CN210636447U - Green ecological slope governance structure - Google Patents
Green ecological slope governance structure Download PDFInfo
- Publication number
- CN210636447U CN210636447U CN201921270804.8U CN201921270804U CN210636447U CN 210636447 U CN210636447 U CN 210636447U CN 201921270804 U CN201921270804 U CN 201921270804U CN 210636447 U CN210636447 U CN 210636447U
- Authority
- CN
- China
- Prior art keywords
- layer
- side slope
- green ecological
- slope body
- management structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model relates to the technical field of side slopes, and discloses a green ecological side slope management structure, which comprises a side slope body, wherein a protective net is fixedly connected on the upper left side of the side slope body, a clay cement mortar layer is fixedly connected on the upper left side of the protective net, a soil layer is fixedly arranged on the upper left side of the clay cement mortar layer, a fixed iron frame is fixedly connected on the left side of the side slope body, a cobble layer is fixedly connected on the upper end of the bottom of the fixed iron frame, and a coarse sand layer is fixedly connected on the upper end of the cobble layer, so that the green ecological side slope management structure is suitable for the green ecological side slope management structure, and the slope and the bottom of the side slope body are comprehensively stabilized through an anchor rod, a fixing part, the protective net, the cobble layer, the fixed iron frame and the soil layer, the landslide phenomenon can be effectively prevented, meanwhile, vegetation can, and the side slope is more beautiful, and the environmental protection and the stability of the green ecological side slope management structure are improved.
Description
Technical Field
The utility model relates to a side slope technical field specifically is a green ecological side slope administers structure.
Background
The side slope is generally used for stabilizing the roadbed, the slope surfaces with certain slopes are formed on two sides of the roadbed, and the side slope has a certain inclination angle, so that the side slope can be scoured in a rainwater scouring process to cause the stability of the side slope to be reduced, the landslide phenomenon is caused, and the safety of coming and going vehicles and pedestrians is damaged.
The general green ecological side slope governance structure is poor in stability, under the action of rainwater and wind-blowing sunshine, slope inclined planes are prone to loosening to generate a landslide phenomenon, once the landslide maintenance cost is high, the landslide is often required to be reinforced again, collapse is often caused due to the fact that the bottom of the side slope is not firmly supported, meanwhile, the side slope is not ornamental generally, and therefore the green ecological side slope governance structure is urgently needed to overcome the defects.
SUMMERY OF THE UTILITY MODEL
The utility model is not enough to prior art, the utility model provides a structure is administered to green ecological side slope has solved current structure is administered to green ecological side slope and has had certain lack in the use, for example, the structure is administered to current general green ecological side slope, the steadiness is very poor, under the effect that rainwater and wind blow the sun, lead to the loose landslide phenomenon that produces of side slope inclined plane easily, the side slope is in case the cost of landslide maintenance is high, often all need to consolidate again, the side slope bottom is owing to not firm support, also often take place to collapse, the side slope generally does not have the sight simultaneously.
The utility model provides a following technical scheme: the utility model provides a structure is administered to green ecological side slope, includes the side slope body, the upper left side fixed connection protection network of side slope body, the upper left side fixed connection clay cement mortar layer of protection network, the fixed soil layer that sets up of the upper left side on clay cement mortar layer, the fixed iron frame of left end fixed connection of side slope body, fixed iron frame bottom upper end fixed connection cobble layer, the coarse sand layer of upper end fixed connection on cobble layer, the upper end fixed connection pitch layer on coarse sand layer, clay cement mortar layer is inside leans on the upper end to fix and sets up the stock, the stock runs through in proper order through clay cement mortar layer, protection network and stretches into the side slope body.
Preferably, a fixing piece is arranged at the joint of the anchor rod and the protective net, and the anchor rod penetrates through the fixing piece.
Preferably, the number of the anchor rods is six, the anchor rods are arranged in an up-and-down symmetrical mode by taking the middle position of the protective net as a symmetry axis, and the upper side and the lower side are respectively three.
Preferably, the depth of the anchor rod extending into the slope body is 5 m.
Preferably, cobble layer, coarse sand layer and pitch layer all set up inside fixed iron frame, down be pitch layer, coarse sand layer, cobble layer from last in proper order, and be the stack state between the two.
Preferably, the vegetation is planted on the soil layer, and an included angle is formed between the asphalt layer and the soil layer and is 120 degrees.
Preferably, one end of each of the protective net, the clay cement mortar layer and the soil layer is connected with the right end of the fixed iron frame.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this structure is administered to green ecological side slope through stock, mounting, clay cement mortar layer and protection network, utilizes the interact between them to the realization is consolidated the domatic of side slope body, prevents the landslide phenomenon, also plays fixed effect to the stock simultaneously, makes its more the firm side slope body of efficient.
2. This be applicable to a green ecological side slope and administer structure, through cobblestone layer and fixed iron framework, utilize the interact of mutually supporting between them to the bottom that realizes the side slope body carries out effectual firm.
3. This be applicable to green ecological side slope and administer structure through planting the vegetation at the soil horizon, can realize slowing down the washing away of rainwater to the side slope, makes the more pleasing to the eye environmental protection of side slope simultaneously.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is a schematic structural view of a-a in fig. 1 according to the present invention.
In the figure: 1. a side slope body; 2. fixing the iron frame; 3. a cobble layer; 4. a coarse sand layer; 5. an asphalt layer; 6. a protective net; 7. a clay cement mortar layer; 8. a soil layer; 9. an anchor rod; 10. and a fixing member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a green ecological slope treatment structure comprises a slope body 1, a protective net 6 fixedly connected to the left upper side of the slope body 1, a clay cement mortar layer 7 fixedly connected to the left upper side of the protective net 6, a soil layer 8 fixedly arranged on the left upper side of the clay cement mortar layer 7, a fixed iron frame 2 fixedly connected to the left end of the slope body 1, a cobble layer 3 fixedly connected to the upper end of the bottom of the fixed iron frame 2, and an anchor rod 9 fixedly arranged inside the clay cement mortar layer 7 near the upper end and sequentially penetrating through the clay cement mortar layer 7 and the protective net 6 and extending into the slope body 1, a fixing member 10 arranged at the joint of the anchor rod 9 and the protective net 6, the anchor rod 9 runs through the fixing part 10, and the mutual cooperation between the anchor rod 9 and the fixing part is utilized, so that the inclined plane of the side slope body 1 is reinforced, the landslide phenomenon is prevented, meanwhile, the anchor rod 9 is also fixed, the side slope body 1 is more efficiently and stably fixed, the number of the anchor rod 9 is six, the middle position of the protection net 6 is arranged in an up-and-down symmetrical mode as a symmetry axis, the upper side and the lower side are respectively three, the depth of the anchor rod 9 extending into the side slope body 1 is 5m, the cobble layer 3, the coarse sand layer 4 and the asphalt layer 5 are arranged inside the fixed iron frame 2, the asphalt layer 5, the coarse sand layer 4 and the cobble layer 3 are sequentially arranged from top to bottom, the two layers are in a superposed state, vegetation is planted on the soil layer 8, the erosion of rainwater to the side slope can be slowed down, the side slope is more attractive and environment-friendly, an included angle is formed between the asphalt layer 5, one end of the protective net 6, the clay cement mortar layer 7 and the soil layer 8 are connected with the right end of the fixed iron frame 2.
The during operation, fix mounting 10 at side slope body 1 inside earlier, then lay protection network 6 on the surface of side slope body 1, run through protection network 6 and mounting 10 with stock 9 again and nail into side slope body 1, just so can carry out effectual reinforcement to the domatic of side slope body 1, later lay clay cement mortar layer 7 on protection network 6 and stabilize protection network 6 and stock 9, cover soil horizon 8 at clay cement mortar layer 7 upper strata, and plant the vegetation at soil horizon 8, set up fixed iron frame 2 at side slope body 1 bottom left end at last, asphalt horizon 5 is placed to the layering in fixed iron frame 2, coarse sand layer 4, cobblestone layer 3, can consolidate fixed iron frame 2 like this, the while can support the reinforcement to side slope body 1 by reinforced fixed iron frame 2.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A green ecological slope governance structure comprises a slope body (1) and is characterized in that the slope body is provided with a slope opening; the utility model discloses a side slope body, including side slope body (1), the upper left side fixed connection protection network (6) of side slope body (1), upper left side fixed connection clay cement mortar layer (7) of protection network (6), the upper left side of clay cement mortar layer (7) is fixed to be set up soil horizon (8), the fixed iron frame of left end fixed connection (2) of side slope body (1), fixed iron frame (2) bottom upper end fixed connection cobble layer (3), upper end fixed connection coarse sand layer (4) of cobble layer (3), the upper end fixed connection pitch layer (5) of coarse sand layer (4), clay cement mortar layer (7) inside leans on the upper end to fix and sets up stock (9), stock (9) run through in proper order through clay mortar layer (7), protection network (6) and stretch into side slope body (1).
2. The green ecological slope management structure of claim 1, which is characterized in that: the anchor rod (9) and the protective net (6) are connected through a fixing piece (10), and the anchor rod (9) penetrates through the fixing piece (10).
3. The green ecological slope management structure of claim 1, which is characterized in that: the number of the anchor rods (9) is six, the middle positions of the protection nets (6) are arranged in an up-and-down symmetrical mode through symmetry axes, and the upper side and the lower side are respectively three.
4. The green ecological slope management structure of claim 1, which is characterized in that: the depth of the anchor rod (9) extending into the side slope body (1) is 5 m.
5. The green ecological slope management structure of claim 1, which is characterized in that: cobble layer (3), coarse sand layer (4) and pitch layer (5) all set up inside fixed iron frame (2), down be pitch layer (5), coarse sand layer (4), cobble layer (3) in proper order from the top, and be the stack state between the two.
6. The green ecological slope management structure of claim 1, which is characterized in that: vegetation is planted on the soil layer (8), and an included angle is formed between the asphalt layer (5) and the soil layer (8) and is 120 degrees.
7. The green ecological slope management structure of claim 1, which is characterized in that: one end of the protective net (6), one end of the clay cement mortar layer (7) and one end of the soil layer (8) are connected with the right end of the fixed iron frame (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921270804.8U CN210636447U (en) | 2019-08-07 | 2019-08-07 | Green ecological slope governance structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921270804.8U CN210636447U (en) | 2019-08-07 | 2019-08-07 | Green ecological slope governance structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210636447U true CN210636447U (en) | 2020-05-29 |
Family
ID=70792717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921270804.8U Active CN210636447U (en) | 2019-08-07 | 2019-08-07 | Green ecological slope governance structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210636447U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324080A (en) * | 2022-08-17 | 2022-11-11 | 国网安徽省电力有限公司建设分公司 | Multifunctional intelligent open-air rock type slope repairing system |
-
2019
- 2019-08-07 CN CN201921270804.8U patent/CN210636447U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324080A (en) * | 2022-08-17 | 2022-11-11 | 国网安徽省电力有限公司建设分公司 | Multifunctional intelligent open-air rock type slope repairing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351238A (en) | Vegetation-concrete double-layer protective screening side slope ecological greening system and method for performing side slope ecological greening by using system | |
CN201080611Y (en) | Rock texture slope stereo afforestation frame work | |
CN105113518A (en) | Construction method for ecological slope protecting base material by arranging slot pits in slope surface | |
CN106193066A (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN210636447U (en) | Green ecological slope governance structure | |
CN206956743U (en) | A kind of low-carbon ecological guard system of rock slope | |
CN106193071A (en) | The multiple structure Ecological Slope protection system of a kind of band diaphragm plate and construction method thereof | |
CN109487776A (en) | A kind of restoration of the ecosystem structure for mining area and the restorative procedure for reducing soil erosion | |
CN204119877U (en) | A kind of Slope greening device | |
CN105544567A (en) | Civil engineering structure for total slope greening construction method of abrupt rock slope | |
CN207904939U (en) | A kind of ecological revetment grass planting plane | |
KR20080090718A (en) | Method constructing eco-friendly retaining wall of grassing a plant | |
CN203618310U (en) | Ecological ridge for slope cropland remediation | |
CN110468855A (en) | A kind of edge slope structure restored conducive to vegetation ecological | |
CN105064273A (en) | Constructing method for grass planting gabion ecological terrace ridge | |
CN214657123U (en) | Ecological protection structure of side slope | |
CN201671103U (en) | Integral construction forming platform of underwater pier cap drilled pile | |
CN204849819U (en) | Environmental retaining wall | |
CN211773858U (en) | Landscape gabion retaining wall | |
CN204418192U (en) | Bayonet type grass planting grid | |
CN203270590U (en) | Thick-layer base material green protective structure for cut steep side slope | |
CN210562216U (en) | Side slope protection structure with pollution blocking and ecological greening functions | |
CN110396983B (en) | Frame beam ecological slope protection structure with drainage and greening functions | |
CN106836128A (en) | Ecological slope protection structure | |
CN203530994U (en) | Stone slag field side slope ecological protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |