CN103926552A - Electricity utilization information collecting simulation testing platform - Google Patents

Electricity utilization information collecting simulation testing platform Download PDF

Info

Publication number
CN103926552A
CN103926552A CN201410147031.XA CN201410147031A CN103926552A CN 103926552 A CN103926552 A CN 103926552A CN 201410147031 A CN201410147031 A CN 201410147031A CN 103926552 A CN103926552 A CN 103926552A
Authority
CN
China
Prior art keywords
simulation
module
power
electricity utilization
emulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410147031.XA
Other languages
Chinese (zh)
Other versions
CN103926552B (en
Inventor
刘水
赵震宇
赵燕
祝婧
朱亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410147031.XA priority Critical patent/CN103926552B/en
Publication of CN103926552A publication Critical patent/CN103926552A/en
Application granted granted Critical
Publication of CN103926552B publication Critical patent/CN103926552B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an electricity utilization information collecting simulation testing platform which is an electricity utilization information collecting system comprising a testing environment simulation module and a testing statistic analysis module. Analog simulation can be carried out on an existing electricity utilization information collecting system put into normal production and operation through the electricity utilization information collecting simulation testing platform, and a platform and a testing object are provided for detecting the performance and the functions of the system. The testing environment simulation module comprises an audio signal generator, a controllable load box and a distribution network power supply model simulation module. Compared with an existing system, the electricity utilization information collecting simulation testing platform has the unique functions of collecting task making and issuing simulation, collecting quality detection under simulated working conditions, device monitoring simulation, data interrogation simulation, batch surveying simulation, data dissemination management, prepayment input simulation, prepayment control parameter issuing, user balance checking, prepayment control, payment reminding control, prepayment working condition information, prepayment condition counting and the like. The electricity utilization information collecting simulation testing platform is suitable for comprehensive and full performance detection of the electricity utilization collecting system.

Description

Power information gathering simulation test platform
 
technical field
The present invention relates to power information gathering simulation test platform, belong to electric-power metering technical field.
Background technology
According to national intelligent grid construction plan, the construction of intelligent grid and a development minute three phases progressively carry out, to the year two thousand twenty, will build up comprehensively, intelligent power link wherein mainly comprises the applying of intelligent electric energy meter, the application of collecting terminal, the aspects such as construction of power information acquisition system, finally realizes the target of power information collection " all standing, entirely gather, control in full ".
All standing is exactly that power information acquisition system will cover all kinds of power consumers in Utilities Electric Co.'s operation region.The power information of all kinds of stoichiometric points that full collection will cover power information acquisition system exactly realizes remote automatic acquisition.Control in full is exactly power consumer power information acquisition system energy continuous acquisition user's electricity consumption situation, calculate the amount of its residue electricity charge and be shown to user, when the residue electricity charge are few, point out subscriber payment, in the residue electricity charge, carry out power purchase tripping operation when setting amount and control, user complete pay the fees after system command electric energy meter close a floodgate and reply power supply.Realizing above target just must overall application intelligent electric energy meter: for Adding User, should adopt the intelligent electric energy meter that possesses expense control function; Intelligent electric energy meter transformation must be carried out in the power supply area or the place that original use are not possessed to expense control function electric energy meter, original electric energy meter is replaced by the intelligent electric energy meter with expense control function.
Power information acquisition system is logically divided into main website layer, communication channel layer, collecting device layer.Main website is the administrative center of system, manages system-wide data processing, market demand and sends collection, expense control breaker tripping and closing order; The major way of telecommunication passage has optical fiber communication, 230MHz radio communication, wireless public network communication, medium voltage electricity line carrier communication etc.Current most of wireless public network (GPRS/CDMA) mode that adopts, wireless public network investment is little, applied range, networking flexibility, adaptability is good, reliability is higher.Collecting device layer is comprised of terminal, collector and intelligent electric energy meter.During communication, main website is by remote channel and terminal called, and terminal is again by down going channel and intelligent electric energy meter communication.Down going channel (communication channel of terminal and electric energy meter) is conventional 2 kinds of modes: a kind of is that acquisition terminal passes through power transmission line low-voltage power carrier and intelligent electric energy meter communication; The second be acquisition terminal by power carrier and collector communication, collector carries out communication by RS-485 and electric energy meter again.
The acquisition time that during operation, acquisition layer arranges according to main website and the time interval gather the information such as electric weight of electric energy meter, and the power information that the order of checking meter of receiving main website is about to each electric energy meter metering sends to main website.Main website layer is counted as the electricity charge by the electric weight collecting, then compares with the situation of paying dues of power consumer, calculates this user's dump energy.In the residue electricity charge, point out user to pay the electricity charge when few, in the residue electricity charge, carry out power purchase tripping operation when setting amount and control, user complete pay the fees after system command electric energy meter close a floodgate and restore electricity.
Because power information acquisition system relates to huge numbers of families' charge calculation, relate to can correctly notify soon and pay tariff on defaulting subscriber, stop exactly defaulting subscriber's electric power supply, has recovered reliably in time to pay the fees user's electric power supply, therefore enters the reliability and stability that each appliances that power information acquisition system used all must carry out function, performance, technical indicator and tests.
Existing power information collecting test device can only complete the test that gathers down going channel from concentrator (terminal) to electric energy meter; Because test main website not, so the performance test from concentrator (terminal) to main website cannot be carried out.If test and can produce following deficiency with the main website moving:
1. test process need to be built a hundreds of Virtual User, also will complete the overall process of each operation flow, because test will be simulated various operating modes, will in formal system, produce a large amount of junk datas, thereby affect the operation of formal system.
2. under formal environments, simulate expense control breaker tripping and closing test, likely cause normal electricity consumption resident mistakenly stop electricity, affect huge numbers of families' normal life, and may produce Social Public Feelings.
For this situation, the present invention proposes a kind of brand-new thinking: design a kind of power information acquisition system simulation test platform, can analog simulation and replace the power information acquisition system of the formal production run of existing input to carry out properties, the Function detection of system; The on-the-spot actual condition that can simulate various interference sources, frequency conversion load and distribution net work structure, provides each alanysis, research, test condition; Emulation platform has test, statistics, analytic function; Emulation platform can not affect the normal electricity consumption of power consumer when testing, and can not produce junk data in formal environments.
summary of the invention
The object of the invention is, the deficiency existing according to existing power information acquisition system, the present invention proposes a kind of power information gathering simulation test platform.
Power information gathering simulation test platform of the present invention is a power information acquisition system that comprises test environment emulation module and test statistics analysis module.It can the formal production run of the existing input of analog simulation power information acquisition system, for carrying out properties, the Function detection of system, provide platform and tested object.
Power information gathering simulation test platform of the present invention is on the basis of existing power information acquisition system, (the main station system software of emulation platform and the system software of commencement of commercial operation are on all four in main functionality), adopt different runtime servers, the extreme slogan in IP address is different.On original platform, increased test emulation module control function, increased the analytic function of test statistics result.
Power information gathering simulation test platform of the present invention needs artificial site actual, because the master data of power information acquisition system is from Electric Power Marketing System, therefore just must with Electric Power Marketing System interface; Expense control system is carried out charge calculation according to the electric weight gathering, and realize the control of power consumer energy charge, just must control system interface with taking.Therefore power information gathering simulation test platform of the present invention has also been set up power marketing analogue system and expense control analogue system.Interface mode between power information gathering simulation test platform and this two systems is: real time data interface is realized by middle database and Webservice mode; Non-real-time data interface is realized by data center's mode.Real time data between system realizes mutual by the Webservice interface mode of data center, non-real-time data is published to the middle database of data center by ETL mode, by data center, be responsible for the data of middle database to send other system to.
The test environment emulation module of power information gathering simulation test platform of the present invention comprises audio signal generator, controllable load case and supplying power allocation model emulation module.By audio signal generator, controllable load case and supplying power allocation model emulation module, can simulate the on-the-spot actual condition of various interference sources, frequency conversion load and distribution net work structure, each alanysis, research, test condition are provided.
Audio signal generator adopts computing method to produce all kinds of harmonic signals, the several times harmonic wave if superpose, first according to the required crest meter of each harmonic, calculate the signal amplitude of each harmonic wave first discrete point in a power frequency period, then the signal amplitude of each harmonic the first discrete point is added to the signal amplitude that can obtain output waveform the first discrete point.The like can obtain the 2nd discrete point, the 3rd discrete point ... the signal amplitude of n discrete point.These discrete points data that calculate send to D/A successively, through digital-to-analog conversion, are the harmonic wave forms that exportable stack is good.The output of harmonic wave is controlled by computer, can be chosen in all test cell output, also can select only in certain several specific test cell output.The harmonic signal of output and the power frequency component that needs output unit are superposeed and amplify and can obtain testing the required power supply containing harmonic wave through power amplifier.
Controllable load case is comprised of pure resistive load module, inductive load module, capacitive load module.Pure resistive load module, for energy simulating electric automobile, electric bicycle charging, has added Three-phase high-power half-wave rectification, full-wave rectification current circuit, and this partial circuit can be controlled and be determined whether access by computer.The characteristic of load can be controlled and can be set as by computer: resistive load, inductive load and capacitive load.By the adjusting of these 3 kinds of loads and combination can be formed to various required loads, the power of load is continuously adjustable, and the adjusting fineness of load is 0.01kW.Resistive load adopts resistance alloys element, and test process can not produce resistance drift because of element heating.Inductance includes resistive parasitic amount and is less than 1%.Electric capacity is the requirement of 0.01kVar power adjustments under 220V/50Hz operating mode, and each branch road of capacitive load is provided with anti-short circuit privacy protection module, avoids capacitor element at the test process burning apparatus that is short-circuited.The resistive load of three-phase, inductive load, capacitive load can phase-splitting independently be controlled and regulate.
Supplying power allocation model emulation module can emulation networking, the on-the-spot actual condition of emulation distribution net work structure.
Original power information acquisition system collecting device layer is designed with 500 electric energy meter epi-positions altogether, wherein every 10 tables form a unit, what the inlet wire of each unit adopted is movable binding post, after each concentrator, collector, there are 10 groups of wiring stands, by PLC, control the confession radio area that the terminal box that the binding post insertion program of each unit is formulated can be combined into different distribution net work structures, different user number, different loads characteristic.For this reason, can emulation networking for radio area, comprising: (1) star three-bristle cudrania flutter structure for radio area; (2) banded (tree type) three-bristle cudrania flutters the radio area that supplies of structure; (3) the confession radio area of annular circuitous configuration.Can flutter the impact of structure on communication success ratio by all kinds of confession of emulation radio area three-bristle cudrania.
The function of power information gathering simulation test platform energy of the present invention emulation comprises:
(1) establishment of acquisition tasks with issue emulation: determine the particular content of acquisition tasks, comprise task names, task type, collection point type, collection point title, collection point numbering, image data item, tasks carrying beginning and ending time, collection period, execution priority and normal filling mining number of times etc.Work out the complete acquisition layer that is issued to, whether correctly detect overall process.
(2) simulate and under each operating mode, detect acquisition quality: under the various operating modes that need simulation, carry out power information collection, show data acquisition success ratio and data integrity rate, record the details such as acquisition tasks failure and image data are abnormal, the implementation status of automatic classification statistics gatherer task, for research, analysis provide material.
(3) monitoring of equipment emulation: emulation various kinds of equipment fault, can detection system correctly be found in time, system should be able to provide device exception information, the processing and the unit exception warning information that comprise data integrity and data reasonalbeness check, comprise the information such as anomalous event, abnormal data, processing procedure and treatment people.
(4) data are called survey emulation together: simulate under various operating modes the manual of the real time data of single or multiple acquisition targets, historical data or event gathered.
(5) in batches patrol survey emulation: that simulates under various operating modes all kinds of events for completing batch capture point or collecting device, data manually patrols survey.
(6) data release management: comprise the issue of customization distributing data and data, customization issue: according to the management of checking meter, market management, power utility check management, marketing is analyzed and the different requirements of business to image data item such as aid decision making, customizes distributing data.Data issue: data sharing service is provided, triggers corresponding flow process, distributing data.
(7) pre-payment drops into emulation: pre-payment power purchase information, drops into or removes forward purchasing electric control, and operation note is provided.
(8) pre-payment control parameter issues: the client to terminal or ammeter pre-payment,, removes to order by forward purchasing electric control input or forward purchasing electric control and controls according to the tripping operation round setting in advance according to client's pre-payment situation.Client to main website pre-payment, issues remote control tripping operation or allows combined floodgate order to control to terminal or electric energy meter.Operation note is provided simultaneously.
