CN204343297U - Structure for processing reserved hole of post-cast beam in mass concrete - Google Patents
Structure for processing reserved hole of post-cast beam in mass concrete Download PDFInfo
- Publication number
- CN204343297U CN204343297U CN201420612357.0U CN201420612357U CN204343297U CN 204343297 U CN204343297 U CN 204343297U CN 201420612357 U CN201420612357 U CN 201420612357U CN 204343297 U CN204343297 U CN 204343297U
- Authority
- CN
- China
- Prior art keywords
- beam section
- reserving hole
- hole
- roof beam
- grout pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011440 grout Substances 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a structure that back pouring roof beam reserved hole was handled in bulky concrete, it is equipped with reservation hole (2) of back pouring roof beam section (3) in thick wall (1) of bulky concrete, top of reserving hole (2) is equipped with grout pipe (4), back pouring roof beam section (3) are pour and are accomplished the back, the one end of grout pipe (4) is buried and is pour in back in roof beam section (3) and insert to reserve hole (2) at the bottom, the other end kickup is exposed outside back pouring roof beam section (3). The utility model discloses a this kind of reserve hole and bury arrangement structure type economy of grout pipe underground is feasible, and structural integrity is good, and the construction degree of difficulty is less, and the cost is lower, has wide application prospect.
Description
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering technical field, particularly relates to the structure of after-pouring beam reserving hole process in a kind of concrete in mass (thick wall).
Background technology
In hydraulic structure, there is the structure of beam, due to many reasons, need the construction carrying out beam after massive concrete walls body concrete has been constructed again, for strengthening structural integrity, improve reliability of structure, need by girder construction according to stressed pattern in concrete preformed hole hole out in massive concrete walls body construction process.The processing method traditional to reserving hole is reserving hole in concrete in mass, carries out building of concrete beam; This situation easily causes beam inner concrete to fill secret room, affects the force structure of beam, there is potential safety hazard; Or reserving hole is more shallow, anchorage length of steel bar is inadequate, cannot meet structural requirement.
Utility model content
The purpose of this utility model is for solving the deficiencies in the prior art, providing the structure of after-pouring beam reserving hole process in a kind of concrete in mass.
This method is achieved by following technical solution:
It is the reserving hole being provided with after-pouring beam section in the thick wall of concrete in mass, grout pipe is provided with above reserving hole, after after-pouring beam section has been built, one end of grout pipe to be imbedded in after-pouring beam section and is inserted at the bottom of reserving hole, and the other end is bent upwards exposure outside after-pouring beam section.By pre-embedment grouting pipe, after after-pouring beam section has been built, make filling in reserving hole closely knit by grouting, improve reliability of structure.
The height of reserving hole is highly identical with after-pouring beam section, the width 0 ~ 10cm wider than after-pouring beam section of reserving hole.The degree of depth of reserving hole should be more than or equal to the anchorage length of steel bar of regulation and stipulation.Reserving hole inside should after concrete initial set dabbing.Need in reserving hole by the assembling reinforcement of specification anchorage length.Reserving hole is built as after-pouring beam section simultaneously.
The beneficial effects of the utility model are:
This reserving hole of the present utility model buries the arrangement pattern economically feasible of grout pipe underground, and structural integrity is good, and difficulty of construction is less, and cost is lower, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is reserving hole structural representation;
Fig. 2 be grout pipe is set and complete after-pouring beam section build after structural representation.
The thick wall of description of reference numerals: 1-, 2-reserving hole, 3-after-pouring beam section, 4-grout pipe, reinforcing bar in 5-beam.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
See Fig. 1, the utility model after concrete in mass, wall 1 arranges reserving hole 2 for solving, and is connected with the good of after-pouring beam section 3 to realize rear wall 1.As shown in Figure 2, the utility model, by arranging grout pipe 4 above reserving hole 2, like this after after-pouring beam section 3 has been built, is in the milk by the position of grout pipe 4 to former reserving hole 2 with the stability improving structure.After after-pouring beam section 3 has been built, a part for grout pipe 4 is buried in wherein, position at the bottom of one end straight cutting to the hole of reserving hole 2, and the other end is bent outwardly exposure outside after-pouring beam section 3 outside reserving hole 2.
As shown in the figure, this method is mainly carried out in accordance with the following steps:
The first step, installs the template of reserving hole 2 while installing concrete in mass thick wall 1 template;
Second step, completes the template that rear dismounting reserving hole 2 periphery built by the thick wall of concrete in mass 1, in reserving hole 2 periphery dabbing after initial set;
3rd step, reinforcing bar 5 in the beam laying after-pouring beam section 3 in reserving hole 2, buries grout pipe 4 underground;
4th step, builds after-pouring beam section 3, is in the milk after after-pouring beam section 3 concrete reaches design strength by grout pipe 4.
More than just embody rule example of the present utility model, the technical scheme that the utility model also has other embodiment, all employings to be equal to replacement or equivalent transformation to be formed, all drops within the protection domain required by the utility model.
Claims (1)
1. the structure of after-pouring beam reserving hole process in a concrete in mass, it is included in the reserving hole (2) being provided with after-pouring beam section (3) in the thick wall (1) of concrete in mass, it is characterized in that: be provided with grout pipe (4) in the top of reserving hole (2), one end of grout pipe (4) to be imbedded in after-pouring beam section (3) and is inserted to reserving hole (2) end, and the other end is bent upwards exposure outside after-pouring beam section (3); The height of described reserving hole (2) is highly identical with after-pouring beam section (3), the width 0 ~ 10cm wider than after-pouring beam section (3) of reserving hole (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420612357.0U CN204343297U (en) | 2014-10-22 | 2014-10-22 | Structure for processing reserved hole of post-cast beam in mass concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420612357.0U CN204343297U (en) | 2014-10-22 | 2014-10-22 | Structure for processing reserved hole of post-cast beam in mass concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204343297U true CN204343297U (en) | 2015-05-20 |
Family
ID=53226575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420612357.0U Expired - Lifetime CN204343297U (en) | 2014-10-22 | 2014-10-22 | Structure for processing reserved hole of post-cast beam in mass concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204343297U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760050A (en) * | 2016-11-24 | 2017-05-31 | 大象建筑设计有限公司 | The attachment structure and through processing method of shear wall and after-pouring concrete frame beam |
CN108265996A (en) * | 2017-12-28 | 2018-07-10 | 浙江核力建筑特种技术有限公司 | A kind of masonry structure break wall punch it is pre- top restore construction |
-
2014
- 2014-10-22 CN CN201420612357.0U patent/CN204343297U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760050A (en) * | 2016-11-24 | 2017-05-31 | 大象建筑设计有限公司 | The attachment structure and through processing method of shear wall and after-pouring concrete frame beam |
CN106760050B (en) * | 2016-11-24 | 2022-04-05 | 大象建筑设计有限公司 | Connecting structure of shear wall and rear pouring concrete frame beam and through type processing method |
CN108265996A (en) * | 2017-12-28 | 2018-07-10 | 浙江核力建筑特种技术有限公司 | A kind of masonry structure break wall punch it is pre- top restore construction |
CN108265996B (en) * | 2017-12-28 | 2020-08-04 | 浙江核力建筑特种技术有限公司 | Masonry structure wall-breaking hole-opening pre-jacking recovery construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908862B (en) | A kind of production method of masonry shell in 3D printing reinforced masonry shear wall | |
CN203603930U (en) | Device for preventing tunnel secondary lining vault from disengaging | |
CN205638482U (en) | Be used for tunnel concrete secondary lining to take template slip casting device | |
CN103437346A (en) | Steel pipe pile with burrs and construction method | |
CN103835303B (en) | A kind of cast-type armored concrete shearing resistance method and structure | |
CN204343297U (en) | Structure for processing reserved hole of post-cast beam in mass concrete | |
CN203238642U (en) | Supporting retaining wall of foundation pit | |
CN204436407U (en) | The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs | |
CN204024053U (en) | A kind of cast-in-place concrete floor pipe preformed hole mould | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN104929129A (en) | Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes | |
CN101979777B (en) | Construction method of combined underground continuous wallboard of cast-in-place hollow square pile | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN204266216U (en) | Bamboo beam anchoring and supporting structure of side slope | |
CN203684509U (en) | Grooved block masonry wall | |
CN203769086U (en) | Concrete embedded part | |
CN203701434U (en) | Reinforcement horizontal locating ladder for shear wall | |
CN204532367U (en) | A kind of underground bracket stake | |
CN205421332U (en) | Contrary coincide underground continuous wall that does of a core section of thick bamboo | |
CN205152958U (en) | Novel combination steel sheet pile | |
CN203014304U (en) | Cross-core wall-interior fixing structure for embedding distribution box into masonry wall | |
CN204238223U (en) | Bamboo cage stone pile for foundation pit supporting | |
CN204098216U (en) | Bulky concrete wall pours roof beam connection structure after with | |
CN206722392U (en) | A kind of structure of transvers plate of shear wall structure | |
CN108035736B (en) | Method and structure for rapidly solving collapse of tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |