CN103882221A - 热轧加热炉模型中动态预测板坯最短在炉时间的方法 - Google Patents
热轧加热炉模型中动态预测板坯最短在炉时间的方法 Download PDFInfo
- Publication number
- CN103882221A CN103882221A CN201210565180.9A CN201210565180A CN103882221A CN 103882221 A CN103882221 A CN 103882221A CN 201210565180 A CN201210565180 A CN 201210565180A CN 103882221 A CN103882221 A CN 103882221A
- Authority
- CN
- China
- Prior art keywords
- furnace
- time
- slab
- rhythm
- time inside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Control Of Heat Treatment Processes (AREA)
- Control Of Metal Rolling (AREA)
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
Abstract
本发明涉及一种热轧加热炉模型中动态预测板坯最短在炉时间的方法。本发明包括步骤:(1)通过抽钢节奏计算剩余在炉时间;(2)按加热能力要求计算在炉时间;(3)按步进梁移动能力要求的剩余在炉时间;(4)计算总的剩余在炉时间;(5)现场操作人员可手动设定异常停机时间,通过编写代码,及时将异常停机时间记入剩余在炉时间内。本发明的方法不仅能快速、准确地计算出板坯的必要炉温、各段炉温以及炉温设定值,并且这种计算方法可以灵活的运用于停炉、待轧时动态计算板坯标准升温曲线。
Description
技术领域:
本发明涉及一种热轧加热炉模型中动态预测板坯最短在炉时间的方法,属于冶金技术领域。
背景技术:
有技术中,炉温设定时,采用了静态剩余在炉时间的方式进行板坯必要炉温的设定,即板坯必要炉温计算时,时间因素对温度的影响不是实时变化的,这种方案会出现以下问题:
1、这种方案只适用于钢种目标温度变化不大,连续运行的轧钢环境;对于轧制环境发生变化,出现换辊、炉内空位等导致的停炉、待轧情况时,该技术方案由于没有考虑到板坯在炉内的停留时间,必要炉温设定不能满足生产需要。
2、温度设定时,无法考虑到轧线的节奏状态。当轧线节奏变慢时,会延长板坯在炉时间。相应的这种变化无法在板坯在炉时间上反应出来,使板坯必要炉温无法满足现场需要。
3、这种设计方案对板坯在炉内的升温曲线有影响,对于段目标温度发生变化,需要对每个段进行控制时,段控制目标发生变化,而实际炉温设定由于板坯在炉时间变化发生变化,没有进行相应调整,因此其实施效果不理想。
4、这种技术方案对于不同钢种,在相同加热段需要不同的加热时间,使用固定时间时,对这些特殊情况不能加以区分,使得板坯存在过烧或者均热不足等缺点,因此其实施效果并不理想。
发明内容:
本发明的目的是针对上述存在的问题提供一种热轧加热炉模型中动态预测板坯最短在炉时间的方法,不仅能快速、准确地计算出板坯的必要炉温、各段炉温以及炉温设定值,并且这种计算方法可以灵活的运用于停炉、待轧时动态计算板坯标准升温曲线,具有较大的使用价值。
上述的目的通过以下的技术方案实现:
热轧加热炉模型中动态预测板坯最短在炉时间的方法,该方法包括如下步骤:
(1)通过抽钢节奏计算剩余在炉时间:
(2)按加热能力要求计算在炉时间;
(3)按步进梁移动能力要求的剩余在炉时间;
(4)计算总的剩余在炉时间;
(5)现场操作人员可手动设定异常停机时间,通过编写代码,及时将异常停机时间记入剩余在炉时间内。
所述的热轧加热炉模型中动态预测板坯最短在炉时间的方法,步骤(1)所述的通过抽钢节奏计算剩余在炉时间包括:创建抽钢数据表,包含时间、抽出温度、规格信息;对于第一块板坯按照预测的节奏直接计算;对第二块及以后的板坯,计算和读出本块钢抽出加热炉前6块板坯的抽出时间以及各相邻板坯的抽出时间间隔,获得5个节奏值;对板坯的节奏进行准确性判断,将取得的5个节奏值相比较,当波动范围在20秒以内时,认为节奏平稳,不需要对炉温设定进行处理,否则,直接对炉温进行调节,节奏稳定时,对五个节奏值进行差权平均,即定之为抽钢节奏,通过计算得出的节奏,对炉内不同位置的板坯的剩余在炉时间进行预测。
有益效果:
1、最短在炉时间的动态性。由于热轧加热炉本身的特殊性,加热过程周期长、加热效果检查周期长,加热情况会影响的板坯数量大,所以如何有效的控制板坯加热情况是加热炉温度控制的关键。通过动态计算在炉时间的控制方法,可以有效的检测出炉内情况的变化对时间的影响,如设备问题、煤气热值问题、钢种过渡变化问题等,并将这些问题,通过最短在炉时间的方法反应出来。最短在炉时间进而影响到板坯的必要炉温以及设定炉温,达到了与现场的紧密贴合,确保板坯加热的实时性。
2、最短在炉时间的最短性。热轧在生产过程中轧线会定期进行维护。而此时加热炉一般不会熄火和空炉,这样炉内板坯的温度就要进行适当的调整,以确保不会过烧等情况。此时温度的调整,就主要通过最短的在炉时间进行控制。停机时,最短在炉时间变长,在出炉目标温度确定的情况下,通过控制煤气流量的方式,达到控制各段处必要炉温的目的。
3、最短在炉时间的动态性和最短性,提高了板坯的加热精度和煤气的利用率。
最短在炉时间准确计算可以为板坯精确控制提供重要依据。根据计算的预测板坯最短在炉时间,可以根据钢种的加热制度动态的调整各个段的设定炉温,从而使得每个出段的板坯能够达到其所需的目标出段温度。同时,针对在最大加热能力情况下,在预测最短在炉时间内加热后,出段板坯温度仍不能达到其要求时,可以提前计算板坯停留时间,从而避免了加热质量的下降,为提高加热质量提供重要帮助。
最短在炉时间由于考虑到轧线轧制节奏的反馈,因而不会出现要钢却无法出钢,或者加热完成板坯堆积过多,需要保温,从而导致加热能耗的提升情况的出现。
附图说明:
图1:本发明中抽钢节奏计算方法的控制流程图。
具体实施方式:
本发明的提供的热轧加热炉模型中动态预测板坯最短在炉时间的方法包括以下步骤:
1)通过抽钢节奏计算剩余在炉时间:
抽钢节奏计算时,前6块板坯的计算方式通过直接差分的形式计算,用最后抽出板坯抽出处理时计算的抽出预定时刻计算下一块抽出板坯离抽出时剩余时间。
加热炉节奏具体实施方法如下:
首先:把本块板坯抽出时刻与上一块抽出时刻的差作为实际节奏。即:
通过前面6块板坯的计算,得出5个实际节奏,通过差分,得出实际平均节奏。
其次,考虑操作工修正节奏:
该延长计算执行方式是在操作工方式时执行,对抽出第二块以后的板坯,在前面计算的周期节奏基础上进行处理,通过画面输入修正值来修正现有的节奏。
: 操作工输入修正量 ( sec ),
再次,按照此方法计算剩余在炉时间问题:对第一块抽出材:
对第二块以后的板坯:
: 第i 块板坯预测剩余在炉时间 ( hr ),
i : 抽出顺序号,
2) 按加热能力要求的在炉时间计算
为了将板坯加热到要求的抽出目标温度,板坯在炉内滞留时间必须大于最短在炉时间。最短在炉时间视板坯宽度,抽出目标温度进行确定,可以从表中检索,具体见附表三。
i : 抽出顺序号,
: 由板坯加热能力要求的预测剩余在炉时间 ( hr ) ,
: 板坯实际在炉时间 ( hr ),
3) 按步进梁移动能力要求的剩余在炉时间(以步进式加热炉为例),该剩余在炉时间主要考虑各板坯从当前位置移动到出炉位置所需要的时间。
β : 考虑炉内板坯分布和实际位置情况的偏差系数 ( 0.7~ 1 ) ,根据不同的环境设定的经验值。
L : 有效炉长,
此处β系数可随着现场情况进行调整,具体的调整方法可根据现场测试的数据进行分析,主要包括步进梁移动距离、移动步数等。
4) 总的剩余在炉时间计算:
将上述1), 2), 3) 计算结果中取其最大值作为总的剩余在炉时间,
: 异常停机时间
6) 根据动态的剩余在炉时间,计算板坯的必要炉温
: 抽出目标温度 ( ℃ )
应用实例:
梅钢热轧厂1422产线加热炉模型使用案例:
炉内板坯分布和实际位置情况的偏差系数β值按照经验选择1。
附表一:标准炉温设定表,通过检索此表,可以读取不同规格板坯对应的标准加热炉温
按照钢种类别成分的不同,将其分成5个类,此表显示的是其中的一部分。
附表二:温度调节方式 (主要针对较长时间的升降温进行的调整)
待轧时间 | 预热段 | 一加段 | 二加段 | 均热段 | 均热段开始升温时间 |
30’~ 60’ | 熄火 | 降30~40℃ | 同均热段 | 原有炉温降10~20℃ | 开轧前15分钟升温 |
60’ ~ 2h | 熄火 | 最小流量 | 同均热段 | 原有炉温降50~100℃ | 开轧前30~60分钟升温 |
2h ~ 3h | 熄火 | 最小流量 | 同均热段 | 原有炉温降100~200℃ | 开轧前60分钟~2小时升温 |
3h ~ 8h | 熄火 | 最小流量 | 1000~1100℃ | 900~1050℃ | 开轧前2~3小时开始升温 |
8h ~ 16h | 熄火 | 熄火 | 900~1050℃ | 800~950℃ | 开轧前3~4小时开始升温 |
16h ~ 48h | 熄火 | 熄火 | 熄5段,6段最小流量 | 700~800℃ | 开轧前6小时开始升温 |
>48h | 熄火 | 熄火 | 熄5段,6段点一半烧嘴 | 熄7段,8段点一半烧嘴 | 开轧前10小时以上开始升温 |
其中,预热段、一加段、二加段、均热段分别是指按照加热炉入口到出口对炉长方向进行的物理划分,其目的是为了更好的控制炉内板坯的加热方式。
附表三:各钢种最短在炉时间表
正常的生产节奏下,以目标出炉温度和板坯宽度划分标准在炉时间
目标出炉温度 | 板坯宽度 | 在炉时间 |
小于950mm | 210min | |
950~1050mm | 220min | |
1050~1150mm | 230min | |
1150~1250mm | 240min | |
大于1250mm | 250min |
Claims (2)
1.一种热轧加热炉模型中动态预测板坯最短在炉时间的方法,其特征是:该方法包括如下步骤:
(1)通过抽钢节奏计算剩余在炉时间:
(2)按加热能力要求计算在炉时间;
(3)按步进梁移动能力要求的剩余在炉时间;
(4)计算总的剩余在炉时间;
(5)现场操作人员可手动设定异常停机时间,通过编写代码,及时将异常停机时间记入剩余在炉时间内。
2.根据权利要求1所述的热轧加热炉模型中动态预测板坯最短在炉时间的方法,其特征是:步骤(1)所述的通过抽钢节奏计算剩余在炉时间包括:创建抽钢数据表,包含时间、抽出温度、规格信息;对于第一块板坯按照预测的节奏直接计算;对第二块及以后的板坯,计算和读出本块钢抽出加热炉前6块板坯的抽出时间以及各相邻板坯的抽出时间间隔,获得5个节奏值;对板坯的节奏进行准确性判断,将取得的5个节奏值相比较,当波动范围在20秒以内时,认为节奏平稳,不需要对炉温设定进行处理,否则,直接对炉温进行调节,节奏稳定时,对五个节奏值进行差权平均,即定之为抽钢节奏,通过计算得出的节奏,对炉内不同位置的板坯的剩余在炉时间进行预测。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210565180.9A CN103882221B (zh) | 2012-12-24 | 2012-12-24 | 热轧加热炉模型中动态预测板坯最短在炉时间的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210565180.9A CN103882221B (zh) | 2012-12-24 | 2012-12-24 | 热轧加热炉模型中动态预测板坯最短在炉时间的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103882221A true CN103882221A (zh) | 2014-06-25 |
CN103882221B CN103882221B (zh) | 2016-04-13 |
Family
ID=50951338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210565180.9A Active CN103882221B (zh) | 2012-12-24 | 2012-12-24 | 热轧加热炉模型中动态预测板坯最短在炉时间的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103882221B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106191411A (zh) * | 2015-04-29 | 2016-12-07 | 宝山钢铁股份有限公司 | 一种用于厚钢板热处理的在炉时间控制方法 |
CN106282533A (zh) * | 2015-05-27 | 2017-01-04 | 宝山钢铁股份有限公司 | 一种加热炉的待轧温度控制方法 |
CN109055711A (zh) * | 2018-08-31 | 2018-12-21 | 中国地质大学(武汉) | 一种连退机组炉区吨钢能耗的获取方法 |
CN109663815A (zh) * | 2018-12-28 | 2019-04-23 | 宝钢湛江钢铁有限公司 | 一种在热轧轧制过程中自动抽钢的控制方法与系统 |
CN109976280A (zh) * | 2019-04-11 | 2019-07-05 | 北京科技大学设计研究院有限公司 | 一种精确预报热轧板坯剩余在炉时间的方法 |
CN110106343A (zh) * | 2019-04-26 | 2019-08-09 | 河钢股份有限公司承德分公司 | 一种钢坯加热时间的修正方法、系统及终端设备 |
CN110639960A (zh) * | 2018-06-27 | 2020-01-03 | 上海梅山钢铁股份有限公司 | 一种热轧全自动抽钢方法 |
CN112077149A (zh) * | 2020-08-05 | 2020-12-15 | 首钢京唐钢铁联合有限责任公司 | 一种热轧加热炉出钢节奏的控制系统 |
CN114317937A (zh) * | 2021-12-17 | 2022-04-12 | 张家港宏昌钢板有限公司 | 一种在加热炉内分段加热热轧板坯的时间控制方法 |
CN115011786A (zh) * | 2022-04-19 | 2022-09-06 | 北京科技大学 | 一种动态感知加热炉工况的炉温优化方法及装置 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101082814A (zh) * | 2006-05-30 | 2007-12-05 | 宝山钢铁股份有限公司 | 热轧加热炉板坯剩余在炉时间确定方法 |
-
2012
- 2012-12-24 CN CN201210565180.9A patent/CN103882221B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101082814A (zh) * | 2006-05-30 | 2007-12-05 | 宝山钢铁股份有限公司 | 热轧加热炉板坯剩余在炉时间确定方法 |
Non-Patent Citations (1)
Title |
---|
陈永刚: ""步进式加热炉加热时间预测优化"", 《冶金自动化》, vol. 33, no. 3, 31 May 2009 (2009-05-31), pages 33 - 36 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106191411B (zh) * | 2015-04-29 | 2018-01-30 | 宝山钢铁股份有限公司 | 一种用于厚钢板热处理的在炉时间控制方法 |
CN106191411A (zh) * | 2015-04-29 | 2016-12-07 | 宝山钢铁股份有限公司 | 一种用于厚钢板热处理的在炉时间控制方法 |
CN106282533A (zh) * | 2015-05-27 | 2017-01-04 | 宝山钢铁股份有限公司 | 一种加热炉的待轧温度控制方法 |
CN106282533B (zh) * | 2015-05-27 | 2018-01-26 | 宝山钢铁股份有限公司 | 一种加热炉的待轧温度控制方法 |
CN110639960A (zh) * | 2018-06-27 | 2020-01-03 | 上海梅山钢铁股份有限公司 | 一种热轧全自动抽钢方法 |
CN109055711A (zh) * | 2018-08-31 | 2018-12-21 | 中国地质大学(武汉) | 一种连退机组炉区吨钢能耗的获取方法 |
CN109663815A (zh) * | 2018-12-28 | 2019-04-23 | 宝钢湛江钢铁有限公司 | 一种在热轧轧制过程中自动抽钢的控制方法与系统 |
CN109976280A (zh) * | 2019-04-11 | 2019-07-05 | 北京科技大学设计研究院有限公司 | 一种精确预报热轧板坯剩余在炉时间的方法 |
CN110106343A (zh) * | 2019-04-26 | 2019-08-09 | 河钢股份有限公司承德分公司 | 一种钢坯加热时间的修正方法、系统及终端设备 |
CN112077149A (zh) * | 2020-08-05 | 2020-12-15 | 首钢京唐钢铁联合有限责任公司 | 一种热轧加热炉出钢节奏的控制系统 |
CN114317937A (zh) * | 2021-12-17 | 2022-04-12 | 张家港宏昌钢板有限公司 | 一种在加热炉内分段加热热轧板坯的时间控制方法 |
CN114317937B (zh) * | 2021-12-17 | 2024-02-13 | 张家港宏昌钢板有限公司 | 一种在加热炉内分段加热热轧板坯的时间控制方法 |
CN115011786A (zh) * | 2022-04-19 | 2022-09-06 | 北京科技大学 | 一种动态感知加热炉工况的炉温优化方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN103882221B (zh) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103882221B (zh) | 热轧加热炉模型中动态预测板坯最短在炉时间的方法 | |
CN109248928B (zh) | 一种热轧加热炉动态炉温控制方法 | |
CN102392119B (zh) | 热镀锌连续退火炉的在线综合控制方法 | |
CN103225017B (zh) | 一种棒线材方坯加热炉模型控制方法及装置 | |
CN105018718B (zh) | 一种基于热负荷分配的加热炉工艺炉温控制方法 | |
CN101806541A (zh) | 一种优化控制大型步进梁式加热炉板坯加热制度的模型 | |
CN103732766A (zh) | 用于运行加工轧件的连续退火机组的方法 | |
CN104250685A (zh) | 一种基于板坯实测宽度的间距装炉控制方法 | |
CN105648164B (zh) | 适用于任意翘曲度钢板的感应加热方法和装置 | |
CN104894362A (zh) | 一种冷热钢坯混装的加热炉炉温设定方法 | |
CN107971345A (zh) | 钢管在线冷却的过程控制系统和控制方法 | |
CN109022757A (zh) | 镀锡产品退火温度的动态分段控制方法 | |
CN103447314A (zh) | 一种粗轧测温反馈控制方法 | |
CN104841701B (zh) | 热轧带钢大降速轧制时的薄板卷取温度控制方法 | |
CN102888506A (zh) | 一种加热炉抽出端板坯位置控制方法 | |
CN104289532A (zh) | 带钢水印点温度控制方法 | |
US20230203612A1 (en) | Method for the open-loop or closed-loop control of the temperature of a steel strip during hot working in a hot strip mill | |
CN104714519A (zh) | 一种连续退火机组生产过程工艺参数设定与在线优化方法 | |
CN110770357B (zh) | 退火炉的运行方法 | |
US3695594A (en) | Method and apparatus for operating a pusher type furnace | |
CN101811143A (zh) | 一种待轧保温铸坯温度控制方法 | |
CN109013713A (zh) | 一种用于热轧钢板轧后冷却控制系统及其控制方法 | |
KR101223808B1 (ko) | 열연강판 냉각공정의 냉각수 유량설정방법 | |
Genkin | Energy conservation in a furnace-mill sheet-rolling system | |
CN105734263A (zh) | 一种预测加热炉内后续钢坯温度和加热炉温度的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |