Prior art keywords
buoyancy tank
semi
cross structure
mounting plate
upper mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410154592.2A
Other languages
English (en)
Other versions
CN103921905A (zh
Inventor
于雁云
林焰
纪卓尚
陈明
李楷
王运龙
管官
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201410154592.2A priority Critical patent/CN103921905B/zh
Publication of CN103921905A publication Critical patent/CN103921905A/zh
Application granted granted Critical
Publication of CN103921905B publication Critical patent/CN103921905B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种用于在水上组合成大型浮体的半潜式模块及其组装方法,其属于大型组合浮体结构与组装领域。该半潜式模块包括浮箱、立柱、上平台、浮箱连接桥和上平台连接桥,浮箱通过立柱固定连接上平台构成半潜式模块,浮箱内部的标准液舱采用通过立柱的遥控管线和遥控阀件汇集至上平台的压载集中控制室。该半潜式模块结构简单,易于建造,可在海上组装成大型组合浮体。各半潜式模块之间用连接桥焊接连接,焊接、涂装等作业均在水上施工。连接桥焊接连接,保持了模块间结构的连续性,具有良好的结构强度。连接桥构件为类悬臂梁结构,具有一定的柔性,对建造误差、方法变形误差具有一定的容差性,利于模块建造,保证水上装配及焊接作业的顺利进行。

Description

用于在水上组合成大型浮体的半潜式模块及其组装方法
技术领域
本发明涉及一种用于在水上组合成大型浮体的半潜式模块及其组装方法,其属于大型组合浮体结构与组装领域。
背景技术
大型组合浮体包括海上机场、海上码头、海上作业平台、大型浮桥和浮动城市等,是开发、利用海洋资源,保卫国家领海等任务的有效装备。鉴于大型组合浮体的重要经济与战略地位,目前我国正在对大型组合浮体进行深入研究。半潜式结构物因波浪载荷小等优点,是最被广泛认可的大型组合浮体结构形式。但是,大型组合浮体的外形尺寸比常规的船舶与海洋平台大一个数量级,所以不能采用常规船舶与海洋结构物的建造方法建造。当前,建造方法是限制大型组合浮体发展的一项关键因素。
发明内容
针对上述问题,本发明提供一种用于在水上组合成大型浮体的半潜式模块及其组装方法,这种模块四周可以与其他模块连接,以组装建造各类大型组合浮体。该模块采用连接桥方式连接,安装过程中连接桥位于水线以上,避免水下装配、焊接及涂装作业。
本发明解决其技术问题所采用的技术方案是:一种用于在水上组合成大型浮体的半潜式模块,它包括浮箱,它还包括立柱、上平台、浮箱连接桥和上平台连接桥,在所述浮箱的周边设有浮箱连接桥,上平台的周边设有上平台连接桥,浮箱通过立柱固定连接上平台构成半潜式模块;所述浮箱的内部设置多个标准液舱,标准液舱采用通过立柱的遥控管线和遥控阀件汇集至上平台的压载集中控制室;所述上平台为提供作业场地、功能舱室和物品存储空间的大型组合浮体,立柱为水密结构;所述浮箱连接桥是浮箱的强力构件的延续,上平台连接桥是上平台的强力构件的延续。
所述浮箱连接桥的结构与浮箱结构连续,浮箱连接桥上面板与浮箱甲板结构连续,连接桥腹板与浮箱的纵、横舱壁保持结构连续,连接桥扶强材与浮箱中相应的扶强材结构连续,浮箱连接桥的外端为悬臂结构。
所述的用于在水上组合成大型浮体的半潜式模块的组装方法:
(a)所述半潜式模块在陆地上或者浮船坞中采用常规建造方法建造,拖至预定海域准备组装;
(b)所述半潜式模块在组装时,通过压载调节系统调整浮箱的吃水线在浮箱连接桥以下,并与相邻的半潜式模块位于同一浮态;
(c)调整需要对接的半潜式模块的浮箱连接桥和上平台连接桥的结构对齐;
(d)在焊接作业时,浮箱连接桥底板焊缝以及焊缝处的涂装在浮箱外仰面施工,其他焊缝均在浮箱连接桥之内或者之上施工;上平台连接桥采用常规方式装配及焊接。
本发明的有益效果是:这种用于在水上组合成大型浮体的半潜式模块包括浮箱、立柱、上平台、浮箱连接桥和上平台连接桥,浮箱通过立柱固定连接上平台构成半潜式模块,浮箱内部的标准液舱采用通过立柱的遥控管线和遥控阀件汇集至上平台的压载集中控制室。该半潜式模块结构简单,易于建造,可以在海上组装成各类大型组合浮体。各半潜式模块之间用连接桥焊接连接,所有焊接、涂装等作业均在水上施工。连接桥焊接连接,保持了模块间结构的连续性,具有良好的结构强度。连接桥构件为类悬臂梁结构,具有一定的柔性,对建造误差、方法变形误差具有一定的容差性,利于模块建造,保证水上装配及焊接作业的顺利进行。
附图说明
下面结合附图和实施方法对本发明作进一步说明。
图1是用于在水上组合成大型浮体的半潜式模块总体外形图。
图2是图1中的A放大图。
图3是图1中的B放大图。
图中:1、浮箱,1a、浮箱甲板,1b、浮箱外板,2、支柱,3、上平台,4、浮箱连接桥,4a、连接桥上面板,4b、连接桥腹板,4c、连接桥下面板,4d、连接桥扶强材,5、上平台连接桥。
具体实施方式
图1、2、3示出了一种用于在水上组合成大型浮体的半潜式模块的结构图。图中,用于在水上组合成大型浮体的半潜式模块包括浮箱1、立柱2、上平台3、浮箱连接桥4和上平台连接桥5,在浮箱1的周边设有浮箱连接桥4,上平台3的周边设有上平台连接桥5,浮箱1通过立柱2固定连接上平台3构成半潜式模块。浮箱1的内部设置多个标准液舱,标准液舱采用通过立柱2的遥控管线和遥控阀件汇集至上平台3的压载集中控制室。上平台3为提供作业场地、功能舱室和物品存储空间的大型组合浮体,立柱2为水密结构。浮箱连接桥4是浮箱1的强力构件的延续,上平台连接桥5是上平台3的强力构件的延续。
浮箱连接桥4的结构与浮箱1结构连续,浮箱连接桥4上面板4a与浮箱甲板1a结构连续,连接桥腹板4b与浮箱1的纵、横舱壁保持结构连续,连接桥扶强材4d与浮箱1中相应的扶强材结构连续,浮箱连接桥4的外端为悬臂结构,具有一定的柔性,模块组装时可以通过外力牵拉产生一定的弹性变形,补偿建造误差或者浮体漂浮产生的局部变形。
半潜式模块在海上合拢时,通过向待安装模块的液舱注排压载水或者在其浮箱1上方四角处设置压载物调整模块的吃水与浮态,使待合拢的模块浮箱连接桥4与已合拢模块的相应浮箱连接桥4对齐后焊接连接。焊接作业时,浮箱连接桥4底板焊缝及其焊缝处的涂装在浮箱外仰面施工,其他焊缝均在浮箱连接桥4内部或在其顶部施工。
采用上述的技术方案,在水面上将不同模块的浮箱连接桥4装配并焊接在一起,上平台连接桥5采用常规方式装配及焊接,完成模块的水上组装合拢。组装时,模块为浅吃水状态,所有焊缝均位于水线以上,无水下焊接或安装作业。正常工作时,吃水在立柱2中间位置,一方面降低浮体的波浪载荷,另一方面避免极端海况下海浪触及上平台造成大型组合浮体或者设备、货物的损坏。

Claims (2)

1.一种用于在水上组合成大型浮体的半潜式模块,它包括浮箱(1)、立柱(2)、上平台(3)、浮箱连接桥(4)和上平台连接桥(5),在所述浮箱(1)的周边设有浮箱连接桥(4),上平台(3)的周边设有上平台连接桥(5),浮箱(1)通过立柱(2)固定连接上平台(3)构成半潜式模块;所述浮箱(1)的内部设置多个标准液舱,标准液舱采用通过立柱(2)的遥控管线和遥控阀件汇集至上平台(3)的压载集中控制室;所述上平台(3)为提供作业场地、功能舱室和物品存储空间的大型组合浮体,立柱(2)为水密结构;所述浮箱连接桥(4)是浮箱(1)的强力构件的延续,上平台连接桥(5)是上平台(3)的强力构件的延续;其特征在于:所述浮箱连接桥(4)的结构与浮箱(1)结构连续,浮箱连接桥(4)上面板(4a)与浮箱甲板(1a)结构连续,连接桥腹板(4b)与浮箱(1)的纵、横舱壁保持结构连续,连接桥扶强材(4d)与浮箱(1)中相应的扶强材结构连续,浮箱连接桥(4)的外端为悬臂结构。
2.根据权利要求1所述的用于在水上组合成大型浮体的半潜式模块的组装方法,其特征在于:
(a)所述半潜式模块在陆地上或者浮船坞中采用常规建造方法建造,拖至预定海域准备组装;
(b)所述半潜式模块在组装时,通过压载调节系统调整浮箱(1)的吃水线在浮箱连接桥(4)以下,并与相邻的半潜式模块位于同一浮态;
(c)调整需要对接的半潜式模块的浮箱连接桥(4)和上平台连接桥(5)的结构对齐;
(d)在焊接作业时,浮箱连接桥(4)底板焊缝以及焊缝处的涂装在浮箱(1)外仰面施工,其他焊缝均在浮箱连接桥(4)之内或者之上施工;上平台连接桥(5)采用常规方式装配及焊接。
CN201410154592.2A 2014-04-17 2014-04-17 用于在水上组合成大型浮体的半潜式模块及其组装方法 Expired - Fee Related CN103921905B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410154592.2A CN103921905B (zh) 2014-04-17 2014-04-17 用于在水上组合成大型浮体的半潜式模块及其组装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410154592.2A CN103921905B (zh) 2014-04-17 2014-04-17 用于在水上组合成大型浮体的半潜式模块及其组装方法

Publications (2)

Publication Number Publication Date
CN103921905A CN103921905A (zh) 2014-07-16
CN103921905B true CN103921905B (zh) 2017-01-25

Family

ID=51140359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410154592.2A Expired - Fee Related CN103921905B (zh) 2014-04-17 2014-04-17 用于在水上组合成大型浮体的半潜式模块及其组装方法

Country Status (1)

Country Link
CN (1) CN103921905B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111024178A (zh) * 2019-12-16 2020-04-17 大连理工大学 一种浮式海洋平台压载监测系统及舱中液体体积计算方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104859788B (zh) * 2015-05-08 2018-05-04 中国海洋石油集团有限公司 一种八角形fdpso的快速建造方法
CN107097911B (zh) * 2016-02-23 2019-04-30 中国国际海运集装箱(集团)股份有限公司 半潜平台的建造方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2170248A (en) * 1985-01-28 1986-07-30 Brown & Root Improvements in and relating to semi-submersible vessels
CN103608256A (zh) * 2011-09-16 2014-02-26 冯金特里公司 模块化半潜式结构及其制造方法
CN203528778U (zh) * 2013-10-09 2014-04-09 清华大学 拼装式海上抗爆巨型混凝土浮式结构

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014058275A (ja) * 2012-09-19 2014-04-03 Mitsui Zosen Akishima Kenkyusho:Kk 半潜水式浮体構造物

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2170248A (en) * 1985-01-28 1986-07-30 Brown & Root Improvements in and relating to semi-submersible vessels
CN103608256A (zh) * 2011-09-16 2014-02-26 冯金特里公司 模块化半潜式结构及其制造方法
CN203528778U (zh) * 2013-10-09 2014-04-09 清华大学 拼装式海上抗爆巨型混凝土浮式结构

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111024178A (zh) * 2019-12-16 2020-04-17 大连理工大学 一种浮式海洋平台压载监测系统及舱中液体体积计算方法

Also Published As

Publication number Publication date
CN103921905A (zh) 2014-07-16

Similar Documents

Publication Publication Date Title
Lamas-Pardo et al. A review of very large floating structures (VLFS) for coastal and offshore uses
CN1955066B (zh) 分体建造坞内合拢的造船方法
CN101844605B (zh) 一种超深海大型圆筒形钻井平台主船体的制造工艺方法
CN105151236A (zh) 浮墩及塔式潜浮移动运载平台装置及其工作方法
CN104229099B (zh) 一种海洋工程船舶接载下水的系统及方法
CN103921905B (zh) 用于在水上组合成大型浮体的半潜式模块及其组装方法
CN104743058B (zh) 张力腿平台上部组块浮托安装的方法
CN204979167U (zh) 半潜式生活平台
CN103171743A (zh) 对接八棱台式浮式生产储油系统
CN105644705A (zh) 一种小水线面双体平台
CN202847986U (zh) 对接八棱台式浮式生产储油系统
CN1769134A (zh) 一种排型海上浮式平台
JP6436449B1 (ja) 制御可能なフロートモジュール、少なくとも1つの制御可能なフロートモジュールを含むモジュール式オフショア構造アセンブリ、および現場でのモジュール式オフショア構造の組立て方法
CN202863728U (zh) 对接圆台式浮式生产储油系统
CN210887174U (zh) 一种固定式海上光伏发电平台支撑结构
MX2011002653A (es) Aparato litoral de aguas profundas y metodo de ensamblaje.
CN107618626A (zh) 改进的深水半潜式铺管起重船
CN201354138Y (zh) 浅海移动式动力平台船
CN102582799A (zh) 浮箱及浮箱水上合拢工艺
CN103231782A (zh) 横向下浮体半潜式平台
CN203902801U (zh) 用于在水上组合成大型浮体的半潜式模块
CN116280048A (zh) 一种类球体式海上漂浮式光伏浮体结构及其实施方法
CN201762686U (zh) 一种半潜式多功能防波堤
CN206847905U (zh) 一种试验用浮体铰接模拟及测试装置
CN208774964U (zh) 一种分布式压载水系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yu Yanyun

Inventor after: Lin Yan

Inventor after: Ji Zhuoshang

Inventor after: Chen Ming

Inventor after: Li Kai

Inventor after: Wang Yunlong

Inventor after: Guan Guan

Inventor before: Yu Yanyun

Inventor before: Lin Yan

Inventor before: Ji Zhuoshang

Inventor before: Chen Ming

Inventor before: Li Kai

Inventor before: Wang Yunlong

Inventor before: Guan Guan

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20210417