CN103807504A - 钢筋混凝土顶管地下t形对接的施工方法 - Google Patents
钢筋混凝土顶管地下t形对接的施工方法 Download PDFInfo
- Publication number
- CN103807504A CN103807504A CN201410070761.4A CN201410070761A CN103807504A CN 103807504 A CN103807504 A CN 103807504A CN 201410070761 A CN201410070761 A CN 201410070761A CN 103807504 A CN103807504 A CN 103807504A
- Authority
- CN
- China
- Prior art keywords
- pipe
- push
- pipes
- docking
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 42
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 20
- 210000001503 Joints Anatomy 0.000 title abstract 8
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 26
- 239000010959 steel Substances 0.000 claims abstract description 26
- 239000004567 concrete Substances 0.000 claims abstract description 23
- 230000003014 reinforcing Effects 0.000 claims abstract description 9
- 238000003032 molecular docking Methods 0.000 claims description 46
- 230000001808 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 239000002689 soil Substances 0.000 claims description 4
- 238000001764 infiltration Methods 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000002457 bidirectional Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001131 transforming Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410070761.4A CN103807504B (zh) | 2014-02-28 | 2014-02-28 | 钢筋混凝土顶管地下t形对接的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410070761.4A CN103807504B (zh) | 2014-02-28 | 2014-02-28 | 钢筋混凝土顶管地下t形对接的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103807504A true CN103807504A (zh) | 2014-05-21 |
CN103807504B CN103807504B (zh) | 2017-04-12 |
Family
ID=50704683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410070761.4A Active CN103807504B (zh) | 2014-02-28 | 2014-02-28 | 钢筋混凝土顶管地下t形对接的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103807504B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105484762A (zh) * | 2015-11-27 | 2016-04-13 | 广州市市政工程设计研究总院 | 大断面顶管侧向开大洞口的施做方法 |
CN106151679A (zh) * | 2015-04-23 | 2016-11-23 | 五冶集团上海有限公司 | 大口径钢筋混凝土管道牵引式对口方法 |
CN112576812A (zh) * | 2020-12-09 | 2021-03-30 | 中铁四局集团有限公司 | 一种大直径长距离直线顶管顶进方法 |
CN113202173A (zh) * | 2021-04-09 | 2021-08-03 | 中铁六局集团太原铁路建设有限公司 | 一种深基坑施工中钢管临时替换跨基坑混凝土管施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202004003872U1 (de) * | 2004-03-12 | 2004-05-27 | Rößler, Uwe | Überprüfungseinrichtung |
CN101463924A (zh) * | 2007-12-20 | 2009-06-24 | 上海市基础工程公司 | 大口径顶管对接工艺 |
CN101532586A (zh) * | 2009-04-08 | 2009-09-16 | 中冶天工建设有限公司基础路桥分公司 | 一种地下管道安装施工装置及其方法 |
CN101788082A (zh) * | 2009-12-21 | 2010-07-28 | 上海市第一市政工程有限公司 | 地下对接顶管施工方法 |
CN101852311A (zh) * | 2009-04-03 | 2010-10-06 | 中冶成工上海五冶建设有限公司 | 过路管道的顶管安装方法 |
CN202360889U (zh) * | 2011-12-06 | 2012-08-01 | 上海广联建设发展有限公司 | 矩形顶管管节的连接装置 |
-
2014
- 2014-02-28 CN CN201410070761.4A patent/CN103807504B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202004003872U1 (de) * | 2004-03-12 | 2004-05-27 | Rößler, Uwe | Überprüfungseinrichtung |
CN101463924A (zh) * | 2007-12-20 | 2009-06-24 | 上海市基础工程公司 | 大口径顶管对接工艺 |
CN101852311A (zh) * | 2009-04-03 | 2010-10-06 | 中冶成工上海五冶建设有限公司 | 过路管道的顶管安装方法 |
CN101532586A (zh) * | 2009-04-08 | 2009-09-16 | 中冶天工建设有限公司基础路桥分公司 | 一种地下管道安装施工装置及其方法 |
CN101788082A (zh) * | 2009-12-21 | 2010-07-28 | 上海市第一市政工程有限公司 | 地下对接顶管施工方法 |
CN202360889U (zh) * | 2011-12-06 | 2012-08-01 | 上海广联建设发展有限公司 | 矩形顶管管节的连接装置 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106151679A (zh) * | 2015-04-23 | 2016-11-23 | 五冶集团上海有限公司 | 大口径钢筋混凝土管道牵引式对口方法 |
CN105484762A (zh) * | 2015-11-27 | 2016-04-13 | 广州市市政工程设计研究总院 | 大断面顶管侧向开大洞口的施做方法 |
CN112576812A (zh) * | 2020-12-09 | 2021-03-30 | 中铁四局集团有限公司 | 一种大直径长距离直线顶管顶进方法 |
CN113202173A (zh) * | 2021-04-09 | 2021-08-03 | 中铁六局集团太原铁路建设有限公司 | 一种深基坑施工中钢管临时替换跨基坑混凝土管施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103807504B (zh) | 2017-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106369223B (zh) | 一种粉砂土地层顶管施工方法 | |
CN106402490B (zh) | 基于钢套头工具管的粉砂土地层顶管顶进施工方法 | |
CN102146672B (zh) | 一种在岩溶地区的桩基施工方法 | |
CN106641440B (zh) | 一种横向穿越铁路线地下管道顶进施工方法 | |
CN103807504A (zh) | 钢筋混凝土顶管地下t形对接的施工方法 | |
CN108915698A (zh) | 一种复杂条件下大直径管幕施工方法 | |
CN103866693B (zh) | 一种钢筋混凝土系杆拱桥拱肋的安装方法 | |
CN103244126B (zh) | 一种防止顶管机和管节后退的施工方法 | |
CN103362517A (zh) | 一种装配式顶管 | |
CN112459785A (zh) | 利用市政井进行超浅埋暗挖隧道下穿既有管线的加固方法 | |
CN103604000B (zh) | 江海底钢顶管对接施工方法 | |
CN109723443B (zh) | 隧道施工方法 | |
CN104404983A (zh) | 一种用于顶管施工的骑马井装置及其施工方法 | |
CN106758759B (zh) | 一种用于深水裸岩河床的栈桥桩基及其锚固方法 | |
CN106121658B (zh) | 冻结法凿井井筒井壁支护结构及其施工方法 | |
KR101715562B1 (ko) | 비굴착 변형강관 교체 시공방법 | |
CN112761188A (zh) | 适用于淤泥质土的混凝土倒挂井的施工结构及其施工方法 | |
CN206477240U (zh) | 一种用于深水裸岩河床的栈桥桩基 | |
CN205527401U (zh) | 一种沉井用简易双吊篮门吊 | |
CN107587500A (zh) | 一种卵石地层管线敷设方法 | |
CN204960366U (zh) | 一种隧道穿越既有大直径桩建筑物的托换装置 | |
CN204023579U (zh) | 一种逆作法柱插筋工具架 | |
CN214363618U (zh) | 适用于淤泥质土的混凝土倒挂井的施工结构 | |
CN212742552U (zh) | 基坑横向支撑机构及基坑支撑装置 | |
CN208669327U (zh) | 一种松软地层地下大空间建筑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee after: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD. Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee before: CMTCC Shanghai Shisanye Construction Co., Ltd. Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd. Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee before: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190815 Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Co-patentee after: China Twenty Metallurgical Group Co., Ltd. Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd. Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469 Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd. |
|
TR01 | Transfer of patent right |