CN206832024U - One kind is used for the full die forging pre-formed joint processing structure of drying oven - Google Patents
One kind is used for the full die forging pre-formed joint processing structure of drying oven Download PDFInfo
- Publication number
- CN206832024U CN206832024U CN201720528927.1U CN201720528927U CN206832024U CN 206832024 U CN206832024 U CN 206832024U CN 201720528927 U CN201720528927 U CN 201720528927U CN 206832024 U CN206832024 U CN 206832024U
- Authority
- CN
- China
- Prior art keywords
- die forging
- drying oven
- airduct
- hem
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forging (AREA)
Abstract
A kind of full mold segment pre-formed joint processing structure of drying oven, including the drying oven chamber body being welded by several die forging unit spliceds are the utility model is related to, each die forging unit is enclosed by top plate, side plate and bottom plate to be formed;Internal airduct is provided with drying oven chamber body, the upper end of internal airduct has upper hem, and the lower end of internal airduct has lower hem, and internal airduct upper end is welded to connect by upper hem and top plate, and internal airduct lower end by lower hem and bottom plate with being welded to connect;Upper hem and lower hem at adjacent die forging unit spliced seam are respectively equipped with otch.The utility model makes for full mold segmentization, does not increase unnecessary process, is easy to assemble, installs, and solves some problems of live spelling and measurement etc..
Description
Technical field
The manufacture technology field of drying oven die forging is the utility model is related to, is made in particular to a kind of full die forgingization of drying oven
Middle die forging and the joint treatment structure of swaged connection.
Background technology
At present, the making of domestic drying oven is substantially that scene dissipates spelling, with the raising of technological development and quality requirement, is dried
The mold segmentization of dry stove makes increasingly popular.Current each equipment manufacturer is when drying oven die forging makes, if internal airduct etc. is complete
It is complete it is prefabricated completely after live spelling, can cause live die forging and outer wall plate welding seams during die forging spelling can not be welded at interior airduct and
Can not be completely prefabricated.Domestic die forging production method at present, is generally all not fill the interior airduct of die forging two ends, at the scene will
Interior airduct herein is installed again after the completion of die forging spelling and welding, such a situation can cause airduct in 1, termination not make in advance
Make, manufactured after needing in-site measurement;2nd, installation quality can not ensure.
The content of the invention
The purpose of this utility model seeks to the deficiency for solving above-mentioned background technology, there is provided a kind of drying that can be completely prefabricated
The seam processing structure of stove die forging.
The technical solution of the utility model is:A kind of full mold segment pre-formed joint processing structure of drying oven, including:By several
The drying oven chamber body that die forging unit spliced is welded, each die forging unit is enclosed by top plate, side plate and bottom plate to be formed;Drying
Internal airduct is provided with furnace chamber body, the upper end of internal airduct has upper hem, and the lower end of internal airduct has lower hem, internal wind
Pipe upper end is welded to connect by upper hem and top plate, and internal airduct lower end by lower hem and bottom plate with being welded to connect;Positioned at phase
Upper hem and lower hem at adjacent die forging unit spliced seam are respectively equipped with otch.
The kerf width is 20-50mm.
The utility model is simple in construction, fabricates, be easy for installation, solving present in existing drying oven manufacturing process
Can not the problem of mold segmentization is prefabricated entirely.
Brief description of the drawings
Fig. 1 is mold segment end structure illustration of the present utility model;
Fig. 2 is top view when not installing interior airduct after die forging spelling of the present utility model;
Fig. 3 is the top view after airduct in mold segment spelling of the present utility model and installation;
Fig. 4 is the structural representation of airduct in the utility model.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As Figure 1-4, the utility model includes:The drying oven chamber body being welded by several die forging unit spliceds,
Each die forging unit is enclosed and formed by top plate 1, side plate 2 and bottom plate 4;Internal airduct 3, internal airduct are provided with drying oven chamber body
3 upper end has upper hem 7, and the lower end of internal airduct 3 has lower hem 8, and the internal upper end of airduct 3 passes through upper hem 7 and top plate 1
It is welded to connect, the internal lower end of airduct 3 by lower hem 8 and bottom plate 4 with being welded to connect;At adjacent die forging unit spliced seam
Upper hem and lower hem are respectively equipped with otch 5.The width of otch 5 is 20-50mm.
Such as Fig. 1, a kind of shown drying oven die forging and end view, in side plate 2, top framework, top plate 1 and bottom plate 4
After being welded to form die forging Deng individual event, drying oven chamber body forms the cavity of " mouth " type in terms of end face.As shown in Fig. 2 not
In installation before airduct, die forging spelling(Fig. 2 is die forging 1 and the connection diagram of die forging 2 10)After the completion of, the weldering between die forging
Connecing to complete.Such as lines in Fig. 3(Seam between mold segment)6(The junction of die forging 1 and die forging 2 10)Shown position is
Sealing wire.In order to reach the completeness of die forging making, the interior airduct of die forging is all installed into inside cavity, now, formd
" II " type structure, now in the junction of die forging and die forging, because interior airduct and top plate 1 and bottom plate 4 are run in the workpiece of chamber body
Direction has been welded, and on chamber body width, the position of die forging seam crossing is pressed in the flanging 7,8 of interior airduct 3, close between die forging
Soldering and sealing can not be completed, the B in seam 6 as shown in Figure 3(B is the length that the flanging 7,8 of interior airduct is pressed in seam 6)Position.
In order that mold segment is completely prefabricated, by interior airduct 3, corner cut is handled on swaged connection flanging here, as shown in Figure 4 in interior airduct 3
The otch 5 cut away after the flanging of part, after complete pre- spelling, the sealing outside body of heater can be completed by otch herein at the scene and is welded
Connect.
Claims (2)
- A kind of 1. full mold segment pre-formed joint processing structure of drying oven, it is characterised in that:Including being welded by several die forging unit spliceds The drying oven chamber body connect, each die forging unit is enclosed by top plate, side plate and bottom plate to be formed;It is provided with drying oven chamber body interior Portion's airduct, the upper end of internal airduct have upper hem, and the lower end of internal airduct has lower hem, and internal airduct upper end passes through upper folding Side is welded to connect with top plate, and internal airduct lower end by lower hem and bottom plate with being welded to connect;Positioned at adjacent die forging unit spliced Upper hem and lower hem at seam are respectively equipped with otch.
- 2. the full mold segment pre-formed joint processing structure of drying oven according to claim 1, it is characterised in that:The kerf width For 20-50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720528927.1U CN206832024U (en) | 2017-05-12 | 2017-05-12 | One kind is used for the full die forging pre-formed joint processing structure of drying oven |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720528927.1U CN206832024U (en) | 2017-05-12 | 2017-05-12 | One kind is used for the full die forging pre-formed joint processing structure of drying oven |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206832024U true CN206832024U (en) | 2018-01-02 |
Family
ID=60771415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720528927.1U Active CN206832024U (en) | 2017-05-12 | 2017-05-12 | One kind is used for the full die forging pre-formed joint processing structure of drying oven |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206832024U (en) |
-
2017
- 2017-05-12 CN CN201720528927.1U patent/CN206832024U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206832024U (en) | One kind is used for the full die forging pre-formed joint processing structure of drying oven | |
CN105414898B (en) | A kind of preparation method of the direct-current motor shell of flange shaping | |
CN101844164A (en) | Production process of quick connecting pipe | |
CN204622446U (en) | A kind of processing structure for the production of wrapped pipe joint | |
CN103861901B (en) | The curved preparation method of the oval manhole door Spot Cooling of steel column | |
CN205482386U (en) | Medicine stove is forged to electric heat | |
CN205520188U (en) | A joint design for welding position | |
CN106949761A (en) | A kind of spiral heat exchanger and its welding method | |
CN207250769U (en) | A kind of structure of copper bar | |
CN205900820U (en) | Cable terminal package assembly | |
CN207178391U (en) | A kind of connecting tube | |
CN202493851U (en) | Heating pipe casing pipe | |
CN207048968U (en) | Prefabricated pumping plant housing | |
CN107692863A (en) | A kind of novel baking oven inner bag | |
CN206787264U (en) | The attachment structure of crop dryer fan housing | |
CN103267354B (en) | Sectional jacket water tank | |
CN208017384U (en) | A kind of pressure-bearing heating water bladder | |
CN204459579U (en) | A kind of new hydrophobic elbow structure | |
CN203148110U (en) | Generator | |
CN204226930U (en) | A kind of building pipe linkage structure | |
CN203363281U (en) | T-joint electrically operated valve | |
CN204425676U (en) | With the electrothermal tube of overtemperature protection system | |
CN202493849U (en) | Sealing sheet used for welding | |
CN208903830U (en) | A kind of dedicated oblong coil winding mold of transformer production | |
CN203493474U (en) | Connecting structure of furnace body and panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220218 Address after: 442021 1 1-1, building 4, No. 9, Dongyi Avenue, Maojian District, Shiyan City, Hubei Province Patentee after: DONGFENG SPECIAL EQUIPMENT TECHNOLOGY Co.,Ltd. Address before: 430056 No.8, Longwang Road, Longwang Industrial Park, Caidian District, Wuhan City, Hubei Province Patentee before: Wuhan Dongfeng Paint Shop Equipment Co.,Ltd. |