(9) pre-payment is controlled emulation: the client to main website pre-payment, and according to client's pre-payment situation, according to the tripping operation round setting in advance, by forward purchasing electric control, drop into or purchase in advance electric control releasing order and control, operation note is provided simultaneously.
(10) urge expense control emulation: inquire about the expense of urging and control SMS notification and stop telegram in reply notice, according to the requirement of underpayment management, expense alarm is urged in input or releasing, the expense of urging is rationed the power supply, and operation note is provided.
The test statistics analysis module of power information gathering simulation platform of the present invention setting has increased test statistics analytic function on software.Increase test, statistics, analytic function, can complete from the overall process of the every business functions of each assembly such as main website, data feedback channel, terminal, down going channel, collector, carrier module, small wireless module, 485 modules, electric energy meter and detect, complete the detection of the various functions such as order issues, data are called survey together, information acquisition, energy charge control, the present invention also can detect collection success ratio, the expense control success ratio of all kinds of concentrators, electric energy meter, finds the problem existing; Can the various distribution net work structures of statistical study, the carrier communication success ratio under electricity consumption loading condition, and provide technical support for the system implementation plan of formulating under this operating mode.
Test statistics analysis module has following functions:
(1) task tracking, substep function of statistic analysis
In formal system, certain subtask is unsuccessful conventionally, but in system, is difficult to the task of finding in which failure.Power information simulation test platform of the present invention increases task status word field at database, and in emulation platform, software, in the process of executing the task, often completes its task status word of a step flow process and all can be rewritten to corresponding numerical value.Unsuccessful if executed the task, the task status word of system will rest on the numerical value of back.System also can be pointed out to go out on missions and at which walk unsuccessfully, for searching, problem analysis provides effective foundation.
(2) reason that can statistic of classification fault
Power information gathering simulation test platform of the present invention can be according to task status word, and statistic of classification go out the to execute the task reason of failure is the factors such as power information acquisition system software itself, manual operation error, acquisition layer equipment or passage.Can clearlyer search quickly, problem analysis.
(3) can statistic of classification expense control success ratio, gather the technical indicators such as success ratio
Power information gathering simulation test platform of the present invention can carry out statistic of classification expense control success ratio, gather the technical indicators such as success ratio, for equipment choosing provides technical basis according to the production firm of collecting device, model, specification.
(4) can carry out pre-payment situation, pre-payment work information statistics
Power information gathering simulation test platform of the present invention can be added up pre-payment situation, checks prepaid user's quantity, and has consumed the amount of money, remaining sum sum, and the information such as terminal operating mode, derive or type information; Can inquiring user terminal operating mode, issue user terminal floor data; Call together and survey user terminal residue balances of advance payments or electric weight and show.
The present invention compared with the prior art, useful effect is: the present invention can not only complete various performances, the function of power information collection down going channel are tested, and can in all kinds of power supply topological structure situations of emulation, detect the communication quality of power carrier, the more important thing is can emulation main website complete power information acquisition system in all directions, the full performance test of business overall process.
accompanying drawing explanation
Fig. 1 is power information gathering simulation test platform principle of work schematic diagram;
Fig. 2 is emulation wiring units structural representation.
Embodiment
The specific embodiment of the present invention is as follows:
1,, for power information gathering simulation test platform, need to research and analyse the following all kinds of indexs under various simulated conditions:
(1) gather success ratio
Gather success ratio=(gathering the electric energy meter sum that successful electric energy meter is counted ÷ access) * 100%
(2) take control success ratio
Take control success ratio=(the successful electric energy meter of expense control is counted the electric energy meter sum of ÷ access) * 100%
(3) platform district line loss
Platform district line loss=(delivery-electricity sales amount) ÷ delivery * 100%
2, the emulation of all kinds of operating modes and realization
(1) for radio area three-bristle cudrania, flutter structure simulation
Collecting device layer is designed with 500 electric energy meter epi-positions altogether, every 10 tables form a unit, what the inlet wire of each unit adopted is movable binding post, as shown in Figure 2, after each concentrator, collector, there are 10 groups of wiring stands, the binding post of certain unit is inserted to the wiring that a terminal box can complete this unit, so the mode of connection of emulation platform can flexible networking.Can emulation networking for radio area: (1) star three-bristle cudrania flutter structure for radio area; (2) banded (tree type) three-bristle cudrania flutters the radio area that supplies of structure; (3) the confession radio area of annular circuitous configuration.Can flutter the impact of structure on communication success ratio by all kinds of confession of emulation radio area three-bristle cudrania.
(2) for radio area number of users emulation
Want the number of users in certain district of emulation, just must after a concentrator, can access and be no more than 500 electric energy meters.Owing to there being 10 groups of wiring stands after each concentrator, collector, therefore need, in access wiring expansion board, 1 wiring stand can be extended to 10.The impact of section's Research statistics platform district number of users on communication success ratio like this.
(3) for radio area power load emulation
When power load is electric automobile charging pile, electric bicycle charging box, convertible frequency air-conditioner, by electric loading because rectification meeting produces each harmonic, harmonic wave can affect the power carrier communication of down going channel, therefore emulation platform can be simulated all kinds of interference by electric loading, can research and analyse the impact on communication success ratio by electric loading.
(4) for radio area concentrator, collector, the emulation of electric energy meter position distribution
By accessing the distance of elongated line energy emulation concentrator to the distance between collector, emulation collector to electric energy meter between wiring stand and connection terminal, research concentrator, collector, electric energy meter distribute, and the impact of radius of electricity supply on communication success ratio.

Claims (5)

1. a power information gathering simulation test platform, is characterized in that, described platform is a power information acquisition system that comprises test environment emulation module and test statistics analysis module; It can the formal production run of the existing input of analog simulation power information acquisition system, for carrying out properties, the Function detection of system, provide platform and tested object;
Described test environment emulation module comprises audio signal generator, controllable load case and supplying power allocation model emulation module; By audio signal generator, controllable load case and supplying power allocation model emulation module, can simulate the on-the-spot actual condition of various interference sources, frequency conversion load and distribution net work structure, each alanysis, research, test condition are provided;
Described testing analysis module can complete from the overall process of main website, data feedback channel, terminal, down going channel, collector, carrier module, small wireless module, 485 modules, the every business function of each assembly of electric energy meter and detect, complete that order issues, data are called survey together, the detection of information acquisition, energy charge control various functions, also can detect collection success ratio, the expense control success ratio of all kinds of concentrators, electric energy meter, find the problem existing; Can the various distribution net work structures of statistical study, the carrier communication success ratio under electricity consumption loading condition, and provide technical support for the system implementation plan of formulating under this operating mode.
2. a kind of power information gathering simulation test platform according to claim 1, is characterized in that, described platform has also been set up power marketing analogue system and expense control analogue system; Interface mode between described platform and this two systems is: real time data interface is realized by middle database and Webservice mode; Non-real-time data interface is realized by data center's mode; Real time data between system realizes mutual by the Webservice interface mode of data center, non-real-time data is published to the middle database of data center by ETL mode, by data center, be responsible for the data of middle database to send other system to.
3. a kind of power information gathering simulation test platform according to claim 1, it is characterized in that, described audio signal generator adopts computing method to produce all kinds of harmonic signals, the several times harmonic wave if superpose, first according to the required crest meter of each harmonic, calculate the signal amplitude of each harmonic wave first discrete point in a power frequency period, then the signal amplitude of each harmonic the first discrete point is added to the signal amplitude that can obtain output waveform the first discrete point; The like can obtain the 2nd discrete point, the 3rd discrete point ... the signal amplitude of n discrete point; These discrete points data that calculate send to D/A successively, through digital-to-analog conversion, are the harmonic wave forms that exportable stack is good; The output of harmonic wave is controlled by computer, can be chosen in all test cell output, also can select only in certain several specific test cell output; The harmonic signal of output and the power frequency component that needs output unit are superposeed and amplify and can obtain testing the required power supply containing harmonic wave through power amplifier.
4. a kind of power information gathering simulation test platform according to claim 1, is characterized in that, described controllable load is comprised of pure resistive load module, inductive load module, capacitive load module; Pure resistive load module, for energy simulating electric automobile, electric bicycle charging, has added Three-phase high-power half-wave rectification, full-wave rectification current circuit, and this partial circuit can be controlled and be determined whether access by computer; The characteristic of load can be controlled and can be set as by computer: resistive load, inductive load and capacitive load; By the adjusting of these three kinds of loads and combination can be formed to various required loads.
5. a kind of power information gathering simulation test platform according to claim 1, is characterized in that, described supplying power allocation model emulation module supplying power allocation model emulation module can emulation networking, the on-the-spot actual condition of emulation distribution net work structure; Described emulation networking comprises that (1) star three-bristle cudrania flutters the radio area that supplies of structure; (2) banded (tree type) three-bristle cudrania flutters the radio area that supplies of structure; (3) the confession radio area of annular circuitous configuration.
CN201410147031.XA 2014-04-14 2014-04-14 Power information gathering simulation test platform Active CN103926552B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410147031.XA CN103926552B (en) 2014-04-14 2014-04-14 Power information gathering simulation test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410147031.XA CN103926552B (en) 2014-04-14 2014-04-14 Power information gathering simulation test platform

Publications (2)

Publication Number Publication Date
CN103926552A true CN103926552A (en) 2014-07-16
CN103926552B CN103926552B (en) 2015-09-30

Family

ID=51144841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410147031.XA Active CN103926552B (en) 2014-04-14 2014-04-14 Power information gathering simulation test platform

Country Status (1)

Country Link
CN (1) CN103926552B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106330358A (en) * 2016-08-31 2017-01-11 中电华瑞技术有限公司 Broadband carrier simulation test system
CN106847016A (en) * 2016-12-12 2017-06-13 国网北京市电力公司 Emulation test system and simulated test device
CN107294562A (en) * 2017-08-16 2017-10-24 国家电网公司 Low-voltage power carrier module simulation detection means
CN107817401A (en) * 2017-10-25 2018-03-20 云南电网有限责任公司电力科学研究院 The method for testing pressure and device of a kind of power information acquisition system
CN109086197A (en) * 2017-06-14 2018-12-25 上海申通地铁集团有限公司 The acceptance testing method and system of urban track traffic CBTC system
CN109598075A (en) * 2018-12-10 2019-04-09 国家电网有限公司信息通信分公司 A kind of test macro and method of the power information equipment based on dynamic load
CN109713719A (en) * 2019-01-22 2019-05-03 国网上海市电力公司 A kind of flexible distributed power grid emulation platform and its appraisal procedure
CN109982284A (en) * 2019-02-21 2019-07-05 国网山东省电力公司临沂供电公司 Communication system and method for line data-logging
CN114050848A (en) * 2021-11-18 2022-02-15 国网四川省电力公司营销服务中心 Performance test method and analysis method based on HPLC

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1791902A (en) * 2003-05-20 2006-06-21 松下电器产业株式会社 Method and device for extending the audio signal band
US20090167557A1 (en) * 2007-12-26 2009-07-02 Bubb John H Advanced meter security system
CN101776740A (en) * 2010-01-19 2010-07-14 云南电网公司 Electric energy metering automation simulation laboratory
CN102401864A (en) * 2011-11-15 2012-04-04 珠海市科荟电器有限公司 Laboratory simulation detection device for low-voltage meter reading system
CN103198420A (en) * 2013-03-29 2013-07-10 山东电力集团公司 Real-time interactive long-distance fee-control management system and method
CN103346846A (en) * 2013-06-21 2013-10-09 国家电网公司 Communication channel stimulation system of electricity consumption information collection system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1791902A (en) * 2003-05-20 2006-06-21 松下电器产业株式会社 Method and device for extending the audio signal band
US20090167557A1 (en) * 2007-12-26 2009-07-02 Bubb John H Advanced meter security system
CN101776740A (en) * 2010-01-19 2010-07-14 云南电网公司 Electric energy metering automation simulation laboratory
CN102401864A (en) * 2011-11-15 2012-04-04 珠海市科荟电器有限公司 Laboratory simulation detection device for low-voltage meter reading system
CN103198420A (en) * 2013-03-29 2013-07-10 山东电力集团公司 Real-time interactive long-distance fee-control management system and method
CN103346846A (en) * 2013-06-21 2013-10-09 国家电网公司 Communication channel stimulation system of electricity consumption information collection system

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
LIU SHUI等: "Design of Integrated Detecting the Pipeline Based on Smart Meter,Terminals,Concentrator", 《PROCEEDINGS OF 2013 FIFTH CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION》, 17 January 2013 (2013-01-17), pages 446 - 451, XP032353897, DOI: doi:10.1109/ICMTMA.2013.112 *
MIN XIANG等: "Design of Test Platform for Electricity Information Collection System Based on Multi-network Fusion Technology", 《PROCEEDINGS OF 2013 IEEE REGION 10 CONFERENCE ON TENCON》, 25 October 2013 (2013-10-25), pages 1 - 5 *
夏水斌等: "一种采集终端现场测试设备的设计与实现", 《电测与仪表》, vol. 50, no. 11, 30 November 2013 (2013-11-30), pages 98 - 101 *
王华伟: "用电信息采集系统试验测试平台的构建及应用", 《安徽电气工程职业技术学院学报》, vol. 18, no. 1, 31 March 2013 (2013-03-31), pages 105 - 109 *
陈蔚文等: "电能计量自动化系统在电力营销中的应用", 《广东电力》, vol. 24, no. 12, 31 December 2011 (2011-12-31), pages 117 - 121 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106330358A (en) * 2016-08-31 2017-01-11 中电华瑞技术有限公司 Broadband carrier simulation test system
CN106847016A (en) * 2016-12-12 2017-06-13 国网北京市电力公司 Emulation test system and simulated test device
CN106847016B (en) * 2016-12-12 2020-04-24 国网北京市电力公司 Simulation test system and simulation test equipment
CN109086197A (en) * 2017-06-14 2018-12-25 上海申通地铁集团有限公司 The acceptance testing method and system of urban track traffic CBTC system
CN107294562A (en) * 2017-08-16 2017-10-24 国家电网公司 Low-voltage power carrier module simulation detection means
CN107294562B (en) * 2017-08-16 2020-11-10 国家电网公司 Low-voltage power carrier module simulation detection device
CN107817401A (en) * 2017-10-25 2018-03-20 云南电网有限责任公司电力科学研究院 The method for testing pressure and device of a kind of power information acquisition system
CN107817401B (en) * 2017-10-25 2020-04-07 云南电网有限责任公司电力科学研究院 Pressure testing method and device for electricity consumption information acquisition system
CN109598075A (en) * 2018-12-10 2019-04-09 国家电网有限公司信息通信分公司 A kind of test macro and method of the power information equipment based on dynamic load
CN109713719A (en) * 2019-01-22 2019-05-03 国网上海市电力公司 A kind of flexible distributed power grid emulation platform and its appraisal procedure
CN109982284A (en) * 2019-02-21 2019-07-05 国网山东省电力公司临沂供电公司 Communication system and method for line data-logging
CN114050848A (en) * 2021-11-18 2022-02-15 国网四川省电力公司营销服务中心 Performance test method and analysis method based on HPLC

Also Published As

Publication number Publication date
CN103926552B (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN103926552B (en) Power information gathering simulation test platform
CN101958544B (en) System and method for calculating line loss rate of electric power distribution line
CN103762723B (en) Method and system for managing a power grid
Yuan et al. Smart grids in China
CN102722851B (en) A kind of majority based on intelligent power grid technology is according to interface synthesis line loss management system of local electric network
CN102707156B (en) Method for finely and accurately comparing line losses based on smart-grid technology
CN103632224A (en) Automatic management system of electric power meter
CN104201780A (en) Load data collecting, transmitting and analyzing device used for rural power distribution area
CN110544082A (en) Business prepayment cloud platform system
CN112598234A (en) Low-voltage transformer area line loss abnormity analysis method, device and equipment
Liu et al. Identification of charging behavior characteristic for large-scale heterogeneous electric vehicle fleet
Boardman The role of integrated distribution management systems in smart grid implementations
Thomas et al. Distribution automation leading to a smarter grid
CN201022023Y (en) Remote monitoring and recording system for distributed power quality
CN108093039B (en) Method for processing sleeping electric meter based on national network Q/GDW3761 protocol
CN106340963A (en) Electric power distribution room intelligent commission maintenance monitoring system
CN105489080A (en) Metering system simulation platform
CN113376456A (en) Cloud platform-based method for analyzing and managing electric quantity and electric charge of large electric power user
de Macedo et al. Opportunities and challenges of DSM in smart grid environment
CN104361453A (en) Decision-making method of intelligentization building projects of intelligent power distribution network
CN109544044B (en) Wide-area power quality evaluation system based on fault recording big data driving
CN103430204A (en) Social-infrastructure control system, server, control method, and program
Ferdowsi et al. Integration of behind-the-meter solar into distribution feeders: The importance of time resolution on model results
Song et al. Construction Scheme of Virtual Power Plant Centralized Control Platform Based on Information Interaction
Thomas Connection imbalance in low voltage distribution networks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180725

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: Power Science Research Institute of Jiangxi Electric Power Co., Ltd.

Address before: 100761 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Co-patentee before: State's net Jiangxi Province Electric power Science Academe

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right