CN1038994C - Construction method of rockery - Google Patents

Construction method of rockery Download PDF

Info

Publication number
CN1038994C
CN1038994C CN91106630A CN91106630A CN1038994C CN 1038994 C CN1038994 C CN 1038994C CN 91106630 A CN91106630 A CN 91106630A CN 91106630 A CN91106630 A CN 91106630A CN 1038994 C CN1038994 C CN 1038994C
Authority
CN
China
Prior art keywords
artificial hillock
outrigger
design
stone
rockery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN91106630A
Other languages
Chinese (zh)
Other versions
CN1063842A (en
Inventor
潘正吾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN91106630A priority Critical patent/CN1038994C/en
Publication of CN1063842A publication Critical patent/CN1063842A/en
Application granted granted Critical
Publication of CN1038994C publication Critical patent/CN1038994C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention relates to a building method of a rockery in a garden architecture, which is characterized in that when the rockery is formed, a framework of the rockery is fixed to a base under the rockery. Model face fabrics are pricked and picked on the framework according to the shape design of the rockery. The rockery formed by the method has the characteristics of beauty and ruggedness, and can be made into the views of inclination, suspension and penetration and the natural postures. Moreover, materials can be saved, and the cost is low. Thus, the method is ideal for building the rockery.

Description

The method of building of artificial hillock
The present invention relates to the method for building of a kind of artificial hillock in the garden architecture.
In garden architecture, artificial orogenetic is one of individual style of classical Chinese garden.Fake at all times that the mountain person is thin, saturating with mountain shape, leakage, high be designing requirement.But because the method for being faked the mountain material and piling up artificial hillock is limited to, got shape and can not surpass nature just as oneself in the past, be difficult to reach thin, saturating, leakage, high requirement in the artificial hillock of nature yet make.In the construction technology on fraud mountain owing to be, be subjected to the constraint of gravity balance with the method for piling up, be difficult to make artificial hillock to make and build dangerously steeply, more can't reach artificial rockery " incline and desire fall, outstanding and desire to fall, desire to wear thoroughly " individual style.
The object of the present invention is to provide a kind of method of building of artificial hillock.By the artificial hillock of this method moulding, have beautiful dangerously steep characteristics, can cause the gesture of " inclining and desire is fallen, outstanding and desire to fall, saturating and desire to wear ", yet shape is as from the attitude that is better than nature.
Technical solution of the present invention is: when artificial hillock was shaped, fixed frame was done the skeleton of artificial hillock on the ground under the artificial hillock, and design is worn and chosen the appearance building stones according to chevron on skeleton.
Owing to adopted technique scheme, the artificial hillock with the present invention builds, have " incline and desire fall, outstanding and desire to fall, saturating and desire to wear " imposing manner.Really reach the effect of " thin, saturating, leakage, high ", increased the aesthetic feeling of the Nature to gardens.And can material saving, cheap, be the Perfected process of moulding artificial hillock.
Description of drawings:
Fig. 1 is with framework outrigger method moulding artificial hillock schematic diagram;
Fig. 2 is column and outrigger structural representation;
Fig. 3 is artificial hillock external form (the two) schematic diagram of moulding of the present invention;
Fig. 4 is artificial hillock external form (the three) schematic diagram of moulding of the present invention.
Embodiment: accompanying drawing has been described three embodiment of the present invention, and referring to accompanying drawing one, the framework of present embodiment all adopts the column (3) of prefabricated crossbeam (2), prefabricated outrigger (1) and on-the-spot ramming to water and smashes shaping, and forms the skeleton of artificial hillock inside; Then, the main material of artificial hillock--porous-stone is got shape by design with building, and punchinges, and to penetrate outrigger, the size in its hole and outrigger size adapt, and uses the cement mortar filling firmly glued again, and this has just constituted the agent structure of artificial hillock.On this basis, artificial hillock is carried out art processing modify, design, on artificial hillock, arrange the art architecture thing of booth, exterior feature, bridge, tower and so on, can become beautiful, a dangerously steep artificial hillock.Its forming step is as follows:
A, according to chevron design precast beam (1) and crossbeam (2);
B, according to chevron design colligation column reinforcing bar;
C, excavation foundation trench, tamping basis, setting column reinforcing bar;
D, build artificial hillock appearance porous-stone by laying bricks or stones by chevron design.Facing bond is built the height limit and is installed crossbeam (2), outrigger (1) limit ramming column (3), chooses earlier when installing fixed cross beam (2) and puts on porous-stone;
E, around the framework of artificial hillock inner skeleton, fill and water the seam rough concrete;
F, treat that column (3) intensity reaches more than 70%, the porous-stone of having punchinged is worn chosen on outrigger, fill up firm and solid with cement mortar;
G, finishing chevron are arranged the profiling artistic shape.
Embodiment one:
Referring to accompanying drawing 1, present embodiment is provided with three root posts (3), two crossbeams (2), and five outriggers (1) are made into artificial hillock by above-mentioned forming step.
Embodiment two:
Referring to accompanying drawing 3, be provided with two root posts (3), a crossbeam (2), three outriggers (1).
Embodiment three:
Referring to accompanying drawing 4, be provided with a root post (3), four outriggers (1).

Claims (1)

1. the method for building of an artificial hillock comprises that chevron design, material are prepared, the artificial hillock forming step, and described forming step comprises:
A, design prefabricated outrigger (1) and crossbeam (2) according to chevron;
B, according to chevron design colligation column reinforcing bar;
C, excavation foundation trench, tamping ground, setting column reinforcing bar;
D, build artificial hillock appearance porous-stone by laying bricks or stones by chevron design, height is built in facing bond, and crossbeam (2), outrigger (1) are installed in the limit, and limit ramming column (3) is worn earlier when installing fixed cross beam (2) and chosen porous-stone;
E, around the framework of artificial hillock inner skeleton, fill and water the seam rough concrete;
F, treat that column (3) intensity reaches and demarcate intensity more than 70%, the porous-stone of punchinging is worn chosen on outrigger (1), fill up substantial with cement mortar;
G, laying profiling design, it is characterized in that the framework of described artificial hillock inner skeleton adopts the column (3) of prefabricated crossbeam (2), prefabricated outrigger (1) and on-the-spot ramming to water and smashes moulding, described porous-stone is got shape by design, punching, the size in its hole and outrigger size adapt.
CN91106630A 1991-02-07 1991-02-07 Construction method of rockery Expired - Fee Related CN1038994C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN91106630A CN1038994C (en) 1991-02-07 1991-02-07 Construction method of rockery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN91106630A CN1038994C (en) 1991-02-07 1991-02-07 Construction method of rockery

Publications (2)

Publication Number Publication Date
CN1063842A CN1063842A (en) 1992-08-26
CN1038994C true CN1038994C (en) 1998-07-08

Family

ID=4908022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN91106630A Expired - Fee Related CN1038994C (en) 1991-02-07 1991-02-07 Construction method of rockery

Country Status (1)

Country Link
CN (1) CN1038994C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1143713A (en) * 1996-06-28 1997-02-26 李状冀 Method for making artificial karst cave
CN100999172B (en) * 2006-12-27 2010-05-19 上海市城市建设设计研究院 Construction method of artificial landscape mountain
CN102343760A (en) * 2010-07-30 2012-02-08 黄华军 Method for manufacturing rockery from low alkalinity glass fiber cement through stone shaping
CN106626945A (en) * 2016-12-28 2017-05-10 苏州园林发展股份有限公司 Anti-seismic rockery construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1038978A (en) * 1988-06-29 1990-01-24 张孟祥 Artificial hillock manufacture craft and goods
CN1044433A (en) * 1989-01-26 1990-08-08 李孝林 Fibre reinforced mud carvings and manufacturing process thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1038978A (en) * 1988-06-29 1990-01-24 张孟祥 Artificial hillock manufacture craft and goods
CN1044433A (en) * 1989-01-26 1990-08-08 李孝林 Fibre reinforced mud carvings and manufacturing process thereof

Also Published As

Publication number Publication date
CN1063842A (en) 1992-08-26

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN106088109B (en) Discarded pit slope ecological recovery covers green construction method
CN207130930U (en) Without construction column combination hollow out plain brick wall
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN102021911A (en) Side slope reinforcing method and structure
CN107268834A (en) Without construction column combination hollow out plain brick wall and its construction method
CN1038994C (en) Construction method of rockery
CN109487776A (en) A kind of restoration of the ecosystem structure for mining area and the restorative procedure for reducing soil erosion
CN207582492U (en) A kind of step landscape retaining wall
CN206607602U (en) A kind of new prefabricated section and new type of retaining system
CN210658432U (en) Assembled concrete box retaining wall
CN209066479U (en) Assembled green ecological reinforced earth retaining wall
CN105064273A (en) Constructing method for grass planting gabion ecological terrace ridge
CN110374050A (en) A kind of structure and method suitable for Landscape River anti-flood wall work stone veneer
CN202202318U (en) Soft soil foundation long-concrete short-gravel pile and preloading combination processing apparatus
CN201908313U (en) Side slope reinforcement structure
CN212533950U (en) Ecological bank protection in river course
CN210636447U (en) Green ecological slope governance structure
CN109779384A (en) Integral type concrete earthen wall
CN2903184Y (en) Self fastening steel reinforced concrete precast block soil resisting wall
CN201714003U (en) Precast concrete stair
KR100400170B1 (en) Revetment structure using natural stones
EP0285202A1 (en) Process for contouring garden and landscape
CN102312424A (en) Soft soil foundation long-concrete short-gravel (LCSG) pile and preloading combined treatment method and device thereof
CN1047219C (en) Design and construction method for large calibre poured pile and large-diameter bottom-enlarging pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee