CN103368110B - The charged installation and removal construction method of non-bearing connecting clip - Google Patents

The charged installation and removal construction method of non-bearing connecting clip Download PDF

Info

Publication number
CN103368110B
CN103368110B CN201310322265.9A CN201310322265A CN103368110B CN 103368110 B CN103368110 B CN 103368110B CN 201310322265 A CN201310322265 A CN 201310322265A CN 103368110 B CN103368110 B CN 103368110B
Authority
CN
China
Prior art keywords
bearing connecting
bus
connecting clip
drainage thread
clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310322265.9A
Other languages
Chinese (zh)
Other versions
CN103368110A (en
Inventor
殷洪海
唐国保
杨正平
彭涛
蒋银国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201310322265.9A priority Critical patent/CN103368110B/en
Publication of CN103368110A publication Critical patent/CN103368110A/en
Application granted granted Critical
Publication of CN103368110B publication Critical patent/CN103368110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention provides a kind of charged installation and removal construction method of non-bearing connecting clip, adopt earth potential working method, installation steps mainly contain: safety inspection, insulation isolation, non-bearing connecting clip install drainage thread, lifts non-bearing connecting clip and make it hang up distribution line bus, non-bearing connecting clip to be fixedly connected with distribution line bus and the quarantine measures that insulate are removed; The key step of dismounting construction has: safety inspection, insulation isolation, with insulation Assembly rail the bus bar part of non-bearing connecting clip unscrewed, lift, non-bearing connecting clip away from the charged bus of distribution line, take the drainage thread on non-bearing connecting clip apart and remove the quarantine measures that insulate.The present invention makes the installation and removal of non-bearing connecting clip convenient and swift, time saving and energy saving, increases work efficiency; Directly constructing when not having a power failure, effectively avoiding the unnecessary loss of the economy because power cut construction brings and society; Events in operation and the job area of distribution network live line work are expanded.

Description

The charged installation and removal construction method of non-bearing connecting clip
Technical field
The present invention relates to the construction method of the electricity getting device in overhead power line, be specifically related to the charged installation and removal construction method of a kind of non-bearing connecting clip adopting earth potential working.
Background technology
Non-bearing connecting clip is the charged lap device of the drainage threads such as a kind of overhead distribution branch, disconnecting link, switch.The parallel groove clamp of common use on current distribution line, pacify the non-bearing connecting clips such as general wire clamp, C shaped cable clamp, insulation puncture line clamping when researching and developing and reckon without the demand of live line working, thus all power cut construction is needed when it is installed, and the frequent power cut construction of distribution line can not meet user to the quality of power supply and the more and more high requirement of power supply reliability, brings unnecessary loss to economy, social development.Above-mentioned wire clamp if desired adopts the operation of earth potential insulating bar, then must research and develop specific purpose tool targetedly temporarily, and the specific purpose tool limitation of these research and development is temporarily large, the activity duration long, task difficulty large, is thus difficult to be promoted.At present, along with the raising of insulating protection technical merit, aerial lift device with insulated arm and insulating gloves direct maintenance is adopted to carry out relevant operation also more common, but this working system requires relatively high to the operating environment such as road, ground, and the place that can not arrive as insulation bucket arm vehicle then cannot adopt which to complete construction.
Summary of the invention
The object of the invention is: overcome the deficiencies in the prior art, there is provided a kind of construction method adopting earth potential working method, use insulating bar charged installation and removal non-bearing connecting clip, the method has expanded events in operation and the job area of distribution network live line work.
Technical scheme of the present invention is: the charged installation and removal construction method of non-bearing connecting clip of the present invention, adopts earth potential working method, utilizes insulating bar charged to non-bearing connecting clip enforcement installation and removal;
Above-mentioned non-bearing connecting clip comprises wire clip body, drainage thread pressing plate, bolt connection assembly, bus bar part, drive screw, guide pin bushing, sliding sleeve and pivot pin;
Wire clip body comprise one connect drainage thread installation portion, drainage thread pressing plate connecting portion, middle interconnecting piece, bus holding portion with is connected otic placode, connection otic placode be provided with connecting through hole; Drainage thread pressing plate is the plate body part that entirety is square, and the lower right-hand side of drainage thread pressing plate is provided with an arcuate projection; Bolt connection assembly is provided with 2 identical covers; Bus bar part comprises fastening main part, 2 pieces of location plate washers and the plate that is in transmission connection that one connects; Drive screw comprises pedestal and the screw drive post of one connection; Guide pin bushing is the column member of hollow, and the inwall of guide pin bushing is provided with internal thread; The wall body of guide pin bushing is provided with 2 pin-and-holes of left and right to through symmetry; Sliding sleeve is the cylinder sliding sleeve of hollow;
Drainage thread pressing plate is bolted assembly and is connected with wire clip body bolt; Bus bar part is threaded with drive screw; Sliding sleeve is fixedly mounted on by the connecting through hole upward and downward interference fit of the connection otic placode of wire clip body and connects on otic placode; The inwall of guide pin bushing uses pivot pin pin joint after being connected with the threaded upper ends of the screw drive post of drive screw again; The outer wall of guide pin bushing and the inwall of sliding sleeve can slide up and down to be socketed;
Above-mentioned insulating bar comprises the body of rod, back-up ring, insulating case, afterburning handle, adapter sleeve, socket pin and grafting spindle nose;
The body of rod is the strip column member of hollow; Back-up ring is torus part; Back-up ring socket is fixedly mounted on the lower end outer wall of the body of rod; Insulating case is the column member of hollow; Insulating case is socketed in the bottom of the body of rod; Afterburning handle is elongated circular body of rod part; Afterburning handle is horizontally through the body of rod and is fixed on the body of rod, and is positioned at the upper end of insulating case; Adapter sleeve comprises lower body and the upper sleeve body of one connection; The lower body of adapter sleeve is the cylinder of hollow, and the external diameter of its internal diameter and the body of rod adapts; The upper sleeve body of adapter sleeve is the cylinder of hollow, and its external diameter is less than the external diameter of the body of rod; The upper sleeve body of adapter sleeve is arranged with as install connecting hole left and right to 2 through holes; Adapter sleeve is socketed by its lower body and is fixed on the upper end of the body of rod; Socket pin is round bar shape part; Grafting spindle nose is round bar shape part; The lower end of grafting spindle nose is provided with left and right to through installing hole; Grafting spindle nose is fixedly mounted on the upper sleeve body of adapter sleeve by socket pin;
The charged construction method of installation of non-bearing connecting clip of the present invention comprises the following steps:
1. review and validate before operation that to wait to take logical circuit zero load and without phase fault and earth fault;
2. earth potential working electrician causes the equipment of short circuit or ground connection hidden danger progressively to take the quarantine measures that insulate from the near to the remote to existing in job area because drainage thread swings on electric pole;
3. phase drainage thread in installing: drainage thread loads in the drainage thread installation portion of the wire clip body of non-bearing connecting clip by earth potential working electrician on electric pole; Cover drainage thread pressing plate and to be bolted assembly fastening to clamp drainage thread;
4. lift non-bearing connecting clip: earth potential working electrician holds on the insulating case of insulating bar, the two ends of the socket pin of insulating bar are enclosed within the pedestal of drive screw; Near non-bearing connecting clip upwards delivery to the bus of overhead distribution;
5. non-bearing connecting clip hangs up distribution line bus: earth potential working electrician is lifted after near non-bearing connecting clip to bus by insulating bar, the wire clip body of non-bearing connecting clip is moved to bus, bus is entered after between the bus holding portion of wire clip body and the fastening main part of bus bar part, slightly toward under pull insulating bar, bus is contacted with the bus holding portion of wire clip body;
6. non-bearing connecting clip is fixedly connected with distribution line bus: the afterburning handle on rotating insulated action bars, insulating bar drives the drive screw servo rotary of non-bearing connecting clip, under the reverse drive of drive screw spiral, bus pressing plate moves upward clamping bus, and non-bearing connecting clip is fixedly suspended on the bus of distribution line;
7. repeat step 3. to step 6., the drainage thread of all the other two-phases is installed;
8. earth potential working electrician draws near progressively to remove and exists because drainage thread swings the insulation quarantine measures caused on the equipment of short circuit or ground connection hidden danger;
The charged dismounting construction method of non-bearing connecting clip of the present invention, comprises the following steps:
1. circuit to be taken apart is reviewed and validate before operation zero load and without phase fault and earth fault;
2. earth potential working electrician causes the equipment of short circuit or ground connection hidden danger progressively to take the quarantine measures that insulate from the near to the remote to existing in job area because drainage thread swings on electric pole;
3. earth potential working electrician uses insulation Assembly rail to be unscrewed by the bus bar part of the non-bearing connecting clip on the charged middle phase bus in distribution line;
4. lift non-bearing connecting clip, non-bearing connecting clip is removed the charged bus of distribution line;
5. repeat step 3. with step 4., the non-bearing connecting clip in all the other two-phases is removed respectively the charged bus of distribution line;
6. the drainage thread on non-bearing connecting clip is taken apart by earth potential working electrician;
7. draw near progressively to remove and exist because drainage thread swings the insulation quarantine measures caused on the equipment of short circuit or ground connection hidden danger.
The present invention has positive effect: the charged installation and removal construction method of (1) non-bearing of the present invention connecting clip, installation and removal are convenient and swift, time saving and energy saving, significantly increase work efficiency.(2) the charged installation and removal construction method of non-bearing connecting clip of the present invention, directly can construct when not having a power failure, and effectively avoids the unnecessary loss of the economy because power cut construction brings and society; (3) the charged installation and removal construction method of non-bearing connecting clip of the present invention, has expanded events in operation and the job area of distribution network live line work.
Accompanying drawing explanation
The perspective view of the non-bearing connecting clip that Fig. 1 applies for the present invention;
Fig. 2 is the perspective view of the wire clip body in Fig. 1;
Fig. 3 is the perspective view of the bus pressing plate in Fig. 1;
Fig. 4 apply for the present invention with the structural representation of the matching used insulating bar of non-bearing connecting clip;
Fig. 5 is the flow chart of construction method of installation of the present invention;
Fig. 6 is the flow chart of dismounting construction method of the present invention.
Reference numeral in above-mentioned accompanying drawing is as follows:
Wire clip body 1, drainage thread installation portion 11, drainage thread pressing plate connecting portion 12, bolt hole 12-1, middle interconnecting piece 13, square breach 13-1, bus holding portion 14, main body curved portions 14-1, abduction curved portions 14-2, connect otic placode 15, connecting through hole 15-1,
Drainage thread pressing plate 2, arcuate projection 21,
Bolt connection assembly 3, bolt 31, spring washer 32, nut 33,
Bus bar part 4, fastening main part 41, location plate washer 42, be in transmission connection plate 43, bolt hole 43-1,
Drive screw 5, pedestal 51, installs sleeve joint hole 51-1, by groove 51-2, screw drive post 52,
Guide pin bushing 6,
Sliding sleeve 7,
Pivot pin 8,
Insulating bar 9, the body of rod 91, back-up ring 92, insulating case 93, afterburning handle 94, adapter sleeve 95, socket pin 96, grafting axle 97.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
(embodiment 1)
The charged installation and removal construction method of the non-bearing connecting clip of the present embodiment, adopts earth potential working method, utilizes custom-designed insulating bar charged to custom-designed non-bearing connecting clip enforcement installation and removal.So-called earth potential working method, refer to the human body of workmen be under (zero) potential state, use insulating tool indirect contact charging equipment, reach the method for construction or maintenance object.
See Fig. 1 to Fig. 3, the non-bearing connecting clip that the present embodiment is applied, form primarily of wire clip body 1, drainage thread pressing plate 2, bolt connection assembly 3, bus bar part 4, drive screw 5, guide pin bushing 6, sliding sleeve 7 and pivot pin 8.
See Fig. 2, wire clip body 1 is aluminum alloy integral piece.Wire clip body 1 is by drainage thread installation portion 11, drainage thread pressing plate connecting portion 12, middle interconnecting piece 13, bus holding portion 14 and be connected otic placode 15 and integrally form.
Drainage thread installation portion 11 is curved plate body part outstanding downwards.Drainage thread pressing plate connecting portion 12 is horizontally disposed rectangle plate body part, and drainage thread pressing plate connecting portion 12 points of front and back are provided with the through manhole of 2 upward and downwards, as the bolt hole 12-1 installed.Middle interconnecting piece 13 is the rectangular plate body part of vertical to setting, and the centre position of middle interconnecting piece 13 is provided with the square breach 13-1 of hollow out.Bus holding portion 14 is made up of the main body curved portions 14-1 integrally connected and abduction curved portions 14-2.The main body curved portions 14-1 in bus holding portion 14 is the curved plate body part given prominence to upward; Abduction curved portions 14-2 is the arc plate body part given prominence to the right; Main body curved portions 14-1 is that streamlined one is connected by its lower-left end and the upper right side of abduction curved portions 14-2.Connecting otic placode 15 be square plate body part, and the circle that the centre position of connection otic placode 15 is provided with 1 upward and downward through is passed through, as connecting through hole 15-1.
The drainage thread installation portion 11 of wire clip body 1 is connected with the bottom righthand side one of drainage thread pressing plate connecting portion 12 by its left upper end; The upper right side of drainage thread installation portion 11 is connected with the lower end one of middle interconnecting piece 13; The upper end of middle interconnecting piece 13 and the bottom righthand side in bus holding portion 14 and the left end one being connected otic placode 15 connect.Thus the wire clip body 1 be integrally formed.
Still see Fig. 1, drainage thread pressing plate 2 is the plate body part that the entirety of aluminum alloy is square; The lower right-hand side of drainage thread pressing plate 2 is provided with an arcuate projection 21, and the radius of the arc of the drainage thread installation portion 11 of the radius of this arcuate projection 21 and wire clip body 1 adapts.Drainage thread pressing plate 2 is provided with 2 construction bolt holes, and these 2 construction bolt holes are corresponding with 2 bolt hole 12-1 on the drainage thread pressing plate connecting portion 12 of wire clip body 1, for installing cooperation.
Bolt connection assembly 3 is made up of bolt 31, spring washer 32 and nut 33.Bolt 31, spring washer 32 and nut 33 are respectively provided with 2 covers respectively.
See Fig. 3, bus bar part 4 is aluminum alloy integral piece.Bus bar part 4 is integrally made up of fastening main part 41, location plate washer 42 and the plate 43 that is in transmission connection.Fastening main part 41 global shape is sagittal cuboid, and its upper end is provided with arc notch recessed down.Location plate washer 42 global shape be left and right to rectangle plate body part; Location plate washer about 42 to the length left and right that is greater than fastening main part 41 to width; The height of location plate washer 42 upward and downward is greater than the height of the upward and downward of fastening main part 41; The upper end of location plate washer 42 is provided with arc notch recessed down, and the lower end of the arc notch of this arc notch and fastening main part 41 is positioned in same level.Location plate washer 42 is provided with identical 2 pieces of structure, and these 2 pieces location plate washers 42 are located at the rear and front end of fastening main part 41 respectively, and is connected with fastening main part 41 one.Be in transmission connection plate 43 for square plate body part; The sagittal length of plate 43 of being in transmission connection is less than the sagittal length of fastening main part 41.The plate 43 that is in transmission connection is connected with the right side integral middle of its left side with fastening main part 41.The be in transmission connection centre of plate 43 is provided with the through bolt hole 43-1 of upward and downward.
Still see Fig. 1, drive screw 5 is steel integral piece.Drive screw 5 is integrally made up of pedestal 51 and screw drive post 52.Pedestal 51 is located at the below of drive screw 5.Pedestal 51 entirety is the cylinder of hollow, and the middle and lower part of the wall body of pedestal 51 is provided with the installation sleeve joint hole 51-1 of symmetrical hollow out; The lower end of pedestal 51 be provided with install that sleeve joint hole 51-1 communicates by groove 51-2.Screw drive post 52 is arranged on the top of pedestal 51, and be connected with pedestal 51 one, stud drive post 52 is provided with left hand thread.The axis of screw drive post 52 is provided with columniform through hole; The top of screw drive post 52 is provided with left and right to through pin-and-hole.
Guide pin bushing 6 is the column member of hollow, and the inwall of guide pin bushing 6 is provided with internal thread.The wall body of guide pin bushing 6 is provided with 2 pin-and-holes of left and right to through symmetry.
Sliding sleeve 7 is the cylinder sliding sleeve of hollow.
The installation of each parts of aforesaid non-bearing connecting clip connects matching relationship as following:
Drainage thread pressing plate 2 is bolted assembly 3 in the downward mode relative with the drainage thread installation portion 11 of wire clip body 1 of its arcuate projection 21 and is connected with drainage thread pressing plate connecting portion 12 bolt of wire clip body 1; Be threaded with the screw drive post 52 of drive screw 5 by its bolt hole 43-1 after the square breach 13-1 of plate 43 to the right through the middle interconnecting piece 13 of wire clip body 1 that be in transmission connection of bus bar part 4.Sliding sleeve 7 is fixedly mounted on by the connecting through hole 15-1 upward and downward ground interference fit of the connection otic placode 15 of wire clip body 1 and connects on otic placode 15; The inwall of guide pin bushing 6 uses pivot pin 8 pin joint after being connected with the threaded upper ends of the screw drive post 52 of drive screw 5 again; The outer wall of guide pin bushing 6 and the inwall of sliding sleeve 7 can slide up and down to be socketed.
The charged construction method of installation of the non-bearing connecting clip of the present embodiment, adopts the insulating bar 9 supporting with aforesaid non-bearing connecting clip to carry out installation.
See Fig. 4, insulating bar 9 forms primarily of the body of rod 91, back-up ring 92, insulating case 93, afterburning handle 94, adapter sleeve 95, socket pin 96 and grafting spindle nose 97.
The material of the body of rod 91 is insulating glass steel.The body of rod 91 is the strip column member of hollow.
Back-up ring 92 is the torus part of insulating glass steel matter; Back-up ring 92 be fixed by socket be arranged on the body of rod 91 lower end outer wall on.Back-up ring 92 prevents the body of rod from slipping out of the hand when facilitating insulating bar 9 in use to grasp.
The material of insulating case 93 is rubber.Insulating case 93 is the column member of hollow; Insulating case 93 is socketed in the bottom of the body of rod 91.
The material of afterburning handle 94 is carbon junction steel.Afterburning handle 94 is elongated circular body of rod part.Afterburning handle 94 is horizontally through the body of rod 91 and is fixed on the body of rod 91, and is positioned at the upper end of insulating case 93.
The material of adapter sleeve 95 is carbon junction steel.Adapter sleeve 95 is integrally made up of lower body and upper sleeve body.The lower body of adapter sleeve 95 is the cylinder of hollow, and the external diameter of its internal diameter and the body of rod 91 adapts.The upper sleeve body of adapter sleeve 95 is the cylinder of hollow, and its external diameter is less than the external diameter of the body of rod 91, the upper sleeve body of adapter sleeve 95 is arranged with left and right to 2 through holes, as installation connecting hole.Adapter sleeve 95 is socketed by its lower body and is fixed on the upper end of the body of rod 91.
The material of socket pin 96 is carbon junction steel.Socket pin 96 is round bar shape part.
The material of grafting spindle nose 97 is carbon junction steel.Grafting spindle nose 97 is round bar shape part; The lower end of grafting spindle nose 97 is provided with left and right to through installing hole.Grafting spindle nose 97 is fixedly mounted on the upper sleeve body of adapter sleeve 95 by socket pin 96.
See Fig. 5, the charged construction method of installation of the non-bearing connecting clip of the present embodiment, mainly comprises the following steps:
1. review and validate before operation that to wait to take logical circuit zero load and without phase fault and earth fault;
2. earth potential working electrician causes the equipment of short circuit or ground connection hidden danger progressively to take the quarantine measures that insulate from the near to the remote to existing in job area because drainage thread swings on electric pole;
3. phase drainage thread in installing: drainage thread loads in the drainage thread installation portion 11 of the wire clip body 1 of non-bearing connecting clip by earth potential working electrician on electric pole; Cover drainage thread pressing plate 2 and to be bolted assembly 3 fastening to clamp drainage thread;
4. non-bearing connecting clip is lifted: earth potential working electrician holds on the insulating case 93 of insulating bar, is enclosed within the pedestal 51 of drive screw 5 by the two ends of the socket pin 96 of insulating bar; Near non-bearing connecting clip upwards delivery to the bus of overhead distribution;
5. non-bearing connecting clip hangs up distribution line bus: earth potential working electrician is lifted after near non-bearing connecting clip to bus by insulating bar, the wire clip body 1 of non-bearing connecting clip is moved to bus, bus is entered after between the bus holding portion 14 of wire clip body 1 and the fastening main part 41 of bus bar part 4, slightly toward under pull insulating bar, bus is contacted with the bus holding portion 14 of wire clip body 1;
6. non-bearing connecting clip is fixedly connected with distribution line bus: the afterburning handle 94 on rotating insulated action bars, insulating bar drives drive screw 5 servo rotary of non-bearing connecting clip, under the reverse drive of drive screw 5 spiral, bus pressing plate 4 moves upward clamping bus, and non-bearing connecting clip is fixedly suspended on the bus of distribution line;
7. repeat step 3. to step 6., the drainage thread of all the other two-phases is installed;
8. earth potential working electrician draws near progressively to remove and exists because drainage thread swings the insulation quarantine measures caused on the equipment of short circuit or ground connection hidden danger;
See Fig. 6, the charged dismounting construction method of the non-bearing connecting clip of the present embodiment, mainly comprises the following steps:
1. circuit to be taken apart is reviewed and validate before operation zero load and without phase fault and earth fault;
2. earth potential working electrician causes the equipment of short circuit or ground connection hidden danger progressively to take the quarantine measures that insulate from the near to the remote to existing in job area because drainage thread swings on electric pole;
3. earth potential working electrician uses insulation Assembly rail to be unscrewed by the bus bar part 4 of the non-bearing connecting clip on the charged middle phase bus in distribution line;
4. lift non-bearing connecting clip, non-bearing connecting clip is removed the charged bus of distribution line;
5. repeat step 3. with step 4., the non-bearing connecting clip in all the other two-phases is removed respectively the charged bus of distribution line;
6. the drainage thread on non-bearing connecting clip is taken apart by earth potential working electrician;
7. draw near progressively to remove and exist because drainage thread swings the insulation caused on the equipment of short circuit or ground connection hidden danger
Quarantine measures.
To sum up, the charged installation and removal construction method of the non-bearing connecting clip of the present embodiment, installation and removal are convenient and swift, time saving and energy saving, significantly increase work efficiency; Directly can construct when not having a power failure, effectively avoiding the unnecessary loss of the economy because power cut construction brings and society; Events in operation and the job area of distribution network live line work are expanded.
Above embodiment is the explanation to the specific embodiment of the present invention; but not limitation of the present invention; person skilled in the relevant technique without departing from the spirit and scope of the present invention; can also make various conversion and change and obtain corresponding equivalent technical scheme, therefore all equivalent technical schemes all should be included into scope of patent protection of the present invention.

Claims (1)

1. a charged installation and removal construction method for non-bearing connecting clip, adopts earth potential working method, utilizes insulating bar charged to non-bearing connecting clip enforcement installation and removal;
Described non-bearing connecting clip comprises wire clip body (1), drainage thread pressing plate (2), bolt connection assembly (3), bus bar part (4), drive screw (5), guide pin bushing (6), sliding sleeve (7) and pivot pin (8);
Wire clip body (1) comprises drainage thread installation portion (11) that one connects, drainage thread pressing plate connecting portion (12), middle interconnecting piece (13), bus holding portion (14) and be connected otic placode (15), and connection otic placode (15) is provided with connecting through hole (15-1); Drainage thread pressing plate (2) is the overall plate body part be square, and the lower right-hand side of drainage thread pressing plate (2) is provided with an arcuate projection (21); Bolt connection assembly (3) is provided with 2 identical covers; Bus bar part (4) comprises the fastening main part (41) of one connection, 2 pieces of location plate washer (42) and the plate that is in transmission connection (43); Drive screw (5) comprises pedestal (51) and the screw drive post (52) of one connection; The column member that guide pin bushing (6) is hollow, the inwall of guide pin bushing (6) is provided with internal thread; The wall body of guide pin bushing (6) is provided with 2 pin-and-holes of left and right to through symmetry; The cylinder sliding sleeve that sliding sleeve (7) is hollow;
Drainage thread pressing plate (2) is bolted assembly (3) and is connected with wire clip body (1) bolt; Bus bar part (4) is threaded with drive screw (5); Sliding sleeve (7) is fixedly mounted on by connecting through hole (15-1) the upward and downward interference fit of the connection otic placode (15) of wire clip body (1) and connects on otic placode (15); The inwall of guide pin bushing (6) uses pivot pin (8) pin joint after being connected with the threaded upper ends of the screw drive post (52) of drive screw (5) again; The outer wall of guide pin bushing (6) and the inwall of sliding sleeve (7) can slide up and down to be socketed;
Described insulating bar comprises the body of rod (91), back-up ring (92), insulating case (93), afterburning handle (94), adapter sleeve (95), socket pin (96) and grafting spindle nose (97);
The strip column member that the body of rod (91) is hollow; Back-up ring (92) is torus part; Back-up ring (92) be fixed by socket be arranged on the body of rod (91) lower end outer wall on; The column member that insulating case (93) is hollow; Insulating case (93) is socketed in the bottom of the body of rod (91); Afterburning handle (94) is elongated circular body of rod part; Afterburning handle (94) is horizontally through the body of rod (91) and is fixed on the body of rod (91), and is positioned at the upper end of insulating case (93); Adapter sleeve (95) comprises lower body and the upper sleeve body of one connection; The lower body of adapter sleeve (95) is the cylinder of hollow, and the external diameter of its internal diameter and the body of rod (91) adapts; The upper sleeve body of adapter sleeve (95) is the cylinder of hollow, and its external diameter is less than the external diameter of the body of rod (91); The upper sleeve body of adapter sleeve (95) is arranged with as install connecting hole left and right to 2 through holes; Adapter sleeve (95) is socketed by its lower body and is fixed on the upper end of the body of rod (91); Socket pin (96) is round bar shape part; Grafting spindle nose (97) is round bar shape part; The lower end of grafting spindle nose (97) is provided with left and right to through installing hole; Grafting spindle nose (97) is fixedly mounted on the upper sleeve body of adapter sleeve (95) by socket pin (96);
It is characterized in that: the construction method of charged installation non-bearing connecting clip comprises the following steps:
1. review and validate before operation that to wait to take logical circuit zero load and without phase fault and earth fault;
2. earth potential working electrician causes the equipment of short circuit or ground connection hidden danger progressively to take the quarantine measures that insulate from the near to the remote to existing in job area because drainage thread swings on electric pole;
3. phase drainage thread in installing: drainage thread loads in the drainage thread installation portion (11) of the wire clip body (1) of non-bearing connecting clip by earth potential working electrician on electric pole; Cover drainage thread pressing plate (2) and to be bolted assembly (3) fastening to clamp drainage thread;
4. non-bearing connecting clip is lifted: earth potential working electrician holds on the insulating case (93) of insulating bar, is enclosed within the pedestal (51) of drive screw (5) by the two ends of the socket pin (96) of insulating bar; Near non-bearing connecting clip upwards delivery to the bus of overhead distribution;
5. non-bearing connecting clip hangs up distribution line bus: earth potential working electrician is lifted after near non-bearing connecting clip to bus by insulating bar, the wire clip body (1) of non-bearing connecting clip is moved to bus, bus is entered after between the bus holding portion (14) of wire clip body (1) and the fastening main part (41) of bus bar part (4), slightly toward under pull insulating bar, bus is contacted with the bus holding portion (14) of wire clip body (1);
6. non-bearing connecting clip is fixedly connected with distribution line bus: the afterburning handle (94) on rotating insulated action bars, insulating bar drives drive screw (5) servo rotary of non-bearing connecting clip, under the reverse drive of drive screw (5) spiral, bus pressing plate (4) moves upward clamping bus, and non-bearing connecting clip is fixedly suspended on the bus of distribution line;
7. repeat step 3. to step 6., the drainage thread of all the other two-phases is installed;
8. earth potential working electrician draws near progressively to remove and exists because drainage thread swings the insulation quarantine measures caused on the equipment of short circuit or ground connection hidden danger;
The construction method of charged dismounting non-bearing connecting clip, comprises the following steps:
1. circuit to be taken apart is reviewed and validate before operation zero load and without phase fault and earth fault;
2. earth potential working electrician causes the equipment of short circuit or ground connection hidden danger progressively to take the quarantine measures that insulate from the near to the remote to existing in job area because drainage thread swings on electric pole;
3. earth potential working electrician uses insulation Assembly rail to be unscrewed by the bus bar part (4) of the non-bearing connecting clip on the charged middle phase bus in distribution line;
4. lift non-bearing connecting clip, non-bearing connecting clip is removed the charged bus of distribution line;
5. repeat step 3. with step 4., the non-bearing connecting clip in all the other two-phases is removed respectively the charged bus of distribution line;
6. the drainage thread on non-bearing connecting clip is taken apart by earth potential working electrician;
7. draw near progressively to remove and exist because drainage thread swings the insulation quarantine measures caused on the equipment of short circuit or ground connection hidden danger.
CN201310322265.9A 2013-07-26 2013-07-26 The charged installation and removal construction method of non-bearing connecting clip Active CN103368110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310322265.9A CN103368110B (en) 2013-07-26 2013-07-26 The charged installation and removal construction method of non-bearing connecting clip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310322265.9A CN103368110B (en) 2013-07-26 2013-07-26 The charged installation and removal construction method of non-bearing connecting clip

Publications (2)

Publication Number Publication Date
CN103368110A CN103368110A (en) 2013-10-23
CN103368110B true CN103368110B (en) 2015-11-18

Family

ID=49368906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310322265.9A Active CN103368110B (en) 2013-07-26 2013-07-26 The charged installation and removal construction method of non-bearing connecting clip

Country Status (1)

Country Link
CN (1) CN103368110B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103746315A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN108808279B (en) * 2018-07-10 2024-02-06 国家电网公司 F-shaped mounting wire clamp for high-voltage electrified T-junction circuit
CN108808558A (en) * 2018-07-26 2018-11-13 国网青海省电力公司海东供电公司 Lead for distribution uninterrupted operation is fixed and interim suspension arrangement
CN111653981B (en) * 2020-06-15 2021-09-24 刘欢 Power grid wire clamp hot-line operation installation equipment and operation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2706931Y (en) * 2004-03-31 2005-06-29 罗若晖 Movable wire clamp for high voltage operating
CN102361299A (en) * 2011-06-30 2012-02-22 永固集团股份有限公司 J-shaped parallel groove clamp
CN103066530A (en) * 2012-12-22 2013-04-24 西安供电局 Insulative line clamp installing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000333331A (en) * 1999-05-24 2000-11-30 Burest Kogyo Kenkyusho Co Ltd Support for cable-lead wire

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2706931Y (en) * 2004-03-31 2005-06-29 罗若晖 Movable wire clamp for high voltage operating
CN102361299A (en) * 2011-06-30 2012-02-22 永固集团股份有限公司 J-shaped parallel groove clamp
CN103066530A (en) * 2012-12-22 2013-04-24 西安供电局 Insulative line clamp installing device

Also Published As

Publication number Publication date
CN103368110A (en) 2013-10-23

Similar Documents

Publication Publication Date Title
CN103457214B (en) Earth potential working non-bearing connecting clip
CN103368104B (en) The insulating bar of earth potential working non-bearing connecting clip
CN103368110B (en) The charged installation and removal construction method of non-bearing connecting clip
CN205141183U (en) Personally line of ensuring safety with electroscopic function
CN103457213B (en) The wire clip body of earth potential working non-bearing connecting clip
CN203367920U (en) Earth potential working non-bearing-force connection wire clamp
CN203367879U (en) Insulating operating rod of earth potential working non-bearing-force connection wire clamp
CN203108026U (en) High-voltage bus safety belt hanging support
CN204144786U (en) Unmanned plane installing 110kV-500kV line security ground wire device
CN204741228U (en) Insulating couple of three -phase short circuit grounding
CN203367919U (en) Wire clamp body of ground-potential-working non-bearing connecting wire clamp
CN203109899U (en) Insulating tool for installing bird repellent device without power failure
CN205204677U (en) Special lifting device of circuit breaker
CN204088985U (en) A kind of integrated 10kv Zhu Shang transformer station
CN102882154B (en) A kind of installation clamp of live line working wire clamp
CN104143781A (en) Electrification installation method and installation tool for live part verification ground ring
CN201373896Y (en) Multifunctional test rod
CN204696525U (en) GW5 type isolating switch static contact finger installation special tool
CN104184071A (en) Unmanned aerial vehicle safety ground wire device for installing 110 kV-500 kV line
CN203233103U (en) Installation tool for electricity testing grounding ring
CN202856278U (en) Crossing cable support
CN203760924U (en) Auxiliary tool for mounting cross arm on telegraph pole
CN204088616U (en) A kind of ground connection anti-drop device
CN204045907U (en) Special purpose tools for electric fastening bolt
CN204407652U (en) High voltage cable branch box earthing mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant