CN103872476A - Novel jumper conductor clamper - Google Patents

Novel jumper conductor clamper Download PDF

Info

Publication number
CN103872476A
CN103872476A CN201310282591.1A CN201310282591A CN103872476A CN 103872476 A CN103872476 A CN 103872476A CN 201310282591 A CN201310282591 A CN 201310282591A CN 103872476 A CN103872476 A CN 103872476A
Authority
CN
China
Prior art keywords
wire clamp
double
screw bolt
conduction wire
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310282591.1A
Other languages
Chinese (zh)
Inventor
乔绪山
王泽众
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310282591.1A priority Critical patent/CN103872476A/en
Publication of CN103872476A publication Critical patent/CN103872476A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a novel jumper conductor clamper, which comprises a jumper conductor clamper main body, a first pressing block and a first driving device, wherein the first pressing block is matched with the jumper conductor clamper main body for forming a first area for clamping a conductor, and the first driving device drives the first pressing block to move towards the direction close to or far away from the jumper conductor clamper main body, so that different clamping areas for clamping different conductors are formed. For jumper conductors of different specifications, the first driving device can drive the first pressing block to move so as to change the size of the first clamping area for clamping the conductor between the pressing block and the jumper conductor clamper main body for clamping the jumper conductors of different specifications, the structure is simple, the cost is low, the operation is convenient and flexible, the novel jumper conductor clamper is suitable for being used on different conductor types and different materials on one jumper conductor, a working method is easy to master and popularize, and workers can operate the novel jumper conductor clamper only after being trained for a short term.

Description

A kind of Novel drainage wire clamp
Technical field
The present invention relates to a kind of electric armour clamp, be specifically related to a kind of Novel drainage wire clamp.
Background technology
Electric power line pole tower drainage thread joint connection manner is various, be in operation because poor, the running overload of line construction technique and drainage thread metal material not square one often can cause joint superheating phenomenon.If process not in time the accident that just there will be cutting off drainage wire, causing power circuit to have a power failure affects the safe and stable operation of electrical network.When processing drainage thread is overheated at present, generally carry out power failure operation processing or equipotential processing with conduction wire clamp.
Chinese patent literature CN2535933Y provides a kind of New-type live-line conducting clip, has card line hook, and the pressing tight plate fastening screw of holding concurrently also has and special drainage thread and card line hook is in clamping connection to the gripping mechanism being integrated mutually, also has locking device.The prior art can reliably connect as one drainage thread and charged conduction wire clamp in advance, but the draw-in groove specification of this existing apparatus is certain, if the diversified in specifications of the specification of drainage thread and this draw-in groove causes, this conduction wire clamp just can not use, and the specification of drainage thread is a lot, if the drainage thread of every kind of specification is all configured to the conduction wire clamp of same equal-specification, need multiple conduction wire clamps, these are concerning operating personnel, when each operation, all need first to know the specification of drainage thread, and then look for corresponding conduction wire clamp according to the specification of drainage thread, this mode operates very inconvenient, and, configure multiple conduction wire clamps and also can increase cost, if certain area only has the drainage thread of several specifications, unnecessary conduction wire clamp also can leave unused, cause waste.
Summary of the invention
For this reason, to be solved by this invention is that existing conduction wire clamp can only clamp operation inconvenience and the high technical problem of cost that the drainage thread of a certain specification brings, thereby a kind of conduction wire clamp that can clamp different size drainage thread is provided.
For solving the problems of the technologies described above, the technical solution used in the present invention is as follows:
A kind of Novel drainage wire clamp, comprises
Conduction wire clamp main body;
The first briquetting, coordinates with described conduction wire clamp main body the first clamping zone that forms clamping wires;
The first drive unit, drive described the first briquetting near or away from the direction of described conduction wire clamp main body move and then form clamping different conductor different clamping zones;
Described conduction wire clamp, also comprises
The second briquetting, coordinates with described conduction wire clamp main body the second clamping zone that forms clamping wires;
The second drive unit, drive described the second briquetting near or away from the direction of described conduction wire clamp main body move and then form clamping different conductor different clamping zones;
Described conduction wire clamp, described the first drive unit comprises:
The first double-screw bolt;
Be arranged at the female installing hole of being with in described conduction wire clamp main body, described the first double-screw bolt is by being with female installing hole precession or screwing out and can move in described conduction wire clamp main body described;
The first securing member, for by described the first briquetting and described the first stud clamping;
Be arranged at the first resilient snubber on described the first double-screw bolt;
Be arranged at the first locking member on described the first double-screw bolt;
The first revolving part, is arranged at one end away from described the first briquetting on described the first double-screw bolt, and described the first revolving part can rotate at the axial direction of described the first double-screw bolt, porose on described the first revolving part and described the first double-screw bolt, for the first fixture is fixed.
Described conduction wire clamp, described the second drive unit comprises:
The second double-screw bolt;
Be arranged at the female installing hole of being with of described conduction wire clamp main body, described the second double-screw bolt is by being with female installing hole precession or screwing out and can move in described conduction wire clamp main body described;
The second securing member, for clamping described the second briquetting and the second double-screw bolt;
Be arranged at the second resilient snubber on described the second double-screw bolt;
Be arranged at the second locking member on described the second double-screw bolt;
The second revolving part, is arranged at one end away from described the second briquetting on described the second double-screw bolt, and described the second revolving part can rotate at the axial direction of described the second double-screw bolt, porose on described the second revolving part and described the second double-screw bolt, for fixing of the second fixture.
Described conduction wire clamp, described the first double-screw bolt and described the second double-screw bolt are top fastening bolt.
Described conduction wire clamp, described the first securing member and described the second securing member are button-headed screw.
Described conduction wire clamp, described the first resilient snubber and described the second resilient snubber are spring washer.
Described conduction wire clamp, described the first locking member and described the second locking member are nut.
Described conduction wire clamp, described the first fixture and described the second fixture are pin.
Described conduction wire clamp, described the first revolving part and described the second revolving part are the shaft coupling that is provided with the pin-and-hole being used in conjunction with described pin.
Technique scheme of the present invention has the following advantages compared to existing technology:
The invention provides a kind of Novel drainage wire clamp, this conduction wire clamp comprises conduction wire clamp main body, the first briquetting and the first drive unit.The first briquetting coordinates with described conduction wire clamp main body the first area that forms clamping wires, the first drive unit drive the first briquetting near or away from the direction of conduction wire clamp main body move and then form clamping different conductor different clamping zones.For the drainage thread of different size, this conduction wire clamp can drive the first briquetting to move by the first drive unit, change the size of the first clamping zone of the first briquetting and the intersubjective clamping wires of conduction wire clamp, drainage thread to different size clamps, simple in structure, and cost is low, easy to operate, flexible, be useful on wire types different on a drainage thread, unlike material and use, method of work is easily grasped, is easily promoted, and staff can operate through short-term cultivation.
Conduction wire clamp provided by the invention also comprises the second briquetting and the second drive unit, and the second briquetting coordinates the second clamping zone that forms clamping wires with conduction wire clamp main body; The second drive unit drive the second briquetting near or away from the direction of conduction wire clamp main body move and then form clamping different conductor different clamping zones.This conduction wire clamp provides two clamping zones, can clamp two drainage threads that specification is identical or different, has improved service efficiency, handled easily personnel's use.
In the time of transmission line drainage thread conductor joint heating, can adopt this conduction wire clamp to replace traditional drainage wire clamp, in time terminal is processed with intermediate potential method, earth potential method, idiostatic method, avoid power failure outside the plan, improve power supply reliability.It is overheated that Novel drainage wire clamp and new method are processed terminal, can simplify workflow.The in the situation that of live line working conditions permit, the past, traditional equipotential was processed the overheated method of drainage thread, and the operating time needs 1 and a half hours, adopts now the work of Novel drainage wire clamp only to need 40 minutes, greatly saves the processing time.
Owing to having researched and developed Novel drainage wire clamp, having adopted new technology and technique, adopt various ways, it is live line working indirect method, idiostatic method or direct potentiometric method process that various situations are defeated, distribution line drainage thread joint overheating fault, have solved the single and not treatable situation of line conductor joint overheat treatment method in the past.By adopting new conduction wire clamp and new manipulation method, realize the processing that do not have a power failure when overheated of defeated, distribution line drainage thread joint, reduce power failure outside the plan, 100% line fault that can avoid drainage thread conductor joint heating to cause, the safe operation that has improved power supply reliability and electrical network.While is overheated owing to adopting new conduction wire clamp and method to process drainage thread joint, has reduced labour intensity, versatile and flexible because of method, has also improved the fail safe of live line working.
Novel drainage wire clamp can be processed drainage thread joint overheating fault in the situation that 10kV-220kV electric line moves, the method processing method more in the past more flexibly, convenient, easily popularize, process range is promoted energetically, and in order to process from now on, 10kV-220kV will be defeated, distribution line drainage thread joint overheating fault has been created condition.
The operation of Novel drainage wire clamp can be used, and under running status, process drainage thread conductor joint heating at circuit in different line conductor models, different conductor material, has reduced line outage.But before Novel drainage wire clamp, can only indivedual qualified could processing, now can 100% process.Novel drainage wire clamp and be equipped with new method of operation, 10Kv-220kV circuit drainage thread joint is able in time, flexibly, process easily, can eliminate in time the hidden trouble of equipment that jeopardizes circuit, guarantee the safe operation of circuit, in line conductor joint Overheating Treatment, be still blank at home, solve the problem of processing in the overheated various situations of line conductor joint, can popularize application in an all-round way.
Accompanying drawing explanation
For content of the present invention is more likely to be clearly understood, below according to a particular embodiment of the invention and by reference to the accompanying drawings, the utility model is described in further detail, wherein
Fig. 1 is the structural representation of an embodiment of a kind of Novel drainage wire clamp of the present invention;
Fig. 2 is the structural representation of another embodiment of a kind of Novel drainage wire clamp of the present invention.
In figure, Reference numeral is expressed as: 1-conduction wire clamp main body; 21-the first briquetting; 22-the second briquetting; 31-the first button-headed screw; 32-the second button-headed screw; 41-the first top fastening bolt; 42-the second top fastening bolt; 51-the first spring washer; 52-the second spring washer; 61-the first nut; 62-the second nut; 71-the first pin; 72-the second pin; 81-the first shaft coupling; 82-the second shaft coupling.
embodiment
embodiment 1:
Provide a concrete execution mode of a kind of Novel drainage wire clamp of the present invention below, shown in Figure 1, a kind of Novel drainage wire clamp, comprising: conduction wire clamp main body 1; The first briquetting 21, coordinates with described conduction wire clamp main body 1 the first clamping zone that forms clamping wires; The first drive unit, drive described the first briquetting 21 near or move and then form the different clamping zone of clamping different thicknesses wire away from the direction of described conduction wire clamp main body 1.
Described the first drive unit comprises: the first double-screw bolt; Be arranged at the female installing hole of being with in described conduction wire clamp main body, described the first double-screw bolt is by being with female installing hole precession or screwing out and can move in described conduction wire clamp main body 1 described; The first securing member, for by described the first briquetting and described the first stud clamping; Be arranged at the first resilient snubber on described the first double-screw bolt; Be arranged at the first locking member on described the first double-screw bolt; The first revolving part, is arranged at one end away from described the first briquetting on described the first double-screw bolt, and described the first revolving part can rotate at the axial direction of described the first double-screw bolt, porose on described the first revolving part and described the first double-screw bolt, for the first fixture is fixed.In the present embodiment, described the first securing member is the first button-headed screw 31, described the first double-screw bolt is the first top fastening bolt 41, the first resilient snubber is the first spring washer 51, the first locking member is the first nut 61, the first revolving part is to be the first pin 71 with the first shaft coupling 81, the first fixtures of pin-and-hole.
In the time will clamping drainage thread, rotate the first shaft coupling 81 at the axial direction of the first top fastening bolt 41, promote described the first top fastening bolt 41 to the direction precession near described conduction wire clamp main body 1, fixing by the first button-headed screw 31 between described the first briquetting 21 and described the first top fastening bolt 41, described the first top fastening bolt 41 drives described the first briquetting 21 to move to the direction near described conduction wire clamp main body 1, in the time clamping drainage thread, described the first nut 61 is pushed down described the first spring washer 51 direction rotation towards close described conduction wire clamp main body 1, described the first spring washer 51 is locked described the first top fastening bolt 41 with described the first nut 61, described the first pin 71 inserts in the pin-and-hole of described the first shaft coupling 81.
In the time will unclamping the drainage thread of clamping, described the first pin 71 is extracted from the pin-and-hole of described the first shaft coupling 81, rotate the first shaft coupling 81 at the axial direction of the first top fastening bolt 41, described the first nut 61 is towards the direction rotation away from described conduction wire clamp main body 1, described the first top fastening bolt 41 screws out to the direction away from described conduction wire clamp main body 1, fixing by the first button-headed screw 31 between described the first briquetting 21 and described the first top fastening bolt 41, described the first top fastening bolt 41 drives described the first briquetting 21 to moving away from the direction of described conduction wire clamp main body 1.
embodiment 2:
On the basis of above-described embodiment 1, shown in Figure 2, described conduction wire clamp also comprises the second briquetting, coordinates with described conduction wire clamp main body the second clamping zone that forms clamping wires; The second drive unit, drive described the second briquetting near or away from the direction of described conduction wire clamp main body move and then form clamping different conductor different clamping zones.
Described the second drive unit comprises: the second double-screw bolt; Be arranged at the female installing hole of being with of described conduction wire clamp main body, described the second double-screw bolt is by being with female installing hole precession or screwing out and can move in described conduction wire clamp main body described; The second securing member, for clamping described the second briquetting and the second double-screw bolt; Be arranged at the second resilient snubber on described the second double-screw bolt; Be arranged at the second locking member on described the second double-screw bolt; The second revolving part, is arranged at one end away from described the second briquetting on described the second double-screw bolt, and described the second revolving part can rotate at the axial direction of described the second double-screw bolt, porose on described the second revolving part and described the second double-screw bolt, for fixing of the second fixture.In the present embodiment, described the second securing member is the second button-headed screw 32, described the second double-screw bolt is the second top fastening bolt 42, the second resilient snubber is the second spring washer 52, the second locking member is the second nut 62, the second revolving part is to be the second pin 72 with the second shaft coupling 82, the second fixtures of pin-and-hole.
This Novel drainage wire clamp can adopt multiple live line working mode, i.e. live line working indirect method, defeated in various situations, distribution line drainage thread conductor joint heating fault that idiostatic method or direct potentiometric method are processed.
Indirect operating method is to utilize insulating bar to process 10KV-220KV wire drainage thread conductor joint heating, and its method is the two ends that Novel wire folder are fixed on to shunt line.Utilize insulating bar that one end of this Novel drainage wire clamp shunt line is hung to the one end to the drainage thread that generates heat, and pin the other end with insulating bar, the person with keep a safe distance, the effective insulated lengths of insulating bar keeps a safe distance.One end hang up properly fastening firm after, then operation hangs up properly the fastening other end.In the time that voltage is 10 kV, the person is 0.4 meter with the safe distance of electrified body, and the safe distance of insulating bar and electrified body is 0.7 meter; In the time that voltage is 35kV, the person is 0.6 meter with the safe distance of electrified body, and the safe distance of insulating bar and electrified body is 0.9 meter; In the time that voltage is 110 kV, the person is 1.0 meters with the safe distance of electrified body, and the safe distance of insulating bar and electrified body is 1.3 meters; In the time that voltage is 220 kV, the person is 1.8 meters with the safe distance of electrified body, and the safe distance of insulating bar and electrified body is 2.1 meters.When adopt this kind of method to process heating joint near the electric pole of road, can utilize live line working overhead insulation bucket arm vehicle to carry out operation by convenient, safety.Its method is that aerial lift device with insulated arm is parked in to the roadside side nearer apart from shaft tower, and operating personnel utilizes insulating bar said method to carry out the processing of overheated drainage thread in insulation bucket.
Overhead insulation bucket arm vehicle direct potential working system is applicable to the processing of 10kV circuit heating drainage thread joint.Operating personnel utilizes 10kV insulation clothing, insulating gloves, insulation boots and overhead aerial lift device with insulating arm for live working, insulation barrier and insulation tilt, insulating sleeve to carry out after insulating bag screening electrified body, uses novel wire clamp and shunt line to carry out cross-over connection processing to the drainage thread joint of heating.First be fixedly connected with one end in processing procedure time, the other end hides with insulation tilt bag, avoids ground short circuit, or on aerial lift device with insulated arm, has another people to help cooperation to process.
Equal potential working method comprises overhead insulation bucket arm vehicle equal potential working method and insulated ladder equal potential working method.Overhead insulation bucket arm vehicle equal potential working method adapts to the processing of 35KV circuit drainage thread conductor joint heating.Operating personnel utilizes equivalent potential screen clothes and overhead insulation bucket arm vehicle, uses novel wire clamp and shunt line to carry out cross-over connection processing to the drainage thread joint of heating.Insulated ladder equal potential working method is applicable to the processing of 110kV~220kV circuit drainage thread conductor joint heating.Operating personnel utilizes equivalent potential screen clothes and the insulated ladder of newly developing, uses novel wire clamp and shunt line to carry out cross-over connection processing to the drainage thread joint of heating.
Obviously, above-described embodiment is only for example is clearly described, and the not restriction to execution mode.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here without also giving exhaustive to all execution modes.And the apparent variation of being extended out thus or variation are still among the protection range in the invention.

Claims (8)

1. a Novel drainage wire clamp, is characterized in that: comprise conduction wire clamp main body; The first briquetting, coordinates with described conduction wire clamp main body the first clamping zone that forms clamping wires; The first drive unit, drive described the first briquetting near or away from the direction of described conduction wire clamp main body move and then form clamping different conductor different clamping zones; Also comprise the second briquetting, coordinate with described conduction wire clamp main body the second clamping zone that forms clamping wires; The second drive unit, drive described the second briquetting near or away from the direction of described conduction wire clamp main body move and then form clamping different conductor different clamping zones;
Described the first drive unit comprises: the first double-screw bolt; Be arranged at the female installing hole of being with in described conduction wire clamp main body, described the first double-screw bolt is by being with female installing hole precession or screwing out and can move in described conduction wire clamp main body described;
The first securing member, for by described the first briquetting and described the first stud clamping; Be arranged at the first resilient snubber on described the first double-screw bolt; Be arranged at the first locking member on described the first double-screw bolt; The first revolving part, is arranged at one end away from described the first briquetting on described the first double-screw bolt, and described the first revolving part can rotate at the axial direction of described the first double-screw bolt, porose on described the first revolving part and described the first double-screw bolt, for the first fixture is fixed.
2. conduction wire clamp according to claim 1, is characterized in that: described the second drive unit comprises: the second double-screw bolt;
Be arranged at the female installing hole of being with of described conduction wire clamp main body, described the second double-screw bolt is by being with female installing hole precession or screwing out and can move in described conduction wire clamp main body described; The second securing member, for clamping described the second briquetting and the second double-screw bolt; Be arranged at the second resilient snubber on described the second double-screw bolt; Be arranged at the second locking member on described the second double-screw bolt; The second revolving part, is arranged at one end away from described the second briquetting on described the second double-screw bolt, and described the second revolving part can rotate at the axial direction of described the second double-screw bolt, porose on described the second revolving part and described the second double-screw bolt, for fixing of the second fixture.
3. conduction wire clamp according to claim 2, is characterized in that: described the first double-screw bolt and described the second double-screw bolt are top fastening bolt.
4. conduction wire clamp according to claim 3, is characterized in that: described the first securing member and described the second securing member are button-headed screw.
5. conduction wire clamp according to claim 4, is characterized in that: described the first resilient snubber and described the second resilient snubber are spring washer.
6. conduction wire clamp according to claim 5, is characterized in that: described the first locking member and described the second locking member are nut.
7. conduction wire clamp according to claim 6, is characterized in that: described the first fixture and described the second fixture are pin.
8. conduction wire clamp according to claim 7, is characterized in that: described the first revolving part and described the second revolving part are the shaft coupling that is provided with the pin-and-hole being used in conjunction with described pin.
CN201310282591.1A 2013-07-07 2013-07-07 Novel jumper conductor clamper Pending CN103872476A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310282591.1A CN103872476A (en) 2013-07-07 2013-07-07 Novel jumper conductor clamper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310282591.1A CN103872476A (en) 2013-07-07 2013-07-07 Novel jumper conductor clamper

Publications (1)

Publication Number Publication Date
CN103872476A true CN103872476A (en) 2014-06-18

Family

ID=50910757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310282591.1A Pending CN103872476A (en) 2013-07-07 2013-07-07 Novel jumper conductor clamper

Country Status (1)

Country Link
CN (1) CN103872476A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377632A (en) * 2014-11-17 2015-02-25 国家电网公司 Double-end hot-line work connecting wire clamp
CN108963502A (en) * 2018-07-24 2018-12-07 国网青海省电力公司海东供电公司 Connection jaws termination and air switch
CN107607798B (en) * 2017-08-07 2020-07-07 厦门亿力吉奥信息科技有限公司 Electric shock risk monitoring method and wearable device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377632A (en) * 2014-11-17 2015-02-25 国家电网公司 Double-end hot-line work connecting wire clamp
CN107607798B (en) * 2017-08-07 2020-07-07 厦门亿力吉奥信息科技有限公司 Electric shock risk monitoring method and wearable device
CN108963502A (en) * 2018-07-24 2018-12-07 国网青海省电力公司海东供电公司 Connection jaws termination and air switch

Similar Documents

Publication Publication Date Title
CN205195145U (en) Support is changed to insulator
CN205141183U (en) Personally line of ensuring safety with electroscopic function
CN201189645Y (en) Cable clamp and bolt tightner of transformer device
CN206211061U (en) A kind of telescopic grounding wire device
CN202585755U (en) Novel drainage thread clip
CN103872476A (en) Novel jumper conductor clamper
CN104882825A (en) High-voltage live lead disconnecting device and lead method, and high-voltage live lead connecting device and lead method
CN204029998U (en) Contact line earthing device
CN107834479A (en) A kind of 10kV wire clamps of self-locking insulating bar method livewire work overlap joint drainage thread
CN103368104A (en) Insulating operating rod of ground potential operation non-bearing-strength consecutive wire clamp
CN203014232U (en) Transformer station tube type bus single-clamp grounding device
CN102820621B (en) Node heating method for ground potential treatment substation equipment
CN103368110B (en) The charged installation and removal construction method of non-bearing connecting clip
CN202042820U (en) Puncture wire clip conveying rod
CN209607927U (en) A kind of power transmission line parallel-connection connecting device
CN205122821U (en) Ground connection rod
CN206211062U (en) A kind of circlip type binding clip for ground wire group
CN202564587U (en) Wire end clip
CN103441350A (en) Low-voltage grounding wire device for compact electrical structure
CN203895633U (en) Short circuit grounding wire suitable for box transformer substation and electricity distribution room
CN203278084U (en) Special tool for fixing mesophase drainage wire in 10KV live working
CN102931612A (en) Conducting wire fixer for 10kV live working
CN105048132B (en) A kind of high-voltage earthing line apparatus
CN203367879U (en) Insulating operating rod of earth potential working non-bearing-force connection wire clamp
CN104348122B (en) Ground potential mounting type shunt wire clamp device and mounting method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140618