CN103850251A - Mechanical drilling cast-in-place pile - Google Patents
Mechanical drilling cast-in-place pile Download PDFInfo
- Publication number
- CN103850251A CN103850251A CN201410104594.0A CN201410104594A CN103850251A CN 103850251 A CN103850251 A CN 103850251A CN 201410104594 A CN201410104594 A CN 201410104594A CN 103850251 A CN103850251 A CN 103850251A
- Authority
- CN
- China
- Prior art keywords
- load box
- steel reinforcement
- reinforcing cage
- reinforcement cage
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a mechanical drilling cast-in-place pile, and belongs to the technical field of burying of load boxes of the mechanical drilling cast-in-place piles. The mechanical drilling cast-in-place pile comprises the load box, wherein an upper section steel reinforcement cage and a lower section steel reinforcement cage are respectively connected with the upper end and the lower end of the load box; guide bars are welded between the upper section steel reinforcement cage and the load box; outer steel reinforcement cage stirrups are arranged on the outer rims of the upper section steel reinforcement cage and the lower section steel reinforcement cage; an annular plate is arranged at the lower end of the lower section steel reinforcement cage. The annular plate is additionally welded at the bottom end of the lower section steel reinforcement cage, so that the steel reinforcement cages and the load box can be kept at the center of a pile hole as much as possible during burying, and the phenomenon of higher data deflection of two lower displacement rods in a later detection process can be avoided.
Description
Technical field
The present invention relates to a kind of machine drilling castinplace pile, belong to the burying technology field of machine drilling castinplace pile load box.
Background technology
In recent years, since, along with the extensive use of machine drilling castinplace pile and self-rebound force balance loading case, when a large amount of machine drilling filling pile constructions is complete, the tapering being caused by engineering machinery drill bit all can be arranged at bottom.But, load box and reinforcing cage are in put procedure, reinforcing cage inserts in tapered hole bottom, cause reinforcing cage and the load box of whole pile body to tilt, cause in late detection process data inaccurate, even because causing concrete disintegrating etc. in pile body, discontinuity affects the situation of pile quality, and machine drilling castinplace pile load box top panel place is not welded with loudspeaker muscle (guiding rib), cause lead slurry pipe can not be smoothly in put procedure by load box middle part, directly by pouring concrete on load box top panel, pouring pressure is reduced and cause load box bottom sediment can not effectively clean out or pour into a mould leakiness etc.
Summary of the invention
In order to overcome above-mentioned defect, the object of the present invention is to provide a kind of machine drilling castinplace pile.
To achieve these goals, the present invention adopts following technical scheme:
A kind of machine drilling castinplace pile, it comprises a load box, epimere reinforcing cage is connected with the top and bottom of load box respectively with hypomere reinforcing cage, between epimere reinforcing cage and load box, is welded with guiding rib;
Outer rim at described epimere reinforcing cage and hypomere reinforcing cage is provided with stirrup outside reinforcing cage, is provided with annular slab in the lower end of described hypomere reinforcing cage.
The junction of epimere reinforcing cage and load box is provided with the auxiliary muscle in right angle.
Described guiding rib and load box angle are greater than or equal to 60 °.
Self-rebound force balance loading case is embedded in equalization point position, and hypomere reinforcing cage bottom needs to be welded with an annular slab, and the external diameter of annular slab is consistent with the outer stirrup diameter of reinforcing cage, while putting reinforcing cage and load box, is supported on the edge of bellmouth by annular slab, prevents from.
Beneficial effect of the present invention:
1, data accuracy improves:
Hypomere reinforcing cage bottom is welded with annular slab, can make reinforcing cage and load box in the time burying underground, remain on a center, hole as far as possible, can not cause 2 bottom offset bar data deviations excessive in late detection process.
2, construction technology is simple:
Get final product left-hand seat without carrying out special training, only the main muscle in hypomere reinforcing cage bottom need be welded on annular slab, diameter must equal outer stirrup diameter, connect and be positioned in stake with load box on request, in the middle of construction, there is no complicated technology content, only need to confirm pile No., check load box and outer dimension of hoop reinforcement.
3, construction quality is good:
Reinforcing cage bottom is welded with and when annular slab can effectively ensure because bury reinforcing cage and load box underground, tilts excessively, and load box, applying in active force process, causes pile body inside discontinuity, the situations such as concrete disintegrating.
4, cost is low:
Annular slab only need adopt diameter consistent with outer stirrup, and common sheet material, can solve the major issue that affects construction in later period progress and quality.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the installation site schematic diagram of the auxiliary muscle in the right angle in the present invention (6).
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing 1,2:
A kind of machine drilling castinplace pile, it comprises a load box 1, epimere reinforcing cage 2 is connected with the top and bottom of load box 1 respectively with hypomere reinforcing cage 3, between epimere reinforcing cage 2 and load box 1, is welded with guiding rib 4;
Be provided with stirrup 5 outside reinforcing cage in described epimere reinforcing cage 2 and the outer rim of hypomere reinforcing cage 3, be provided with annular slab 7 in the lower end of described hypomere reinforcing cage 3.
Epimere reinforcing cage 2 is provided with the auxiliary muscle 6 in right angle with the junction of load box 1.Prevent from throwing off and dropping burying in process reinforcing cage and load box underground.
Described guiding rib 4 is greater than or equal to 60 ° with load box 1 angle.Object is that guiding grout pipe carries out secondary pile hole cleaning and cast by load box centre bore, plays booster action simultaneously.
Hypomere reinforcing cage is forbidden the welding that is connected with jack outside or epimere reinforcing cage.
Necessary smooth, the firm welding of annular slab that is welded on hypomere reinforcing cage bottom, can not cause distortion when welding.
When loudspeaker muscle (guiding rib) and reinforcing cage, load box are welded to each other, must firm welding, forbid the defects such as rosin joint, weldering are broken.
Loudspeaker muscle (guiding rib) must use the round steel of Φ 16 above diameters, and soldering angle must be greater than 60 °.
The main muscle end face in hypomere reinforcing cage bottom should ensure concordant.
Place self-rebound force balance loading case in pile foundation time, displacement detector need be with on fixation with steel wire reinforcing cage and every 1 meter of colligation once.
Burying underground of self-rebound force balance loading case also needs to meet " pile body self-rebound force balance Static Test Technique code " (DB36/J002-2006).
?load box must be through having the provincial calibrating unit calibrating of calibrating qualification, and obtain qualified calibration certificate and can use.
Load box should adopt certain safeguard measure in loading, unloading and transportation, forbids rash-and-rough way of loading and unloading, does not allow extruding, sharp impacts, in order to avoid make casing, oil pipe and displacement bar joint impaired, impact is used.
?load box is being reached the spot, and as do not installed at that time, should be placed on from job site compared with distant positions or on-the-spot material keeping place, in order to avoid accessories such as other construction damage load boxes and oil pipes.
Oil pipe need guarantee to bear the required rated pressure of detection.
Claims (3)
1. a machine drilling castinplace pile, it is characterized in that: it comprises a load box (1), epimere reinforcing cage (2) is connected with the top and bottom of load box (1) respectively with hypomere reinforcing cage (3), between epimere reinforcing cage (2) and load box (1), is welded with guiding rib (4);
Be provided with stirrup outside reinforcing cage (5) in described epimere reinforcing cage (2) and the outer rim of hypomere reinforcing cage (3), be provided with annular slab (7) in the lower end of described hypomere reinforcing cage (3).
2. machine drilling castinplace pile according to claim 1, is characterized in that: epimere reinforcing cage (2) is provided with the auxiliary muscle in right angle (6) with the junction of load box (1).
3. machine drilling castinplace pile according to claim 1, is characterized in that: described guiding rib (4) is greater than or equal to 60 ° with load box (1) angle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410104594.0A CN103850251B (en) | 2014-03-20 | 2014-03-20 | A kind of Model analysis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410104594.0A CN103850251B (en) | 2014-03-20 | 2014-03-20 | A kind of Model analysis |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103850251A true CN103850251A (en) | 2014-06-11 |
CN103850251B CN103850251B (en) | 2016-06-22 |
Family
ID=50858364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410104594.0A Active CN103850251B (en) | 2014-03-20 | 2014-03-20 | A kind of Model analysis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103850251B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544551A (en) * | 2016-01-16 | 2016-05-04 | 云南建工基础工程有限责任公司 | Super-long cast-in-place pile construction method for rapidly downwards putting steel reinforcement cage |
CN105761609A (en) * | 2016-03-10 | 2016-07-13 | 云南经济管理学院 | Detachable building element steel reinforcement cage model |
CN110130420A (en) * | 2019-06-04 | 2019-08-16 | 重庆交通大学 | A kind of self-reaction force load box and Slagoff method convenient for deslagging |
CN112853944A (en) * | 2021-02-04 | 2021-05-28 | 中建二局第二建筑工程有限公司 | Steel reinforcement cage for building construction and pouring construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078282A (en) * | 1992-05-08 | 1993-11-10 | 东北金城建筑安装工程总公司地基基础工程处 | Pile shoe pouring process and special reinforcing steel cage thereof |
CN102296596A (en) * | 2011-06-30 | 2011-12-28 | 河北建设勘察研究院有限公司 | Method for manufacturing cast-in-situ bored pile reinforcing cage |
CN202090337U (en) * | 2011-05-26 | 2011-12-28 | 宿迁市固丰管桩有限公司 | Centrifugal concrete pile |
CN102535529A (en) * | 2011-12-08 | 2012-07-04 | 中铁五局(集团)有限公司 | Construction method of self-balancing method pile foundation bearing capacity test device |
CN203782690U (en) * | 2014-03-20 | 2014-08-20 | 南昌永祺科技发展有限公司 | Mechanical drilling filling pile |
-
2014
- 2014-03-20 CN CN201410104594.0A patent/CN103850251B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078282A (en) * | 1992-05-08 | 1993-11-10 | 东北金城建筑安装工程总公司地基基础工程处 | Pile shoe pouring process and special reinforcing steel cage thereof |
CN202090337U (en) * | 2011-05-26 | 2011-12-28 | 宿迁市固丰管桩有限公司 | Centrifugal concrete pile |
CN102296596A (en) * | 2011-06-30 | 2011-12-28 | 河北建设勘察研究院有限公司 | Method for manufacturing cast-in-situ bored pile reinforcing cage |
CN102535529A (en) * | 2011-12-08 | 2012-07-04 | 中铁五局(集团)有限公司 | Construction method of self-balancing method pile foundation bearing capacity test device |
CN203782690U (en) * | 2014-03-20 | 2014-08-20 | 南昌永祺科技发展有限公司 | Mechanical drilling filling pile |
Non-Patent Citations (1)
Title |
---|
易教良等: "自反力平衡静载技术在朝阳大桥试桩中的应用", 《工程质量》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544551A (en) * | 2016-01-16 | 2016-05-04 | 云南建工基础工程有限责任公司 | Super-long cast-in-place pile construction method for rapidly downwards putting steel reinforcement cage |
CN105544551B (en) * | 2016-01-16 | 2017-07-14 | 云南建投基础工程有限责任公司 | A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage |
CN105761609A (en) * | 2016-03-10 | 2016-07-13 | 云南经济管理学院 | Detachable building element steel reinforcement cage model |
CN105761609B (en) * | 2016-03-10 | 2018-08-24 | 云南经济管理学院 | Reassembling type building element steel reinforcement cage model |
CN110130420A (en) * | 2019-06-04 | 2019-08-16 | 重庆交通大学 | A kind of self-reaction force load box and Slagoff method convenient for deslagging |
CN110130420B (en) * | 2019-06-04 | 2020-12-01 | 重庆交通大学 | Self-reaction load box convenient for slag discharge and slag discharge method |
CN112853944A (en) * | 2021-02-04 | 2021-05-28 | 中建二局第二建筑工程有限公司 | Steel reinforcement cage for building construction and pouring construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103850251B (en) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021000444A1 (en) | Foundation reinforcement structure and method for hoisting heavy equipment close to unclosed building | |
CN111042185B (en) | Construction method of basement raft foundation with tower crane foundation | |
CN103850251A (en) | Mechanical drilling cast-in-place pile | |
CN104264902A (en) | Steel-pipe column disc positioner, steel core concrete column and pile foundation connection structure | |
CN102535529A (en) | Construction method of self-balancing method pile foundation bearing capacity test device | |
CN207714309U (en) | Borehole filling pile cage of reinforcement | |
CN101220593A (en) | Fastening method of post-treating pipe pile break with pre-stress pipe pile construction | |
CN112900450A (en) | Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method | |
CN103132537A (en) | Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method | |
CN107503344A (en) | The construction method of turnover type merogenesis steel pile casting retaining wall manually digging hole filling pile | |
CN103437375A (en) | Method for installing steel pipe column under cover and excavation top-down method in segmental-locating mode | |
CN102587386A (en) | Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement | |
CN106120793A (en) | A kind of tilt the method for correcting error of pile for prestressed pipe and structure | |
CN203782690U (en) | Mechanical drilling filling pile | |
CN102828533B (en) | Vertical pressure resistance static load test pile head advanced processing node of cast-in-place pile and construction method | |
CN109853569A (en) | A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation | |
CN110528526B (en) | Method and device for positioning and controlling verticality of reinforcement cage of manual hole digging pile | |
CN108221963A (en) | A kind of quincunx concrete tubular pile | |
CN105003088B (en) | The construction method of embedded part is leaked in a kind of Construction of Steel Structure | |
CN207846406U (en) | A kind of quincunx concrete tubular pile | |
JP2005248523A (en) | Structure of pile head joint section | |
CN114277790B (en) | Repairing and processing method for defect filling pile | |
CN205975615U (en) | Structure of rectifying of stress tube stake in advance inclines | |
CN206581318U (en) | A kind of pre-embedded device of foundation pile drilling core checking | |
CN211113669U (en) | Prestressed reinforced concrete breast wall pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 330200 No. 6, Fuqi Road, Jinsha Fourth Road, Xiaolan Economic Development Zone, Nanchang City, Jiangxi Province Patentee after: Yongqi Technology Testing Co.,Ltd. Address before: 330200 No. 6, Fuqi Road, Jinsha Fourth Road, Xiaolan Economic Development Zone, Nanchang City, Jiangxi Province Patentee before: NANCHANG YONGQI TECHNOLOGY DEVELOPMENT Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |