CN203233103U - Installation tool for electrical inspection grounding ring - Google Patents

Installation tool for electrical inspection grounding ring Download PDF

Info

Publication number
CN203233103U
CN203233103U CN 201320254755 CN201320254755U CN203233103U CN 203233103 U CN203233103 U CN 203233103U CN 201320254755 CN201320254755 CN 201320254755 CN 201320254755 U CN201320254755 U CN 201320254755U CN 203233103 U CN203233103 U CN 203233103U
Authority
CN
China
Prior art keywords
grounding ring
insulating rod
fastening
lifting
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320254755
Other languages
Chinese (zh)
Inventor
李广军
马连君
张国海
李勇
武建国
徐永孝
杜英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Beijing Electric Power Corp
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Electric Power Corp, State Grid Corp of China SGCC filed Critical Beijing Electric Power Corp
Priority to CN 201320254755 priority Critical patent/CN203233103U/en
Application granted granted Critical
Publication of CN203233103U publication Critical patent/CN203233103U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model provides an installation tool for an electricity testing grounding ring. The installation tool comprises a lifting component, wherein the support component comprises a first insulating rod and a lifting frame, and the lifting frame is arranged on the first end of the first insulating rod; and a fastening component, wherein the fastening component comprises a second insulating rod and a fastening part, and the fastening part is arranged on the first end of the second insulating rod. When the installation tool is used, firstly the electricity testing grounding ring is lifted close to a wire through the lifting component, and then the electricity testing grounding ring is firmly connected with the wire through the fastening component. According to the utility model, overmuch auxiliary electricity tools such as a plurality of emergency repair vehicles are no longer in need, and operation can be completed by at most only two workers working cooperatively, thereby reducing resource waste and maintenance cost. Workers no longer need to wait for a live-working class to install the electricity testing grounding ring, thereby shortening waiting time of emergency repair and improving reliability of power supply.

Description

验电接地环的安装工具Installation tool for electrical inspection grounding ring

技术领域technical field

本实用新型涉及电力施工领域,更具体地,涉及一种验电接地环的安装工具。The utility model relates to the field of electric power construction, in particular to an installation tool for an electric test grounding ring.

背景技术Background technique

目前,架空导线绝缘化的现象较为普遍,工作人员安装验电接地环(例如:穿刺型验电接地环,穿刺型验电接地环可在不剥除导线的绝缘层的情况下安装在导线上,同时不伤及导线并能够达到所需的短路电流)的方法不能满足事故抢修和日常运行维护工作的需要。At present, the phenomenon of insulation of overhead wires is relatively common. The staff install the grounding ring for electrical inspection (for example: puncture-type electrical inspection grounding ring, the puncture-type electrical inspection grounding ring can be installed on the wire without stripping the insulation layer of the wire. , and at the same time do not damage the conductor and can reach the required short-circuit current) method cannot meet the needs of accident repair and daily operation and maintenance work.

普通工作人员对线路进行维修时需要停电作业,然后通过攀爬电杆或站立在升降台车上对停电线路进行安装验电接地环的工作。但这种安装验电接地环的方法存在以下问题:Ordinary workers need to do power outage work when maintaining the line, and then install the grounding ring for the power outage line by climbing the pole or standing on the lifting trolley. However, there are the following problems in this method of installing the grounding ring for electrical testing:

1.存在安全隐患。即使停电安装验电接地环,在线路没有接地时,有时也会返送电及感应电,从而造成工作人员触电。1. There are potential safety hazards. Even if the grounding ring is installed for power failure, when the line is not grounded, sometimes the power will be returned and induced, which will cause the staff to get an electric shock.

2.增加了停电等待时间,给人们的生产、生活带来不便。由于需要先将线路进行停电操作,再进行安装验电接地环的工作,从而影响居民和企业的正常用电。2. The waiting time for power outage is increased, which brings inconvenience to people's production and life. Since it is necessary to perform power outage operation on the line first, and then install the grounding ring for electrical inspection, it will affect the normal electricity consumption of residents and enterprises.

3.不能根据需要随时补加验电接地环,延误抢修时间。根据电力施工要求,在线路上补加验电接地环需要申请计划停电,或者在综合检修时进行补加验电接地环,或者申请带电班安装验电接地环。但是申请停电安装验电接地环的周期过长,工作人员不能及时对需要检修的线路进行处理,延误了抢修时间、造成安全隐患。在综合检修时才补加验电接地环,导致线路运行存在安全隐患。3. It is not possible to add grounding rings for electrical testing at any time as needed, which will delay the repair time. According to the requirements of electric power construction, it is necessary to apply for a planned power outage to add a grounding ring for electrical inspection on the line, or to add an electrical inspection grounding ring during comprehensive maintenance, or to apply for the installation of an electrical inspection grounding ring for live shifts. However, the period for applying for a power outage to install a power inspection grounding ring is too long, and the staff cannot deal with the lines that need to be repaired in time, which delays the repair time and causes safety hazards. The electrical inspection grounding ring is only added during comprehensive maintenance, which leads to potential safety hazards in line operation.

为保证工作人员的人身安全,对带电线路进行事故抢修时需要带电班进行安装验电接地环的工作。但是采用带电班安装验电接地环的方法存在以下问题:In order to ensure the personal safety of the staff, the live shift needs to install the grounding ring for electrical testing when emergency repairs are carried out on live lines. However, there are the following problems in the method of installing the grounding ring for electrical testing in live shifts:

A.延误抢修时间,带电班安装验电接地环受施工场地周围环境的限制,有时带电车不能进入施工现场,从而无法及时安装验电接地环。A. Delaying the repair time, the installation of the electric inspection grounding ring by the electrified shift is limited by the surrounding environment of the construction site, and sometimes the electrified vehicle cannot enter the construction site, so that the electric inspection grounding ring cannot be installed in time.

B.需要多名工作人员协作、需要辅助电力工具多,造成资源浪费。事故抢修过程中,为在原有验电接地环上装设接地线或安装验电接地环时,需要同时使用多台抢修车辆,多名工作人员协同合作完成抢修工作,从而造成资源浪费、增加了抢修时间、扩大了抢修范围、降低了供电的可靠性。B. It requires the cooperation of multiple staff members and many auxiliary power tools, resulting in a waste of resources. In the process of accident repair, in order to install the grounding wire on the original electric test ground ring or install the electric test ground ring, it is necessary to use multiple repair vehicles at the same time, and several staff members cooperate to complete the repair work, resulting in waste of resources and increased repair work. time, expanding the scope of emergency repairs, and reducing the reliability of power supply.

实用新型内容Utility model content

本实用新型旨在提供一种验电接地环的安装工具,以解决现有技术中带电安装验电接地环时存在需要多名工作人员协作、需要辅助电力工具过多而造成资源浪费的问题。The utility model aims to provide an installation tool for an electric inspection grounding ring to solve the problems in the prior art that when installing an electric inspection grounding ring with electricity, many workers are required to cooperate and too many auxiliary power tools are required to cause waste of resources.

为解决上述技术问题,根据本实用新型的一个方面,提供了一种验电接地环的安装工具,包括:托举组件,托举组件包括第一绝缘杆和托举架,托举架设置在第一绝缘杆的第一端;和紧固组件,紧固组件包括第二绝缘杆和紧固部,紧固部设置在第二绝缘杆的第一端。In order to solve the above-mentioned technical problems, according to one aspect of the utility model, an installation tool for an electrical test grounding ring is provided, including: a lifting assembly, the lifting assembly includes a first insulating rod and a lifting frame, and the lifting frame is arranged on a first end of the first insulating rod; and a fastening assembly comprising a second insulating rod and a fastening portion disposed on the first end of the second insulating rod.

进一步地,托举架包括:架体,架体的第一端与第一绝缘杆的第一端连接;和验电接地环挂钩,验电接地环挂钩设置在架体的第二端。Further, the lifting frame includes: a frame body, the first end of which is connected to the first end of the first insulating rod; and an electrical test ground ring hook, which is arranged at the second end of the frame body.

进一步地,架体包括:固定部,固定部与第一绝缘杆的第一端连接;两个支撑件,每个支撑件的第一端均与固定部连接,两个支撑件相间隔地设置,且每个支撑件的第二端均向远离第一绝缘杆的方向向外伸出,每个支撑件的第二端均设置有一个验电接地环挂钩。Further, the frame body includes: a fixing part, the fixing part is connected with the first end of the first insulating rod; two supporting parts, the first end of each supporting part is connected with the fixing part, and the two supporting parts are arranged at intervals , and the second end of each supporting member protrudes outward in a direction away from the first insulating rod, and the second end of each supporting member is provided with an electrical test grounding ring hook.

进一步地,托举架与第一绝缘杆可拆卸地连接。Further, the lifting frame is detachably connected to the first insulating rod.

进一步地,紧固部包括:连接杆,连接杆的第一端与第二绝缘杆可拆卸地连接;和用于与验电接地环的紧固件配合的套筒,套筒可拆卸地设置在连接杆的第二端。Further, the fastening part includes: a connecting rod, the first end of the connecting rod is detachably connected to the second insulating rod; and a sleeve for cooperating with the fastener of the electrometric grounding ring, the sleeve is detachably arranged at the second end of the connecting rod.

进一步地,紧固组件还包括扭力扳手,扭力扳手与第二绝缘杆的第二端可拆卸地连接。Further, the fastening assembly further includes a torque wrench, which is detachably connected to the second end of the second insulating rod.

进一步地,安装工具还包括连接卡具,连接卡具设置在托举组件上,紧固组件通过连接卡具与托举组件可拆卸地连接。Further, the installation tool further includes a connection clip, which is arranged on the lifting assembly, and the fastening assembly is detachably connected to the lifting assembly through the connection clip.

本实用新型中的托举组件的第一绝缘杆的第一端设置有托举架,紧固组件的第二绝缘杆的第一端设置有紧固部。使用本实用新型中的安装工具时,首先需要使用托举组件将验电接地环托举到导线处,然后使用紧固组件将验电接地环与导线紧固连接。由于不再需要使用过多的辅助电力工具,例如多台抢修车辆,最多仅需两名工作人员协同工作,因而减少了资源的浪费、降低了维修成本。由于工作人员不再需要等待带电班进行安装验电接地环的工作,因而缩短了抢修等待时间,提高了供电的可靠性。In the utility model, the first end of the first insulating rod of the lifting component is provided with a lifting frame, and the first end of the second insulating rod of the fastening component is provided with a fastening part. When using the installation tool in the utility model, it is first necessary to use the lifting assembly to lift the electrical inspection grounding ring to the wire, and then use the fastening assembly to fasten the electrical inspection grounding ring to the wire. Since it is no longer necessary to use too many auxiliary power tools, such as multiple emergency repair vehicles, at most only two workers are required to work together, thereby reducing waste of resources and reducing maintenance costs. Since the staff no longer need to wait for the live shift to install the grounding ring for electrical inspection, the waiting time for emergency repair is shortened and the reliability of power supply is improved.

附图说明Description of drawings

构成本申请的一部分的附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings constituting a part of this application are used to provide a further understanding of the utility model, and the schematic embodiments of the utility model and their descriptions are used to explain the utility model, and do not constitute an improper limitation of the utility model. In the attached picture:

图1示意性示出了本实用新型中的一个优选实施例中的安装工具的托举组件的主视图;Fig. 1 schematically shows the front view of the lifting assembly of the installation tool in a preferred embodiment of the present invention;

图2示意性示出了图1的左视图;Fig. 2 schematically shows the left view of Fig. 1;

图3示意性示出了本实用新型中的另一个优选实施例中的安装工具的托举组件的主视图;Fig. 3 schematically shows the front view of the lifting assembly of the installation tool in another preferred embodiment of the present invention;

图4示意性示出了图3的左视图;以及Figure 4 schematically shows the left side view of Figure 3; and

图5示意性示出了本实用新型中的安装工具的紧固组件的结构示意图。Fig. 5 schematically shows the structure diagram of the fastening assembly of the installation tool in the present invention.

图中附图标记:10、托举组件;11、第一绝缘杆;11a、第一绝缘杆的第一端;11b、第一绝缘杆的第二端;12、托举架;13、架体;13a、固定部;13b、两个支撑件;14、验电接地环挂钩;20、紧固组件;21、第二绝缘杆;21a、第二绝缘杆的第一端;21b、第二绝缘杆的第二端;22、紧固部;22a、套筒;22b、连接杆;23、扭力扳手;24、连接件。Reference signs in the figure: 10, lifting assembly; 11, the first insulating rod; 11a, the first end of the first insulating rod; 11b, the second end of the first insulating rod; 12, lifting frame; 13, frame body; 13a, fixed part; 13b, two supporting parts; 14, electric test grounding ring hook; 20, fastening assembly; 21, second insulating rod; 21a, first end of second insulating rod; 21b, second The second end of the insulating rod; 22, the fastening part; 22a, the sleeve; 22b, the connecting rod; 23, the torque wrench; 24, the connecting piece.

具体实施方式Detailed ways

以下结合附图对本实用新型的实施例进行详细说明,但是本实用新型可以由权利要求限定和覆盖的多种不同方式实施。The embodiments of the utility model will be described in detail below in conjunction with the accompanying drawings, but the utility model can be implemented in various ways defined and covered by the claims.

作为本实用新型的第一个方面,提供了一种验电接地环的带电安装方法。带电安装方法包括:步骤S1:使用托举工具将验电接地环(例如:穿刺型验电接地环)托举到导线(例如:10KV的架空绝缘导线)处;步骤S2:使用紧固工具将验电接地环与导线紧固连接。As the first aspect of the utility model, a live installation method of the grounding ring for electric testing is provided. The live installation method includes: Step S1: Use a lifting tool to lift the electrical inspection grounding ring (for example: puncture-type electrical inspection grounding ring) to the wire (for example: 10KV overhead insulated wire); Step S2: Use a fastening tool to lift the grounding ring The electrical test grounding ring is firmly connected to the wire.

工作人员使用本实用新型中的带电安装方法安装验电接地环(可以进行验电、装设接地线的作业)时,需要佩戴绝缘手套,由于不再需要使用过多的辅助电力工具,例如:多台抢修车辆,最多仅需两名工作人员协同工作,因而减少了资源的浪费、降低了维修成本。由于工作人员不再需要等待带电班进行安装验电接地环的工作,因而缩短了抢修等待时间,提高了供电的可靠性。由于工作人员可以根据需要在抢修和检修时及时添加验电接地环,因而提高了抢修效率。由于不需要停电作业,因而提高了供电可靠性。本实用新型中的带电安装方法可以适应不同的抢修环境,即使带电车无法进入的抢修现场,工作人员也可以进行安装验电接地环的工作。When using the electrified installation method in the utility model to install the electric test grounding ring (can carry out electric test and install the ground wire), the staff need to wear insulating gloves, because it is no longer necessary to use too many auxiliary power tools, such as: For multiple emergency repair vehicles, at most only two staff members are required to work together, thus reducing the waste of resources and reducing maintenance costs. Since the staff no longer need to wait for the live shift to install the grounding ring for electrical inspection, the waiting time for emergency repair is shortened and the reliability of power supply is improved. Since the staff can timely add the grounding ring for electrical testing during rush repair and overhaul according to needs, thus improving the rush repair efficiency. Power supply reliability is improved because power outage operations are not required. The live installation method in the utility model can adapt to different emergency repair environments, even if the electrified vehicle cannot enter the emergency repair site, the staff can also install the electric test grounding ring.

优选地,步骤S1具体包括:步骤S11:将验电接地环挂接在托举工具上;步骤S12:移动托举工具,将验电接地环托举到导线处,并使验电接地环卡接在导线上。由于验电接地环挂接在托举工具上,因而便于工作人员将验电接地环放置在托举工具上,且便于验电接地环在与导线连接后,托举工具可以方便地从验电接地环上卸下,从而提高了安装验电接地环的可靠性。Preferably, step S1 specifically includes: step S11: hook the electrical inspection grounding ring on the lifting tool; step S12: move the lifting tool, lift the electrical inspection grounding ring to the wire, and make the electrical inspection grounding ring clamp connected to the wire. Since the electric test grounding ring is hooked on the lifting tool, it is convenient for the staff to place the electric test grounding ring on the lifting tool, and after the electric test grounding ring is connected with the wire, the lifting tool can be easily removed from the electric test It can be removed from the grounding ring, thereby improving the reliability of installing the grounding ring for electrical testing.

优选地,步骤S2具体包括:步骤S21:将紧固工具与验电接地环的紧固件卡合;步骤S22:操动紧固工具使紧固件将验电接地环与导线紧固连接;步骤S23:继续操动紧固工具,直至紧固件被拧断为止。在一个优选的实施例中,工作人员在带电的导线上安装穿刺型验电接地环时,验电接地环(验电接地环包括环体和穿刺线夹,穿刺线夹与环体焊接,穿刺线夹用于卡接在导线上)已经卡接在导线上,此时仅需使用紧固工具旋拧验电接地环的紧固件,从而使验电接地环的刺针穿刺进入导线的绝缘皮内,并使验电接地环与导线固定连接。根据穿刺型验电接地环的使用要求,当紧固件已经旋紧后,工作人员仍需使用紧固工具继续旋拧紧固件,直至紧固件拧断在验电接地环内部为止。Preferably, step S2 specifically includes: step S21: engage the fastening tool with the fastener of the electrical test ground ring; step S22: operate the fastening tool to make the fastener fasten the electric test ground ring to the wire; Step S23: Continue to operate the fastening tool until the fastener is twisted off. In a preferred embodiment, when the worker installs the puncture-type electric test ground ring on the live wire, the electric test ground ring (the electric test ground ring includes the ring body and the puncture wire clip, the puncture wire clip is welded to the ring body, and the puncture The wire clip is used to clamp on the wire) has been clamped on the wire, at this time only need to use the fastening tool to screw the fastener of the electric test grounding ring, so that the puncture needle of the electric test ground ring penetrates into the insulation skin of the wire Inside, and connect the grounding ring of the electric test with the wire fixedly. According to the use requirements of the puncture-type electrical inspection grounding ring, after the fasteners have been tightened, the staff still need to use the tightening tool to continue to screw the fasteners until the fasteners are twisted off inside the electrical inspection grounding ring.

作为本实用新型的第二个方面,提供了一种验电接地环的安装工具。如图1至图5所示,安装工具包括:托举组件10,托举组件10包括第一绝缘杆11和托举架12,托举架12设置在第一绝缘杆11的第一端11a;和紧固组件20,紧固组件20包括第二绝缘杆21和紧固部22,紧固部22设置在第二绝缘杆21的第一端21a。由于设置有托举组件10,因而方便工作人员将验电接地环托举到导线处。由于设置有紧固组件20,因而工作人员可以对卡接在导线处的验电接地环的紧固件进行紧固。As the second aspect of the utility model, an installation tool for an electrical test grounding ring is provided. As shown in Figures 1 to 5, the installation tool includes: a lifting assembly 10, the lifting assembly 10 includes a first insulating rod 11 and a lifting frame 12, and the lifting frame 12 is arranged on the first end 11a of the first insulating rod 11 and a fastening assembly 20, the fastening assembly 20 includes a second insulating rod 21 and a fastening portion 22, and the fastening portion 22 is disposed on the first end 21a of the second insulating rod 21. Since the lifting assembly 10 is provided, it is convenient for the staff to lift the grounding ring for electric testing to the wire. Since the fastening assembly 20 is provided, the staff can fasten the fasteners of the electrical testing grounding ring clamped at the conductors.

优选地,第一绝缘杆11和第二绝缘杆21的长度大于0.7米。根据电力行业带电作业的要求,为保证工作人员带电作业的安全,第一绝缘杆11和第二绝缘杆21的长度不应小于0.7米。在一个优选的实施例中,第一绝缘杆11和第二绝缘杆21的长度均为1米。Preferably, the length of the first insulating rod 11 and the second insulating rod 21 is greater than 0.7 meters. According to the requirements of live work in the electric power industry, in order to ensure the safety of live work of staff, the length of the first insulating rod 11 and the second insulating rod 21 should not be less than 0.7 meters. In a preferred embodiment, the lengths of the first insulating rod 11 and the second insulating rod 21 are both 1 meter.

优选地,第一绝缘杆11和第二绝缘杆21是绝缘闸杆。由于绝缘闸杆满足电力行业的施工要求标准,因而使用绝缘闸杆作为绝缘杆,不仅满足使用要求,而且可靠性高,给工作人员的施工提供安全保障。Preferably, the first insulating rod 11 and the second insulating rod 21 are insulating brake rods. Since the insulating gate rod meets the construction requirements and standards of the electric power industry, the use of the insulating gate rod as the insulating rod not only meets the requirements of use, but also has high reliability, providing safety guarantee for the construction of the staff.

优选地,第一绝缘杆11包括至少两个第一杆体,至少两个第一杆体依次可拆卸地连接。进一步地,至少两个第一杆体通过螺纹连接。由于至少两个第一杆体依次可拆卸地连接,因而工作人员可以根据施工现场环境的需求,添加或减少第一杆体的个数,从而使本实用新型中的托举组件10的长度可以调节,增加了托举组件10的使用范围。Preferably, the first insulating rod 11 includes at least two first rod bodies, and the at least two first rod bodies are detachably connected in sequence. Further, at least two first rods are connected by threads. Since at least two first rod bodies are detachably connected sequentially, the staff can add or reduce the number of first rod bodies according to the requirements of the construction site environment, so that the length of the lifting assembly 10 in the utility model can be adjusted. The range of use of the lifting assembly 10 is increased.

工作人员使用托举组件10时,应将验电接地环的环体挂接在托举架12上,工作人员的手部应持握第一绝缘杆11的远离托举架12的一端。When the staff uses the lifting assembly 10, the ring body of the electric test grounding ring should be hung on the lifting frame 12, and the staff's hand should hold the end of the first insulating rod 11 away from the lifting frame 12.

优选地,托举架12包括:架体13,架体13的第一端与第一绝缘杆11的第一端11a连接;和验电接地环挂钩14,验电接地环挂钩14设置在架体13的第二端(请参考图1至图4)。由于设置有验电接地环挂钩14,因而方便工作人员将验电接地环挂接在托举架12上,并且在验电接地环与导线连接后,方便托举组件10从验电接地环上卸除。Preferably, the lifting frame 12 includes: a frame body 13, the first end of which is connected to the first end 11a of the first insulating rod 11; The second end of the body 13 (please refer to FIG. 1 to FIG. 4 ). Since the electric test ground ring hook 14 is provided, it is convenient for the staff to hang the electric test ground ring on the lifting frame 12, and after the electric test ground ring is connected with the wire, it is convenient to lift the assembly 10 from the electric test ground ring remove.

优选地,架体13呈U形或V形。Preferably, the frame body 13 is U-shaped or V-shaped.

优选地,验电接地环挂钩14是金属材料制成的。进一步地,金属材料是铁丝或导线的线芯。由于验电接地环挂钩14是金属材料制成的,因而不仅能保证验电接地环可以稳固地挂接在验电接地环挂钩14上,而且工作人员还可以根据验电接地环的大小,对验电接地环挂钩14的弯曲程度进行调节,从而使验电接地环挂钩14与验电接地环具有良好的匹配性,提高了安装可靠性。Preferably, the electrical test ground ring hook 14 is made of metal material. Further, the metal material is the core of iron wire or wire. Since the electrical inspection grounding ring hook 14 is made of metal material, it can not only ensure that the electrical inspection grounding ring can be stably hooked on the electrical inspection grounding ring hook 14, but also the staff can adjust the size of the electrical inspection grounding ring according to the size of the electrical inspection grounding ring. The bending degree of the electrical inspection grounding ring hook 14 is adjusted, so that the electrical inspection grounding ring hook 14 has a good match with the electrical inspection grounding ring, and the installation reliability is improved.

优选地,如图1至图4所示,架体13包括:固定部13a,固定部13a与第一绝缘杆11的第一端11a连接;两个支撑件13b,每个支撑件13b的第一端均与固定部13a连接,两个支撑件13b相间隔地设置,且每个支撑件13b的第二端均向远离第一绝缘杆11的方向向外伸出,每个支撑件13b的第二端均设置有一个验电接地环挂钩14。由于设置有两个支撑件13b,且每个支撑件13b的第二端均设置有一个验电接地环挂钩14,因而验电接地环可以稳定地挂接在架体13上,从而避免由于验电接地环挂接不稳而脱落的问题。Preferably, as shown in Figures 1 to 4, the frame body 13 includes: a fixed portion 13a, the fixed portion 13a is connected to the first end 11a of the first insulating rod 11; two supports 13b, the first end of each support 13b One end is connected to the fixing part 13a, two support members 13b are arranged at intervals, and the second end of each support member 13b protrudes outward in a direction away from the first insulating rod 11, each support member 13b An electrical test grounding ring hook 14 is provided at the second ends. Since two supports 13b are provided, and the second end of each support 13b is provided with an electrical test grounding ring hook 14, the electrical test grounding ring can be stably hung on the frame body 13, thereby avoiding the The problem that the electric grounding ring is unstable and falls off.

优选地,托举架12与第一绝缘杆11可拆卸地连接。进一步地,托举架12与第一绝缘杆11通过螺纹连接。由于托举架12与第一绝缘杆11可拆卸地连接,因而第一绝缘杆11具有良好的可替换性,工作人员可以使用第一绝缘杆11处理其他带电作业的问题,从而扩大了托举组件10的使用范围。当然,紧固组件20的紧固部22与第二绝缘杆21也可以可拆卸地连接。Preferably, the lifting frame 12 is detachably connected to the first insulating rod 11 . Further, the lifting frame 12 is connected to the first insulating rod 11 through threads. Since the lifting frame 12 is detachably connected with the first insulating rod 11, the first insulating rod 11 has good replaceability, and the staff can use the first insulating rod 11 to deal with other live work problems, thereby expanding the scope of lifting. Scope of use of component 10. Of course, the fastening part 22 of the fastening assembly 20 can also be detachably connected to the second insulating rod 21 .

优选地,紧固部22包括:连接杆22b,连接杆22b的第一端与第二绝缘杆21可拆卸地连接;和用于与验电接地环的紧固件配合的套筒22a,套筒22a可拆卸地设置在连接杆22b的第二端,(请参考图5)。进一步地,连接杆22b与第二绝缘杆21螺纹连接。优选地,套筒22a为内六角套筒。由于套筒22a与紧固件配合,因而套筒22a的尺寸大小最好与紧固件的大小吻合,这样方便工作人员旋拧紧固件。由于套筒22a与连接杆22b可拆卸地连接,因而方便工作人员对套筒22a进行更换,工作人员可以根据紧固件的尺寸大小,选择适合的套筒22a,从而提高紧固组件20的使用可靠性。Preferably, the fastening part 22 includes: a connecting rod 22b, the first end of the connecting rod 22b is detachably connected to the second insulating rod 21; The barrel 22a is detachably disposed on the second end of the connecting rod 22b (please refer to FIG. 5 ). Further, the connecting rod 22b is screwed to the second insulating rod 21 . Preferably, the sleeve 22a is an inner hexagon socket. Since the sleeve 22a cooperates with the fastener, the size of the sleeve 22a preferably matches the size of the fastener, which is convenient for the staff to screw the fastener. Since the sleeve 22a is detachably connected to the connecting rod 22b, it is convenient for the staff to replace the sleeve 22a, and the staff can select a suitable sleeve 22a according to the size of the fastener, thereby improving the use of the fastening assembly 20 reliability.

优选地,如图5所示,紧固组件20还包括连接件24,连接件24的一端与第二绝缘杆21螺纹连接,连接件24的第二端设置有卡槽,扭力扳手23的连接端设置有与卡槽卡接的凸起。由于连接件24与第二绝缘杆21螺纹连接,因而方便工作人员将连接件24从第二绝缘杆21上拆卸下来,这样第二绝缘杆21还可以用于其它带电作业中,从而扩大了第二绝缘杆21的使用范围。由于连接件24与扭力扳手23通过卡接配合,因而工作人员可以很方便地将扭力扳手23与连接件24拆卸开,扭力扳手23仍可以应用于其它作业场合,因而进一步提高了扭力扳手23的使用范围,提高了紧固组件20的使用可靠性。Preferably, as shown in FIG. 5 , the fastening assembly 20 further includes a connecting piece 24, one end of the connecting piece 24 is threadedly connected to the second insulating rod 21, and the second end of the connecting piece 24 is provided with a card slot, and the connection of the torque wrench 23 The end is provided with a protrusion snapped into the card slot. Since the connecting piece 24 is threadedly connected with the second insulating rod 21, it is convenient for the staff to disassemble the connecting piece 24 from the second insulating rod 21, so that the second insulating rod 21 can also be used in other live work, thus expanding the size of the second insulating rod 21. The scope of use of the two insulating rods 21. Since the connecting piece 24 is engaged with the torque wrench 23 through snap fit, the staff can easily disassemble the torque wrench 23 from the connecting piece 24, and the torque wrench 23 can still be used in other work occasions, thereby further improving the performance of the torque wrench 23. The use range improves the use reliability of the fastening assembly 20 .

优选地,如图5所示,紧固组件20还包括扭力扳手23,扭力扳手23与第二绝缘杆21的第二端21b可拆卸地连接。由于设置有扭力扳手23,因而工作人员可以根据使用需要设定扭力扳手23的扭转力大小,从而避免旋转第二绝缘杆21的过程中用力过猛或过小,提高了紧固组件20的使用可靠性。由于设置有扭力扳手23,因而工作人员可以一手持握第二绝缘杆21、另一手持握扭力扳手23对第二绝缘杆21进行旋转,从而增大了力臂、减小了施力的大小、降低了劳动强度、提高了工作效率。Preferably, as shown in FIG. 5 , the fastening assembly 20 further includes a torque wrench 23 , and the torque wrench 23 is detachably connected to the second end 21 b of the second insulating rod 21 . Since the torque wrench 23 is provided, the staff can set the torsional force of the torque wrench 23 according to the needs of use, thereby avoiding excessive force or too little force in the process of rotating the second insulating rod 21, and improving the use of the fastening assembly 20 reliability. Since the torque wrench 23 is provided, the staff can hold the second insulating rod 21 in one hand and the torque wrench 23 in the other hand to rotate the second insulating rod 21, thereby increasing the force arm and reducing the force applied , Reduce labor intensity and improve work efficiency.

优选地,本实用新型中的安装工具还包括连接卡具,连接卡具设置在托举组件10上,紧固组件20通过连接卡具与托举组件10可拆卸地连接。当工作人员使用安装工具时,可以将紧固组件20从连接卡具上拆卸下来,使紧固组件20与托举组件10分离,方便工作人员对紧固组件20、托举组件10进行操控。当不需要使用安装工具时,紧固组件20通过连接卡具与托举组件10连接,这样不仅方便工作人员携带安装工具,也避免紧固组件20或托举组件10因分离而丢失。当然,连接卡具也可以设置在紧固组件20上,托举组件10通过连接卡具与紧固组件20可拆卸地连接。Preferably, the installation tool in the present utility model further includes a connection fixture, which is arranged on the lifting assembly 10, and the fastening assembly 20 is detachably connected to the lifting assembly 10 through the connection fixture. When the staff uses the installation tool, the fastening assembly 20 can be disassembled from the connecting fixture, so that the fastening assembly 20 is separated from the lifting assembly 10 , which is convenient for the staff to manipulate the fastening assembly 20 and the lifting assembly 10 . When the installation tool is not needed, the fastening assembly 20 is connected to the lifting assembly 10 through the connection fixture, which not only facilitates the staff to carry the installation tool, but also prevents the fastening assembly 20 or the lifting assembly 10 from being lost due to separation. Of course, the connection clip can also be arranged on the fastening assembly 20, and the lifting assembly 10 is detachably connected to the fastening assembly 20 through the connection clip.

优选地,连接卡具固定设置在托举组件10的第一绝缘杆11上,且连接卡具可与紧固组件20的第二绝缘杆21卡合。Preferably, the connecting clip is fixedly arranged on the first insulating rod 11 of the lifting assembly 10 , and the connecting clip can be engaged with the second insulating rod 21 of the fastening assembly 20 .

优选地,连接卡具为U型卡夹。Preferably, the connecting clip is a U-shaped clip.

在一个优选的实施中,托举组件10的架体13呈U形;架体13与验电接地环挂钩14一体成型;架体13与验电接地环挂钩14是4.0的铁线制成的;托举架12通过第一外扣螺杆与第一绝缘杆11可拆卸地连接,第一外扣螺杆的直径是30mm,第一外扣螺杆的长度为70mm;紧固组件20的套筒22a的长度为14mm;连接杆22b为阶梯型的圆柱体,连接杆22b由套杆和第二外扣螺杆组成,套杆的直径是15mm,套杆的长度为75mm,第二外扣螺杆的直径是30mm,第二外扣螺杆的长度为50mm;连接件24为圆柱体,连接件24的一端的内径为35mm,连接件24的高度为45mm,连接件24的另一端开设有长度为1.25mm的方形孔。In a preferred implementation, the frame body 13 of the lifting assembly 10 is U-shaped; the frame body 13 and the electric test ground ring hook 14 are integrally formed; the frame body 13 and the electric test ground ring hook 14 are made of 4.0 iron wire The lifting frame 12 is detachably connected with the first insulating rod 11 through the first outer buckle screw rod, the diameter of the first outer buckle screw rod is 30mm, and the length of the first outer buckle screw rod is 70mm; the sleeve 22a of the fastening assembly 20 The length of the connecting rod 22b is a stepped cylinder, and the connecting rod 22b is made up of a sleeve rod and a second outer buckle screw rod. The diameter of the sleeve rod is 15mm, and the length of the sleeve rod is 75mm. The diameter of the second outer buckle screw rod is It is 30mm, and the length of the second outer buckle screw is 50mm; the connector 24 is a cylinder, the inner diameter of one end of the connector 24 is 35mm, the height of the connector 24 is 45mm, and the other end of the connector 24 has a length of 1.25mm. square hole.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (7)

1. the erecting tools of an electricity testing grounding ring is characterized in that, comprising:
Lift assembly (10), the described assembly (10) of lifting comprises first insulating bar (11) and lift stand (12), and described lift stand (12) is arranged on first end (11a) of described first insulating bar (11); With
Fastening assembly (20), described fastening assembly (20) comprise second insulating bar (21) and fastening part (22), and described fastening part (22) are arranged on first end (21a) of described second insulating bar (21).
2. erecting tools according to claim 1 is characterized in that, described lift stand (12) comprising:
Support body (13), first end of described support body (13) is connected with first end (11a) of described first insulating bar (11); With
Electricity testing grounding ring hook (14), described electricity testing grounding ring hook (14) is arranged on second end of described support body (13).
3. erecting tools according to claim 2 is characterized in that, described support body (13) comprising:
Fixed part (13a), described fixed part (13a) is connected with first end (11a) of described first insulating bar (11);
Two strutting pieces (13b), first end of each described strutting piece (13b) all is connected with described fixed part (13a), two described strutting pieces (13b) arrange at intervals, and second end of each described strutting piece (13b) is all to protruding away from the direction of described first insulating bar (11), and second end of each described strutting piece (13b) is provided with a described electricity testing grounding ring hook (14).
4. erecting tools according to claim 1 is characterized in that, described lift stand (12) removably is connected with described first insulating bar (11).
5. erecting tools according to claim 1 is characterized in that, described fastening part (22) comprising:
Connecting rod (22b), first end of described connecting rod (22b) removably is connected with described second insulating bar (21); With
For the sleeve (22a) that cooperates with the securing member of described electricity testing grounding ring, described sleeve (22a) is removably disposed in second end of described connecting rod (22b).
6. erecting tools according to claim 1 is characterized in that, described fastening assembly (20) also comprises torque spanner (23), and described torque spanner (23) removably is connected with second end (21b) of described second insulating bar (21).
7. erecting tools according to claim 1, it is characterized in that, described erecting tools also comprises the connection jig, and described connection jig is arranged on described lifting on the assembly (10), and described fastening assembly (20) removably is connected with the described assembly (10) of lifting by described connection jig.
CN 201320254755 2013-05-10 2013-05-10 Installation tool for electrical inspection grounding ring Expired - Lifetime CN203233103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320254755 CN203233103U (en) 2013-05-10 2013-05-10 Installation tool for electrical inspection grounding ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320254755 CN203233103U (en) 2013-05-10 2013-05-10 Installation tool for electrical inspection grounding ring

Publications (1)

Publication Number Publication Date
CN203233103U true CN203233103U (en) 2013-10-09

Family

ID=49289207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320254755 Expired - Lifetime CN203233103U (en) 2013-05-10 2013-05-10 Installation tool for electrical inspection grounding ring

Country Status (1)

Country Link
CN (1) CN203233103U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104143781A (en) * 2013-05-10 2014-11-12 国家电网公司 Live installation method of electrical inspection grounding ring and installation tool for electrical inspection grounding ring
CN110739641A (en) * 2019-12-10 2020-01-31 国网江苏省电力有限公司常州供电分公司 Live-line installation tool for electroscopic grounding ring

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104143781A (en) * 2013-05-10 2014-11-12 国家电网公司 Live installation method of electrical inspection grounding ring and installation tool for electrical inspection grounding ring
CN104143781B (en) * 2013-05-10 2017-08-01 国家电网公司 Live installation method of electrical inspection grounding ring and installation tool for electrical inspection grounding ring
CN110739641A (en) * 2019-12-10 2020-01-31 国网江苏省电力有限公司常州供电分公司 Live-line installation tool for electroscopic grounding ring

Similar Documents

Publication Publication Date Title
CN102882153B (en) Phase replacing insulator string method in charged for replacement circuit many times towers
CN105914646B (en) Working method for replacing 35kV tension insulator strings with power on
CN203456796U (en) Broadsword fixture for replacing single insulator of duplex insulator string during power failure
CN103606854A (en) Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode
CN106451214B (en) A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator
CN203674624U (en) A sleeve-type combination tool for fastening and draining wire clips
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN203233103U (en) Installation tool for electrical inspection grounding ring
CN205070303U (en) 750kV circuit block of four strain insulator string tip fixture
CN104143781B (en) Live installation method of electrical inspection grounding ring and installation tool for electrical inspection grounding ring
CN106684756A (en) Power transmission angle iron tower conductor and ground wire lifting tool and application method of the same
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN101364716A (en) Clamp type hot-line work fastener and using method
CN206099164U (en) Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity
CN103606849A (en) Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device
CN110653741A (en) Tool for electrically fastening clamp bolt in overhead electrified remote control of power transmission line
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN210704540U (en) A tool for high-altitude live remote control electric tightening of wire clamp bolts for transmission lines
CN103388418A (en) Method for connecting pulling wires through transmission line non-self-supporting pole/tower pulling wire repair and backup protection type connector
CN201518397U (en) 220kV line conductor live replacement linear insulator string tool
CN105790158A (en) Special tools for live replacement of 35kV tension insulator strings
CN206099159U (en) Electrified fixture of changing two clusters of straight line or two cluster insulators of strain insulator
CN205195138U (en) A sharp shoulder pole card for changing sharp insulator chain that singly goes here and there
CN206004211U (en) Replacement of 35‑110kV compression type line clamp tension single string insulator clamp
CN206004225U (en) Utensil installed by ground potential fast-assembling synthetic insulator preventing wind drift wire

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131009