CN103861901B - The curved preparation method of the oval manhole door Spot Cooling of steel column - Google Patents

The curved preparation method of the oval manhole door Spot Cooling of steel column Download PDF

Info

Publication number
CN103861901B
CN103861901B CN201210541118.6A CN201210541118A CN103861901B CN 103861901 B CN103861901 B CN 103861901B CN 201210541118 A CN201210541118 A CN 201210541118A CN 103861901 B CN103861901 B CN 103861901B
Authority
CN
China
Prior art keywords
steel plate
processed
steel
clod wash
baffle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210541118.6A
Other languages
Chinese (zh)
Other versions
CN103861901A (en
Inventor
尹兰宁
罗琛晟
李义轩
张朝刚
岳锟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201210541118.6A priority Critical patent/CN103861901B/en
Publication of CN103861901A publication Critical patent/CN103861901A/en
Application granted granted Critical
Publication of CN103861901B publication Critical patent/CN103861901B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention relates to the oval manhole door of steel column.The curved preparation method of the oval manhole door Spot Cooling of a kind of steel column, it comprises: one, clod wash internal model making, and this clod wash mold comprises a semicircle baffle plate and a straight baffle plate; Be placed on scene, driving or portal jib crane walking are across interior; At both sides, steel plate one end to be processed welding stiffened panel, perforate on stiffened panel; Two fixing points are set about ground clod wash mold at the scene, and connect fixed pulley; The other end of the steel plate to be processed through step 3 process is inserted between the semicircle baffle plate of clod wash mold and straight baffle plate; Be connected on the hole as reinforcement with steel cable, the other end walks around fixed pulley connection driving or portal jib crane hook pulls steel plate one end to be processed to be bent downwardly; Pull down steel wire rope, be connected on another fixed pulley, steel plate bending to be processed is put in place; Another steel plate bending; Be shaped completing two bending steel plate splicings, and be welded to connect.The present invention is simple for production, and ensure that the making duration.

Description

The curved preparation method of the oval manhole door Spot Cooling of steel column
Technical field
The present invention relates to the oval manhole door of steel column, particularly relate to the preparation method of the oval manhole door of steel column.
Background technology
All be designed with various visit passage and travelling crane inspection passage in various structural steel industrial building now, and this type of passage is often arranged in steel column system, for guarantee personnel walk unimpeded, usual design all requires to design manhole in solid-web steel column.This type of manhole is generally oval (two ends are a semi-circular structure, and middle part is rectangle), therefore needs to bend elliptical manhole in steel upper prop manufacturing process.For the making of this class formation, usually adopt fire bending curved and bend in conjunction with mechanical external force or use professional roller mill to carry out machinery and bend.The former complex process, steel plate heating-up temperature cannot accurately control, and simmering and bending hot spot is difficult to accurately determine, oval molding effect and perception are all poor, and fabrication cycle is longer, are not suitable for batch making; Use roller mill bends, and needs to be equipped with professional roller mill, and drop into excessive, field fabrication does not satisfy the requirements, if entrust professional factory to bend specially manhole plate, turn increase cost of manufacture, and fabrication cycle is long.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and provides the oval manhole door Spot Cooling of a kind of steel column curved preparation method.The present invention is simple for production, utilizes existing appointed condition, reaches the object that batch bent, accurately bent elliptical manhole plate, and ensure that the making duration.
For solving the problem, the curved preparation method of the present invention's oval manhole door Spot Cooling of a kind of steel column, it comprises:
Step one, clod wash internal model making, this clod wash mold comprises a semicircle baffle plate and a straight baffle plate, and the radian of described semicircle baffle plate is determined according to people's bore ends semicircle diameter to be processed;
Step 2, clod wash mold step one made is placed on scene, and driving or portal jib crane walking are across interior;
Step 3, at both sides, steel plate one end to be processed welding stiffened panel, perforate on stiffened panel;
Step 4, arranges two fixing points at the scene about ground clod wash mold, and connects a fixed pulley;
Step 5, inserts between the semicircle baffle plate of clod wash mold and straight baffle plate by the other end of the steel plate to be processed through step 3 process; Be connected on the hole as reinforcement with steel cable, the other end is walked around fixed pulley and is connected driving or portal jib crane hook; Driving or portal jib crane start, and pull steel plate one end to be processed to bend downward into 40 ° ~ 50 °;
Step 6, pulls down steel wire rope, is connected on another fixed pulley, utilizes driving or portal jib crane to be put in place by steel plate bending to be processed;
Step 7, repeats step 5 and six, another steel plate bending;
Step 8, is shaped completing two bending steel plate splicings, and is welded to connect.
Present invention efficiently solves batch, accurately bend the making difficult point of elliptical manhole plate.Conventional fire bending kinking conjunction mechanical external force bends method and professional roller mill bends method, and early investment is large, complex process, cost of manufacture are high, fabrication cycle is long.Method of the present invention efficiently solves on-the-spot batch, accurately bends the practical challenges of this type of Long Circle manhole plate, avoids Large-scale professional equipment investment, greatly reduces the cost of manufacture of this operation, and ensure that fabrication cycle.The present invention is easy to make, economical and practical.
Accompanying drawing explanation
Below, the present invention is further illustrated by reference to the accompanying drawings:
Fig. 1-Fig. 2 is clod wash schematic diagram of the present invention.
Detailed description of the invention
As depicted in figs. 1 and 2, the curved preparation method of the present invention's oval manhole door Spot Cooling of a kind of steel column, it comprises:
Step one, clod wash internal model making, this clod wash mold comprises a semicircle baffle plate 2 and baffle plate 3 always, and the radian of described semicircle baffle plate is determined according to people's bore ends semicircle diameter to be processed;
Step 2, the clod wash mold 1 step one made is placed on scene, and driving or portal jib crane walking are across interior;
Step 3, at both sides, steel plate 4 one end to be processed welding stiffened panel 7, perforate on stiffened panel;
Step 4, arranges two fixing points 5,6 at the scene about ground clod wash mold, and connects a fixed pulley;
Step 5, inserts between the semicircle baffle plate 2 of clod wash mold, straight baffle plate 3 by the other end of the steel plate to be processed through step 3 process; Be connected on the hole of stiffened panel with steel cable, the other end is walked around fixing point 5 fixed pulley and is connected driving or portal jib crane hook; Driving or portal jib crane start, and pull steel plate one end to be processed to bend downward into 40 ° ~ 50 ° (see Fig. 1);
Step 6, pulls down steel wire rope, is connected on another fixing point 6 fixed pulley, utilizes driving or portal jib crane to put steel plate bending to be processed in place (see Fig. 2);
Step 7, repeats step 5 and six, another steel plate bending;
Step 8, is shaped completing two bending steel plate splicings, and is welded to connect.

Claims (1)

1. the curved preparation method of the oval manhole door Spot Cooling of steel column, it is characterized in that, it comprises:
Step one, clod wash internal model making, this clod wash mold comprises a semicircle baffle plate and baffle plate always, and the radian of described semicircle baffle plate is determined according to people's bore ends semicircle diameter to be processed;
Step 2, clod wash mold step one made is placed on scene, and driving or portal jib crane walking are across interior;
Step 3, at both sides, steel plate one end to be processed welding stiffened panel, perforate on stiffened panel;
Step 4, arranges two fixing points at the scene, and connects fixed pulley about ground clod wash mold;
Step 5, inserts between the semicircle baffle plate of clod wash mold and straight baffle plate by the other end of the steel plate to be processed through step 3 process; Be connected on the hole of stiffened panel with steel cable, the other end is walked around fixed pulley and is connected driving or portal jib crane hook; Driving or portal jib crane start, and pull steel plate one end to be processed to bend downward into 40 ° ~ 50 °;
Step 6, pulls down steel wire rope, is connected on another fixed pulley, utilizes driving or portal jib crane to be put in place by steel plate bending to be processed;
Step 7, repeats step 5 and six, another steel plate bending;
Step 8, is shaped completing two bending steel plate splicings, and is welded to connect.
CN201210541118.6A 2012-12-14 2012-12-14 The curved preparation method of the oval manhole door Spot Cooling of steel column Active CN103861901B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210541118.6A CN103861901B (en) 2012-12-14 2012-12-14 The curved preparation method of the oval manhole door Spot Cooling of steel column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210541118.6A CN103861901B (en) 2012-12-14 2012-12-14 The curved preparation method of the oval manhole door Spot Cooling of steel column

Publications (2)

Publication Number Publication Date
CN103861901A CN103861901A (en) 2014-06-18
CN103861901B true CN103861901B (en) 2016-02-03

Family

ID=50901256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210541118.6A Active CN103861901B (en) 2012-12-14 2012-12-14 The curved preparation method of the oval manhole door Spot Cooling of steel column

Country Status (1)

Country Link
CN (1) CN103861901B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11014225B2 (en) 2017-12-15 2021-05-25 Alfonso GARCIA MIRO PESCHIERA Workbench for the cold intervention, folding, bending, twisting or deformation of metal plates or sheets
CN113334034B (en) * 2021-07-07 2022-06-14 南京科技职业学院 Manufacturing method of eccentric suspension post

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07171628A (en) * 1993-12-20 1995-07-11 Kanai Hiroyuki Method for forming cylindrical work out of flat sheet
RO119825B1 (en) * 2002-12-16 2005-04-29 Prompt-S.A. Main beam
CN201644641U (en) * 2010-03-18 2010-11-24 上海江南长兴重工有限责任公司 Gasket mould for bending thick plate for ship
CN101898207A (en) * 2010-07-12 2010-12-01 燕山大学 Four-point bending progressive die forming method for large straight seam pipe blank
CN202493638U (en) * 2012-03-14 2012-10-17 福州铭林钢塔钢构制造有限公司 Transmission mechanism of manhole ring brake bending machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07171628A (en) * 1993-12-20 1995-07-11 Kanai Hiroyuki Method for forming cylindrical work out of flat sheet
RO119825B1 (en) * 2002-12-16 2005-04-29 Prompt-S.A. Main beam
CN201644641U (en) * 2010-03-18 2010-11-24 上海江南长兴重工有限责任公司 Gasket mould for bending thick plate for ship
CN101898207A (en) * 2010-07-12 2010-12-01 燕山大学 Four-point bending progressive die forming method for large straight seam pipe blank
CN202493638U (en) * 2012-03-14 2012-10-17 福州铭林钢塔钢构制造有限公司 Transmission mechanism of manhole ring brake bending machine

Also Published As

Publication number Publication date
CN103861901A (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN106003364B (en) The method for preventing the concrete shear force wall based on 3D printing from shelling
CN103615064B (en) A kind of Cable dome and installation method thereof
CN103861901B (en) The curved preparation method of the oval manhole door Spot Cooling of steel column
CN206722517U (en) One kind assembling concrete wire pole
CN102044938A (en) Method for hoisting large-scale motor by using shoulder-pole hoisting rotor penetration method
CN103161154A (en) Distribution and application of pile foundation well squeezed bearing disk steel bars
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN103882994B (en) Ring beam steel bar connecting structure and ring beam construction method
CN204023417U (en) For building the bearing pin bracket of high pier 0# block concrete
CN204475817U (en) Communication type combination construction hanging basket
CN104594797B (en) A kind of detachable U-shaped cat ladder of hydraulic engineering and manufacture method thereof
CN106077200A (en) The boiler hot-bending method of U-shaped suspension rod
CN205123133U (en) Dismantled and assembled construction cable support
CN103231446B (en) Inner wall of building plate factorial praluction device
CN204343297U (en) The structure of after-pouring beam reserving hole process in a kind of concrete in mass
CN204384693U (en) Annealing furnace suspender
CN204355968U (en) A kind of bulb flat lifting instrument
CN203061768U (en) Curve wire self-made tool for steel strand stay wire handle heads
CN106592956A (en) Method for moving and changing fastener type steel pipe double-row scaffold
CN107344215A (en) U-shaped angle-bender
CN206832024U (en) One kind is used for the full die forging pre-formed joint processing structure of drying oven
CN202334173U (en) Electric heater for maintaining submersible motor core wire
CN107700754A (en) One kind combination flat tube post
CN206661977U (en) A kind of straightener is interference fitted device
CN206276754U (en) A kind of grounding flat steel cold bending equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant