CN103831014A CN201410115974.4A CN201410115974A CN103831014A CN 103831014 A CN103831014 A CN 103831014A CN 201410115974 A CN201410115974 A CN 201410115974A CN 103831014 A CN103831014 A CN 103831014A
Authority
CN
China
Prior art keywords
orbit
catalyst module
post orbit
lifting
catalyst
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410115974.4A
Other languages
Chinese (zh)
Other versions
CN103831014B (en
Inventor
杨小虎
姚德康
肖海涛
王伟
徐佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Bo Zhi Wade Environmental Protection Technology Co Ltd
Original Assignee
Beijing Bo Zhi Wade Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Bo Zhi Wade Environmental Protection Technology Co Ltd filed Critical Beijing Bo Zhi Wade Environmental Protection Technology Co Ltd
Priority to CN201410115974.4A priority Critical patent/CN103831014B/en
Publication of CN103831014A publication Critical patent/CN103831014A/en
Application granted granted Critical
Publication of CN103831014B publication Critical patent/CN103831014B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an assembly method for catalyst modules in a novel SCR (Selective Catalytic Reduction) denitration reactor. The method comprises the following four steps: step one, arranging a transverse hoisting main rail and a vertical hoisting secondary rail on a monorail hoist which is located on the bottom of a top steel beam of a layer when assembling the catalyst modules of the layer, and enabling the catalyst modules to enter a reactor along with transverse movement of a manual hoist or an electric hoist which is arranged on the hoisting main rail; step two, putting the catalyst modules down near the hoisting secondary rail after reaching main units through the hoisting main rail, then withdrawing from the electric hoist or manual hoist of the main rail; step three, manually assembling a secondary rail connection part, vertically moving the secondary rail connection part and a manual hoist to hoist the catalyst modules in determined positions; and step four, taking the secondary rail connection part down after a whole line of catalyst modules is assembled for each time and applying the secondary rail connection part to assembly of other lines or other layers. The assembly method for the catalyst modules in the novel SCR denitration reactor is a catalyst module assembling technique which is simple, reliable, easy to operate and convenient to assembly in site.

Description

A kind of installation method of Novel SCR Benitration reactor inner catalyst module
Technical field
The present invention relates to the installation method of a kind of Novel SCR Benitration reactor of field of Environment Protection inner catalyst module.It is a kind of improvement to former external imported technology Benitration reactor catalyst module mounting technique.Belong to environmental technology field SCR (SCR) gas denitrifying technology.
Background technology
At present SCR (SCR) denitrating flue gas method, because its efficiency is high, stable performance, is widely used in engineering both domestic and external, becomes smoke evacuation tail gas and remove the mainstream technology of nitrogen oxide.SCR denitrating system refers under the effect of catalyst, by spray into ammonia in flue gas, the reduction of nitrogen oxide in flue gas is become to the reaction unit system of nitrogen G&W.The capital equipment of SCR denitrating technique is SCR reactor.And core component in SCR reactor is catalyst module.
Denitrification catalyst module general (comprising imported product) is standard component, and module size is generally: be about 2m(and be less than but approach 2m), wide about 1m (be less than but approach 1m), the cuboid of high 0.6~1.8m scope.Module length and width size is comparatively fixing, and short transverse size is unfixing.Catalyst module weight is according to the difference of its height, and weight change is larger, every module weight generally between 0.6~1.5T, the heaviest 2T that is no more than.In general a SCR reactor need arrange 2 to 4 layers of catalyst according to technological requirement (namely reactor domestic demand correspondence arranges 2 to 4 layers of catalyst brace summer.Between catalyst layer, spacing is about 3.5m.), and every one deck catalyst is made up of near a tiling one of multiple catalyst module.
Catalyst module main active is V2O5, the rare earth compounds such as TiO2, WO3, and catalyst module is the parts of the most valuable and core of whole denitrating system.Catalyst module need need to change once every 3~5 years.Therefore adopt one safe reliable, it is particularly important that easy-operating mounting means just seems.
Catalyst module is installed the mounting technique while always continuing to use foreign technology introduction all the time.Main mounting technique has two kinds: one is when this layer of catalyst module is installed, by the overhead trolley arranging at the bottom of last layer support steel beam beam, catalyst module lifting is lifted from reactor outside to reactor the inside (transverse shifting), then by the rail " catalyst dolly " (a kind of coaster of walking on two trapped orbits) arranging in this layer of catalyst module brace summer altitude range, catalyst module is manually pushed to assigned position (vertically moving).Another kind method is just in time contrary: by " flooring " double-rail track of " temporarily " is set at this layer, use " catalyst dolly " catalyst module manually to be pushed to reactor the inside (transverse shifting) from reactor outside, then by the overhead trolley arranging at the bottom of last layer support steel beam beam, catalyst module is lifted into assigned address (vertically moving).
Above-mentioned two kinds of mounting techniques all need to arrange " catalyst dolly ".Due to the existence of " catalyst dolly ", all need the supporting setting can be at the double-rail track of this layer of walking.The first lifting mode above-mentioned, due to the reason of " catalyst trolley track ", horizontal support is not established in this layer of girder steel top flange, affect the stable of this layer of catalyst module support steel beam, therefore popular response device inner catalyst module support steel beam all needs to adopt box beam, can solve stable problem, the minimum constructive height of this layer of catalyst module brace summer also needs 600mm.This brings a lot " trouble " and restriction to reactor body structural design, causes reactor body design steel consumption large, and structure is not quite reasonable; Though not affecting every layer of horizontal support in reactor, arranges first scheme, but often install a row catalyst module and need remove the " " double-rail track temporarily of one section of this layer being arranged on " flooring ", one whole layer of catalyst module is installed, the overhead trolley that needs this layer of end face of being dismounted for multiple times to vertically move, installation is taken a lot of work, is required great effort, and efficiency is low.
In view of the Installation Modes of these two kinds of conventional catalysts in engineering, because " " problem of track is brought the trouble in a lot of designs and construction to catalyst dolly.We have invented denitrification catalyst module installation system a kind of without catalyst dolly and its supporting track, easy, reliable, easy to operate, that be convenient to building site installation thus.
Summary of the invention
1, the object of this invention is to provide a kind of installation method of Novel SCR Benitration reactor inner catalyst module, it is without " catalyst dolly ", be a kind of easy, reliable, easy to operate, be convenient to the catalyst module mounting technique that install in building site.
2, in order to reach the object of foregoing invention, the present invention adopts following technology and facility:
The installation method of a kind of Novel SCR Benitration reactor of the present invention inner catalyst module, the method concrete steps are as follows:
Step 1, when this layer of catalyst module is installed, arranges laterally " lifting main orbit " and longitudinally " lifting Post Orbit " at (that is: at the bottom of last layer catalyst module support steel beam beam) at the bottom of the end face girder steel of this layer.Catalyst module enters inside reactor by electronic or bottle gouard moved by hands " transverse shifting " is set on " lifting main orbit ".Refer to accompanying drawing of the present invention " Fig. 1 "--" SCR Benitration reactor inner catalyst module hoisting elevational schematic view "." Fig. 1 " is for installing the Installation Modes of one deck catalyst.The installation of other layer of catalyst module is all undertaken by this.
Near step 2: catalyst module is moved and arrived each unit " lifting Post Orbit " by the electronic or bottle gouard moved by hands on " lifting main orbit ".After arrival, catalyst module is put down, then exit " the electronic or bottle gouard moved by hands " of main orbit.
Step 3: artificial install " Post Orbit connector ", the artificial end that " Post Orbit connector " is suspended on to both sides " lifting Post Orbit ".Again catalyst module is sling, by " Post Orbit connector " and on bottle gouard moved by hands vertically move catalyst module be lifted into assigned address.(note: on Post Orbit connector, suspender employing bottle gouard moved by hands is mainly to consider that it is light, convenient manually installation, but also can adopt electric block.)
Step 4: often install a permutation catalyst module, " Post Orbit connector " need take off, installs for other row or other layers.For accelerating lifting progress, can utilize main orbit suspender to lift fireballing advantage, many " Post Orbit connectors " are set, carry out multiple row installation exercise, therefore can accelerate installation progress.After catalyst module all installs, should take off " Post Orbit connector ", and be deposited in warehouse and use when in the future catalyst changes the outfit.
Wherein: " lifting main orbit " bottom surface described in step 1 be differ 30mm with " lifting Post Orbit " end face more than, primary and secondary track can stagger mutually, non-interference." lifting Post Orbit " top flange, end is provided with " top draw-in groove ", and lower flange is provided with " lower bearing pin ".Concrete structure is shown in accompanying drawing of the present invention " Fig. 3 a ".
Wherein: " Post Orbit connector " described in step 3 is about 800mm, and cross section model is consistent with " lifting Post Orbit ", is generally " work 20a " I-steel." Post Orbit connector " top flange, end is provided with " upper bearing pin ".This " upper bearing pin " can bear the vertical load of 3T." upper bearing pin " can snap in " top draw-in groove " that " lifting Post Orbit " top flange, end arranges." Post Orbit connector " lower flange, end is provided with " bottom draw-in groove ".This is supporting with " the lower bearing pin " that be arranged on " lifting Post Orbit " lower flange, forms interlocking.Refer to accompanying drawing of the present invention " Fig. 3 a "." draw-in groove " and bearing pin ", between stay 2-3mm gap, convenient installation." Post Orbit connector " lightweight (the about 24kg of weight), size is little, facilitates artificial unloading.
3, advantage and effect: the present invention provides " catalyst dolly " and " catalyst dolly " orbit is set without producer, has saved cost.Owing to not taking space, this layer of catalyst brace summer top flange, facilitate the layout of structure of reactor horizontal support and support steel beam, optimize reactor body design, make reactor design more reasonable.This mounting technique adopts building site common machinery, and cost is low, it is simple, easy to operate to construct, be well suited for that install in denitration project building site and catalyst module is changed.
Accompanying drawing explanation
Fig. 1 is SCR Benitration reactor inner catalyst module hoisting elevational schematic view.
Fig. 2 is the 1-1 section of Fig. 1---catalyst module lifting orbit plane layout drawing in SCR Benitration reactor.
Fig. 3 a is the A-A profile of Fig. 2.
Fig. 3 b is the B-B profile of Fig. 3 a.
Fig. 3 c is the C-C profile of Fig. 3 a.
The specific embodiment
See Fig. 1, Fig. 2, Fig. 3 a, Fig. 3 b, Fig. 3 c, the installation method of a kind of Novel SCR Benitration reactor of the present invention inner catalyst module, its concrete steps are as follows:
Step 1, when this layer of catalyst module is installed, arranges laterally " lifting main orbit " and longitudinally " lifting Post Orbit " at (that is: at the bottom of last layer catalyst module support steel beam beam) at the bottom of the end face girder steel of this layer.Catalyst module enters inside reactor by electronic or bottle gouard moved by hands " transverse shifting " is set on " lifting main orbit ".Refer to accompanying drawing of the present invention " Fig. 1 "--" SCR Benitration reactor inner catalyst module hoisting elevational schematic view "." Fig. 1 " is for installing the Installation Modes of one deck catalyst.The installation of other layer of catalyst module is all undertaken by this.
Near step 2: catalyst module is moved and arrived each unit " lifting Post Orbit " by the electronic or bottle gouard moved by hands on " lifting main orbit ".After arrival, catalyst module is put down, then exit " the electronic or bottle gouard moved by hands " of main orbit.
Step 3: artificial install " Post Orbit connector ", the artificial end that " Post Orbit connector " is suspended on to both sides " lifting Post Orbit ".Again catalyst module is sling, by " Post Orbit connector " and on bottle gouard moved by hands vertically move catalyst module be lifted into assigned address.(note: on Post Orbit connector, suspender employing bottle gouard moved by hands is mainly to consider that it is light, convenient manually installation, but also can adopt electric block.)
Step 4: often install a permutation catalyst module, " Post Orbit connector " need take off, installs for other row or other layers.For accelerating lifting progress, can utilize main orbit suspender to lift fireballing advantage, many " Post Orbit connectors " are set, carry out multiple row installation exercise, therefore can accelerate installation progress.After catalyst module all installs, should take off " Post Orbit connector ", and be deposited in warehouse and use when in the future catalyst changes the outfit.
Wherein: " lifting main orbit " bottom surface described in step 1 be differ 30mm with " lifting Post Orbit " end face more than, primary and secondary track can stagger mutually, non-interference." lifting Post Orbit " top flange, end is provided with " top draw-in groove ", and lower flange is provided with " lower bearing pin ".Concrete structure is shown in accompanying drawing of the present invention " Fig. 3 a ".
Wherein: " Post Orbit connector " described in step 3 is about 800mm, and cross section model is consistent with " lifting Post Orbit ", is generally " work 20a " I-steel." Post Orbit connector " top flange, end is provided with " upper bearing pin ".This " upper bearing pin " can bear the vertical load of 3T." upper bearing pin " can snap in " top draw-in groove " that " lifting Post Orbit " top flange, end arranges." Post Orbit connector " lower flange, end is provided with " bottom draw-in groove ".This is supporting with " the lower bearing pin " that be arranged on " lifting Post Orbit " lower flange, forms interlocking.Refer to accompanying drawing of the present invention " Fig. 3 a "." draw-in groove " and bearing pin ", between stay 2-3mm gap, convenient installation." Post Orbit connector " lightweight (the about 24kg of weight), size is little, facilitates artificial unloading.

Claims (3)

1. an installation method for Novel SCR Benitration reactor inner catalyst module, is characterized in that: the method concrete steps are as follows:
Step 1, when this layer of catalyst module is installed, it at the bottom of the end face girder steel of this layer, is the overhead trolley that last layer catalyst module support steel beam beam bottom arranges, laterally " lifting main orbit " and longitudinally " lifting Post Orbit " are set, and catalyst module enters inside reactor by manual or electric block " transverse shifting " is set on " lifting main orbit "; Other layer of catalyst module installed and all undertaken by this;
Near step 2: arrive each unit " lifting Post Orbit " by " lifting main orbit ", catalyst module is put down, then exit " the electronic or bottle gouard moved by hands " of main orbit;
Step 3: artificial install " Post Orbit connector ", " Post Orbit connector " direct labor is suspended on to the end of both sides " lifting Post Orbit ", again catalyst module is sling, by " Post Orbit connector " and on bottle gouard moved by hands, vertically move catalyst module be lifted into assigned address;
Step 4: often install a permutation catalyst module, " Post Orbit connector " need take off, installs for other row or other layers; For accelerating lifting progress, many " Post Orbit connectors " are set, utilize main orbit suspender to lift fireballing advantage, multiple row is carried out installation exercise simultaneously, accelerates installation progress; After catalyst module all installs, " Post Orbit connector " should take out, and deposits warehouse in and prepares against use when catalyst changes the outfit in the future.
2. the installation method of a kind of Novel SCR Benitration reactor inner catalyst module according to claim 1, it is characterized in that: " lifting main orbit " bottom surface described in step 1 be differ 30mm with " lifting Post Orbit " end face more than, primary and secondary track staggers mutually, non-interference; " lifting Post Orbit " top flange, end is provided with " top draw-in groove ", and lower flange is provided with " lower bearing pin ".
3. the installation method of a kind of Novel SCR Benitration reactor inner catalyst module according to claim 1, it is characterized in that: " Post Orbit connector " the long 800mm described in step 3, cross section model is consistent with " lifting Post Orbit ", is " work 20a " I-steel; " Post Orbit connector " top flange, end is provided with " going up bearing pin ", and this " upper bearing pin " can bear the vertical load of 3T; " upper bearing pin " can snap in " top draw-in groove " that " lifting Post Orbit " top flange, end arranges, and " Post Orbit connector " lower flange, end is provided with " bottom draw-in groove "; This is supporting with " the lower bearing pin " that be arranged on " lifting Post Orbit " lower flange, forms interlocking; " draw-in groove " and bearing pin ", between stay 2-3mm gap, convenient installation; " Post Orbit connector " is lightweight, and size is little, facilitates artificial unloading.
CN201410115974.4A 2014-03-26 2014-03-26 A kind of installation method of SCR denitration catalyst in reactor module Expired - Fee Related CN103831014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410115974.4A CN103831014B (en) 2014-03-26 2014-03-26 A kind of installation method of SCR denitration catalyst in reactor module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410115974.4A CN103831014B (en) 2014-03-26 2014-03-26 A kind of installation method of SCR denitration catalyst in reactor module

Publications (2)

Publication Number Publication Date
CN103831014A true CN103831014A (en) 2014-06-04
CN103831014B CN103831014B (en) 2015-09-09

Family

ID=50795098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410115974.4A Expired - Fee Related CN103831014B (en) 2014-03-26 2014-03-26 A kind of installation method of SCR denitration catalyst in reactor module

Country Status (1)

Country Link
CN (1) CN103831014B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111841318A (en) * 2020-06-05 2020-10-30 安徽海螺建材设计研究院有限责任公司 Device and method for installing catalyst module in SCR (Selective catalytic reduction) denitration reactor
CN113262633A (en) * 2021-05-31 2021-08-17 重庆市渝琥玻璃有限公司 Flue gas desulfurization process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101318105A (en) * 2007-06-07 2008-12-10 同方环境股份有限公司 Bidirectional vehicle suitable for mounting catalyst module
US20100092360A1 (en) * 2008-10-15 2010-04-15 Linde Aktiengesellschaft Catalyst Containing Platinum and Palladium for the Selective Reduction of NOx with Hydrogen (H2-SCR)
CN202687749U (en) * 2012-08-06 2013-01-23 大唐南京环保科技有限责任公司 Catalyst module lifting device with spring slip bolts

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101318105A (en) * 2007-06-07 2008-12-10 同方环境股份有限公司 Bidirectional vehicle suitable for mounting catalyst module
US20100092360A1 (en) * 2008-10-15 2010-04-15 Linde Aktiengesellschaft Catalyst Containing Platinum and Palladium for the Selective Reduction of NOx with Hydrogen (H2-SCR)
CN202687749U (en) * 2012-08-06 2013-01-23 大唐南京环保科技有限责任公司 Catalyst module lifting device with spring slip bolts

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111841318A (en) * 2020-06-05 2020-10-30 安徽海螺建材设计研究院有限责任公司 Device and method for installing catalyst module in SCR (Selective catalytic reduction) denitration reactor
CN113262633A (en) * 2021-05-31 2021-08-17 重庆市渝琥玻璃有限公司 Flue gas desulfurization process
CN113262633B (en) * 2021-05-31 2023-04-25 重庆市渝琥玻璃有限公司 Flue gas desulfurization treatment process

Also Published As

Publication number Publication date
CN103831014B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN201417657Y (en) Installation device of indoor transformer
CN104358336A (en) Unit type curtain wall installation system and installation method thereof
CN106522362A (en) Construction device and construction method of steel structure beam of corridor system
CN103086227B (en) Lift facility
CN103366844B (en) Nuclear power station upper-part in-reactor component installation method
CN103831014B (en) A kind of installation method of SCR denitration catalyst in reactor module
CN201786002U (en) Sliding jig for construction of large-span steel structure
CN103397782A (en) Construction method and device for installing connecting beams on frame-type steel structure
CN110747307B (en) Large steam drum hoisting method in converter energy-saving and environment-friendly reconstruction
CN205874987U (en) Simply put up bridge crane
CN203669879U (en) Down-hole hydraulic support assembling chamber
KR101162346B1 (en) Launching box using l-box structure and moving appratus and bridge construction method
CN105984821A (en) Hoisting device used according to needs and used in wind power unit cabin
CN202465213U (en) Hanging basket system for slope construction
CN201817201U (en) Trolley slippage construction device
CN204873491U (en) Self -supporting does not have crossbeam hoist system
CN102515030A (en) Construction process for replacement for steam pocket in narrow condition
CN207392766U (en) A kind of hoistway module assembling system
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN203079578U (en) Special overhaul bent for equipment dismounting and mounting
CN103498418A (en) Device for shifting hanging basket assembly pieces and construction method
CN205012232U (en) Double -line cantilever type frame bridge crane
CN205087796U (en) Lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20200326