CN103926552B - Power information gathering simulation test platform - Google Patents

Power information gathering simulation test platform Download PDF

Info

Publication number
CN103926552B
CN103926552B CN201410147031.XA CN201410147031A CN103926552B CN 103926552 B CN103926552 B CN 103926552B CN 201410147031 A CN201410147031 A CN 201410147031A CN 103926552 B CN103926552 B CN 103926552B
Authority
CN
China
Prior art keywords
simulation
test
module
platform
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410147031.XA
Other languages
Chinese (zh)
Other versions
CN103926552A (en
Inventor
刘水
赵震宇
赵燕
祝婧
朱亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority to CN201410147031.XA priority Critical patent/CN103926552B/en
Publication of CN103926552A publication Critical patent/CN103926552A/en
Application granted granted Critical
Publication of CN103926552B publication Critical patent/CN103926552B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

一种用电信息采集仿真测试平台,该平台是一个包含测试环境仿真模块和测试统计分析模块的用电信息采集系统;它可以模拟仿真现有投入正式生产运行的用电信息采集系统,为进行系统的各项性能、功能检测提供平台和测试对象。所述测试环境仿真模块包括音频信号发生器、可控负载箱和配网供电模型仿真模块。与现有系统相比,本发明用电信息仿真平台独具的功能包括:采集任务的编制与下发仿真、模拟各工况下检测采集质量、设备监测仿真、数据召测仿真、批量巡测仿真、数据发布管理、预付费投入仿真、预付费控制参数下发、用户余额查看、预付费控制、催费控制、预付费工况信息、预付费情况统计等功能。适用于用电信息采集系统全方面、全性能检测使用。

A power consumption information collection simulation test platform, the platform is a power consumption information collection system including a test environment simulation module and a test statistical analysis module; it can simulate the existing power consumption information collection system that has been put into formal production and operation, for Various performance and function tests of the system provide a platform and test objects. The test environment simulation module includes an audio signal generator, a controllable load box and a distribution network power supply model simulation module. Compared with the existing system, the unique functions of the power consumption information simulation platform of the present invention include: preparation and delivery simulation of collection tasks, detection of collection quality under simulated working conditions, equipment monitoring simulation, data recall simulation, batch inspection Simulation, data release management, pre-payment input simulation, pre-payment control parameter distribution, user balance check, pre-payment control, reminder control, pre-payment working condition information, pre-payment statistics and other functions. It is suitable for all aspects and performance testing of electricity consumption information collection system.

Description

Power information gathering simulation test platform
Technical field
The present invention relates to power information gathering simulation test platform, belong to electric-power metering technical field.
Background technology
According to national intelligent grid construction plan, the construction and development of intelligent grid divides three phases progressively to carry out, to build up to the year two thousand twenty comprehensively, intelligent power link wherein mainly comprises the aspects such as the applying of intelligent electric energy meter, the application of collecting terminal, the construction of power information acquisition system, finally realizes the target of power information collection " all standing, entirely to gather, control in full ".
All standing is exactly all kinds of power consumers that power information acquisition system will cover in Utilities Electric Co.'s operation region.Full collection will realize remote automatic acquisition to the power information of all kinds of stoichiometric points that power information acquisition system covers exactly.Control in full is exactly the electricity consumption situation of power user power consumption information acquisition system energy continuous acquisition user, calculate the amount of its residue electricity charge and be shown to user, the prompting subscriber payment when remaining the electricity charge and being few, remain the electricity charge lower than setting amount time perform power purchase tripping operation control, user complete payment after system command electric energy meter close a floodgate reply power supply.Realizing above target just must overall application intelligent electric energy meter: for the intelligent electric energy meter that should adopt and possess expense control function that Adds User; The power supply area of expense control function electric energy meter is not possessed to original use or intelligent electric energy meter transformation must be carried out in place, original electric energy meter is replaced by the intelligent electric energy meter with expense control function.
Power information acquisition system is logically divided into main website layer, communication channel layer, collecting device layer.Main website is the administrative center of system, manages system-wide data processing, market demand and sends collection, expense control breaker tripping and closing order; The major way of telecommunication passage has optical fiber communication, 230MHz radio communication, wireless public network communication, medium voltage electricity line carrier communication etc.Current major part adopts wireless public network (GPRS/CDMA) mode, and wireless public network investment is little, and applied range, networking flexibility, adaptability are good, reliability is higher.Collecting device layer is made up of terminal, collector and intelligent electric energy meter.During communication, main website is by remote channel and terminal called, and terminal is again by down going channel and intelligent electric energy meter communication.What down going channel (communication channel of terminal and electric energy meter) was conventional has 2 kinds of modes: one is that acquisition terminal is by power transmission line low-voltage power carrier and intelligent electric energy meter communication; The second be acquisition terminal by power carrier and collector communication, collector carries out communication by RS-485 and electric energy meter again.
The acquisition time that during operation, acquisition layer is arranged according to main website and the time interval gather the information such as the electricity of electric energy meter, and the power information that the order of checking meter receiving main website is measured by each electric energy meter is sent to main website.The electricity collected then is counted as the electricity charge by main website layer, then compares with the situation of paying dues of power consumer, calculates the dump energy of this user.Remain the electricity charge few time prompting user pay the electricity charge, remain the electricity charge lower than setting amount time perform power purchase tripping operation control, user complete payment after system command electric energy meter close a floodgate restore electricity.
Because power information acquisition system relates to the charge calculation of huge numbers of families, relate to and can correctly notify to pay tariff by defaulting subscriber, stop the electric power supply of defaulting subscriber exactly, reliably recovered the electric power supply of payment user in time, each appliances therefore entering the use of power information acquisition system all must carry out the reliability and stability test of function, performance, technical indicator.
Existing power information collecting test device can only complete the test gathering down going channel from concentrator (terminal) to electric energy meter; Because do not test with main website, so cannot carry out from concentrator (terminal) to the performance test of main website.If carry out testing with the main website run, following deficiency can be produced:
1. test process needs to build a hundreds of Virtual User, also will complete the overall process of each operation flow, because test will simulate various operating mode, will produce a large amount of junk data, thus affect the operation of formal system in formal system.
2. under formal environments, carry out simulation expense control breaker tripping and closing test, likely cause normal electricity consumption resident mistakenly stop electricity, affect the normal life of huge numbers of families, and may Social Public Feelings be produced.
For this situation, the present invention proposes a kind of brand-new thinking: design a kind of power information acquisition system simulation test platform, can analog simulation replace the power information acquisition system of the formal production run of existing input to carry out properties, the Function detection of system; The on-the-spot actual condition of various interference source, frequency conversion load and distribution net work structure can be simulated, each alanysis, research, test condition are provided; Emulation platform has test, statistics, analytic function; Emulation platform can not affect the normal electricity consumption of power consumer when testing, can not produce junk data in formal environments.
Summary of the invention
The object of the invention is, according to the deficiency that existing power information acquisition system exists, the present invention proposes a kind of power information gathering simulation test platform.
Power information gathering simulation test platform of the present invention is a power information acquisition system comprising test environment emulation module and test statistics analysis module.It can the power information acquisition system of the formal production run of the existing input of analog simulation, for properties, the Function detection of carrying out system provides platform and tested object.
Power information gathering simulation test platform of the present invention is on the basis of existing power information acquisition system, (the main station system software of emulation platform and the system software of commencement of commercial operation are on all four in main functionality), adopt different runtime servers, the extreme slogan in IP address is different.Original platform adds the controlling functions of test emulation module, adds the analytic function of test statistics result.
Power information gathering simulation test platform of the present invention needs artificial site actual, because the master data of power information acquisition system is from Electric Power Marketing System, therefore just must with Electric Power Marketing System interface; Expense Ore-controlling Role according to gather electricity carry out charge calculation, the control of power consumer energy charge be realized, just must with take Ore-controlling Role interface.Therefore power information gathering simulation test platform of the present invention also establishes power marketing analogue system and expense control analogue system.Interface mode between power information gathering simulation test platform and this two systems is: Real-time data interface is realized by middle database and Webservice mode; Non-real-time data interface is realized by data center's mode.Real time data between system realizes mutual by the Webservice interface mode of data center, and non-real-time data is published to the middle database of data center by ETL mode, is responsible for the data of middle database to send other system to by data center.
The test environment emulation module of power information gathering simulation test platform of the present invention comprises audio signal generator, controllable load case and supplying power allocation model emulation module.By audio signal generator, controllable load case and supplying power allocation model emulation module, the on-the-spot actual condition of various interference source, frequency conversion load and distribution net work structure can be simulated, each alanysis, research, test condition are provided.
Audio signal generator adopts computing method to produce all kinds of harmonic signal, to superposition several times harmonic wave, crest meter then first needed for each harmonic calculates the signal amplitude of each harmonic wave first discrete point in a power frequency period, then the signal amplitude of each harmonic first discrete point is added the signal amplitude that can obtain output waveform first discrete point.The like can obtain the 2nd discrete point, the 3rd discrete point ... the signal amplitude of the n-th discrete point.These discrete points data calculated are sent to D/A successively, through digital-to-analog conversion and the good harmonic wave forms of exportable superposition.The output of harmonic wave, by conputer controlled, can be selected to export at all test cells, also can select only to export at certain several specific test cell.By the harmonic signal of output with need the power frequency component of output unit to carry out superposing and amplify the power supply containing harmonic wave needed for can obtaining testing through power amplifier.
Controllable load case is made up of purely resistive load blocks, inductive load module, capacitive load module.Purely resistive load blocks is in order to energy simulating electric automobile, electric bicycle charging, and added Three-phase high-power half-wave rectification, full-wave rectification current circuit, this partial circuit determines whether access by conputer controlled.The characteristic of load can be set as by conputer controlled: resistive load, inductive load and capacitive load.By the adjustment of these 3 kinds of loads and combination can be formed various required load, the power of load is continuously adjustable, and the fineness adjustment of load is 0.01kW.Resistive load adopts resistance alloys element, and test process can not produce resistance drift because of element heating.Inductance includes resistive parasitic amount and is less than 1%.Electric capacity is 0.01kVar power regulation requirements under 220V/50Hz operating mode, and each branch road of capacitive load is provided with against short-circuit privacy protection module, avoids capacitor element to be short-circuited burning apparatus at test process.The resistive load of three-phase, inductive load, capacitive load phase-splitting independently can control and regulate.
Supplying power allocation model emulation module can emulate networking, the on-the-spot actual condition of emulation distribution net work structure.
Original power information acquisition system collecting device layer is designed with 500 electric energy meter epi-positions altogether, wherein every 10 pieces of table compositions unit, what the inlet wire of each unit adopted is movable binding post, there are 10 groups of wiring stands after each concentrator, collector, control the confession radio area that the terminal box that the binding post of each unit insertion program is formulated can be combined into different distribution net work structure, different user number, different loads characteristic by PLC.For this reason, can networking be emulated for radio area, comprise: (1) star three-bristle cudrania flutters the confession radio area of structure; (2) banded (tree-shaped) three-bristle cudrania flutters the confession radio area of structure; (3) the confession radio area of annular circuitous configuration.All kinds of confession radio areas three-bristle cudrania can be emulated and flutter the impact of structure on communication success ratio.
The function that power information gathering simulation test platform of the present invention can emulate comprises:
(1) acquisition tasks establishment with issue emulation: the particular content determining acquisition tasks, comprises task names, task type, collection point type, collection point title, collection point numbering, image data item, tasks carrying beginning and ending time, collection period, execution priority and normal filling mining number of times etc.Work out and be completely issued to acquisition layer, whether correctly detect overall process.
(2) acquisition quality is detected under simulating each operating mode: under the operating mode of various needs simulation, carry out power information collection, display data acquisition success ratio and data integrity rate, the details such as the failure of record acquisition tasks and image data exception, the implementation status of automatic classification statistics gatherer task, for research, analysis provide material.
(3) monitoring of equipment emulation: emulation various kinds of equipment fault, can detection system correctly find in time, system should be able to provide device exception information, comprise process and the unit exception warning information of data integrity and data reasonalbeness check, comprise the information such as anomalous event, abnormal data, processing procedure and treatment people.
(4) data are called together and are surveyed emulation: simulate the collected by hand to the real time data of single or multiple acquisition target, historical data or event under various operating mode.
(5) batch patrols and surveys emulation: simulate under various operating mode for complete all kinds of events of batch capture point or collecting device, data manually patrol survey.
(6) data publication management: comprise customization distributing data and data publication, customization is issued: according to the business such as management of checking meter, market management, power utility check management, marketing analyses and aid decision making to the different requirements of image data item, customize distributing data.Data publication: provide data sharing service, triggers corresponding flow process, distributing data.
(7) pre-payment drops into emulation: pre-payment power purchase information, drops into or removes forward purchasing electric control, and provide operation note.
(8) pre-payment controling parameters issues: to the client of terminal or ammeter pre-payment, according to client's pre-payment situation according to the tripping operation round pre-set, and is dropped into or forward purchasing electric control is removed order and controlled by forward purchasing electric control.To the client of main website pre-payment, issue remote control tripping operation to terminal or electric energy meter or allow combined floodgate order to control.There is provided operation note simultaneously.
(9) pre-payment control imitation: to the client of main website pre-payment, according to client's pre-payment situation according to the tripping operation round pre-set, drops into or purchases in advance electric control releasing order by forward purchasing electric control and control, provide operation note simultaneously.
(10) expense control imitation is urged: inquire about expense of urging and control SMS notification and stop telegram in reply notice, according to the requirement of underpayment management, expense alarm is urged in input or releasing, expense of urging is rationed the power supply, and provided operation note.
The test statistics analysis module that power information gathering simulation platform of the present invention is arranged adds test statistics analytic function on software.Increase test, statistics, analytic function, can complete and detect from the overall process of the every business functions of each assembly such as main website, data feedback channel, terminal, down going channel, collector, carrier module, small wireless module, 485 modules, electric energy meter, complete the detection of the various functions such as order issues, data call survey together, information acquisition, energy charge control, the present invention also can detect all kinds of concentrator, the collection success ratio of electric energy meter, expense control success ratio, finds Problems existing; Can the various distribution net work structure of statistical study, carrier communication success ratio under electricity consumption loading condition, and provide technical support for the system implementation plan formulated under this operating mode.
Test statistics analysis module has following functions:
(1) task tracking, substep function of statistic analysis
In formal system, certain subtask usual is unsuccessful, but is difficult to task of finding in system in which failure.Power information simulation test platform of the present invention increases task status word field at database, and in emulation platform, software is in the process of executing the task, and often completes its task status word of a step flow process and all can be rewritten to corresponding numerical value.Unsuccessful if executed the task, the task status word of system will rest on back numerically.System also can be pointed out to go out on missions and which walks unsuccessfully at, and for searching, problem analysis provides effective foundation.
(2) can the reason of statistic of classification fault
Power information gathering simulation test platform of the present invention can according to task status word, and statistic of classification go out the to execute the task reason of failure is the factors such as power information acquisition system software itself, manual operation error, acquisition layer equipment or passage.Can clearlyer search quickly, problem analysis.
(3) statistic of classification expense can control success ratio, gather the technical indicators such as success ratio
Power information gathering simulation test platform of the present invention can carry out statistic of classification expense control success ratio, gather the technical indicators such as success ratio, for equipment choosing provides technical basis according to the production firm of collecting device, model, specification.
(4) pre-payment situation, pre-payment work information statistics can be carried out
Power information gathering simulation test platform of the present invention can be added up pre-payment situation, checks prepaid user's quantity, and spending amount, remaining sum sum, and the information such as terminal operating mode, derive or type information; Can inquiring user terminal operating mode, issue user terminal floor data; Call together and survey user terminal residue balances of advance payments or electricity showing.
The present invention compared with the prior art, useful effect is: the present invention can not only complete and gather the various performances of down going channel to power information, function is tested, and the communication quality of power carrier can be detected in all kinds of power supply topological structure situations of emulation, the more important thing is can emulate main website complete power information acquisition system in all directions, the full performance test of business overall process.
Accompanying drawing explanation
Fig. 1 is power information gathering simulation test platform principle of work schematic diagram;
Fig. 2 is emulation wiring units structural representation.
Embodiment
The specific embodiment of the present invention is as follows:
1, for power information gathering simulation test platform, need to research and analyse the following all kinds of index under various simulated condition:
(1) success ratio is gathered
Gather success ratio=(gathering the electric energy meter sum that successful electric energy meter number ÷ accesses) × 100%
(2) control success ratio is taken
Take control success ratio=(the electric energy meter sum that the successful electric energy meter number ÷ of expense control accesses) × 100%
(3) platform district line loss
Platform district line loss=(delivery-electricity sales amount) ÷ delivery × 100%
2, the emulation of all kinds of operating mode and realization
(1) structure simulation is flutterred for radio area three-bristle cudrania
Collecting device layer is designed with 500 electric energy meter epi-positions altogether, every 10 pieces of table compositions unit, what the inlet wire of each unit adopted is movable binding post, as shown in Figure 2,10 groups of wiring stands are had after each concentrator, collector, the binding post of certain unit is inserted the wiring that a terminal box can complete this unit, therefore the mode of connection of emulation platform can flexible networking.Confession radio area can emulate networking: (1) star three-bristle cudrania flutters the confession radio area of structure; (2) banded (tree-shaped) three-bristle cudrania flutters the confession radio area of structure; (3) the confession radio area of annular circuitous configuration.All kinds of confession radio areas three-bristle cudrania can be emulated and flutter the impact of structure on communication success ratio.
(2) for the emulation of radio area number of users
Emulate the number of users in certain district, just must can access after a concentrator and be no more than 500 electric energy meters.Owing to there being 10 groups of wiring stands after each concentrator, collector, therefore in access wiring expansion board, 1 wiring stand need can be extended to 10.Such section Research statistics platform district number of users is on the impact of communication success ratio.
(3) for the emulation of radio area power load
When power load is electric automobile charging pile, electric bicycle charging box, convertible frequency air-conditioner, by electric loading because rectification can produce each harmonic, harmonic wave can affect the power carrier communication of down going channel, therefore emulation platform can simulate the interference of all kinds of electric loading, can research and analyse with the impact of electric loading on communication success ratio.
(4) for radio area concentrator, collector, the emulation of electric energy meter position distribution
Can emulate distance between concentrator to collector, emulation collector to the distance of electric energy meter by accessing elongated line between wiring stand and connection terminal, research concentrator, collector, electric energy meter distribute, and radius of electricity supply is on the impact of communication success ratio.

Claims (5)

1.一种用电信息采集仿真测试平台,其特征在于,所述平台是一个包含测试环境仿真模块和测试分析模块的用电信息采集系统;它可以模拟仿真现有投入正式生产运行的用电信息采集系统,为进行系统的各项性能、功能检测提供平台和测试对象;1. A power consumption information acquisition simulation test platform, characterized in that the platform is a power consumption information collection system comprising a test environment simulation module and a test analysis module; it can simulate the existing power consumption that has been put into formal production and operation The information collection system provides a platform and test objects for various performance and function tests of the system; 所述测试环境仿真模块包括音频信号发生器、可控负载箱和配网供电模型仿真模块;通过音频信号发生器、可控负载箱以及配网供电模型仿真模块,可模拟各种干扰源、变频负载和配电网结构的现场实际工况,提供各类分析、研究、测试条件;The test environment simulation module includes an audio signal generator, a controllable load box and a distribution network power supply model simulation module; through the audio signal generator, a controllable load box and a distribution network power supply model simulation module, various interference sources, frequency conversion On-site actual working conditions of load and distribution network structure, providing various analysis, research and test conditions; 所述测试分析模块能够完成从主站、上行通道、终端、下行通道、采集器、载波模块、小无线模块、485模块、电能表各组件各项业务功能的全过程检测,完成命令下发、数据召测、信息采集、用电费控各项功能的检测,还可检测各类集中器、电能表的采集成功率、费控成功率,发现存在的问题;可统计分析各种配电网结构、用电负载情况下的载波通讯成功率,并为制定该工况下的系统实施方案提供技术支持。The test analysis module can complete the whole process detection of various business functions from the main station, uplink channel, terminal, downlink channel, collector, carrier module, small wireless module, 485 module, and electric energy meter components, and complete command issuance, Data collection, information collection, and electricity cost control functions can be tested. It can also detect the collection success rate and cost control success rate of various concentrators and electric energy meters, and find existing problems; it can statistically analyze various distribution network structures , The success rate of carrier communication under the condition of electric load, and provide technical support for formulating the system implementation plan under this condition. 2.根据权利要求1所述的一种用电信息采集仿真测试平台,其特征在于,所述平台还建立了电力营销仿真系统及费控仿真系统;所述平台与这两个系统之间的接口方式为:实时数据接口通过中间库和Webservice方式实现;非实时数据接口通过数据中心方式实现;系统间的实时数据通过数据中心的Webservice接口方式实现交互,非实时数据通过ETL方式发布到数据中心的中间库,由数据中心负责把中间库的数据传送给其他系统。2. A kind of electricity consumption information collection simulation test platform according to claim 1, is characterized in that, described platform has also set up power marketing simulation system and cost control simulation system; The communication between described platform and these two systems The interface method is: the real-time data interface is realized through the intermediate library and Webservice; the non-real-time data interface is realized through the data center; the real-time data between systems is realized through the Webservice interface of the data center, and the non-real-time data is published to the data center through ETL The intermediate library, the data center is responsible for transferring the data of the intermediate library to other systems. 3.根据权利要求1所述的一种用电信息采集仿真测试平台,其特征在于,所述音频信号发生器采用计算法产生各类谐波信号,若要叠加若干次谐波输出,则首先根据各次谐波所需的幅值计算出各谐波在一个工频周期内第一离散点的信号幅值,再将各次谐波第一离散点的信号幅值相加即可得到输出波形第一离散点的信号幅值;依次类推即可得到第2离散点、第3离散点…第n离散点的信号幅值;这些计算好的离散点数据依次发送到D/A,经数模转换即可输出叠加好的谐波波形;谐波的输出由电脑控制,可选择在所有测试单元输出,也可选择只在某几个特定的测试单元输出;将输出的谐波信号与需要输出单元的工频信号进行叠加并经功放放大即可得到测试所需的含谐波的供电电源。3. A kind of simulation test platform for electricity consumption information collection according to claim 1, characterized in that, the audio signal generator adopts calculation methods to generate various harmonic signals, if it is necessary to superimpose several harmonic outputs, first Calculate the signal amplitude of the first discrete point of each harmonic in a power frequency cycle according to the required amplitude of each harmonic, and then add the signal amplitudes of the first discrete point of each harmonic to obtain the output The signal amplitude of the first discrete point of the waveform; by analogy, the signal amplitude of the second discrete point, the third discrete point...the nth discrete point can be obtained; these calculated discrete point data are sent to D/A in turn, and the The analog-to-analog conversion can output the superimposed harmonic waveform; the output of the harmonic is controlled by the computer, and it can be selected to output in all test units, or only in a few specific test units; the output harmonic signal and the required The power frequency signal of the output unit is superimposed and amplified by the power amplifier to obtain the power supply with harmonics required for the test. 4.根据权利要求1所述的一种用电信息采集仿真测试平台,其特征在于,所述可控负载相由纯阻性负载模块、感性负载模块、容性负载模块组成;纯阻性负载模块为了能仿真电动汽车、电动自行车充电,加设了三相大功率半波整流、全波整流电流电路,该部分电路可通过电脑控制确定是否接入;负载的特性可通过电脑控制可设定为:阻性负载、感性负载及容性负载;通过将这三种负载的调节和组合可形成各种所需的负载。4. A kind of electricity consumption information collection simulation test platform according to claim 1, is characterized in that, described controllable load phase is made up of pure resistive load module, inductive load module, capacitive load module; Pure resistive load In order to simulate the charging of electric vehicles and electric bicycles, the module is equipped with three-phase high-power half-wave rectification and full-wave rectification current circuits. This part of the circuit can be controlled by a computer to determine whether it is connected; the characteristics of the load can be set by computer control. It is: resistive load, inductive load and capacitive load; various required loads can be formed by adjusting and combining these three loads. 5.根据权利要求1所述的一种用电信息采集仿真测试平台,其特征在于,所述配网供电模型仿真模块可仿真组网,仿真配电网结构的现场实际工况;所述仿真组网包括(1)星形柘扑结构的供电台区;(2)带状或树型柘扑结构的供电台区;(3)环形迂回结构的供电台区。5. A kind of electricity consumption information collection simulation test platform according to claim 1, it is characterized in that, described distribution network power supply model simulation module can simulate networking, the scene actual working condition of simulation distribution network structure; The simulation The networking includes (1) the power supply station area of the star-shaped zigzag structure; (2) the power supply station area of the strip or tree-shaped zigzag structure; (3) the power supply station area of the ring circuitous structure.
CN201410147031.XA 2014-04-14 2014-04-14 Power information gathering simulation test platform Active CN103926552B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410147031.XA CN103926552B (en) 2014-04-14 2014-04-14 Power information gathering simulation test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410147031.XA CN103926552B (en) 2014-04-14 2014-04-14 Power information gathering simulation test platform

Publications (2)

Publication Number Publication Date
CN103926552A CN103926552A (en) 2014-07-16
CN103926552B true CN103926552B (en) 2015-09-30

Family

ID=51144841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410147031.XA Active CN103926552B (en) 2014-04-14 2014-04-14 Power information gathering simulation test platform

Country Status (1)

Country Link
CN (1) CN103926552B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106330358B (en) * 2016-08-31 2019-02-12 中电华瑞技术有限公司 A Wideband Carrier Simulation Test System
CN106847016B (en) * 2016-12-12 2020-04-24 国网北京市电力公司 Simulation test system and simulation test equipment
CN109086197A (en) * 2017-06-14 2018-12-25 上海申通地铁集团有限公司 The acceptance testing method and system of urban track traffic CBTC system
CN107294562B (en) * 2017-08-16 2020-11-10 国家电网公司 Low-voltage power carrier module simulation detection device
CN107817401B (en) * 2017-10-25 2020-04-07 云南电网有限责任公司电力科学研究院 Pressure testing method and device for electricity consumption information acquisition system
CN109598075A (en) * 2018-12-10 2019-04-09 国家电网有限公司信息通信分公司 A kind of test macro and method of the power information equipment based on dynamic load
CN109713719A (en) * 2019-01-22 2019-05-03 国网上海市电力公司 A kind of flexible distributed power grid emulation platform and its appraisal procedure
CN109982284B (en) * 2019-02-21 2020-11-03 国网山东省电力公司临沂供电公司 Communication system and method for line inspection
CN114050848B (en) * 2021-11-18 2023-05-16 国网四川省电力公司营销服务中心 Performance test method and analysis method based on HPLC

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7577259B2 (en) * 2003-05-20 2009-08-18 Panasonic Corporation Method and apparatus for extending band of audio signal using higher harmonic wave generator
US20090167557A1 (en) * 2007-12-26 2009-07-02 Bubb John H Advanced meter security system
CN101776740B (en) * 2010-01-19 2012-12-26 云南电网公司 Electric energy metering automation simulation laboratory
CN102401864B (en) * 2011-11-15 2014-01-22 珠海市科荟电器有限公司 Laboratory simulation detection device for low-voltage meter reading system
CN103198420B (en) * 2013-03-29 2015-12-23 山东电力集团公司 Real-time interactive long-distance fee-control management system and method
CN103346846B (en) * 2013-06-21 2015-06-10 国家电网公司 Communication channel stimulation system of electricity consumption information collection system

Also Published As

Publication number Publication date
CN103926552A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103926552B (en) Power information gathering simulation test platform
Arif et al. Load modeling—A review
US11070058B2 (en) Forecasting net load in a distributed utility grid
CN102722851B (en) Multi-data-interface comprehensive line loss management system based on smart grid technology
US12547799B2 (en) Real-time update of power system models for dynamic security assessment
CN111208384B (en) Smart power grids management system
CN102707156A (en) A refined and accurate line loss comparison method based on smart grid technology
CN110991718B (en) A grid planning method for distribution network
CN103632224A (en) Automatic management system of electric power meter
Leão et al. The future of low voltage networks: Moving from passive to active
Vanfretti et al. Monitoring and control of renewable energy sources using synchronized phasor measurements
CN113376456A (en) Cloud platform-based method for analyzing and managing electric quantity and electric charge of large electric power user
CN105762843A (en) Power output allocation method for non-storage type dispatchable photovoltaic power station
CN119362549A (en) An intelligent dispatching method, system, device, and storage medium for electric vehicle bidirectional charging grid load based on artificial intelligence
Mehr et al. Harnessing the full potential of clean energy: The role of Southern California's utility distributed energy resource pilots
Kiliccote et al. Fast dr: Controlling small loads over the internet
JP7319838B2 (en) Power management device and power management method
de Macedo et al. Opportunities and challenges of DSM in smart grid environment
Rahim et al. Dynamic load modelling based on power quality recorder data
Boardman The role of integrated distribution management systems in smart grid implementations
Bahramara et al. Planning of a Grid-connected Smart Micro-power system
Gotseff et al. Data-driven residential load modeling and validation in gridlab-d
Zhang et al. Smart Energy Campus: A Smart Grid Testbed for Advanced Modeling, Simulation, and Decision-Making
Follum et al. Advanced measurements for resilient integration of inverter-based resources: Progress matrix year-1 report
Ferdowsi et al. Integration of behind-the-meter solar into distribution feeders: The importance of time resolution on model results

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180725

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: Power Science Research Institute of Jiangxi Electric Power Co., Ltd.

Address before: 100761 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Co-patentee before: State's net Jiangxi Province Electric power Science Academe

Patentee before: State Grid Corporation of China