CN103953014A - Novel fishway structure - Google Patents

Novel fishway structure Download PDF

Info

Publication number
CN103953014A
CN103953014A CN201410178849.8A CN201410178849A CN103953014A CN 103953014 A CN103953014 A CN 103953014A CN 201410178849 A CN201410178849 A CN 201410178849A CN 103953014 A CN103953014 A CN 103953014A
Authority
CN
China
Prior art keywords
pier stud
blocks water
water
fish
contraction section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410178849.8A
Other languages
Chinese (zh)
Other versions
CN103953014B (en
Inventor
朱世洪
周良景
石运深
向光红
张亚利
宋志忠
吴俊东
王程
黎贤访
汪亚超
黄明海
姜伯乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201410178849.8A priority Critical patent/CN103953014B/en
Publication of CN103953014A publication Critical patent/CN103953014A/en
Application granted granted Critical
Publication of CN103953014B publication Critical patent/CN103953014B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Abstract

The invention discloses a novel fishway structure and relates to a fish passing facility for solving the problem that migratory fish swim upwards through a river crossing building. The novel fishway structure comprises fishway side walls, a contraction section and pool chambers, wherein the contraction section comprises long contraction sections and short contraction sections, the long contraction sections and the short contraction sections are oppositely distributed, fish passing vertical gaps are arranged between the long contraction sections and the short contraction sections, and the adjacent pool chambers are communicated through the fish passing vertical gaps; first groups of water blocking piers are arranged in the middles of the pool chambers, second groups of water blocking piers are arranged in the middle lower sections of the pool chambers, and third groups of water blocking piers are arranged in the fish passing vertical gaps. According to the novel fishway structure, plane and spatial three-dimensional zoning is carried out on water flow rates, so that various passing fish objects with different habits can pass in the same fish passing facility. The novel fishway structure has remarkable advantages over the traditional vertical gap type fishway in the term of water flow state. Meanwhile, the novel fishway structure has the function of a bypass channel under the condition of occupying small engineering land and has remarkable advantages on the aspect of engineering investment.

Description

Novel fish channel structure
Technical field
The invention belongs to hydraulic engineering and field of environmental engineering, relate to a kind of fish pass structure tracing back by barrage building for solving straddling fish stocks, say more specifically a kind of novel fish channel structure.
Background technology
At present, the fish pass structure of flood retarding project has five types substantially, and fish pass is that wherein applicability is the widest.Current in conventional fish pass fall at dividing plate or obstruction place, form the larger single uniform flow of flow velocity, can only meet certain specific requirement of tracing back of crossing the ripe body of fish object.The fish that other Burden-Swimming Ability of KM is relatively poor, or target crosses juvenile fish and the prelarva of fish object, is difficult to by conventional fish pass.The fish pass that China last century 50, the sixties build belongs to this type of substantially.In the later stage in last century, Europe starts to adopt by-pass (imitative nature passage), obtain the good fish effect of crossing, but the fish and water head excessively of its adaptation is less, generally, in 10m, the gradient is slow, floor space is larger, affect the economic indicator of engineering, for the barrage building compared with high water head, implement difficulty larger, be therefore necessary to improve.
Summary of the invention
The object of the invention is the weak point in order to overcome background technology, and provide a kind of fish that can adapt to variety classes, different body length, all ages and classes and different Burden-Swimming Ability of KMs by the novel fish channel structure of barrage building.
To achieve these goals, technical scheme of the present invention is: comprise fish pass sidewall and contraction section, described contraction section is arranged on fish pass sidewall, and fish pass is divided into chamber, multiple spaced apart pond; Described contraction section comprises long contraction section and short contraction section, long contraction section and short contraction section are positioned opposite, between long contraction section and short contraction section, it was fish perps, between adjacent pool chamber, passing through fish perps is communicated with, it is characterized in that: described long contraction section is interlaced arrangement at fish pass two ends, middle part, chamber, pond is provided with first group of pier stud that blocks water; In chamber, pond, hypomere is provided with second group of pier stud that blocks water, and described second group of pier stud that blocks water is positioned at next stage crosses the upstream side of fish perps; Cross and in fish perps, be provided with the 3rd group of pier stud that blocks water.
In technique scheme, described first group of pier stud that blocks water comprises first pier stud and second pier stud that blocks water that blocks water, the described first center that blocks water pier stud is crossed at upper level on the extended line of fish perps center line, the first vertical distance blocking water between pier stud and the center of the long contraction section of upper level is 0.4~0.6Lm, the described first height that blocks water pier stud is 0.85~1.05H, and diameter is 1.0~1.6m; Second block water pier stud in the horizontal direction with the first pier stud conllinear that blocks water, the second block water pier stud and the first horizontal range blocking water between pier stud is 0.50~0.70Bn, the second block water pier stud and the first air line distance blocking water between pier stud is 0.10~0.40Bm, the second height that blocks water pier stud is 0.85~1.05H, and diameter is 0.5~1.5m; Wherein, H is chamber, pond design head, gets 1.5~4m; Lm is the vertical distance between adjacent two contraction section axis, got the longest the fish length in fish object 3~5 times; Bm is chamber, pond top width, gets 0.50~0.90Lm; Bn is contraction section perps top width, gets 0.2~0.7Bm.
In technique scheme, described first group of pier stud that blocks water also comprises the 3rd pier stud that blocks water, the described the 3rd block water pier stud and the first vertical distance blocking water between pier stud is 0.10~0.20Lm, the 3rd block water pier stud and the first horizontal range blocking water between pier stud is 0.40~0.60Bn, the 3rd height that blocks water pier stud is 0.20~0.40H, and diameter is 0.5~1.5m.
In technique scheme, described second group of pier stud that blocks water comprises the 4th pier stud, the 5th pier stud, the 6th pier stud and the 7th pier stud that blocks water that blocks water that blocks water that blocks water, wherein, the 4th block water pier stud and the first vertical distance blocking water between pier stud is 0.20~0.35Lm, the 4th block water pier stud and the first horizontal range blocking water between pier stud is 0.50~0.70Bn, the 4th height that blocks water pier stud is 0.20~0.40H, and diameter is 0.3~1.0m; The 5th block water pier stud and the first vertical distance blocking water between pier stud is 0.20~0.35Lm, and the 5th block water pier stud and the first horizontal range blocking water between pier stud is 0.80~1.20Bn, and the 5th height that blocks water pier stud is 0.20~0.40H, and diameter is 0.3~1.0m; The 6th block water pier stud and the first vertical distance blocking water between pier stud is 0.30~0.45Lm, and the 6th block water pier stud and the first horizontal range blocking water between pier stud is 0.35~0.55Bn, and the 6th height that blocks water pier stud is 0.40~0.60H, and diameter is 0.3~1.0m; The 7th block water pier stud and the first vertical distance blocking water between pier stud is 0.30~0.50Lm, and the 7th block water pier stud and the first horizontal range blocking water between pier stud is 0.75~1.05Bn, and the 7th height that blocks water pier stud is 0.20~0.40H, and diameter is 0.3~1.0m; The 4th block water pier stud and the 5th air line distance blocking water between pier stud is 0.10~0.30Bm, and the 6th block water pier stud and the 7th air line distance blocking water between pier stud is 0.15~0.35Bm.
In technique scheme, described the 3rd group of pier stud that blocks water comprises the 8th pier stud and the 9th pier stud that blocks water that blocks water, wherein, the 8th block water pier stud and the first vertical distance blocking water between pier stud is 0.40~0.60Lm, the 8th block water pier stud and the first horizontal range blocking water between pier stud is 0.60~0.95Bn, the 8th height that blocks water pier stud is 0.20~0.40H, and diameter is 0.3~1.0m; The 9th block water pier stud and the first vertical distance blocking water between pier stud is 0.40~0.60Lm, and the 9th block water pier stud and the first horizontal range blocking water between pier stud is 0.35~0.55Bn, and the 9th height that blocks water pier stud is 0.20~0.40H, and diameter is 0.3~1.0m; The 8th block water pier stud and the 9th air line distance blocking water between pier stud is 0.30~0.50Bm.
In technique scheme, described the 3rd group of pier stud that blocks water also comprises the tenth pier stud that blocks water, and the described the tenth pier stud that blocks water was positioned at the water outlet of fish perps, and the tenth height that blocks water pier stud is 0.4~0.6H, and diameter is 0.3~1.0m.
In technique scheme, described first group of pier stud that blocks water be stone column, grout the one in structure, ecological basket structure, described second group of pier stud that blocks water be stone column, grout the one in structure, ecological basket structure, and described the 3rd group of pier stud that blocks water be stone column, grout the one in structure, ecological basket structure.
In technique scheme, the ratio of the length of described long contraction section and the length of short contraction section is 2.5~6.5, and the length sum of the length of long contraction section and short contraction section is 0.10~0.50Lm.
In technique scheme, described long contraction section is interlaced arrangement in fish pass both sides.
Technique scheme is all taking water (flow) direction as reference, and wherein, the distance of Parallel to the flow direction is vertical distance, and the distance of Transverse to the flow direction is horizontal range.The long contraction section of interlaced arrangement and short contraction section can effectively prevent the larger single uniform flow of formation flow velocity in fish pass.
First group of pier stud that blocks water can carry out energy dissipating and make the diffusion of current direction both sides flow into the current of this chamber, pond from chamber, higher level pond, when real work, staff need to be according to first the block water streamflow regime in pier stud downstream of pier stud and second that blocks water, determine whether to arrange the 3rd pier stud that blocks water, and according to crossing fingerling class and size, determine its height.
Second group of pier that blocks water can make current form the layering current of different in flow rate in space, and the height of pier stud is determined by crossing fingerling class.
The 3rd group of pier stud that blocks water can make current in the time passing through fish perps, form the subregion flow field in plane and space, meets the requirement of tracing back of different grams of stream ability fish.
The present invention is mainly that the current by intercepting adjacent two-stage contraction section connect, Dissipation reduce flow velocity while making current by chamber, pond, and on the cross-section of river, form high, medium and low flow velocity district, and then realize the flow velocity subregion of current on plane and space, finally reach and made the flow rate of water flow of fish perps adapt to the object that multiple fish are traced back.
Fish channel structure of the present invention is by carrying out plane and space multistory subregion to flow rate of water flow, the multiple fish object of crossing that can meet different habits in same fish pass structure passes through, and vertical seam type fish channel more traditional aspect flow-shape has a clear superiority in.
The present invention does not affect the hinge of hydroelectric project and arranges general layout, and easy and hinge Other Engineering combines together, and project occupation of land area is little compared with by-pass, and flow condition and by-pass are close, can be used as the first-selected structural shape of flood retarding project fish pass structure.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is structural representation of the present invention.
Fig. 3 is the front view of Fig. 1.
1-fish pass sidewall in figure, 2-contraction section, the long contraction section of 21-, the short contraction section of 22-, 3-fish pass, chamber, 4-pond, 5-crosses fish perps, first group of pier stud that blocks water of 61-, second group of pier stud that blocks water of 62-, the 3rd group of pier stud that blocks water of 63-, a-first pier stud that blocks water, b-second pier stud that blocks water, c-the 3rd pier stud that blocks water, d-the 4th pier stud that blocks water, e-the 5th pier stud that blocks water, f-the 6th pier stud that blocks water, g-the 7th pier stud that blocks water, h-the 8th pier stud that blocks water, i-the 9th pier stud that blocks water, j-the tenth pier stud that blocks water.
Detailed description of the invention
Describe performance of the present invention in detail below in conjunction with accompanying drawing, but they do not form limitation of the invention, only for example.Make advantage of the present invention more know and easily understand by explanation simultaneously.
Consult accompanying drawing known: novel fish channel structure, comprise fish pass sidewall 1 and contraction section 2, described contraction section 2 is arranged on fish pass sidewall 1, and fish pass 3 is divided into chamber, multiple spaced apart pond 4, described contraction section 2 comprises long contraction section 21 and short contraction section 22, and long contraction section 21 is positioned opposite with short contraction section 22, between long contraction section 21 and short contraction section 22, is fish perps 5, between adjacent pool chamber 4, passed through fish perps 5 and be communicated with, described long contraction section 21 is interlaced arrangement in fish pass 3 both sides.
Fish pass or channel 3 are concrete rectangular or trapezoidal flume, and the present invention is equidistant in fish pass or unequal-interval arranges the contraction section 2 of length limit interlaced arrangement, and then forms chamber, pond 4, then arranges 3 groups of pier studs that block water at interior interval, chamber, pond 4.
When real work, 4 middle parts, chamber, pond arrange first group of pier stud 61 that blocks water, first group of pier stud 61 that blocks water crossed fish perps 5 0.4~0.6Lm places, center apart from upper level, first group of pier stud 61 that blocks water can carry out energy dissipating to current, and mobile water body is spread to both sides, the flow intensity that makes chamber, higher level pond flow into chamber, pond at the corresponding levels is reduced for the first time.First group of pier stud 61 that blocks water comprises first pier stud a, second pier stud b and the 3rd pier stud c that blocks water that blocks water that blocks water.
Flow-shape after reducing according to water body diffusion, flow velocity, second group of pier stud 62 that blocks water is set in 4 middle and lower parts, chamber, pond, the height of pier stud is determined by crossing fingerling class, second group of pier stud 62 that blocks water is arranged on first group of pier stud 61 downstream that block water, and being positioned at the water inlet upstream of fish perps 5, second group of pier stud 62 that blocks water can make current form the layering current of different in flow rate in space.Second group of pier stud 62 that blocks water comprises the 4th pier stud d, the 5th pier stud e, the 6th pier stud f and the 7th pier stud g that blocks water that blocks water that blocks water that blocks water.
Crossing, fish perps 5 is interior arranges the 3rd group of pier stud 63 that blocks water, the 3rd group of pier stud 63 that blocks water crossed the water inlet of fish perps 5 and crossing between the delivery port of fish perps 5, current form the flow field of big or small subregion when by contraction section, trace back with the fish that meet different grams of stream abilities.The 3rd group of pier stud 63 that blocks water comprises the 8th pier stud h, the 9th pier stud i and the tenth pier stud j that blocks water that blocks water that blocks water
The layout of the above-mentioned pier stud that blocks water need be determined according to the flow condition in channel.The above-mentioned pier stud that blocks water can adopt stone column, grout the structural shape such as structure, ecological cage.First group of pier stud 61 that blocks water can be stone column, grout the one in structure, ecological basket structure, second group of pier stud 62 that blocks water can be stone column, grout the one in structure, ecological basket structure, and the 3rd group of pier stud 63 that blocks water can be stone column, grout the one in structure, ecological basket structure.
Operating principle of the present invention is: current are after upper level is crossed fish perps 5 and to be flowed out, and through the obstruct of first group of pier stud 61 that blocks water, current disperse, flow velocity reduces; Block water after pier stud 62 through second group, current will further disperse to slow down, and form layering current; The 3rd group of pier stud 63 that blocks water is arranged on contraction section, and current block water after pier stud 63 through the 3rd group, and flow field is subzone again, and part flow rate of water flow meets the most weak fish of Burden-Swimming Ability of KM and traces back requirement.
Taking water (flow) direction as with reference to and with reference to figure 2, the arrangement of the pier stud that blocks water is as following table:
Table 1
In upper table, when the arrangement of the pier stud that blocks water is shown in following table time, working effect of the present invention is more obvious:
Table 2
The described first center that blocks water pier stud a is crossed at upper level on the extended line of fish perps 5 center lines, and the first vertical distance blocking water between pier stud a and the long contraction section 21 of upper level center is 0.4~0.6Lm.
As shown in Figure 2, the tenth pier stud j that blocks water should be arranged on the water outlet of fish perps 5.The ratio of the length B2 of the length B1 of long contraction section 21 and short contraction section 22 is 2.5~6.5, and the length B2 sum of the length B1 of long contraction section 21 and short contraction section 22 is 0.10~0.50Lm.
In practical work process, when the first height and second that blocks water pier stud a blocks water the height of the pier stud b depth of water indoor with pond when identical, the working effect of first group of pier stud 61 that blocks water is best, staff need to be according to first the block water streamflow regime in pier stud b downstream of pier stud a and second that blocks water, determine whether to arrange the 3rd pier stud c that blocks water, and determine the 3rd height that blocks water pier stud c according to crossing fingerling class and size.
Show through long-term practice, when the 6th height that blocks water pier stud f is 1/2 of chamber, the pond depth of water, and the block water height of pier stud e and the 7th height that blocks water pier stud g of the 4th height, the 5th that blocks water pier stud d is 1/3 o'clock of chamber, the pond depth of water, and second group of pier stud 62 that blocks water reaches best working effect.
Show through long-term practice, when the block water height of pier stud i of the 8th height and the 9th that blocks water pier stud h is 1/3 of chamber, the pond depth of water, and the tenth height that blocks water pier stud j is 1/2 o'clock of chamber, the pond depth of water, and the 3rd group of pier stud 63 that blocks water reaches best working effect.Staff need to be according to the 8th the block water streamflow regime in pier stud i downstream of pier stud h and the 9th that blocks water, determine whether to arrange the tenth pier stud j that blocks water, and determine the tenth height that blocks water pier stud j according to crossing fingerling class and size, in real work, the tenth pier stud j that blocks water should be arranged on the water outlet of fish perps 5.The present invention solves the new tool that straddling fish stocks are traced back by barrage building, it is compared with external by-pass (imitative nature fish pass), the head that the present invention adapts to is higher, in can be used as, the first-selected structural shape of low water head barrage building fish pass structure.Its advantage is to have the plane similar with by-pass pattern and space flow-shape, can pass through multiple fish, also meets the dam demand of crossing of juvenile fish and prelarva; Meanwhile, floor space of the present invention is less, is better than technically and economically by-pass pattern.
Other unaccounted part all belongs to prior art.

Claims (9)

1. novel fish channel structure, comprise fish pass sidewall (1) and contraction section (2), it is upper that described contraction section (2) is arranged on fish pass sidewall (1), and fish pass (3) is divided into chamber, multiple spaced apart pond (4); Described contraction section (2) comprises long contraction section (21) and short contraction section (22), long contraction section (21) is positioned opposite with short contraction section (22), between long contraction section (21) and short contraction section (22), be fish perps (5), between adjacent pool chamber (4), passed through fish perps (5) and be communicated with, it is characterized in that: middle part, chamber, described pond (4) was provided with first group of pier stud that blocks water (61); Hypomere is provided with second group of pier stud that blocks water (62) in chamber, pond (4), and described second group of pier stud that blocks water (62) is positioned at next stage crosses the upstream side of fish perps (5); Cross and in fish perps (5), be provided with the 3rd group of pier stud (63) that blocks water.
2. novel fish channel structure according to claim 1, is characterized in that: described first group of pier stud that blocks water (61) comprises first pier stud (a) and second pier stud (b) that blocks water that blocks water,
The described first center that blocks water pier stud (a) is crossed at upper level on the extended line of fish perps (5) center line, the first vertical distance blocking water between pier stud (a) and the center of the long contraction section of upper level (21) is 0.4~0.6Lm, the described first height that blocks water pier stud (a) is 0.85~1.05H, and diameter is 1.0~1.6m;
Second block water pier stud (b) in the horizontal direction with first pier stud (a) conllinear that blocks water, second blocks water, and horizontal range that pier stud (b) and first blocks water between pier stud (a) is 0.50~0.70Bn, second blocks water, and air line distance that pier stud (b) and first blocks water between pier stud (a) is 0.10~0.40Bm, the second height that blocks water pier stud (b) is 0.85~1.05H, and diameter is 0.5~1.5m;
Wherein, H is chamber, pond design head, gets 1.5~4m; Lm is the vertical distance between adjacent two contraction section axis, got the longest the fish length in fish object 3~5 times; Bm is chamber, pond top width, gets 0.50~0.90Lm; Bn is contraction section perps top width, gets 0.2~0.7Bm.
3. novel fish channel structure according to claim 2, it is characterized in that: described first group of pier stud that blocks water (61) also comprises the 3rd pier stud (c) that blocks water, the described the 3rd blocks water, and vertical distance that pier stud (c) and first blocks water between pier stud (a) is 0.10~0.20Lm, the 3rd blocks water, and horizontal range that pier stud (c) and first blocks water between pier stud (a) is 0.40~0.60Bn, the 3rd height that blocks water pier stud (c) is 0.20~0.40H, and diameter is 0.5~1.5m.
4. according to the novel fish channel structure described in any one claim in claims 1 to 3, it is characterized in that: described second group of pier stud that blocks water (62) comprises the 4th pier stud (d), the 5th pier stud (e), the 6th pier stud (f) and the 7th pier stud (g) that blocks water that blocks water that blocks water that blocks water
The 4th blocks water, and vertical distance that pier stud (d) and first blocks water between pier stud (a) is 0.20~0.35Lm, the 4th blocks water, and horizontal range that pier stud (d) and first blocks water between pier stud (a) is 0.50~0.70Bn, the 4th height that blocks water pier stud (d) is 0.20~0.40H, and diameter is 0.3~1.0m;
The 5th blocks water, and vertical distance that pier stud (e) and first blocks water between pier stud (a) is 0.20~0.35Lm, the 5th blocks water, and horizontal range that pier stud (e) and first blocks water between pier stud (a) is 0.80~1.20Bn, the 5th height that blocks water pier stud (e) is 0.20~0.40H, and diameter is 0.3~1.0m;
The 6th blocks water, and vertical distance that pier stud (f) and first blocks water between pier stud (a) is 0.30~0.45Lm, the 6th blocks water, and horizontal range that pier stud (f) and first blocks water between pier stud (a) is 0.35~0.55Bn, the 6th height that blocks water pier stud (f) is 0.40~0.60H, and diameter is 0.3~1.0m;
The 7th blocks water, and vertical distance that pier stud (g) and first blocks water between pier stud (a) is 0.30~0.50Lm, the 7th blocks water, and horizontal range that pier stud (g) and first blocks water between pier stud (a) is 0.75~1.05Bn, the 7th height that blocks water pier stud (g) is 0.20~0.40H, and diameter is 0.3~1.0m;
The 4th blocks water, and air line distance that pier stud (d) and the 5th blocks water between pier stud (e) is 0.10~0.30Bm, and the 6th blocks water, and air line distance that pier stud (f) and the 7th blocks water between pier stud (g) is 0.15~0.35Bm.
5. novel fish channel structure according to claim 4, is characterized in that: described the 3rd group of pier stud (63) that blocks water comprises the 8th pier stud (h) and the 9th pier stud (i) that blocks water that blocks water,
The 8th blocks water, and vertical distance that pier stud (h) and first blocks water between pier stud (a) is 0.40~0.60Lm, the 8th blocks water, and horizontal range that pier stud (h) and first blocks water between pier stud (a) is 0.60~0.95Bn, the 8th height that blocks water pier stud (h) is 0.20~0.40H, and diameter is 0.3~1.0m;
The 9th blocks water, and vertical distance that pier stud (i) and first blocks water between pier stud (a) is 0.40~0.60Lm, the 9th blocks water, and horizontal range that pier stud (i) and first blocks water between pier stud (a) is 0.35~0.55Bn, the 9th height that blocks water pier stud (i) is 0.20~0.40H, and diameter is 0.3~1.0m;
The 8th blocks water, and air line distance that pier stud (h) and the 9th blocks water between pier stud (i) is 0.30~0.50Bm.
6. novel fish channel structure according to claim 5, it is characterized in that: described the 3rd group of pier stud (63) that blocks water also comprises the tenth pier stud (j) that blocks water, the described the tenth pier stud (j) that blocks water was positioned at the water outlet of fish perps (5), the tenth height that blocks water pier stud (j) is 0.4~0.6H, and diameter is 0.3~1.0m.
7. according to the novel fish channel structure described in any one claim in claims 1 to 3, it is characterized in that: described first group of pier stud that blocks water (61) is stone column, grouts the one in structure, ecological basket structure, described second group of pier stud that blocks water (62) is stone column, grouts the one in structure, ecological basket structure, and described the 3rd group of pier stud (63) that blocks water is stone column, grouts the one in structure, ecological basket structure.
8. according to the novel fish channel structure described in any one claim in claims 1 to 3, taking Transverse to the flow direction as reference, it is characterized in that: the lenth ratio of the length of described long contraction section (21) and short contraction section (22) is 2.5~6.5, the length sum of the length of long contraction section (21) and short contraction section (22) is 0.10~0.50Lm.
9. according to the novel fish channel structure described in any one claim in claims 1 to 3, taking Transverse to the flow direction as reference, it is characterized in that: described long contraction section (21) is interlaced arrangement in fish pass (3) both sides.
CN201410178849.8A 2014-04-29 2014-04-29 fishway structure Active CN103953014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410178849.8A CN103953014B (en) 2014-04-29 2014-04-29 fishway structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410178849.8A CN103953014B (en) 2014-04-29 2014-04-29 fishway structure

Publications (2)

Publication Number Publication Date
CN103953014A true CN103953014A (en) 2014-07-30
CN103953014B CN103953014B (en) 2017-01-11

Family

ID=51330351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410178849.8A Active CN103953014B (en) 2014-04-29 2014-04-29 fishway structure

Country Status (1)

Country Link
CN (1) CN103953014B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220664A (en) * 2015-10-27 2016-01-06 珠江水利委员会珠江水利科学研究院 There is the ecological fishway of multistage flow passage
CN105442503A (en) * 2015-11-27 2016-03-30 中国电建集团贵阳勘测设计研究院有限公司 Fishway with energy dissipation columns
CN105464058A (en) * 2015-12-25 2016-04-06 长江勘测规划设计研究有限责任公司 Tunnel type artificially-natural fishway
CN105484213A (en) * 2015-12-25 2016-04-13 长江勘测规划设计研究有限责任公司 Tunnel type multi-outlet nature-like fish way
CN106759167A (en) * 2017-02-06 2017-05-31 长江水利委员会长江科学院 A kind of imitative nature fish pass of narrow deep type for adapting to multiple target population
CN109403284A (en) * 2018-10-30 2019-03-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of assemblnig collection aquatic animal migrates and the ecology corridor of drift function
CN114808877A (en) * 2022-05-24 2022-07-29 朱成冬 Cylindrical fishway partition plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009044069A1 (en) * 2009-09-22 2011-03-31 Ingenieurbüro Floecksmühle Dumont Kessels Wolf-Schumann GbR (Vertretungsberechtigte Gesellschafter Ulrich Dumont, 52078 Aachen und Norbert Kessels, 52477 Alsdorf) Fish ladder for bypassing migrant obstruction in flowing watercourse, has basin whose flow cross-section is located at end, where another flow cross-section is located in middle of basin under consideration of longitudinal direction
KR20120015557A (en) * 2010-08-12 2012-02-22 김경한 Fish passing block to protect aquatic ecology system
CN102747716A (en) * 2012-07-25 2012-10-24 中国水电顾问集团成都勘测设计研究院 Vertical seam type fishway structure
CN202745020U (en) * 2012-07-27 2013-02-20 水利部交通运输部国家能源局南京水利科学研究院 Water-pervious fish pass used for migration fish dam-passing protection
CN203890976U (en) * 2014-04-29 2014-10-22 长江勘测规划设计研究有限责任公司 Novel fishway structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009044069A1 (en) * 2009-09-22 2011-03-31 Ingenieurbüro Floecksmühle Dumont Kessels Wolf-Schumann GbR (Vertretungsberechtigte Gesellschafter Ulrich Dumont, 52078 Aachen und Norbert Kessels, 52477 Alsdorf) Fish ladder for bypassing migrant obstruction in flowing watercourse, has basin whose flow cross-section is located at end, where another flow cross-section is located in middle of basin under consideration of longitudinal direction
KR20120015557A (en) * 2010-08-12 2012-02-22 김경한 Fish passing block to protect aquatic ecology system
CN102747716A (en) * 2012-07-25 2012-10-24 中国水电顾问集团成都勘测设计研究院 Vertical seam type fishway structure
CN202745020U (en) * 2012-07-27 2013-02-20 水利部交通运输部国家能源局南京水利科学研究院 Water-pervious fish pass used for migration fish dam-passing protection
CN203890976U (en) * 2014-04-29 2014-10-22 长江勘测规划设计研究有限责任公司 Novel fishway structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220664A (en) * 2015-10-27 2016-01-06 珠江水利委员会珠江水利科学研究院 There is the ecological fishway of multistage flow passage
CN105442503A (en) * 2015-11-27 2016-03-30 中国电建集团贵阳勘测设计研究院有限公司 Fishway with energy dissipation columns
CN105464058A (en) * 2015-12-25 2016-04-06 长江勘测规划设计研究有限责任公司 Tunnel type artificially-natural fishway
CN105484213A (en) * 2015-12-25 2016-04-13 长江勘测规划设计研究有限责任公司 Tunnel type multi-outlet nature-like fish way
CN105464058B (en) * 2015-12-25 2018-01-19 长江勘测规划设计研究有限责任公司 Tunnel formula imitates nature fish pass
CN105484213B (en) * 2015-12-25 2018-03-20 长江勘测规划设计研究有限责任公司 Tunnel formula multiple exit imitates nature fish pass
CN106759167A (en) * 2017-02-06 2017-05-31 长江水利委员会长江科学院 A kind of imitative nature fish pass of narrow deep type for adapting to multiple target population
CN109403284A (en) * 2018-10-30 2019-03-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of assemblnig collection aquatic animal migrates and the ecology corridor of drift function
CN114808877A (en) * 2022-05-24 2022-07-29 朱成冬 Cylindrical fishway partition plate
CN114808877B (en) * 2022-05-24 2023-09-15 朱成冬 Cylindrical fishway partition plate

Also Published As

Publication number Publication date
CN103953014B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN103953014A (en) Novel fishway structure
CN204212122U (en) A kind of fish pass
CN102747716B (en) Vertical seam type fishway structure
CN100577920C (en) Drainage system estuary pier bar swirl chamber composite energy dissipation method
CN207392163U (en) One species nature vertical seam type fish channel
CN103806419A (en) Rectification pool type fishway and flow state control method
CN203890976U (en) Novel fishway structure
CN203188185U (en) United energy dissipation structure under ultralow Froude number
CN202745019U (en) Ecological fishway
CN106192935A (en) The method of adjustment of a kind of fish pass import department river flow and system
CN107190712A (en) A kind of toe bank falls bank stiling basin formula underflow energy dissipator and design method
CN102747713B (en) fishway
CN105909566A (en) Combined type vortex control device for pump station water inlet flow field
CN204940222U (en) A kind of bilateral vertical seam type fish channel structure
CN202688968U (en) Vertical connection type fishway
CN105442503A (en) Fishway with energy dissipation columns
CN106759167A (en) A kind of imitative nature fish pass of narrow deep type for adapting to multiple target population
CN205152916U (en) Energy dissipation column type fishway structure
CN204097978U (en) A kind of device utilizing jet attracting
CN208436843U (en) It is rotatably arranged tower tray
CN105604130A (en) Method for eliminating air-suction vortex at water inlet of pumping station under condition of beeline layout of gate and station
CN202882097U (en) Multi-nozzle large jet angle diffuser for sewage deep-sea discharge
CN204385687U (en) Without aileron layout of sluice form
CN110130471B (en) Wedge-shaped flow guiding pier for coping with large diffusion angle of front pool of pump station and research method thereof
CN209194484U (en) A kind of assemblnig collection aquatic animal migrates and the ecology corridor of drift function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant