07-07 太原理工大学 一种充填复采特厚煤层残采区护巷煤柱的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122235A (zh) * 2007-10-31 2008-02-13 中国矿业大学 一种控制综放面采空区侧煤层巷道的围岩方法
CN104533419A (zh) * 2014-12-16 2015-04-22 湖南科技大学 一种部分回收大煤柱残煤的方法
CN104963715A (zh) * 2015-05-11 2015-10-07 山东科技大学 高瓦斯易自燃综放采空区耦合灾害的动态隔离防治方法
CN105909295A (zh) * 2015-09-30 2016-08-31 北京中矿创新联盟能源环境科学研究院 无巷道无煤柱自留巷开采工法的快速回撤支架及装备系统
CN106930763A (zh) * 2017-03-21 2017-07-07 太原理工大学 一种充填复采特厚煤层残采区护巷煤柱的方法

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930763A (zh) * 2017-03-21 2017-07-07 太原理工大学 一种充填复采特厚煤层残采区护巷煤柱的方法
CN107313778A (zh) * 2017-08-11 2017-11-03 太原理工大学 一种复采特厚煤层停采线煤柱的方法
CN107313778B (zh) * 2017-08-11 2019-07-26 太原理工大学 一种复采特厚煤层停采线煤柱的方法
CN108518222A (zh) * 2018-03-14 2018-09-11 太原理工大学 膏体充填结合顶板预裂复采特厚煤层停采线煤柱的方法
CN108518222B (zh) * 2018-03-14 2019-06-11 太原理工大学 膏体充填结合顶板预裂复采特厚煤层停采线煤柱的方法
CN108661643A (zh) * 2018-04-25 2018-10-16 太原理工大学 一种采煤工作面末采回撤通道切顶卸压护巷方法
CN109025997A (zh) * 2018-07-27 2018-12-18 太原理工大学 一种放顶煤工作面分段交错切割循环放煤方法
CN109209490A (zh) * 2018-09-05 2019-01-15 太原理工大学 一种矸石充填辅助末采阶段工作面回撤方法
CN109209484A (zh) * 2018-10-24 2019-01-15 太原理工大学 一种回撤通道结合膏体预制块辅助工作面回撤方法
CN110145363B (zh) * 2019-04-30 2024-03-29 中国矿业大学(北京) 一种实现综采面垮落到充填开采过渡的顶板控制方法
CN110145363A (zh) * 2019-04-30 2019-08-20 中国矿业大学(北京) 一种实现综采面垮落到充填开采过渡的顶板控制方法
CN110671146A (zh) * 2019-10-25 2020-01-10 中冶长天国际工程有限责任公司 一种胶结充填体宽度确定方法
CN110671146B (zh) * 2019-10-25 2020-12-04 中冶长天国际工程有限责任公司 一种胶结充填体宽度确定方法
CN111594168B (zh) * 2020-05-26 2021-04-06 山东科技大学 一种岩矸配合成形的伪采空层支护限沉回采方法
WO2021237912A1 (zh) * 2020-05-26 2021-12-02 山东科技大学 一种岩矸配合成形的伪采空层支护限沉回采方法
CN111594168A (zh) * 2020-05-26 2020-08-28 山东科技大学 一种岩矸配合成形的伪采空层支护限沉回采方法
CN111878170A (zh) * 2020-07-03 2020-11-03 太原理工大学 基于超声波强度测试的放顶煤放煤作业控制的装置与方法
CN111878170B (zh) * 2020-07-03 2022-02-11 太原理工大学 基于超声波强度测试的放顶煤放煤作业控制的装置与方法
CN112302654A (zh) * 2020-10-12 2021-02-02 天地科技股份有限公司 特厚煤层快速放煤参数实测确定方法
CN113482711A (zh) * 2021-08-16 2021-10-08 中国矿业大学(北京) 一种减小末采煤柱的预充填方法
CN113513345A (zh) * 2021-08-16 2021-10-19 中国矿业大学(北京) 一种随支架撤出进行充填加固实现减小保护煤柱的方法
CN113482711B (zh) * 2021-08-16 2022-04-12 中国矿业大学(北京) 一种减小末采煤柱的预充填方法
CN113513345B (zh) * 2021-08-16 2022-04-12 中国矿业大学(北京) 一种随支架撤出进行充填加固实现减小保护煤柱的方法

Also Published As

Publication number Publication date
CN106869933B (zh) 2018-11-13

Similar Documents

Publication Publication Date Title
CN106869933B (zh) 一种砌充结合减小特厚煤层停采煤柱宽度的方法
CN102996131B (zh) 一种预掘两巷前进式固体充填采煤方法
CN106930763B (zh) 一种充填复采特厚煤层残采区护巷煤柱的方法
CN103527197B (zh) 一种特厚煤层固体胶结充填巷式开采方法
CN105626071B (zh) 一种缓倾斜薄矿体采矿方法
CN108612530A (zh) 一种上盘围岩破碎倾斜中厚矿体的采矿方法
CN108756885A (zh) 一种矿岩极破碎的急倾斜矿体的下向或上向胶结充填机械化采矿方法
CN104632220B (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN109869150B (zh) 一种矿山资源分段全采局充开采方法
CN107725052B (zh) 一种采留一体化开采沿空巷道顶板恒阻锚体梁支护方法
WO2014086296A1 (zh) 一种采空区局部充填控制地表沉陷的方法
CN110424966A (zh) 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法
CN106968671B (zh) 煤矿井下采煤工作面回撤通道充填回撤方法
CN106907177B (zh) 一种薄煤层沿空留巷巷旁充填支护方法
CN103939137B (zh) 西部沙漠化矿区浅埋煤层的风积沙空场充填方法
CN108756882A (zh) 一种区段平巷无掘进式短充长采开采方法
CN109736806A (zh) 一种无预掘巷道前进式砌块充填采煤方法
CN110410076A (zh) 一种用于老房柱采空区遗留煤柱回收的充填开采方法
CN103161498B (zh) 急倾斜煤层区段煤柱巷旁充填方法
CN109630112A (zh) 一种切顶充填的n00采矿法
CN103993881A (zh) 一种长壁巷式胶结充填开采方法
CN106640080A (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN109899070B (zh) 基于椭球体放矿结构的缓倾斜中厚矿体无固废充填采矿法
CN105649673A (zh) 一种大倾角煤层巷旁矸混充填沿空留巷方法
CN107575228A (zh) 一种减少双巷护巷煤柱尺寸及降低巷道变形量的采煤方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant