CN103368110B - The charged installation and removal construction method of non-bearing connecting clip - Google Patents
The charged installation and removal construction method of non-bearing connecting clip Download PDFInfo
- Publication number
- CN103368110B CN103368110B CN201310322265.9A CN201310322265A CN103368110B CN 103368110 B CN103368110 B CN 103368110B CN 201310322265 A CN201310322265 A CN 201310322265A CN 103368110 B CN103368110 B CN 103368110B
- Authority
- CN
- China
- Prior art keywords
- bus
- bearing connecting
- drainage thread
- load
- connecting clip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Electric Cable Installation (AREA)
Abstract
本发明提供一种非承力接续线夹的带电安装与拆卸施工方法,采用地电位作业法,安装步骤主要有:安全检查、绝缘隔离、非承力接续线夹上安装引流线、托举非承力接续线夹使其挂上配电线路母线、非承力接续线夹与配电线路母线固定连接和绝缘隔离措施拆除;拆卸施工的主要步骤有:安全检查、绝缘隔离、用绝缘装配杆将非承力接续线夹的母线紧固件旋松、托举、非承力接续线夹使其离开配电线路带电母线、拆开非承力接续线夹上的引流线和拆除绝缘隔离措施。本发明使非承力接续线夹的安装与拆卸方便快捷、省时省力,提高工作效率;在不停电的情况下直接施工,有效避免因停电施工带来的经济和社会不必要的损失;拓展了配网带电作业的作业项目及作业范围。
The invention provides a live installation and disassembly construction method of a non-load-bearing connection clamp, which adopts the ground potential operation method. The load-bearing connection clamps are hung on the distribution line busbar, the non-load-bearing connection clamps are fixedly connected to the distribution line busbars, and the insulation and isolation measures are removed; the main steps of disassembly construction are: safety inspection, insulation isolation, and insulation assembly rods Unscrew and lift the bus bar fasteners of the non-load-bearing connection clamp to make it leave the live busbar of the power distribution line, disassemble the drainage wire on the non-load-bearing connection clip and remove the insulation and isolation measures . The invention makes the installation and disassembly of the non-load-bearing connection clip convenient and fast, saves time and effort, and improves work efficiency; it can be directly constructed without power failure, and effectively avoid unnecessary economic and social losses caused by power failure construction; expand The work items and scope of live work in the distribution network are clarified.
Description
技术领域 technical field
本发明涉及架空电力线路中的取电装置的施工方法,具体涉及采用地电位作业的一种非承力接续线夹的带电安装与拆卸施工方法。 The invention relates to a construction method for a power-taking device in an overhead power line, in particular to a construction method for live installation and disassembly of a non-load-bearing connection clip that adopts ground potential operation.
背景技术 Background technique
非承力接续线夹是一种架空配电线路分支、刀闸、开关等引流线的带电搭接装置。目前配电线路上常见使用的并沟线夹、安普线夹、C型线夹、绝缘穿刺线夹等非承力接续线夹在研发时并未考虑到带电作业的需求,因而其安装时均需要停电施工,而配电线路经常的停电施工不能满足用户对电能质量和供电可靠性愈来愈高的要求,给经济、社会发展带来不必要的损失。上述线夹若需要采用地电位绝缘操作杆作业,则必须临时研发针对性的专用工具,而这些临时研发的专用工具局限性大、作业时间长、作业难度大,因而难以得到推广。目前,随着绝缘防护技术水平的提高,采用绝缘斗臂车和绝缘手套直接作业法进行相关作业也较常见,但该作业法对道路、地面等作业环境要求相对较高,如绝缘斗臂车辆不能到达的地方则无法采用该方式完成施工。 The non-load-bearing splicing clamp is a live lapping device for overhead distribution line branches, knife switches, switches and other drainage lines. At present, the non-load-bearing splicing clamps such as parallel trench clamps, amp clamps, C-type clamps, and insulation piercing clamps commonly used on distribution lines did not consider the needs of live work when they were developed. Both require power outage construction, and the frequent power outage construction of distribution lines cannot meet the user's increasingly high requirements for power quality and power supply reliability, and bring unnecessary losses to economic and social development. If the above-mentioned clamps need to be operated with ground potential insulating operating rods, it is necessary to temporarily develop targeted special tools, and these temporarily developed special tools have limitations, long working hours, and difficult operations, so they are difficult to be popularized. At present, with the improvement of insulation protection technology, it is more common to use insulated arm trucks and insulated gloves to carry out related operations directly. However, this operation method has relatively high requirements for the working environment such as roads and ground. In places that cannot be reached, the construction cannot be completed in this way.
发明内容 Contents of the invention
本发明的目的是:克服现有技术的不足,提供一种采用地电位作业法、使用绝缘操作杆带电安装与拆卸非承力接续线夹的施工方法,该方法拓展了配网带电作业的作业项目及作业范围。 The purpose of the present invention is: to overcome the deficiencies of the prior art, to provide a construction method that adopts the ground potential operation method and uses the insulating operating rod to install and disassemble the non-load-bearing connection clamp when it is live, and this method expands the operation of the distribution network Project and scope of work.
本发明的技术方案是:本发明的非承力接续线夹的带电安装与拆卸施工方法,采用地电位作业法,利用绝缘操作杆带电对非承力接续线夹实施安装和拆卸; The technical solution of the present invention is: the live installation and disassembly construction method of the non-load-bearing splice clip of the present invention adopts the ground potential operation method, and uses the insulating operating rod to install and disassemble the non-load-bearing splice clip when it is charged;
上述的非承力接续线夹包括线夹主体、引流线压板、螺栓连接组件、母线紧固件、驱动螺杆、导套、滑套和轴销; The above-mentioned non-load-bearing connection clamp includes a clamp main body, a drain wire pressure plate, a bolt connection assembly, a busbar fastener, a driving screw, a guide sleeve, a sliding sleeve and a shaft pin;
线夹主体包括一体连接的引流线安装部、引流线压板连接部、中间连接部、母线夹持部和连接耳板,连接耳板上设有连接通孔;引流线压板为整体呈方形的板体件,引流线压板的右侧下方设有一个弧形突出部;螺栓连接组件设有相同的2套;母线紧固件包括一体连接的紧固主体部、2块定位档板和传动连接板;驱动螺杆包括一体连接的基座和螺纹驱动柱;导套为中空的圆柱体件,导套的内壁上设有内螺纹;导套的壁体上设有左右向贯通的对称的2个销孔;滑套为中空的圆柱体滑套; The main body of the cable clamp includes a drain wire installation part connected integrally, a drain wire pressure plate connection part, an intermediate connection part, a busbar clamping part and a connecting ear plate, and the connecting ear plate is provided with a connection through hole; the drain line pressure plate is a square plate as a whole Body parts, there is an arc-shaped protrusion on the lower right side of the drainage line pressure plate; there are two sets of the same bolt connection components; the busbar fasteners include an integrally connected fastening main body, two positioning baffles and a transmission connecting plate ;The drive screw includes a base and a threaded drive column integrally connected; the guide sleeve is a hollow cylinder, and the inner wall of the guide sleeve is provided with internal threads; the wall of the guide sleeve is provided with two symmetrical pins penetrating left and right hole; the sliding sleeve is a hollow cylindrical sliding sleeve;
引流线压板通过螺栓连接组件与线夹主体螺栓连接;母线紧固件与驱动螺杆螺纹连接;滑套通过线夹主体的连接耳板的连接通孔上下向过盈配合固定安装在连接耳板上;导套的内壁与驱动螺杆的螺纹驱动柱的上端螺纹连接后再用轴销销接;导套的外壁与滑套的内壁可上下滑动地套接; The drain line pressure plate is bolted to the main body of the line clamp through the bolt connection assembly; the busbar fastener is threadedly connected to the drive screw; the sliding sleeve is fixedly installed on the connecting ear plate through the connection through hole of the connecting ear plate of the main body of the line clamp with an interference fit up and down ; The inner wall of the guide sleeve is threadedly connected with the upper end of the threaded driving column of the driving screw and then connected with a shaft pin; the outer wall of the guide sleeve and the inner wall of the sliding sleeve can be slidably socketed up and down;
上述的绝缘操作杆包括杆体、挡圈、绝缘套、加力手柄、连接套、套接销和插接轴头; The above-mentioned insulating operating rod includes a rod body, a retaining ring, an insulating sleeve, an afterburner handle, a connecting sleeve, a sleeve pin and a plug shaft head;
杆体为中空的长条状圆柱体件;挡圈为圆环体件;挡圈套接固定安装在杆体的下端外壁上;绝缘套为中空的圆柱体件;绝缘套套接在杆体的下部;加力手柄为细长圆形杆体件;加力手柄横向穿过杆体并固定在杆体上,且位于绝缘套的上端;连接套包括一体连接的下套体和上套体;连接套的下套体为中空的圆柱体,其内径与杆体的外径相适应;连接套的上套体为中空的圆柱体,其外径小于杆体的外径;连接套的上套体上对称设有作为安装连接孔的左右向的2个通孔;连接套由其下套体套接并固定在杆体的上端;套接销为圆杆状件;插接轴头为圆杆状件;插接轴头的下端设有左右向贯通的安装孔;插接轴头通过套接销固定安装在连接套的上套体上; The rod body is a hollow long cylinder; the retaining ring is a circular ring; the retaining ring is fixedly mounted on the outer wall of the lower end of the rod; the insulating sleeve is a hollow cylinder; the insulating sleeve is connected to the lower part of the rod; The handle is a slender round rod body; the reinforced handle crosses the rod body and is fixed on the rod body, and is located at the upper end of the insulating sleeve; the connecting sleeve includes a lower sleeve body and an upper sleeve body connected integrally; the lower sleeve body of the connecting sleeve is Hollow cylinder, its inner diameter is compatible with the outer diameter of the rod body; the upper sleeve of the connecting sleeve is a hollow cylinder, and its outer diameter is smaller than the outer diameter of the rod body; the upper sleeve of the connecting sleeve is symmetrically provided as a mounting connection hole Two through holes in the left and right directions; the connecting sleeve is socketed by its lower sleeve and fixed on the upper end of the rod body; the socket pin is a round rod-shaped piece; the plug-in shaft head is a round rod-shaped piece; the lower end of the plug-in shaft head There are mounting holes penetrating left and right; the plug-in shaft head is fixedly installed on the upper sleeve body of the connecting sleeve through the sleeve pin;
本发明的非承力接续线夹的带电安装施工方法包括以下步骤: The live installation construction method of the non-load-bearing connection clamp of the present invention comprises the following steps:
①作业前检查并确认待搭通线路无负荷及无相间短路和接地故障; ① Check and confirm that the line to be connected has no load and no phase-to-phase short circuit and ground fault before operation;
②地电位作业电工在电杆上对作业范围内存在因引流线摆动造成短路或接地隐患的设备由近到远逐步采取绝缘隔离措施; ②Electricians working on ground potential shall gradually take insulation and isolation measures from near to far for the equipment with potential short circuit or grounding hazard caused by the swing of the drain wire within the working range on the pole;
③安装中相引流线:地电位作业电工在电杆上将引流线装入非承力接续线夹的线夹主体的引流线安装部内;盖上引流线压板并通过螺栓连接组件紧固以夹紧引流线; ③Installing the middle-phase drain wire: the ground potential electrician installs the drain wire into the drain wire installation part of the clamp main body of the non-load-bearing continuous wire clamp; covers the drain wire pressure plate and fastens the clamp with the bolt connection assembly tight drain line;
④托举非承力接续线夹:地电位作业电工手握在绝缘操作杆的绝缘套上,将绝缘操作杆的套接销的两端套在驱动螺杆的基座上;将非承力接续线夹向上托送到架空配电线路的母线附近; ④Lifting the non-load-bearing splicing clamp: the ground potential electrician holds the insulating sleeve of the insulating operating rod, and puts the two ends of the socket pin of the insulating operating rod on the base of the driving screw; The clamp is lifted up to the vicinity of the busbar of the overhead distribution line;
⑤非承力接续线夹挂上配电线路母线:地电位作业电工通过绝缘操作杆托举非承力接续线夹至母线附近后,使非承力接续线夹的线夹主体向母线运动,使母线进入线夹主体的母线夹持部和母线紧固件的紧固主体部之间后,稍向下拉动绝缘操作杆,使母线与线夹主体的母线夹持部相接触; ⑤The non-load-bearing connecting line clamp is hung on the distribution line busbar: the ground potential electrician lifts the non-loading connecting line clamp to the vicinity of the busbar through the insulating operating rod, and then moves the main body of the non-loading connecting line clamp towards the busbar, After the busbar enters between the busbar clamping part of the main body of the clamp and the fastening main part of the busbar fastener, pull the insulating operating lever downward slightly to make the busbar contact the busbar clamping part of the main body of the clamp;
⑥非承力接续线夹与配电线路母线固定连接:旋转绝缘操作杆上的加力手柄,绝缘操作杆带动非承力接续线夹的驱动螺杆随动旋转,在驱动螺杆螺旋的反向驱动下,母线压板向上运动夹紧母线,使非承力接续线夹固定悬挂在配电线路的母线上; ⑥Fixed connection between the non-load-bearing extension clamp and the distribution line busbar: rotate the force handle on the insulating operating rod, and the insulating operating rod drives the driving screw of the non-load-bearing connecting wire clamp to rotate accordingly. Next, the busbar pressure plate moves upward to clamp the busbar, so that the non-load-bearing connection clamp is fixed and suspended on the busbar of the distribution line;
⑦重复步骤③至步骤⑥,安装其余两相的引流线; ⑦Repeat step ③ to step ⑥ to install the drainage lines of the remaining two phases;
⑧地电位作业电工由远及近逐步解除存在因引流线摆动造成短路或接地隐患的设备上的绝缘隔离措施; ⑧Electricians working on ground potential gradually remove the insulation and isolation measures on the equipment that has potential short circuit or grounding hazards caused by the swing of the drain line from far to near;
本发明的非承力接续线夹的带电拆卸施工方法,包括以下步骤: The live disassembly construction method of the non-load-bearing connection clamp of the present invention comprises the following steps:
①作业前检查并确认待拆开线路无负荷及无相间短路和接地故障; ① Check and confirm that the line to be disassembled has no load and no phase-to-phase short circuit and ground fault before operation;
②地电位作业电工在电杆上对作业范围内存在因引流线摆动造成短路或接地隐患的设备由近到远逐步采取绝缘隔离措施; ②Electricians working on ground potential shall gradually take insulation and isolation measures from near to far for the equipment with potential short circuit or grounding hazard caused by the swing of the drain wire within the working range on the pole;
③地电位作业电工使用绝缘装配杆将配电线路中的带电中相母线上的非承力接续线夹的母线紧固件旋松; ③Electricians working at ground potential use insulating assembly rods to unscrew the busbar fasteners of the non-load-bearing connection clamps on the live mid-phase busbar in the distribution line;
④托举非承力接续线夹,将非承力接续线夹移开配电线路带电母线; ④ Lift the non-load-bearing connection clamp, and move the non-load-bearing connection clamp away from the live busbar of the distribution line;
⑤重复步骤③和步骤④,将其余两相上的非承力接续线夹分别移开配电线路的带电母线; ⑤Repeat steps ③ and ④, and remove the non-load-bearing connection clamps on the remaining two phases from the live busbar of the distribution line;
⑥地电位作业电工将非承力接续线夹上的引流线拆开; ⑥ The electrician working at the ground potential disassembles the drainage wire on the non-load-bearing connection clamp;
⑦由远及近逐步解除存在因引流线摆动造成短路或接地隐患的设备上的绝缘隔离措施。 ⑦ Gradually remove the insulation and isolation measures on the equipment that has potential short circuit or grounding hazards caused by the swing of the drain wire from far to near.
本发明具有积极的效果:(1)本发明的非承力接续线夹的带电安装与拆卸施工方法,安装与拆卸方便快捷、省时省力,大幅提高工作效率。(2)本发明的非承力接续线夹的带电安装与拆卸施工方法,可在不停电的情况下直接施工,有效避免因停电施工带来的经济和社会不必要的损失;(3)本发明的非承力接续线夹的带电安装与拆卸施工方法,拓展了配网带电作业的作业项目及作业范围。 The present invention has positive effects: (1) The live installation and disassembly construction method of the non-load-bearing splicing clamp of the present invention is convenient and quick to install and disassemble, saves time and effort, and greatly improves work efficiency. (2) The live installation and disassembly construction method of the non-load-bearing splicing clamp of the present invention can be directly constructed without power failure, effectively avoiding unnecessary economic and social losses caused by power failure construction; (3) This The live installation and disassembly construction method of the non-load-bearing splicing clamp invented expands the operation items and operation scope of the distribution network live operation.
附图说明 Description of drawings
图1为本发明所应用的非承力接续线夹的立体结构示意图; Fig. 1 is the schematic diagram of the three-dimensional structure of the non-load-bearing splicing clamp applied in the present invention;
图2为图1中的线夹主体的立体结构示意图; Fig. 2 is a schematic diagram of the three-dimensional structure of the main body of the wire clip in Fig. 1;
图3为图1中的母线压板的立体结构示意图; Fig. 3 is a schematic diagram of the three-dimensional structure of the bus bar pressing plate in Fig. 1;
图4为本发明所应用的与非承力接续线夹配套使用的绝缘操作杆的结构示意图; Fig. 4 is a schematic structural view of the insulating operating rod used in conjunction with the non-load-bearing splicing clamp used in the present invention;
图5为本发明的安装施工方法的流程图; Fig. 5 is the flowchart of installation construction method of the present invention;
图6为本发明的拆卸施工方法的流程图。 Fig. 6 is a flow chart of the demolition and construction method of the present invention.
上述附图中的附图标记如下: The reference signs in the above-mentioned accompanying drawings are as follows:
线夹主体1,引流线安装部11,引流线压板连接部12,螺栓孔12-1,中间连接部13,方形缺口13-1,母线夹持部14,主体弧形部14-1,外展弧形部14-2,连接耳板15,连接通孔15-1, Clamp main body 1, drainage wire installation part 11, drainage wire pressure plate connection part 12, bolt hole 12-1, middle connection part 13, square notch 13-1, bus bar clamping part 14, main body arc part 14-1, outer The arc-shaped part 14-2 is connected to the lug plate 15, connected to the through hole 15-1,
引流线压板2,弧形突出部21, Drain line pressure plate 2, arc-shaped protrusion 21,
螺栓连接组件3,螺栓31,弹簧垫圈32,螺母33, Bolt connection assembly 3, bolt 31, spring washer 32, nut 33,
母线紧固件4,紧固主体部41,定位档板42,传动连接板43,螺栓孔43-1, Busbar fastener 4, fastening body part 41, positioning baffle plate 42, transmission connecting plate 43, bolt hole 43-1,
驱动螺杆5,基座51,安装套接孔51-1,通过槽51-2,螺纹驱动柱52, Drive screw 5, base 51, mounting sleeve hole 51-1, through groove 51-2, threaded drive column 52,
导套6, guide bush 6,
滑套7, slip sleeve 7,
轴销8, Shaft pin 8,
绝缘操作杆9,杆体91,挡圈92,绝缘套93,加力手柄94,连接套95,套接销96,插接轴97。 Insulated operating rod 9, rod body 91, back-up ring 92, insulating sleeve 93, afterburner handle 94, connecting sleeve 95, sleeve pin 96, plug-in shaft 97.
具体实施方式 Detailed ways
下面结合附图和具体实施方式对本发明作进一步详细的说明。 The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
(实施例1) (Example 1)
本实施例的非承力接续线夹的带电安装与拆卸施工方法,采用地电位作业法,利用专门设计的绝缘操作杆带电对专门设计的非承力接续线夹实施安装和拆卸。所谓地电位作业法,是指施工人员的人体处于地(零)电位状态下,使用绝缘工具间接接触带电设备,来达到施工或检修目的的方法。 The live installation and disassembly construction method of the non-load-bearing connection clip of this embodiment adopts the ground potential operation method, and uses a specially designed insulating operating rod to install and disassemble the specially designed non-load-bearing connection clip when it is live. The so-called ground potential operation method refers to the method in which the construction personnel's human body is in the ground (zero) potential state, and the insulated tools are used to indirectly contact the live equipment to achieve the purpose of construction or maintenance.
见图1至图3,本实施例所应用的非承力接续线夹,主要由线夹主体1、引流线压板2、螺栓连接组件3、母线紧固件4、驱动螺杆5、导套6、滑套7和轴销8组成。 See Figures 1 to 3, the non-load-bearing connection clamp used in this embodiment is mainly composed of a clamp main body 1, a drain line pressure plate 2, a bolt connection assembly 3, a busbar fastener 4, a driving screw 5, and a guide sleeve 6 , Sliding sleeve 7 and axle pin 8 are formed.
见图2,线夹主体1为铝合金制一体件。线夹主体1由引流线安装部11、引流线压板连接部12、中间连接部13、母线夹持部14和连接耳板15一体组成。 As shown in Fig. 2, the clamp main body 1 is an integral part made of aluminum alloy. The clamp main body 1 is integrally composed of a drain wire mounting part 11 , a drain wire pressing plate connecting part 12 , an intermediate connecting part 13 , a bus bar clamping part 14 and a connecting ear plate 15 .
引流线安装部11为向下方突出的呈弧形的板体件。引流线压板连接部12为水平设置的长方形板体件,引流线压板连接部12分前后设置有2个上下向贯通的圆形通孔,作为安装用的螺栓孔12-1。中间连接部13为铅垂向设置的长方形的板体件,且中间连接部13的中间位置设有镂空的方形缺口13-1。母线夹持部14由一体连接的主体弧形部14-1和外展弧形部14-2组成。母线夹持部14的主体弧形部14-1为向上方突出的呈弧形的板体件;外展弧形部14-2为向右下方突出的弧形板体件;主体弧形部14-1由其左下端与外展弧形部14-2的右上端呈流线形一体连接。连接耳板15为方形板体件,连接耳板15的中间位置设有1个上下向贯通的圆形通过,作为连接通孔15-1。 The drain wire installation part 11 is an arc-shaped plate body protruding downward. The drain line clamping plate connecting portion 12 is a rectangular plate body part arranged horizontally, and the draining wire clamping plate connecting portion 12 is provided with 2 circular through-holes penetrating up and down, as bolt holes 12-1 for installation. The middle connecting portion 13 is a vertically arranged rectangular board member, and a hollow square notch 13 - 1 is provided in the middle of the middle connecting portion 13 . The bus bar clamping portion 14 is composed of a main body arc portion 14-1 and an outward arc portion 14-2 integrally connected. The main body arc part 14-1 of the busbar clamping part 14 is an arc-shaped plate body protruding upward; 14-1 is integrally connected in streamline form by its left lower end and the right upper end of the outstretched arc portion 14-2. The connecting ear plate 15 is a square plate body part, and a circular through hole 15-1 is provided in the middle of the connecting ear plate 15 to pass through from top to bottom.
线夹主体1的引流线安装部11由其左上端与引流线压板连接部12的右下端一体连接;引流线安装部11的右上端与中间连接部13的下端一体连接;中间连接部13的上端与母线夹持部14的右下端以及连接耳板15的左端一体连接。从而构成一体的线夹主体1。 The drain wire mounting part 11 of the wire clip main body 1 is integrally connected with the lower right end of the drain wire pressing plate connecting part 12 by its upper left end; the upper right end of the drain wire mounting part 11 is integrally connected with the lower end of the middle connecting part 13; The upper end is integrally connected with the lower right end of the bus bar clamping portion 14 and the left end of the connecting ear plate 15 . In this way, an integrated cable clip main body 1 is formed.
仍见图1,引流线压板2为铝合金制的整体呈方形的板体件;引流线压板2的右侧下方设有一个弧形突出部21,且该弧形突出部21的半径与线夹主体1的引流线安装部11的弧形的半径相适应。引流线压板2上设有2个安装螺栓孔,该2个安装螺栓孔与线夹主体1的引流线压板连接部12上的2个螺栓孔12-1相对应,用于安装配合。 Still see Fig. 1, the drainage wire pressing plate 2 is a square plate body part made of aluminum alloy as a whole; an arc-shaped protrusion 21 is arranged on the right side of the drainage line pressing plate 2, and the radius of the arc-shaped protrusion 21 is the same as that of the line. The radius of the arc of the drain wire installation portion 11 of the clip body 1 is adapted. There are two mounting bolt holes on the drain wire pressing plate 2, which correspond to the two bolt holes 12-1 on the drain wire pressing plate connecting portion 12 of the clamp main body 1, and are used for installation and cooperation.
螺栓连接组件3由螺栓31、弹簧垫圈32和螺母33组成。螺栓31、弹簧垫圈32和螺母33分别各设有2套。 The bolt connection assembly 3 consists of bolts 31 , spring washers 32 and nuts 33 . Two sets of bolts 31 , spring washers 32 and nuts 33 are respectively provided.
见图3,母线紧固件4为铝合金制一体件。母线紧固件4由紧固主体部41、定位档板42和传动连接板43一体组成。紧固主体部41整体形状为前后向的长方体,其上端设有向下凹进的弧形缺口。定位档板42整体形状为左右向的长方形板体件;定位档板42左右向的长度大于紧固主体部41的左右向的宽度;定位档板42上下向的高度大于紧固主体部41的上下向的高度;定位档板42的上端设有向下凹进的弧形缺口,该弧形缺口与紧固主体部41的弧形缺口的下端位于同一水平面上。定位档板42设有结构相同的2块,该2块定位档板42分别设于紧固主体部41的前后两端,且与紧固主体部41一体连接。传动连接板43为方形板体件;传动连接板43的前后向的长度小于紧固主体部41的前后向的长度。传动连接板43以其左端面与紧固主体部41的右端面中部一体连接。传动连接板43的中间设有上下向贯通的螺栓孔43-1。 As shown in Fig. 3, the bus bar fastener 4 is an integral part made of aluminum alloy. The bus bar fastener 4 is integrally composed of a fastening body part 41 , a positioning baffle plate 42 and a transmission connecting plate 43 . The overall shape of the fastening main body 41 is a rectangular parallelepiped facing forward and backward, and a downwardly recessed arc-shaped notch is provided at its upper end. The overall shape of the positioning baffle plate 42 is a left-right rectangular plate body; the left-right length of the positioning baffle plate 42 is greater than the left-right width of the fastening main body portion 41; Up and down height; the upper end of the positioning baffle 42 is provided with a downwardly recessed arc-shaped notch, which is located on the same level as the lower end of the arc-shaped notch fastening the main body 41 . Two positioning baffles 42 are provided with the same structure, and the two positioning baffles 42 are respectively arranged at the front and rear ends of the fastening main body 41 and integrally connected with the fastening main body 41 . The transmission connecting plate 43 is a square plate body; the front and rear length of the transmission connecting plate 43 is smaller than the front and rear length of the fastening main body 41 . The transmission connecting plate 43 is integrally connected with the middle part of the right end surface of the fastening main body part 41 by its left end surface. In the middle of the transmission connecting plate 43 is provided a bolt hole 43 - 1 penetrating from top to bottom.
仍见图1,驱动螺杆5为钢制一体件。驱动螺杆5由基座51和螺纹驱动柱52一体组成。基座51设于驱动螺杆5的下方。基座51整体为中空的圆柱体,基座51的壁体的中下部设有左右对称的镂空的安装套接孔51-1;基座51的下端设有与安装套接孔51-1相通的通过槽51-2。螺纹驱动柱52设置在基座51的上方,与基座51一体连接,螺柱驱动柱52上设有左旋螺纹。螺纹驱动柱52的中轴线上设有圆柱形的通孔;螺纹驱动柱52的上部设有左右向贯通的销孔。 Still referring to Fig. 1, the driving screw rod 5 is an integral piece made of steel. The driving screw 5 is integrally composed of a base 51 and a threaded driving column 52 . The base 51 is disposed below the driving screw 5 . The base 51 is a hollow cylinder as a whole, and the middle and lower part of the wall of the base 51 is provided with a left-right symmetrical hollow mounting socket hole 51-1; the lower end of the base 51 is provided with a socket connecting hole 51-1 through slot 51-2. The threaded driving column 52 is arranged above the base 51 and integrally connected with the base 51 , and the screw driving column 52 is provided with a left-hand thread. The central axis of the threaded driving post 52 is provided with a cylindrical through hole; the upper part of the threaded driving post 52 is provided with pin holes penetrating left and right.
导套6为中空的圆柱体件,导套6的内壁上设有内螺纹。导套6的壁体上设有左右向贯通的对称的2个销孔。 The guide sleeve 6 is a hollow cylinder, and the inner wall of the guide sleeve 6 is provided with internal threads. The wall body of the guide sleeve 6 is provided with two symmetrical pin holes penetrating left and right.
滑套7为中空的圆柱体滑套。 The sliding sleeve 7 is a hollow cylinder sliding sleeve.
前述的非承力接续线夹的各部件的安装连接配合关系如下述: The installation, connection and coordination relationship of the various parts of the aforementioned non-load-bearing splicing clamps are as follows:
引流线压板2以其弧形突出部21向下与线夹主体1的引流线安装部11相对的方式通过螺栓连接组件3与线夹主体1的引流线压板连接部12螺栓连接;母线紧固件4的传动连接板43向右穿过线夹主体1的中间连接部13的方形缺口13-1后通过其螺栓孔43-1与驱动螺杆5的螺纹驱动柱52螺纹连接。滑套7通过线夹主体1的连接耳板15的连接通孔15-1上下向地过盈配合固定安装在连接耳板15上;导套6的内壁与驱动螺杆5的螺纹驱动柱52的上端螺纹连接后再用轴销8销接;导套6的外壁与滑套7的内壁可上下滑动地套接。 The drain wire pressing plate 2 is bolted to the drain wire pressing plate connecting portion 12 of the wire clamp main body 1 through the bolt connection assembly 3 in such a way that its arc-shaped protruding portion 21 is facing downward to the drain wire mounting portion 11 of the wire clamp main body 1; the busbar is fastened The transmission connecting plate 43 of the piece 4 passes through the square gap 13-1 of the middle connecting portion 13 of the clamp main body 1 to the right and is threadedly connected with the threaded driving column 52 of the driving screw 5 through its bolt hole 43-1. The sliding sleeve 7 is fixedly installed on the connecting ear plate 15 through the connecting through hole 15-1 of the connecting ear plate 15 of the clamp main body 1, and is fixedly installed on the connecting ear plate 15; After the upper end is threaded, it is pin-connected with the shaft pin 8; the outer wall of the guide sleeve 6 and the inner wall of the sliding sleeve 7 can slide up and down.
本实施例的非承力接续线夹的带电安装施工方法,采用与前述的非承力接续线夹配套的绝缘操作杆9进行安装施工。 The live installation and construction method of the non-load-bearing connection clamp of this embodiment adopts the insulating operating rod 9 matched with the aforementioned non-load-bearing connection clamp for installation and construction.
见图4,绝缘操作杆9主要由杆体91、挡圈92、绝缘套93、加力手柄94、连接套95、套接销96和插接轴头97组成。 As shown in FIG. 4 , the insulating operating rod 9 is mainly composed of a rod body 91 , a retaining ring 92 , an insulating sleeve 93 , an afterburner handle 94 , a connecting sleeve 95 , a sleeve pin 96 and a plug shaft head 97 .
杆体91的材质为绝缘玻璃钢。杆体91为中空的长条状圆柱体件。 The rod body 91 is made of insulating glass fiber reinforced plastic. The rod body 91 is a hollow elongated cylinder.
挡圈92为绝缘玻璃钢材质的圆环体件;挡圈92套接固定安装在杆体91的下端外壁上。挡圈92方便绝缘操作杆9在使用过程中抓握时防止杆体脱手。 The retaining ring 92 is an annular member made of insulating glass fiber reinforced plastic; the retaining ring 92 is sleeved and fixedly installed on the lower outer wall of the rod body 91 . The retaining ring 92 is convenient for the insulating operation rod 9 to prevent the rod body from falling out of the hand when grasping during use.
绝缘套93的材质为橡胶。绝缘套93为中空的圆柱体件;绝缘套93套接在杆体91的下部。 The insulating sleeve 93 is made of rubber. The insulating sleeve 93 is a hollow cylinder; the insulating sleeve 93 is sleeved on the lower part of the rod body 91 .
加力手柄94的材质为碳结钢。加力手柄94为细长圆形杆体件。加力手柄94横向穿过杆体91并固定在杆体91上,且位于绝缘套93的上端。 The material of afterburner handle 94 is carbon steel. The afterburner handle 94 is an elongated circular rod body. The force handle 94 passes through the rod body 91 transversely and is fixed on the rod body 91 , and is located at the upper end of the insulating sleeve 93 .
连接套95的材质为碳结钢。连接套95由下套体和上套体一体组成。连接套95的下套体为中空的圆柱体,其内径与杆体91的外径相适应。连接套95的上套体为中空的圆柱体,其外径小于杆体91的外径,连接套95的上套体上对称设有左右向的2个通孔,作为安装连接孔。连接套95由其下套体套接并固定在杆体91的上端。 The connecting sleeve 95 is made of carbon steel. Connecting sleeve 95 is integrally made up of lower sleeve body and upper sleeve body. The lower sleeve body of the connecting sleeve 95 is a hollow cylinder, and its inner diameter is compatible with the outer diameter of the rod body 91 . The upper sleeve body of the connecting sleeve 95 is a hollow cylinder, and its outer diameter is smaller than the outer diameter of the rod body 91. The upper sleeve body of the connecting sleeve 95 is symmetrically provided with 2 through holes to the left and right as the installation connecting holes. The connecting sleeve 95 is sleeved by its lower sleeve and fixed on the upper end of the rod body 91 .
套接销96的材质为碳结钢。套接销96为圆杆状件。 The material of socket pin 96 is carbon steel. The socket pin 96 is a round bar-shaped part.
插接轴头97的材质为碳结钢。插接轴头97为圆杆状件;插接轴头97的下端设有左右向贯通的安装孔。插接轴头97通过套接销96固定安装在连接套95的上套体上。 The material of the plug-in shaft head 97 is carbon steel. The plug-in shaft head 97 is a round bar-shaped piece; the lower end of the plug-in shaft head 97 is provided with a mounting hole extending left and right. The plug shaft head 97 is fixedly installed on the upper body of the connecting sleeve 95 through the socket pin 96 .
见图5,本实施例的非承力接续线夹的带电安装施工方法,主要包括以下步骤: As shown in Figure 5, the live installation construction method of the non-load-bearing splicing clamp of this embodiment mainly includes the following steps:
①作业前检查并确认待搭通线路无负荷及无相间短路和接地故障; ① Check and confirm that the line to be connected has no load and no phase-to-phase short circuit and ground fault before operation;
②地电位作业电工在电杆上对作业范围内存在因引流线摆动造成短路或接地隐患的设备由近到远逐步采取绝缘隔离措施; ②Electricians working on ground potential shall gradually take insulation and isolation measures from near to far for the equipment with potential short circuit or grounding hazard caused by the swing of the drain wire within the working range on the pole;
③安装中相引流线:地电位作业电工在电杆上将引流线装入非承力接续线夹的线夹主体1的引流线安装部11内;盖上引流线压板2并通过螺栓连接组件3紧固以夹紧引流线; ③Installing the middle-phase drain line: the ground potential electrician installs the drain line into the drain line installation part 11 of the clamp main body 1 of the non-load-bearing connection clamp; covers the drain line pressure plate 2 and connects the components through bolts 3 Fasten to clamp the drain wire;
④托举非承力接续线夹:地电位作业电工手握在绝缘操作杆的绝缘套93上,将绝缘操作杆的套接销96的两端套在驱动螺杆5的基座51上;将非承力接续线夹向上托送到架空配电线路的母线附近; ④Lifting the non-load-bearing splicing clamp: the ground potential electrician holds the insulating cover 93 of the insulating operating rod, and sets the two ends of the socket pin 96 of the insulating operating rod on the base 51 of the driving screw 5; The non-load-bearing splicing clamp is lifted upwards to the vicinity of the bus bar of the overhead distribution line;
⑤非承力接续线夹挂上配电线路母线:地电位作业电工通过绝缘操作杆托举非承力接续线夹至母线附近后,使非承力接续线夹的线夹主体1向母线运动,使母线进入线夹主体1的母线夹持部14和母线紧固件4的紧固主体部41之间后,稍向下拉动绝缘操作杆,使母线与线夹主体1的母线夹持部14相接触; ⑤The non-load-bearing extension clamp is hung on the distribution line busbar: after the ground potential electrician lifts the non-load-bearing extension clip to the vicinity of the busbar through the insulating operating rod, the clamp main body 1 of the non-load-bearing extension clip moves toward the busbar After the busbar enters between the busbar clamping part 14 of the clamp main body 1 and the fastening main part 41 of the busbar fastener 4, pull the insulating operating lever downward slightly to make the busbar and the busbar clamping part of the clamp main body 1 14 contact;
⑥非承力接续线夹与配电线路母线固定连接:旋转绝缘操作杆上的加力手柄94,绝缘操作杆带动非承力接续线夹的驱动螺杆5随动旋转,在驱动螺杆5螺旋的反向驱动下,母线压板4向上运动夹紧母线,使非承力接续线夹固定悬挂在配电线路的母线上; ⑥The non-load-bearing extension clamp is fixedly connected with the distribution line busbar: rotate the force handle 94 on the insulating operating lever, and the insulating operating lever drives the driving screw 5 of the non-bearing extending clamp to rotate accordingly. Under reverse driving, the bus bar pressing plate 4 moves upwards to clamp the bus bar, so that the non-load-bearing connection clamp is fixed and suspended on the bus bar of the power distribution line;
⑦重复步骤③至步骤⑥,安装其余两相的引流线; ⑦Repeat step ③ to step ⑥ to install the drainage lines of the remaining two phases;
⑧地电位作业电工由远及近逐步解除存在因引流线摆动造成短路或接地隐患的设备上的绝缘隔离措施; ⑧Electricians working on ground potential gradually remove the insulation and isolation measures on the equipment that has potential short circuit or grounding hazards caused by the swing of the drain line from far to near;
见图6,本实施例的非承力接续线夹的带电拆卸施工方法,主要包括以下步骤: As shown in Figure 6, the construction method of live disassembly of the non-load-bearing splicing clamp of this embodiment mainly includes the following steps:
①作业前检查并确认待拆开线路无负荷及无相间短路和接地故障; ① Check and confirm that the line to be disassembled has no load and no phase-to-phase short circuit and ground fault before operation;
②地电位作业电工在电杆上对作业范围内存在因引流线摆动造成短路或接地隐患的设备由近到远逐步采取绝缘隔离措施; ②Electricians working on ground potential shall gradually take insulation and isolation measures from near to far for the equipment with potential short circuit or grounding hazard caused by the swing of the drain wire within the working range on the pole;
③地电位作业电工使用绝缘装配杆将配电线路中的带电中相母线上的非承力接续线夹的母线紧固件4旋松; ③ The ground potential electrician uses an insulating assembly rod to unscrew the busbar fastener 4 of the non-load-bearing connection clamp on the live mid-phase busbar in the distribution line;
④托举非承力接续线夹,将非承力接续线夹移开配电线路带电母线; ④ Lift the non-load-bearing connection clamp, and move the non-load-bearing connection clamp away from the live busbar of the distribution line;
⑤重复步骤③和步骤④,将其余两相上的非承力接续线夹分别移开配电线路的带电母线; ⑤Repeat steps ③ and ④, and remove the non-load-bearing connection clamps on the remaining two phases from the live busbar of the distribution line;
⑥地电位作业电工将非承力接续线夹上的引流线拆开; ⑥ The electrician working at the ground potential disassembles the drainage wire on the non-load-bearing connection clamp;
⑦由远及近逐步解除存在因引流线摆动造成短路或接地隐患的设备上的绝缘 ⑦ From far to near, gradually remove the insulation on the equipment that has a short circuit or grounding hazard caused by the swing of the drain wire
隔离措施。 Quarantine measures.
综上,本实施例的非承力接续线夹的带电安装与拆卸施工方法,安装与拆卸方便快捷、省时省力,大幅提高工作效率;可在不停电的情况下直接施工,有效避免因停电施工带来的经济和社会不必要的损失;拓展了配网带电作业的作业项目及作业范围。 To sum up, the live installation and disassembly construction method of the non-load-bearing splicing clamp of this embodiment is convenient and quick to install and disassemble, saves time and effort, and greatly improves work efficiency; it can be directly constructed without power failure, effectively avoiding power failure due to power failure. Unnecessary economic and social losses brought about by construction; expanding the operation items and scope of live work in distribution network.
以上实施例是对本发明的具体实施方式的说明,而非对本发明的限制,有关技术领域的技术人员在不脱离本发明的精神和范围的情况下,还可以做出各种变换和变化而得到相对应的等同的技术方案,因此所有等同的技术方案均应该归入本发明的专利保护范围。 The above embodiments are descriptions of specific implementations of the present invention, rather than limitations of the present invention. Those skilled in the relevant technical fields can also make various transformations and changes without departing from the spirit and scope of the present invention. Corresponding equivalent technical solutions, therefore all equivalent technical solutions should fall into the patent protection scope of the present invention.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310322265.9A CN103368110B (en) | 2013-07-26 | 2013-07-26 | The charged installation and removal construction method of non-bearing connecting clip |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310322265.9A CN103368110B (en) | 2013-07-26 | 2013-07-26 | The charged installation and removal construction method of non-bearing connecting clip |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103368110A CN103368110A (en) | 2013-10-23 |
| CN103368110B true CN103368110B (en) | 2015-11-18 |
Family
ID=49368906
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310322265.9A Active CN103368110B (en) | 2013-07-26 | 2013-07-26 | The charged installation and removal construction method of non-bearing connecting clip |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103368110B (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103746315A (en) * | 2013-12-30 | 2014-04-23 | 江苏省电力公司常州供电公司 | Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line |
| CN108808279B (en) * | 2018-07-10 | 2024-02-06 | 国家电网公司 | F-shaped mounting wire clamp for high-voltage electrified T-junction circuit |
| CN108808558B (en) * | 2018-07-26 | 2025-02-25 | 国网青海省电力公司海东供电公司 | Lead fixing and temporary suspension device for non-stop power supply operation of distribution network |
| CN111567513A (en) * | 2020-04-24 | 2020-08-25 | 申思博 | Bird repelling spacer, insulating operating rod and mounting method of insulating operating rod |
| CN111653981B (en) * | 2020-06-15 | 2021-09-24 | 刘欢 | Power grid wire clamp hot-line operation installation equipment and operation method thereof |
| CN115296200B (en) * | 2022-07-11 | 2024-08-13 | 浙江大有实业有限公司带电作业分公司 | Non-bearing line clamp overhauling method for checking operation correctness by using bypass system |
| CN118281753A (en) * | 2024-03-29 | 2024-07-02 | 云南海力特电气自动化有限公司 | Wire clamp device for non-stop construction of power distribution engineering and application method thereof |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2706931Y (en) * | 2004-03-31 | 2005-06-29 | 罗若晖 | Movable wire clamp for high voltage operating |
| CN102361299A (en) * | 2011-06-30 | 2012-02-22 | 永固集团股份有限公司 | J-shaped parallel groove clamp |
| CN103066530A (en) * | 2012-12-22 | 2013-04-24 | 西安供电局 | Insulative line clamp installing device |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000333331A (en) * | 1999-05-24 | 2000-11-30 | Burest Kogyo Kenkyusho Co Ltd | Cable lead support |
-
2013
- 2013-07-26 CN CN201310322265.9A patent/CN103368110B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2706931Y (en) * | 2004-03-31 | 2005-06-29 | 罗若晖 | Movable wire clamp for high voltage operating |
| CN102361299A (en) * | 2011-06-30 | 2012-02-22 | 永固集团股份有限公司 | J-shaped parallel groove clamp |
| CN103066530A (en) * | 2012-12-22 | 2013-04-24 | 西安供电局 | Insulative line clamp installing device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103368110A (en) | 2013-10-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105140864B (en) | The earth potential working non-bearing connecting clip of low cost | |
| CN103368110A (en) | Electric mounting and dismounting construction method for non-bearing-force connection wire clamp | |
| CN105914646B (en) | Working method for replacing 35kV tension insulator strings with power on | |
| CN103368104B (en) | The insulating bar of earth potential working non-bearing connecting clip | |
| CN204103316U (en) | For the charged insulation eagle's beak pliers action bars disconnected of isolated circuit breaker | |
| CN103840393B (en) | A kind of portable bird-scaring unit erector | |
| CN102185267B (en) | 66KV ground potential hot-line make-and-break bypassing method | |
| CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
| CN203277304U (en) | Built-in high-voltage fuse sleeve installation apparatus | |
| CN103457213B (en) | The wire clip body of earth potential working non-bearing connecting clip | |
| CN203367919U (en) | Wire clamp body of ground-potential-working non-bearing connecting wire clamp | |
| CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
| CN203367879U (en) | Insulating operating rod of earth potential working non-bearing-force connection wire clamp | |
| CN204741228U (en) | Insulating couple of three -phase short circuit grounding | |
| CN203367920U (en) | Earth potential working non-bearing-force connection wire clamp | |
| CN204414015U (en) | A kind of bolt disassembly device | |
| CN102691436A (en) | T joint device for connecting upper T-shaped cross arm of live-wire work line | |
| CN203895633U (en) | Short circuit grounding wire suitable for box transformer substation and electricity distribution room | |
| CN211480468U (en) | A universal grounding lever | |
| CN105790158B (en) | Special tools for live replacement of 35kV tension insulator strings | |
| CN205646197U (en) | Novel high pressure bonding device | |
| CN204696553U (en) | A kind of automobile-used insulator crossarm | |
| CN210957558U (en) | Lifting assistor tool for insulated operating rod | |
| CN210704540U (en) | A tool for high-altitude live remote control electric tightening of wire clamp bolts for transmission lines | |
| CN204088982U (en) | A kind of ground protection pincers |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |