CN204343297U - Structure for processing reserved hole of post-cast beam in mass concrete - Google Patents

Structure for processing reserved hole of post-cast beam in mass concrete Download PDF

Info

Publication number
CN204343297U
CN204343297U CN201420612357.0U CN201420612357U CN204343297U CN 204343297 U CN204343297 U CN 204343297U CN 201420612357 U CN201420612357 U CN 201420612357U CN 204343297 U CN204343297 U CN 204343297U
Authority
CN
China
Prior art keywords
beam section
reserving hole
hole
roof beam
grout pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420612357.0U
Other languages
Chinese (zh)
Inventor
陈小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201420612357.0U priority Critical patent/CN204343297U/en
Application granted granted Critical
Publication of CN204343297U publication Critical patent/CN204343297U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a structure that back pouring roof beam reserved hole was handled in bulky concrete, it is equipped with reservation hole (2) of back pouring roof beam section (3) in thick wall (1) of bulky concrete, top of reserving hole (2) is equipped with grout pipe (4), back pouring roof beam section (3) are pour and are accomplished the back, the one end of grout pipe (4) is buried and is pour in back in roof beam section (3) and insert to reserve hole (2) at the bottom, the other end kickup is exposed outside back pouring roof beam section (3). The utility model discloses a this kind of reserve hole and bury arrangement structure type economy of grout pipe underground is feasible, and structural integrity is good, and the construction degree of difficulty is less, and the cost is lower, has wide application prospect.

Description

The structure of after-pouring beam reserving hole process in a kind of concrete in mass
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering technical field, particularly relates to the structure of after-pouring beam reserving hole process in a kind of concrete in mass (thick wall).
Background technology
In hydraulic structure, there is the structure of beam, due to many reasons, need the construction carrying out beam after massive concrete walls body concrete has been constructed again, for strengthening structural integrity, improve reliability of structure, need by girder construction according to stressed pattern in concrete preformed hole hole out in massive concrete walls body construction process.The processing method traditional to reserving hole is reserving hole in concrete in mass, carries out building of concrete beam; This situation easily causes beam inner concrete to fill secret room, affects the force structure of beam, there is potential safety hazard; Or reserving hole is more shallow, anchorage length of steel bar is inadequate, cannot meet structural requirement.
Utility model content
The purpose of this utility model is for solving the deficiencies in the prior art, providing the structure of after-pouring beam reserving hole process in a kind of concrete in mass.
This method is achieved by following technical solution:
It is the reserving hole being provided with after-pouring beam section in the thick wall of concrete in mass, grout pipe is provided with above reserving hole, after after-pouring beam section has been built, one end of grout pipe to be imbedded in after-pouring beam section and is inserted at the bottom of reserving hole, and the other end is bent upwards exposure outside after-pouring beam section.By pre-embedment grouting pipe, after after-pouring beam section has been built, make filling in reserving hole closely knit by grouting, improve reliability of structure.
The height of reserving hole is highly identical with after-pouring beam section, the width 0 ~ 10cm wider than after-pouring beam section of reserving hole.The degree of depth of reserving hole should be more than or equal to the anchorage length of steel bar of regulation and stipulation.Reserving hole inside should after concrete initial set dabbing.Need in reserving hole by the assembling reinforcement of specification anchorage length.Reserving hole is built as after-pouring beam section simultaneously.
The beneficial effects of the utility model are:
This reserving hole of the present utility model buries the arrangement pattern economically feasible of grout pipe underground, and structural integrity is good, and difficulty of construction is less, and cost is lower, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is reserving hole structural representation;
Fig. 2 be grout pipe is set and complete after-pouring beam section build after structural representation.
The thick wall of description of reference numerals: 1-, 2-reserving hole, 3-after-pouring beam section, 4-grout pipe, reinforcing bar in 5-beam.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
See Fig. 1, the utility model after concrete in mass, wall 1 arranges reserving hole 2 for solving, and is connected with the good of after-pouring beam section 3 to realize rear wall 1.As shown in Figure 2, the utility model, by arranging grout pipe 4 above reserving hole 2, like this after after-pouring beam section 3 has been built, is in the milk by the position of grout pipe 4 to former reserving hole 2 with the stability improving structure.After after-pouring beam section 3 has been built, a part for grout pipe 4 is buried in wherein, position at the bottom of one end straight cutting to the hole of reserving hole 2, and the other end is bent outwardly exposure outside after-pouring beam section 3 outside reserving hole 2.
As shown in the figure, this method is mainly carried out in accordance with the following steps:
The first step, installs the template of reserving hole 2 while installing concrete in mass thick wall 1 template;
Second step, completes the template that rear dismounting reserving hole 2 periphery built by the thick wall of concrete in mass 1, in reserving hole 2 periphery dabbing after initial set;
3rd step, reinforcing bar 5 in the beam laying after-pouring beam section 3 in reserving hole 2, buries grout pipe 4 underground;
4th step, builds after-pouring beam section 3, is in the milk after after-pouring beam section 3 concrete reaches design strength by grout pipe 4.
More than just embody rule example of the present utility model, the technical scheme that the utility model also has other embodiment, all employings to be equal to replacement or equivalent transformation to be formed, all drops within the protection domain required by the utility model.

Claims (1)

1. the structure of after-pouring beam reserving hole process in a concrete in mass, it is included in the reserving hole (2) being provided with after-pouring beam section (3) in the thick wall (1) of concrete in mass, it is characterized in that: be provided with grout pipe (4) in the top of reserving hole (2), one end of grout pipe (4) to be imbedded in after-pouring beam section (3) and is inserted to reserving hole (2) end, and the other end is bent upwards exposure outside after-pouring beam section (3); The height of described reserving hole (2) is highly identical with after-pouring beam section (3), the width 0 ~ 10cm wider than after-pouring beam section (3) of reserving hole (2).
CN201420612357.0U 2014-10-22 2014-10-22 Structure for processing reserved hole of post-cast beam in mass concrete Expired - Lifetime CN204343297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420612357.0U CN204343297U (en) 2014-10-22 2014-10-22 Structure for processing reserved hole of post-cast beam in mass concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420612357.0U CN204343297U (en) 2014-10-22 2014-10-22 Structure for processing reserved hole of post-cast beam in mass concrete

Publications (1)

Publication Number Publication Date
CN204343297U true CN204343297U (en) 2015-05-20

Family

ID=53226575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420612357.0U Expired - Lifetime CN204343297U (en) 2014-10-22 2014-10-22 Structure for processing reserved hole of post-cast beam in mass concrete

Country Status (1)

Country Link
CN (1) CN204343297U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760050A (en) * 2016-11-24 2017-05-31 大象建筑设计有限公司 The attachment structure and through processing method of shear wall and after-pouring concrete frame beam
CN108265996A (en) * 2017-12-28 2018-07-10 浙江核力建筑特种技术有限公司 A kind of masonry structure break wall punch it is pre- top restore construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760050A (en) * 2016-11-24 2017-05-31 大象建筑设计有限公司 The attachment structure and through processing method of shear wall and after-pouring concrete frame beam
CN106760050B (en) * 2016-11-24 2022-04-05 大象建筑设计有限公司 Connecting structure of shear wall and rear pouring concrete frame beam and through type processing method
CN108265996A (en) * 2017-12-28 2018-07-10 浙江核力建筑特种技术有限公司 A kind of masonry structure break wall punch it is pre- top restore construction
CN108265996B (en) * 2017-12-28 2020-08-04 浙江核力建筑特种技术有限公司 Masonry structure wall-breaking hole-opening pre-jacking recovery construction method

Similar Documents

Publication Publication Date Title
CN105908862B (en) A kind of production method of masonry shell in 3D printing reinforced masonry shear wall
CN203603930U (en) Device for preventing tunnel secondary lining vault from disengaging
CN205638482U (en) Be used for tunnel concrete secondary lining to take template slip casting device
CN103437346A (en) Steel pipe pile with burrs and construction method
CN103835303B (en) A kind of cast-type armored concrete shearing resistance method and structure
CN204343297U (en) Structure for processing reserved hole of post-cast beam in mass concrete
CN203238642U (en) Supporting retaining wall of foundation pit
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN204024053U (en) A kind of cast-in-place concrete floor pipe preformed hole mould
CN204252119U (en) The special-shaped supporting pile structure of X
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN101979777B (en) Construction method of combined underground continuous wallboard of cast-in-place hollow square pile
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN204266216U (en) Bamboo beam anchoring and supporting structure of side slope
CN203684509U (en) Grooved block masonry wall
CN203769086U (en) Concrete embedded part
CN203701434U (en) Reinforcement horizontal locating ladder for shear wall
CN204532367U (en) A kind of underground bracket stake
CN205421332U (en) Contrary coincide underground continuous wall that does of a core section of thick bamboo
CN205152958U (en) Novel combination steel sheet pile
CN203014304U (en) Cross-core wall-interior fixing structure for embedding distribution box into masonry wall
CN204238223U (en) Bamboo cage stone pile for foundation pit supporting
CN204098216U (en) Bulky concrete wall pours roof beam connection structure after with
CN206722392U (en) A kind of structure of transvers plate of shear wall structure
CN108035736B (en) Method and structure for rapidly solving collapse of tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant