CN103951359B - A kind of high-performance road rehabilitation king material - Google Patents

A kind of high-performance road rehabilitation king material Download PDF

Info

Publication number
CN103951359B
CN103951359B CN201410185354.8A CN201410185354A CN103951359B CN 103951359 B CN103951359 B CN 103951359B CN 201410185354 A CN201410185354 A CN 201410185354A CN 103951359 B CN103951359 B CN 103951359B
Authority
CN
China
Prior art keywords
king
road rehabilitation
good
performance road
rehabilitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410185354.8A
Other languages
Chinese (zh)
Other versions
CN103951359A (en
Inventor
柳子栋
周育华
吴卫明
施礼
钱晓倩
方明晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanli Building Materials Co Ltd
Original Assignee
LANXI SANLI BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LANXI SANLI BUILDING MATERIALS Co Ltd filed Critical LANXI SANLI BUILDING MATERIALS Co Ltd
Priority to CN201410185354.8A priority Critical patent/CN103951359B/en
Publication of CN103951359A publication Critical patent/CN103951359A/en
Application granted granted Critical
Publication of CN103951359B publication Critical patent/CN103951359B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention is a kind of high-performance road rehabilitation king material, and its raw materials by weight portion meter, comprises following component: the strong aluminosulfate cement of superelevation: 20-60 part; Polycarboxylic acid series high efficiency water reducing agent: 0.1-1.2 part; Ferric oxide: 0.2-3.5 part; Retarded adhesive material/efficient short hard accelerating chemicals: 0.1-1.5 part; Quartz sand: 35-68 part; High-elasticity putty powder: 1-12 part; Building macromolecular material: 0.1-3 part; The application overcomes the defect of prior art, be a kind of can repair the concrete road surfaces such as motorway, urban road, airport roadway fast emergency repair and the type material designed and developed, not only raw material composition is simple, and easy to operate, with low costly have that time of coagulation is fast, cohesiveness good, intensity is high, a good and advantage such as weather resistance is high, anti-skid is good with normal concrete matching.

Description

A kind of high-performance road rehabilitation king material
Technical field
This patent belongs to building material technical field, particularly relates to a kind of high-performance road rehabilitation king material.
Background technology
After concrete pouring construction, if do not note maintenance, very easily produce cracking, fault-layer-phenomenon.Because concrete is a kind of quasi-brittle material, its tensile strength is low, poor toughness, so crack ubiquity in construction and the bad concrete structure of maintenance, in use often undergo the effect of various travelling load and dead load, the pucker & bloat effect caused because of temperature and humidity change, and the physics of environmental gas and liquid and chemical erosion effect, that concrete produces great Fissure and fracture phenomenon, the havoc traffic capacity of road, some even causes the severe paralysis of passing road.
And at present Application comparison many have fluoaluminate cement fondu system patching material, ultimate compression strength after 2 ~ 6 hours of constructing can reach 15Mpa; Also has the rehabilitating concrete of phosphoric acid salt+peroxide magnesium oxide+retardant matrix material preparation, ultimate compression strength after 1 hour of constructing it is reported and can reach 30Mpa, but this patching material permanent seal cooling need checking, and its price is more than 2 times of silicate cementing material, its construction generally adopts injection, grouting and landfill, the intensity of jet cement generally only has 1 hour about 2Mpa, substantially cannot meet the requirement of repairing rush construction; Although epoxide resin material seam-filling ability is extremely strong, poor with the viscosifying power of tomography, itself ageing-resistant performance is also bad, and repair efficiency is poor, cannot reach the object of rapid rush-repair.
Summary of the invention
The object of the present invention is to provide a kind of high-performance road rehabilitation king material, by the composition of feed change, invent a kind of can repair the concrete road surfaces such as motorway, urban road, urban construction, airport roadway, tunnel fast emergency repair and the type material designed and developed, not only raw material composition is simple, and easy to operate, with low costly have that time of coagulation is fast, cohesiveness good, intensity is high, an advantage such as good and weather resistance is high, anti-skid is good, remarkable reduction noise with normal concrete matching.
For achieving the above object, technical scheme of the present invention is as follows:
A kind of high-performance road rehabilitation king material, its raw materials by weight portion meter, comprises following component:
High-elasticity putty powder originates from Zhejiang, Fujian; The strong aluminosulfate cement of superelevation and low-alkalinity sulphoaluminate cement originate from Shijiazhuang, Hebei, Zhengzhou, henan; Poly carboxylic acid originates from Jiangsu; Retarded adhesive material originates from Shandong.
Preferably, also comprise the low-alkalinity sulphoaluminate cement that weight part is 1-20 part, this material can be complementary with high strength aluminosulfate cement, reduces the alkali content in concrete, improve concrete serviceability.
Preferably, it is No. 3 purity quartzites of 30-55 part and No. 9 purity quartzites of 5-13 part that described quartz sand comprises weight part.
Preferably, described building macromolecular material is any one in anti-crack fiber, tackiness agent, elastic coating, rubber.
A preparation method for high-performance road rehabilitation king material, comprise the steps: to stir in the airtight stirring storehouse of drying according to the parts by weight proportioning of raw material, can obtain road rehabilitation king material, churning time is 20-45 minute.
The beneficial effect of the technical program is: 1) condensation fast: i.e. solidifiable in about 15 minutes, within 1 hour, can be open to traffic, within 1 hour, ultimate compression strength reaches more than 50.0Mpa, and within 1 day, ultimate compression strength just can reach more than 60.0Mpa.
2) cementability is good: folding strength is greater than C30 normal concrete.
3) matching is good: volume stability is high, and contract with dry rate is almost nil, and thermal expansivity reaches normal concrete level.
4) durable height, anti-skid are good: have good freeze-thaw resistance and chemical resistance, wear resistance.
5) can according to old concrete road surface color adjustment product colour, the problem that can aberration avoided as far as possible excessive.
6) use this preparation method to be mixed by raw material, preparation method is simple, and all raw materials are purchase and use, without the need to through secondary processing, and raw-material low price.
Embodiment
In order to understand the present invention further, below in conjunction with embodiment, the preferred embodiment for the present invention is described, but should be appreciated that these describe just in order to further illustrate the features and advantages of the present invention, instead of limiting to the claimed invention.
Embodiment 1
According to the weight of above-mentioned raw materials, all raw materials are stirred, mixing time is 30 minutes, the disposable water adding the compound total amount 12-18 number stirred, and fully stir until evenly, the wet feed be stirred is inserted operation side, shakeout, jolt ramming can obtain color and original road surface color repair surface very nearly the same, and i.e. solidifiable in 12 minutes, within 1 hour, can be open to traffic, the ultimate compression strength of 1 hour reaches 52.5Mpa, and folding strength reaches 5.5Mpa; The ultimate compression strength of 24 hours reaches 65Mpa, and folding strength reaches 7.8Mpa; Degree of mobilization is 280mm.
Embodiment 2
According to the weight of above-mentioned raw materials, all raw materials are stirred, mixing time is 20 minutes, the disposable water adding the compound total amount 12-18 number stirred, and fully stir until evenly, the wet feed be stirred is inserted operation side, shakeout, jolt ramming can obtain color and original road surface color repair surface very nearly the same, and i.e. solidifiable in 15 minutes, within 1 hour, can be open to traffic, the ultimate compression strength of 1 hour reaches 55Mpa, and folding strength reaches 6.2Mpa; The ultimate compression strength of 24 hours reaches 67Mpa, and folding strength reaches 8.2Mpa; Degree of mobilization is 300mm.
Embodiment 3
According to the weight of above-mentioned raw materials, all raw materials are stirred, mixing time is 37 minutes, the disposable water adding the compound total amount 12-18 number stirred, and fully stir until evenly, the wet feed be stirred is inserted operation side, shakeout, jolt ramming can obtain color and original road surface color repair surface very nearly the same, and i.e. solidifiable in 12 minutes, within 1 hour, can be open to traffic, the ultimate compression strength of 1 hour reaches 57Mpa, and folding strength reaches 6.8Mpa; The ultimate compression strength of 24 hours reaches 69Mpa, and folding strength reaches 8.4Mpa; Degree of mobilization is 320mm.
Embodiment 4
According to the weight of above-mentioned raw materials, all raw materials are stirred, mixing time is 42 minutes, the disposable water adding the compound total amount 12-18 number stirred, and fully stir until evenly, the wet feed be stirred is inserted operation side, shakeout, jolt ramming can obtain color and original road surface color repair surface very nearly the same, and i.e. solidifiable in 8 minutes, within 1 hour, can be open to traffic, the ultimate compression strength of 1 hour reaches 56Mpa, and folding strength reaches 6.6Mpa; The ultimate compression strength of 24 hours reaches 70Mpa, and folding strength reaches 8.8Mpa; Degree of mobilization is 325mm.
The foregoing is only the preferred embodiment of the present invention, it should be pointed out that for the ordinary skill in the art, not departing under principle prerequisite of the present invention, can also make various deformation and improvement, this also should be considered as protection scope of the present invention.

Claims (4)

1. a high-performance road rehabilitation king material, is characterized in that: its raw materials by weight portion meter, comprises following component:
Superelevation strong aluminosulfate cement 20-60 part
Low-alkalinity sulphoaluminate cement 1-20 part
Polycarboxylic acid series high efficiency water reducing agent 0.1-1.2 part
Ferric oxide 0.2-3.5 part
Retarded adhesive material/efficient short hard accelerating chemicals 0.1-1.5 part
Quartz sand 35-68 part
High-elasticity putty powder 1-12 part
Building macromolecular material 0.1-3 part
It is No. 3 purity quartzites of 30-55 part and No. 9 purity quartzites of 5-13 part that described quartz sand comprises weight part.
2. according to the high-performance road rehabilitation king material described in claim 1, it is characterized in that: described building macromolecular material is any one in anti-crack fiber, tackiness agent, elastic coating, rubber.
3. a preparation method for the high-performance road rehabilitation king material as described in claim 1, comprises the steps: to stir in the airtight stirring storehouse of drying according to the parts by weight proportioning of raw material, can obtain road rehabilitation king material.
4., according to the preparation method of the high-performance road rehabilitation king material described in claim 3, it is characterized in that churning time is 20-45 minute.
CN201410185354.8A 2014-05-05 2014-05-05 A kind of high-performance road rehabilitation king material Expired - Fee Related CN103951359B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410185354.8A CN103951359B (en) 2014-05-05 2014-05-05 A kind of high-performance road rehabilitation king material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410185354.8A CN103951359B (en) 2014-05-05 2014-05-05 A kind of high-performance road rehabilitation king material

Publications (2)

Publication Number Publication Date
CN103951359A CN103951359A (en) 2014-07-30
CN103951359B true CN103951359B (en) 2015-10-21

Family

ID=51328750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410185354.8A Expired - Fee Related CN103951359B (en) 2014-05-05 2014-05-05 A kind of high-performance road rehabilitation king material

Country Status (1)

Country Link
CN (1) CN103951359B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106336184A (en) * 2016-08-19 2017-01-18 浙江三力建筑材料有限公司 Power quick paste material for outdoor face bricks

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106517911A (en) * 2016-11-10 2017-03-22 过冬 Cement-based repairing material
CN108002722A (en) * 2017-11-30 2018-05-08 天峨县宏昌农机专业合作社 A kind of method for promoting cement rapid subsidence
CN109338861A (en) * 2018-09-04 2019-02-15 徐春辉 A kind of road surface, which is quickly repaired, uses concrete
CN109250994A (en) * 2018-11-22 2019-01-22 南京梦联桥传感科技有限公司 A kind of concrete repair materials that expressway surface is quickly repaired and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101096304B (en) * 2006-06-30 2011-12-07 富春控股集团有限公司 Rapid restoring material for building and road making
CN101830684B (en) * 2010-05-26 2013-01-09 江苏博特新材料有限公司 Super early strength polymer rapid-patching motar material
CN103145396B (en) * 2013-02-26 2015-04-01 上海建为建筑修缮工程有限公司 Multifunctional quick repair material for cement concrete pavements and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106336184A (en) * 2016-08-19 2017-01-18 浙江三力建筑材料有限公司 Power quick paste material for outdoor face bricks

Also Published As

Publication number Publication date
CN103951359A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN102390943B (en) Magnesium phosphate cement prepared by using magnesium oxide byproduct in process of extracting lithium carbonate from salt lake
CN103951359B (en) A kind of high-performance road rehabilitation king material
KR101441784B1 (en) Composition used for high strength and watertight concrete
CN104860615A (en) Mortar for concrete base surface repair, and preparation method thereof
CN101096303B (en) Rapid restoring material for building and road making
CN101698590B (en) Repairing material for concrete and preparation method thereof
KR101135175B1 (en) Protective mortar using calcium aluminate and oraganic-inorganic hybrid coating agent
CN104119056B (en) Road paving material prepared from phosphogypsum composite residues and preparation method thereof
CN106587885B (en) Patching material and application for Existing Railway Bridges bridge surface waterproof layer protective layer
CN102086112A (en) Concrete repairing material and preparation method thereof
KR101405295B1 (en) Eco-Friendly Concrete Composition for Paving Bridge Using Seaweeds and Constructing Methods Using Thereof
CN108328977B (en) Concrete repairing material
CN108424087B (en) Geopolymer-based cement pavement crack rapid repairing material and preparation method and application thereof
CN112279601A (en) Ultrahigh-performance concrete for rapid repair and preparation method thereof
CN104291761B (en) Antique Imitation Tiles and application thereof
CN104016609B (en) One kind prepares the addition of ferronickel slag environment-friendly type active mineral material and excites agent method
CN104086140B (en) A kind of concrete for the preparation of electric power electric pole
KR101088355B1 (en) Soil hardener composition and construction methods
CN108069692A (en) A kind of Rapid-Repair magnesium phosphate grout material and preparation method thereof
CN103771796A (en) Thin-layer pavement patching mortar
CN110563433A (en) magnesium phosphate cement-sulphoaluminate cement concrete and preparation method thereof
CN1183055C (en) Patching material in ultra-tast for hard road
CN108546068A (en) A kind of self-compaction frost thawing resistance concrete and preparation method thereof that quality is high
CN103253901A (en) Concrete bridge-deck rapid paving mortar and preparation method thereof
CN103693932A (en) Geopolymer/waste rubber powder compound dry powder material and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 321104 Yongchang industrial function zone, Jinhua, Zhejiang, Lanxi

Patentee after: Zhejiang Sanli building materials Co., Ltd.

Address before: 321104 Yongchang industrial function zone, Jinhua, Zhejiang, Lanxi

Patentee before: LANXI SANLI BUILDING MATERIALS CO., LTD.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 321104 Lanxi Economic Development Zone, Zhejiang, Jinhua

Patentee after: Zhejiang Sanli building materials Co., Ltd.

Address before: 321104 Yongchang industrial function zone, Jinhua, Zhejiang, Lanxi

Patentee before: Zhejiang Sanli building materials Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20210505