CN202360889U - 矩形顶管管节的连接装置 - Google Patents
矩形顶管管节的连接装置 Download PDFInfo
- Publication number
- CN202360889U CN202360889U CN2011205020037U CN201120502003U CN202360889U CN 202360889 U CN202360889 U CN 202360889U CN 2011205020037 U CN2011205020037 U CN 2011205020037U CN 201120502003 U CN201120502003 U CN 201120502003U CN 202360889 U CN202360889 U CN 202360889U
- Authority
- CN
- China
- Prior art keywords
- prestress
- group
- tube coupling
- rod
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
一种矩形顶管管节的连接装置,涉及地下隧道施工技术领域,所解决的是管节顶力撤销后结合部会松动的技术问题。该装置包括与各个矩形管节一一对应的多个预应力组件;所述预应力组件包括一预埋件、一预应力杆、一连接器、一预应力螺母;所述预埋件固定在对应矩形管节上,其前后两端各固定有一可拆卸的固定块,每个固定块上均设有供预应力杆穿过的通孔;所述连接器的前后两端均设有带内螺纹的连接孔;所述预应力杆的杆面设有外螺纹,其杆身穿过本组各固定块的通孔,其前端与本组连接器的后端连接孔螺纹连接;所述预应力螺母以螺纹连接方式安装在本组预应力杆上,并抵住本组预埋件后端的固定块。本实用新型提供的装置,适用于地下顶管施工。
Description
技术领域
本实用新型涉及地下隧(通)道施工技术,特别是涉及一种矩形顶管管节的连接装置的技术。
背景技术
矩形顶管技术是传统顶管法施工技术的延伸,是建设地下人行通道、地铁车站出入口、地下管线共同沟等的一种暗挖施工方法。矩形通道比圆形通道可更有效地利用空间,减少地下掘进土方。用于人行、车辆等地下通道不需要再进行地面铺装工序,不仅省时而且可降低工程造价。因此,在城市地下通道的施工中,越来越多地采用矩形顶管技术。
目前采用顶管法施工矩形通道时对管节间的连接均采用无联结力自由面连接。因此在管节顶力撤销后,会因相邻管节之间产生松动而出现渗、漏水现象,严重时会导致管节间脱节,影响地下通道正常使用。
实用新型内容
针对上述现有技术中存在的缺陷,本实用新型所要解决的技术问题是提供一种能避免管节顶力撤销后相邻管节之间产生松动的矩形顶管管节的连接装置。
为了解决上述技术问题,本实用新型所提供的一种矩形顶管管节的连接装置,包括多个矩形管节,其特征在于:该装置包括与各个矩形管节一一对应的多个预应力组件;
所述预应力组件包括一预埋件、一预应力杆、一连接器、一预应力螺母;
所述预埋件固定在对应矩形管节上,其前后两端各固定有一可拆卸的固定块,每个固定块上均设有供预应力杆穿过的通孔;
所述连接器的前后两端均设有带内螺纹的连接孔;
所述预应力杆的杆面设有外螺纹,其杆身穿过本组各固定块的通孔,其前端与本组连接器的后端连接孔螺纹连接;
所述预应力螺母以螺纹连接方式安装在本组预应力杆上,并抵住本组预埋件后端的固定块。
本实用新型提供的矩形顶管管节的连接装置,通过预应力组件对各个矩形管节施加预应力,能避免管节顶力撤销后相邻管节之间产生松动,从而避免管节间的结合面出现渗、漏水现象,保证地下通道正常使用。
附图说明
图1是本实用新型实施例的矩形顶管管节的连接装置的结构示意图。
具体实施方式
以下结合附图说明对本实用新型的实施例作进一步详细描述,但本实施例并不用于限制本实用新型,凡是采用本实用新型的相似结构及其相似变化,均应列入本实用新型的保护范围。
如图1所示,本实用新型实施例所提供的一种矩形顶管管节的连接装置,包括多个矩形管节,其特征在于:该装置包括与各个矩形管节一一对应的多个预应力组件;
所述预应力组件包括一预埋件、一预应力杆、一连接器、一预应力螺母;
所述预埋件固定在对应矩形管节上,其前后两端各固定有一可拆卸的固定块,每个固定块上均设有供预应力杆穿过的通孔;
所述连接器的前后两端均设有带内螺纹的连接孔;
所述预应力杆的杆面设有外螺纹,其杆身穿过本组各固定块的通孔,其前端与本组连接器的后端连接孔螺纹连接;
所述预应力螺母以螺纹连接方式安装在本组预应力杆上,并抵住本组预埋件后端的固定块。
本实用新型实施例在地下顶管施工中的使用方法如下:
1)下第一段矩形管节,并将该矩形管节上的连接器通过其前端连接孔与顶管掘进机头固接;
2)将第一段矩形管节上的预应力杆及预应力螺母分别拧紧,利用预应力螺母的旋转使预应力杆产生相对第一段矩形管节向后的位移,从而对第一段矩形管节施加预应力;
3)下后一段矩形管节,并将该矩形管节上的连接器通过其前端连接孔,与前一段矩形管节上的预应力杆后端螺纹连接并拧紧,再将该段矩形管节与前一段矩形管节靠拢,然后再将该段矩形管节上的预应力杆及预应力螺母分别拧紧,利用预应力螺母的旋转使预应力杆产生相对该段矩形管节向后的位移,从而对该段矩形管节及其前一段矩形管节施加预应力;
4)重复步骤3)直至完成所有管节的连接。
本实用新型实施例适用于地下顶管施工,且适用于各种尺寸的矩形管节。
Claims (1)
1.一种矩形顶管管节的连接装置,包括多个矩形管节,其特征在于:该装置包括与各个矩形管节一一对应的多个预应力组件;
所述预应力组件包括一预埋件、一预应力杆、一连接器、一预应力螺母;
所述预埋件固定在对应矩形管节上,其前后两端各固定有一可拆卸的固定块,每个固定块上均设有供预应力杆穿过的通孔;
所述连接器的前后两端均设有带内螺纹的连接孔;
所述预应力杆的杆面设有外螺纹,其杆身穿过本组各固定块的通孔,其前端与本组连接器的后端连接孔螺纹连接;
所述预应力螺母以螺纹连接方式安装在本组预应力杆上,并抵住本组预埋件后端的固定块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205020037U CN202360889U (zh) | 2011-12-06 | 2011-12-06 | 矩形顶管管节的连接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205020037U CN202360889U (zh) | 2011-12-06 | 2011-12-06 | 矩形顶管管节的连接装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202360889U true CN202360889U (zh) | 2012-08-01 |
Family
ID=46572075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205020037U Withdrawn - After Issue CN202360889U (zh) | 2011-12-06 | 2011-12-06 | 矩形顶管管节的连接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202360889U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102494188A (zh) * | 2011-12-06 | 2012-06-13 | 上海广联建设发展有限公司 | 矩形顶管管节的预应力装置及其施工方法 |
CN103807504A (zh) * | 2014-02-28 | 2014-05-21 | 中冶天工上海十三冶建设有限公司 | 钢筋混凝土顶管地下t形对接的施工方法 |
CN106884439A (zh) * | 2017-03-16 | 2017-06-23 | 中交公局厦门工程有限公司 | 一种大型管、箱的预制构件及其平面精准对接方法 |
CN110375114A (zh) * | 2019-07-29 | 2019-10-25 | 叶宁 | 一种油气输送管道铺设安装施工方法 |
-
2011
- 2011-12-06 CN CN2011205020037U patent/CN202360889U/zh not_active Withdrawn - After Issue
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102494188A (zh) * | 2011-12-06 | 2012-06-13 | 上海广联建设发展有限公司 | 矩形顶管管节的预应力装置及其施工方法 |
CN102494188B (zh) * | 2011-12-06 | 2015-08-12 | 上海广联建设发展有限公司 | 矩形顶管管节的预应力装置及其施工方法 |
CN103807504A (zh) * | 2014-02-28 | 2014-05-21 | 中冶天工上海十三冶建设有限公司 | 钢筋混凝土顶管地下t形对接的施工方法 |
CN103807504B (zh) * | 2014-02-28 | 2017-04-12 | 中冶天工上海十三冶建设有限公司 | 钢筋混凝土顶管地下t形对接的施工方法 |
CN106884439A (zh) * | 2017-03-16 | 2017-06-23 | 中交公局厦门工程有限公司 | 一种大型管、箱的预制构件及其平面精准对接方法 |
CN110375114A (zh) * | 2019-07-29 | 2019-10-25 | 叶宁 | 一种油气输送管道铺设安装施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202360889U (zh) | 矩形顶管管节的连接装置 | |
CN102777189A (zh) | 一种超长管幕无中继间顶进施工装置及方法 | |
CN103397843A (zh) | 一种微型非开挖水平钻孔设备 | |
CN102313078B (zh) | 用于曲线钢顶管的施工方法 | |
CN104790960A (zh) | 一种顶管与盾构转换设备及其施工方法 | |
CN101749486B (zh) | 用于地下管道暗挖的管节预应力连接方法 | |
CN106838463B (zh) | 提高矩形顶管工后纵向整体刚度的预埋组件及用法 | |
CN102505847B (zh) | 一种压浆管装置 | |
CN201763350U (zh) | 地下暗埋箱涵或管道施工的拉顶装置 | |
CN102494188A (zh) | 矩形顶管管节的预应力装置及其施工方法 | |
CN205956552U (zh) | 顶管管节防水连接结构 | |
CN204879079U (zh) | 一种顶管穿墙管止水结构 | |
CN204083520U (zh) | 管道贯穿混凝土楼面防水结构 | |
CN204459454U (zh) | 一种顶管施工中止后复顶施工装置 | |
CN102338244A (zh) | 用于顶管的钢管节结构 | |
CN205173848U (zh) | 一种用于管道修复的玻璃钢内套环组件 | |
CN204960869U (zh) | 卡箍式简易井口装置 | |
CN204739357U (zh) | 海洋复合软管弯曲限制器 | |
CN204098067U (zh) | 方涵式地下管廊 | |
CN204213510U (zh) | 双o型圈承插螺纹拉杆连接装置 | |
CN203654716U (zh) | 一种工具式脚手架剪刀撑连接装置 | |
CN203175580U (zh) | 一种电力电缆隧道顶管出洞施工用洞口止水装置 | |
CN203669877U (zh) | 一种配有可调节密封的盾构机始发装置 | |
CN204691776U (zh) | 一种顶管与盾构转换设备 | |
CN202215842U (zh) | 用于顶管的钢管节结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20120801 Effective date of abandoning: 20150812 |
|
RGAV | Abandon patent right to avoid regrant |