CN103866766A - Steel anchor pier for landslide emergency treatment and construction method thereof - Google Patents

Steel anchor pier for landslide emergency treatment and construction method thereof Download PDF

Info

Publication number
CN103866766A
CN103866766A CN201410131485.8A CN201410131485A CN103866766A CN 103866766 A CN103866766 A CN 103866766A CN 201410131485 A CN201410131485 A CN 201410131485A CN 103866766 A CN103866766 A CN 103866766A
Authority
CN
China
Prior art keywords
backing plate
steel
anchor cable
belly
anchor pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410131485.8A
Other languages
Chinese (zh)
Inventor
王全成
石胜伟
杨栋
宋军
严君凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Exploration Technology Chinese Academy of Geological Sciences
Original Assignee
Institute of Exploration Technology Chinese Academy of Geological Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Exploration Technology Chinese Academy of Geological Sciences filed Critical Institute of Exploration Technology Chinese Academy of Geological Sciences
Priority to CN201410131485.8A priority Critical patent/CN103866766A/en
Publication of CN103866766A publication Critical patent/CN103866766A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a steel anchor pier for landslide emergency treatment and a construction method thereof, wherein the steel anchor pier comprises the following steps: the top base plate is provided with a first anchor cable preformed hole; the top base plate and the bottom base plate are arranged in parallel, and a second anchor cable preformed hole is formed in the bottom base plate; the first end of the cylinder is connected with the top base plate, the second end of the cylinder is connected with the bottom base plate, the first end of the cylinder is aligned with the first anchor cable reserved hole, and the second end of the cylinder is aligned with the second anchor cable reserved hole; a plurality of belly floor, install around the circumference of drum, and the belly floor is located between top backing plate and the bottom backing plate, has seted up the steel cable connecting hole on the belly floor. The steel anchor pier can realize quick assembly and high-strength bearing in slope reinforcement construction; the prefabricated holes are convenient to connect various combinations such as lattice beams, steel cables or protective nets and the like; the method is favorable for improving the safety and the environmental friendliness of the slope anchoring construction.

Description

For steel anchor pier and the construction method thereof of the emergency processing of coming down
Technical field
The present invention relates to geology field, particularly a kind of steel anchor pier and construction method thereof for the emergency processing of coming down.
Background technology
Landslide disaster is as the topmost a kind of geologic hazard type of China; usually can bury village, destroy factories and miness, destroy railway and highway communication, obstruction rivers, damage farmland and forest etc., thereby cause heavy losses to the people's lives and property and national economic construction.According to the national geological disaster circular of Ministry of Land and Resources's issue in 2006-2012,2006-2012, there is 207809 of geological disasters in China altogether, wherein comes down 158144, accounts for sum 76%.
Prestress anchorage cable framework is a kind of conventional landslide disaster improvement technology, it can organically combine Landslide control with domatic flexible protective, the deep layer that will come down control and slope protection organically combine, both reached the object of preventing and treating high slope disease, can increase again green coverage, beautify the environment, realized engineering and naturally harmony.
But generally adopt at present on-the-spot arrangement of reinforcement and cast in situs form, need the operations such as on-the-spot formwork, arrangement of reinforcement, cast and maintenance due to cast-in-situ concrete lattice, construction period is longer, complex process, and lock needed supporting capacity for reaching anchoring, need certain curing period, from construction, the time that anchor cable really works probably needs nearly one month, cannot meet the needs that burst landslide disaster is reinforced fast.
In addition, because traditional cast-in-place prestressed anchor cable framework needs dig on a wide area, and smooth domatic, could construct.And for the severe high gradient slope of execution conditions after shake with need to show consideration for the scenic spot side slope of ecoscape, clear slope is to be difficult to reach or unallowed.
To sum up, in order to realize, landslide disaster is disposed fast and the limited landslide control in clear slope, need to develop a kind of new anchor pier structure, to change conventional on-site arrangement of reinforcement and cast in situs form.
Summary of the invention
Object of the present invention is exactly for the deficiencies in the prior art; for the severe high gradient slope of the common execution conditions in burst landslide disaster, meizoseismal area and need to show consideration for the scenic spot side slope of ecoscape; a kind of steel anchor pier and construction method thereof for the emergency processing of coming down is provided; to greatest extent the reduction of erection time, save floor occupying area, realize and reinforcing fast and environmental protection.
For this reason, as a first aspect of the present invention, provide a kind of steel anchor pier for the emergency processing of coming down, having comprised: top backing plate, offers the first anchor cable preformed hole on the backing plate of top; Backing plate at bottom, top backing plate and backing plate at bottom be arranged in parallel, offer the second anchor cable preformed hole on backing plate at bottom; Cylinder, the first end of cylinder is connected with top backing plate, and the second end of cylinder is connected with backing plate at bottom, and the first end of cylinder aligns with the first anchor cable preformed hole, and the second end of cylinder aligns with the second anchor cable preformed hole; Multiple belly floors, around the circumferential installation of cylinder, and belly floor is between top backing plate and backing plate at bottom, offers wirerope connecting hole on belly floor.
Further, the junction of the circumferential side wall of belly floor and cylinder is provided with recess, between recess and the circumferential side wall of cylinder, forms groove.
Further, backing plate at bottom is square, and the foursquare length of side is determined by following formula:
L ≥ k s T f ak + πd 2 4
In formula:
T-anchor cable pulling force design load;
K s-safety factor, gets 1.2-1.3;
F ak-slope foundation characteristic load bearing capacity;
D-base plate middle part opening diameter, 70mm≤d≤80mm;
The foursquare length of side of L-, L >=600mm.
Further, top backing plate is circular, and circular radius is determined by following formula:
R ≥ k s T πf y
In formula:
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F ythe compressive strength design load of-top backing plate steel;
The radius of R-circle, R >=200mm.
Further, the thickness of top backing plate is determined by following formula:
B 1 ≥ k s T 8 ( R - r ) f v
In formula:
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F vthe shear strength design load of-backing plate steel;
The radius of r-the first anchor cable preformed hole;
The radius of R-top backing plate;
B 1the thickness of-top board backing plate.
Further, the number of belly floor is four, and belly floor is right-angled trapezium, and its thickness is determined by following formula:
B 3 ≥ k s T 4 ( R - r ) f y
In formula,
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F vthe shear strength design load of-belly floor;
The radius of r-the first anchor cable preformed hole;
The radius of R-top backing plate;
B 3the thickness of-belly floor.
Further, between the each several part of steel anchor pier, weld, and adopt the mode of galvanizing anticorrosion.
As a second aspect of the present invention, a kind of construction method of steel anchor pier is provided, steel anchor pier is above-mentioned steel anchor pier, comprising: step 1, cutting, clear substrate, thus make anchor cable axis vertical with substrate; Step 2, bed course levelling; Step 3, installs steel anchor pier; Step 4, is used wirerope that multiple steel anchor pier integrated connections are got up.
Further, in step 2, adopt spun yarn and rubber tile levelling.
Compared with prior art, the invention has the beneficial effects as follows: this steel anchor pier can be separately and anchor cable be used in conjunction with, or be applied to as a whole slope reinforcement after being connected in length and breadth by wirerope, protective screening.This steel anchor pier can be realized rapid-assembling and high-strength carrying in slope reinforcement construction; Being convenient to utilize preformed hole to connect the multiple collocation such as lattice girder, wirerope or protective screening uses; Do not need the clear slope of dig on a wide area, can solve the limited problem in clear slope in the scenic spot slope reinforcement that shakes the severe high gradient slope of rear execution conditions and need to show consideration for ecoscape, be conducive to improve safety and the environmental friendliness degree of slope anchorage construction.
Brief description of the drawings
Fig. 1 is the top view of steel anchor pier;
Fig. 2 is the lateral view of steel anchor pier;
Fig. 3 is the complete layout of steel anchor pier.
Detailed description of the invention
As a first aspect of the present invention, please refer to Fig. 1 and Fig. 2, a kind of steel anchor pier for the emergency processing of coming down is provided, comprising: top backing plate 1, offers the first anchor cable preformed hole 2 on top backing plate 1; Backing plate at bottom 3, top backing plate 1 be arranged in parallel with backing plate at bottom 3, offers the second anchor cable preformed hole 4 on backing plate at bottom 3; Cylinder 5, the first end of cylinder 5 is connected with top backing plate 1, and the second end of cylinder 5 is connected with backing plate at bottom 3, and the first end of cylinder 5 aligns with the first anchor cable preformed hole 2, and the second end of cylinder 5 aligns with the second anchor cable preformed hole 4; Multiple belly floors 6, around the circumferential installation of cylinder 5, and belly floor 6 is between top backing plate 1 and backing plate at bottom 3, preferably, offers wirerope connecting hole 7 on belly floor 6, so that being connected of steel Puritan and anchor pier.。Cylinder 5 can be used as anchor cable preformed hole, and anchor cable can be installed by the first anchor cable preformed hole 2, cylinder 5 and the second anchor cable preformed hole 4.Preferably, the height of steel anchor pier can be 200-300mm.
By wirerope connecting hole 7, steel anchor pier of the present invention is applied to slope reinforcement after can being connected in length and breadth by wirerope, protective screening as a whole, and connecting adjacent steel anchor pier with wirerope can increase enhancing globality.For example, the diameter of wirerope connecting hole 7 can be 5cm.Preferably, according to engineering experience, the spacing of steel anchor pier can be 3-4 rice.Please refer to Fig. 3, multiple steel anchor piers 9 connect into an entirety by wirerope 10, for example, multiple steel anchor piers 9 can be connected into net structure, between adjacent two steel anchor piers, all connect by wirerope 10.
Compared with prior art, the invention has the beneficial effects as follows: this steel anchor pier can be separately and anchor cable be used in conjunction with, or be applied to as a whole slope reinforcement after being connected in length and breadth by wirerope, protective screening.This steel anchor pier can be realized rapid-assembling and high-strength carrying in slope reinforcement construction; Being convenient to utilize preformed hole to connect the multiple collocation such as lattice girder, wirerope or protective screening uses; Do not need the clear slope of dig on a wide area, can solve the limited problem in clear slope in the scenic spot slope reinforcement that shakes the severe high gradient slope of rear execution conditions and need to show consideration for ecoscape, be conducive to improve safety and the environmental friendliness degree of slope anchorage construction.
General thought of the present invention is realize anchor pier prefabricated, and directly install at scene, is used in conjunction with anchor cable.For convenience of carrying and installation, the present invention turns to principle with small-size light-weight.
Preferably, belly floor 6 is provided with recess with the junction of the circumferential side wall of cylinder 5, forms groove 8, to avoid rainwater to combine between adjacent floor between recess and the circumferential side wall of cylinder 5.For example, the length of this groove can be 3-5cm.
Preferably, steel anchor pier base plate is square, and its length of side is determined by characteristic value of foundation bearing capacity, because compressive stress should be less than characteristic value of foundation bearing capacity, i.e. σ max< f ak, σ max=k st/ (L*L-π d 2/ 4) < f ak.Hence one can see that, and in the time that backing plate at bottom 3 is square, the foursquare length of side is determined by following formula:
L &GreaterEqual; k s T f ak + &pi;d 2 4
In formula:
T-anchor cable pulling force design load for example, can be 500kN;
K s-safety factor, gets 1.2-1.3;
F ak-slope foundation characteristic load bearing capacity;
D-base plate middle part opening diameter, because T is 500kN, therefore, can use 4-5 root anchor cable, correspondingly, and 70mm≤d≤80mm;
The foursquare length of side of L-, L >=600mm.
Especially, according to geotechnical engineering exploration data, slope foundation parameters in soil mechanics be can determine, internalfrictionangleφ, cohesion C and slope foundation characteristic load bearing capacity f comprised akdeng.
Top backing plate 1 directly bears anchor cable extruding load, is checked by steel plate compressive strength.Therefore, preferably, top backing plate 1 is circular, and circular radius is determined by following formula:
R &GreaterEqual; k s T &pi;f y
In formula:
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F ythe compressive strength design load of-top backing plate steel;
The radius of R-circle, R >=200mm.
Top backing plate 1 also should meet shear strength requirement.Preferably, the thickness of top backing plate 1 is determined by following formula:
B 1 &GreaterEqual; k s T 8 ( R - r ) f v
In formula:
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F vthe shear strength design load of-backing plate steel;
The radius of r-the first anchor cable preformed hole;
The radius of R-top backing plate;
B 1the thickness of-top board backing plate.
Preferably, the number of belly floor 6 be four (preferably, belly floor 6 be distributed in backing plate at bottom diagonal between the reserved anchor cable hole in center, end is mutually vertical), belly floor 6 is right-angled trapezium, its thickness is determined by following formula:
B 3 &GreaterEqual; k s T 4 ( R - r ) f y
In formula,
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F vthe shear strength design load of-belly floor;
The radius of r-the first anchor cable preformed hole;
The radius of R-top backing plate;
B 3the thickness of-belly floor.
Backing plate at bottom 3 must meet the normal deformation requirements using of member,
Figure BDA0000486432550000082
i > 150qL 3/ 8E, and can from i iron specification table, can find out I=f (B 2, H, B 1), moment of inertia is by B 2, H, B 1determine, and anchor pier height H is about 200~300mm, B 1determined by aforesaid way, so can try to achieve by tabling look-up the thickness B of backing plate at bottom 3 2.
Preferably, between the each several part of steel anchor pier, weld, and adopt the mode of galvanizing anticorrosion.
As a second aspect of the present invention, a kind of construction method of steel anchor pier is provided, steel anchor pier is above-mentioned steel anchor pier, comprising:
Step 1, cutting, clear substrate, thus make anchor cable axis vertical with substrate;
Step 2, bed course levelling;
Step 3, installs steel anchor pier;
Step 4, is used wirerope that multiple steel anchor pier integrated connections are got up.
Preferably, in step 2, adopt spun yarn and rubber tile levelling.
Below by two embodiment, the present invention is described in detail.
Embodiment mono-
Certain Slope is to 60~110 °, 50~80 ° of the gradients, horizontal wide 370m, longitudinally long 500m, the about 330m of relative relief.Reconnoitring stratum component in district has Quaternary system to collapse slide rock (Q4 from top to bottom col+dl), Quaternary system rushes proluvial (Q4 al+pl) and basement rock (Triassic system Shang Tong dwarf Japan group), be described below: (1) Quaternary system collapses slide rock (Q4 col+dl) be mainly distributed in domatic and toe area, slope, pile up and form by avalanche, thickness 0.5-40m, mainly taking gravelly soil as main, shiver stone particle diameter 20-50cm, the about 3.0m in largest block stone footpath, lithology is mainly metamorphic limestone, plasma is mainly silty clay, and the structure of matter is loose~slightly close, and water content is low.(2) Quaternary system is rushed proluvial (Q4 al+pl) be mainly distributed on leading edge terrace, slope, main matter is sand pebble soil.(3) basement rock is Triassic system Shang Tong dwarf Japan group metamorphic limestone, 85 ° of (T of 120 ° of ∠ of occurrence 3zw), basement rock is middle weathering-severely-weathered shape, developmental joint fissure.Basement rock engineering geology rock group belongs to half hard rock group.
Because this grade of side slope is more precipitous, road inconvenience, therefore preferred version is that steel anchor pier coordinates anchor cable, and administers by the method for wirerope connection reinforcement globality, its concrete steps are as follows:
A. according to geotechnical engineering exploration data, determine slope foundation (gravelly soil) characteristic load bearing capacity f ak=950kPa;
B. according to engineering experience and orographic condition, the interval S of steel anchor pier is 4m, is used in conjunction with anchor cable, and anchorage cable stretching power value is 500kN, and safety factor gets 1.2; Steel anchor pier uses Q235 steel to make.Then increase the globality of prevention and cure project with steel cable.
C. for making steel anchor pier appearance looks elegant, and ensure some strength, height H is 200mm;
D. steel anchor pier base plate is square, and its length of side is determined by characteristic value of foundation bearing capacity, because compressive stress should be less than characteristic value of foundation bearing capacity σ max< f ak, σ max=k st/ (L*L-π d 2/ 4) < f ak, through deriving, L is determined by following formula
Figure BDA0000486432550000101
(preformed hole diameter 70mm), and L>=600mm, get L=800mm.
E. top circular backing plate directly bears anchor cable extruding load, is checked its radius by steel plate compressive strength and R>=200mm, gets R=250mm.
F. top circular backing plate also should meet shear strength requirement, through derivation, and top plate thickness
Figure BDA0000486432550000103
get B 1=16mm.
G. floor group by 4 be distributed in backing plate at bottom diagonal between the reserved anchor cable hole in center, the orthogonal right-angled trapezium steel plate in end forms, its thickness B 3should meet compressive strength requirement
Figure BDA0000486432550000104
get B 3=10mm.
H. base plate must meet the normal deformation requirements using of member,
Figure BDA0000486432550000105
i > 1500qL 3/ 8E, and can from i iron specification table, can find out I=f (B 2, H, B 1), moment of inertia is by B 2, H, B 1determine, and anchor pier height H is about 200mm, B 1by step, D determines, so can try to achieve by tabling look-up base plate thickness B 2=10mm.
I. steel anchor pier is anticorrosion by the mode of galvanizing, increases the service life.
Embodiment bis-
The long 60m of certain sliding mass major axis, the wide 40m of leading edge, the wide 50m in trailing edge and middle part, mean breadth 45m, the about 10m of thickness, the about 27000m of sliding mass volume 3.This landslide has formed obvious border, grows a series of tensile crack and new steep bank along sliding mass border.The main glide direction on landslide is N40 ° of E, belongs to along the downward slippage of hillside direction.The maximum slippage of sliding mass exceedes 1.3m, and maximum settlement amount exceedes 0.52m.Glide direction is along hillside down sliding.In sliding mass, grow a series of transverse stretchings crack, landslide cuts mouth owing to being subject to stopping of bottom retaining wall, and local eminence appears in landslide leading edge.This landslide belongs to gravity traction landslide, still in slippage operational phase.Earth's surface is distributed as Quaternary system eluvial layer, underlies for lithological property.Quaternary system eluvial layer is taking silty clay as main, and lithological property lithology is the solidifying grey rhyolite-porphyry of tufaceous rhyolite-porphyry, angle gravel and argillaceous siltstoue or packsand, and the weathering of top, rock stratum is strong.Sliding mass top is Quaternary system eluvial layer, in close gravelly soil, bottom is completely decomposed tufaceous rhyolite-porphyry, infer landslide interface between completely decomposed and severely-weathered tufaceous rhyolite-porphyry interface.
Owing to planting a large amount of industrial crops on this slope body, and landslide disaster disposal fast, therefore preferred version is that steel anchor pier coordinates anchor cable, and administers by the method for wirerope connection reinforcement globality, its concrete steps are as follows:
A. according to geotechnical engineering exploration data, determine slope foundation (gravelly soil) characteristic load bearing capacity f ak=800kPa;
B. according to engineering experience and orographic condition, the interval S of steel anchor pier is 3m, is used in conjunction with anchor cable, and anchorage cable stretching power value is 500kN, and getting safety factor is 1.2; Steel anchor pier uses Q235 steel to make.Then increase the globality of prevention and cure project with steel cable.
C. for making steel anchor pier appearance looks elegant, and ensure some strength, height H is 200mm;
D. steel anchor pier base plate is square, and its length of side is determined by characteristic value of foundation bearing capacity, because compressive stress should be less than characteristic value of foundation bearing capacity σ max< f ak, σ max=k st/ (L*L-π d 2/ 4) < f ak, through deriving, L is determined by following formula
Figure BDA0000486432550000111
(preformed hole diameter 70mm), and L>=600mm, get L=900mm.
E. top circular backing plate directly bears anchor cable extruding load, is checked its radius by steel plate compressive strength
Figure BDA0000486432550000112
and R>=200mm, gets R=250mm.
F. top circular backing plate also should meet shear strength requirement, through derivation, and top plate thickness
Figure BDA0000486432550000113
get B 1=16mm.
G. floor group by 4 be distributed in backing plate at bottom diagonal between the reserved anchor cable hole in center, the orthogonal right-angled trapezium steel plate in end forms, its thickness B 3should meet compressive strength requirement
Figure BDA0000486432550000121
get B 3=10mm.
H. base plate must meet the normal deformation requirements using of member,
Figure BDA0000486432550000122
i > 1500qL 3/ 8E, and can from i iron specification table, can find out I=f (B 2, H, B 1), moment of inertia is by B 2, H, B 1determine, and anchor pier height H is about 200mm, B 1by step, D determines, so can try to achieve by tabling look-up base plate thickness B 2=12mm.
J. steel anchor pier is anticorrosion by the mode of galvanizing, increases the service life.

Claims (9)

1. for a steel anchor pier for the emergency processing of coming down, it is characterized in that, comprising:
Top backing plate (1), offers the first anchor cable preformed hole (2) on described top backing plate (1);
Backing plate at bottom (3), described top backing plate (1) be arranged in parallel with described backing plate at bottom (3), offers the second anchor cable preformed hole (4) on described backing plate at bottom (3);
Cylinder (5), the first end of described cylinder (5) is connected with described top backing plate (1), the second end of described cylinder (5) is connected with described backing plate at bottom (3), and the first end of described cylinder (5) aligns with described the first anchor cable preformed hole (2), the second end of described cylinder (5) aligns with described the second anchor cable preformed hole (4);
Multiple belly floors (6), around the circumferential installation of described cylinder (5), and described belly floor (6) is positioned between described top backing plate (1) and described backing plate at bottom (3), offers wirerope connecting hole (7) on described belly floor (6).
2. steel anchor pier according to claim 1, is characterized in that, described belly floor (6) is provided with recess with the junction of the circumferential side wall of described cylinder (5), between described recess and the circumferential side wall of described cylinder (5), forms groove (8).
3. steel anchor pier according to claim 1, is characterized in that, described backing plate at bottom (3) is square, and the described foursquare length of side is determined by following formula:
L &GreaterEqual; k s T f ak + &pi;d 2 4
In formula:
T-anchor cable pulling force design load;
K s-safety factor, gets 1.2-1.3;
F ak-slope foundation characteristic load bearing capacity;
D-base plate middle part opening diameter, 70mm≤d≤80mm;
The foursquare length of side of L-, L >=600mm.
4. steel anchor pier according to claim 1, is characterized in that, described top backing plate (1) is circular, and the radius of described circle is determined by following formula:
R &GreaterEqual; k s T &pi;f y
In formula:
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F ythe compressive strength design load of-top backing plate steel;
The radius of R-circle, R >=200mm.
5. steel anchor pier according to claim 4, is characterized in that, the thickness of described top backing plate (1) is determined by following formula:
B 1 &GreaterEqual; k s T 8 ( R - r ) f v
In formula:
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F vthe shear strength design load of-backing plate steel;
The radius of r-the first anchor cable preformed hole;
The radius of R-top backing plate;
B 1the thickness of-top board backing plate.
6. steel anchor pier according to claim 1, is characterized in that, the number of described belly floor (6) is four, and described belly floor (6) is right-angled trapezium, and its thickness is determined by following formula:
B 3 &GreaterEqual; k s T 4 ( R - r ) f y
In formula,
K s-safety factor, gets 1.2-1.3;
T-anchor cable pulling force design load;
F vthe shear strength design load of-belly floor;
The radius of r-the first anchor cable preformed hole;
The radius of R-top backing plate;
B 3the thickness of-belly floor.
7. steel anchor pier according to claim 1, is characterized in that, welds, and adopt the mode of galvanizing anticorrosion between the each several part of described steel anchor pier.
8. a construction method for steel anchor pier, described steel anchor pier is the steel anchor pier described in any one in claim 1 to 7, it is characterized in that, comprising:
Step 1, cutting, clear substrate, thus make anchor cable axis vertical with substrate;
Step 2, bed course levelling;
Step 3, installs described steel anchor pier;
Step 4, is used wirerope that multiple described steel anchor pier integrated connections are got up.
9. construction method according to claim 8, is characterized in that, in described step 2, adopts spun yarn and rubber tile levelling.
CN201410131485.8A 2014-04-02 2014-04-02 Steel anchor pier for landslide emergency treatment and construction method thereof Pending CN103866766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410131485.8A CN103866766A (en) 2014-04-02 2014-04-02 Steel anchor pier for landslide emergency treatment and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410131485.8A CN103866766A (en) 2014-04-02 2014-04-02 Steel anchor pier for landslide emergency treatment and construction method thereof

Publications (1)

Publication Number Publication Date
CN103866766A true CN103866766A (en) 2014-06-18

Family

ID=50905747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410131485.8A Pending CN103866766A (en) 2014-04-02 2014-04-02 Steel anchor pier for landslide emergency treatment and construction method thereof

Country Status (1)

Country Link
CN (1) CN103866766A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404970A (en) * 2014-11-21 2015-03-11 中水北方勘测设计研究有限责任公司 Steel structure anchor pier for supporting pre-stressed anchor cable for side slope
CN104532856A (en) * 2015-01-05 2015-04-22 广西瑞宇建筑科技有限公司 Fabricated lattice unit for foundation pit supporting and installation method
CN105946159A (en) * 2016-05-04 2016-09-21 江苏中南建筑产业集团有限责任公司 Production method for FRP nut clamped double-pressure-relieving composite anchorage pier
CN110080256A (en) * 2019-06-06 2019-08-02 福建工程学院 A kind of assembled cross anchor pier and its construction method
CN111832109A (en) * 2020-07-14 2020-10-27 重庆大学 Design method of rock slope gravity type retaining wall without camber structural surface
CN112922044A (en) * 2021-02-01 2021-06-08 浙江工业大学 Anchor rod combined anti-floating system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002173939A (en) * 2000-12-07 2002-06-21 Nippon Steel Metal Prod Co Ltd Slope stabilizing method and slope stabilizing structure
JP2008121423A (en) * 2008-02-22 2008-05-29 Nippon Steel & Sumikin Metal Products Co Ltd Slope stabilizing method for suppressing sediment outflow and surface layer sediment outflow suppressing member used for the same
CN101560772A (en) * 2009-04-30 2009-10-21 北京中水科海利工程技术有限公司 Prestressed grid anchorage technology for side slope governance

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002173939A (en) * 2000-12-07 2002-06-21 Nippon Steel Metal Prod Co Ltd Slope stabilizing method and slope stabilizing structure
JP2008121423A (en) * 2008-02-22 2008-05-29 Nippon Steel & Sumikin Metal Products Co Ltd Slope stabilizing method for suppressing sediment outflow and surface layer sediment outflow suppressing member used for the same
CN101560772A (en) * 2009-04-30 2009-10-21 北京中水科海利工程技术有限公司 Prestressed grid anchorage technology for side slope governance

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王明等: "钢锚墩头在小湾地下厂房锚索施工中的应用", 《云南水利发电》, vol. 22, no. 5, 31 October 2006 (2006-10-31) *
赵利鹏: "预应力锚索钢垫板锚墩结构设计", 《云南水利发电》, vol. 28, no. 4, 31 August 2012 (2012-08-31) *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404970A (en) * 2014-11-21 2015-03-11 中水北方勘测设计研究有限责任公司 Steel structure anchor pier for supporting pre-stressed anchor cable for side slope
CN104532856A (en) * 2015-01-05 2015-04-22 广西瑞宇建筑科技有限公司 Fabricated lattice unit for foundation pit supporting and installation method
CN105946159A (en) * 2016-05-04 2016-09-21 江苏中南建筑产业集团有限责任公司 Production method for FRP nut clamped double-pressure-relieving composite anchorage pier
CN105946159B (en) * 2016-05-04 2018-07-03 江苏中南建筑产业集团有限责任公司 A kind of production method of the double slow compound anchor piers of pressure of FRP nuts clamping
CN110080256A (en) * 2019-06-06 2019-08-02 福建工程学院 A kind of assembled cross anchor pier and its construction method
CN111832109A (en) * 2020-07-14 2020-10-27 重庆大学 Design method of rock slope gravity type retaining wall without camber structural surface
CN111832109B (en) * 2020-07-14 2022-08-05 重庆大学 Design method of rock slope gravity type retaining wall without camber structural surface
CN112922044A (en) * 2021-02-01 2021-06-08 浙江工业大学 Anchor rod combined anti-floating system

Similar Documents

Publication Publication Date Title
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN103866766A (en) Steel anchor pier for landslide emergency treatment and construction method thereof
CN105155558A (en) Combined retaining structure and construction method thereof
CN104846840B (en) A kind of shallow embedding reinforcement of soft soil integrated pipe canal device and construction method
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN102493497A (en) Multidimensional seismic isolation layer/belt structure applicable to multilayer construction foundation
CN102031760A (en) Anti-rockfall method for subgrade in rock deposit zone
CN106836275A (en) Landscape eco-friendly retaining wall for rapidly protecting tillite slope and implementation method
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN101967786B (en) Airfield pavement structure with box-type shock-isolation foundation
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN108330963A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN109487793A (en) Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction&#39;s supporting construction under existing facility
CN204940310U (en) A kind of combination retaining structure
CN212642730U (en) Collapsible loess area tunnel passes people&#39;s air defense structure
CN211571780U (en) Rib plate type retaining wall structure for combined support of anchor rods and anchor cables
CN210395379U (en) A side slope reinforcerment system for basic building engineering
CN204715364U (en) A kind of foundation pit support device
CN110219248B (en) Anti-overturning simple temporary bridge pier construction method and anti-overturning simple temporary bridge construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140618

RJ01 Rejection of invention patent application after publication