CN103803017B - A kind of fast construction combined method of combined high-speed naval vessel - Google Patents

A kind of fast construction combined method of combined high-speed naval vessel Download PDF

Info

Publication number
CN103803017B
CN103803017B CN201410048182.XA CN201410048182A CN103803017B CN 103803017 B CN103803017 B CN 103803017B CN 201410048182 A CN201410048182 A CN 201410048182A CN 103803017 B CN103803017 B CN 103803017B
Authority
CN
China
Prior art keywords
module
navigating power
power module
deck
navigating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410048182.XA
Other languages
Chinese (zh)
Other versions
CN103803017A (en
Inventor
姜明
霍刚
陈卫国
姜鹏
朱惠芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Hengsen Composite Materials Technology Co ltd
Original Assignee
JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co Ltd filed Critical JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co Ltd
Priority to CN201410048182.XA priority Critical patent/CN103803017B/en
Publication of CN103803017A publication Critical patent/CN103803017A/en
Application granted granted Critical
Publication of CN103803017B publication Critical patent/CN103803017B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention provides a kind of fast construction combined method of combined high-speed naval vessel, naval vessel is resolved into deck module and navigating power module, by V-shaped groove anatomical connectivity between deck module and navigating power module, in the design of deck module, the shipborne weapon of different operation purposes is configured according to different warship kind, in the design of navigating power module, adopt independently hull design, function is for deck module provides navigating power and electric energy, by the configuration navigating power module of varying number and the Rapid Combination of deck module, build the high speed of a ship or plane naval vessel of the different fight function of different displacement, construction combined method comprises: the construction <b> method </b> of procedural style dock, the construction <b> method </b> of deck module, the construction <b> method </b> of navigating power module, the maintenance of deck module and navigating power block combiner <b> method and </b> navigating power module and replacing options.

Description

A kind of fast construction combined method of combined high-speed naval vessel
Technical field
The present invention relates to a kind of Large marine military equipment, specifically a kind of the fast construction combined method on combined high-speed naval vessel.
Background technology
As everyone knows, naval vessel is moveable naval warfare platform, naval vessel is mainly attack weapon with carrier-borne aircraft, the nuclear ship technology of the little tonnage of Made in China is ripe, numerous atomic submarine is on duty in war preparedness, but large-tonnage water surface naval vessel especially nuclear power source water surface naval vessel China does not also have, therefore to draw in conjunction with the national conditions of China the experience that the U.S. makes naval vessel, creatively build the large-tonnage naval vessel being applicable to China's actual conditions or nuclear ship, although China has grasped the technology of the nuclear reactor building cheap low-enrichment uranium, if build large-scale naval vessel with low-enrichment uranium, just mean, make scrap soon fast, use cost is high, lose more than gain, the naval vessel part of scrapping because changing reactor core is formally the important one deck section in top, naval vessel, the process of changing reactor core is exactly the process of tearing deck open, the cost changing a reactor core is equivalent to build a new ship.If caught up with and surpassed the world's advanced levels at displacement with on service life, just must solve and use cheap low-enrichment uranium and change reactor core and do not scrap the gordian technique threshold on whole naval vessel.
Summary of the invention
The object of this invention is to provide one the fast construction combined method on combined high-speed naval vessel.
The object of the invention is to realize in the following manner, comprising: deck module, navigating power module, build process is as follows:
Naval vessel is resolved into deck module and navigating power module, by V-shaped groove anatomical connectivity between deck module and navigating power module, in the design of deck module, the shipborne weapon of different operation purposes is configured according to different warship kind, in the design of navigating power module, adopt independently hull design, function is for deck module provides navigating power and electric energy, by the configuration navigating power module of varying number and the Rapid Combination of deck module, build the high speed of a ship or plane naval vessel of the different fight function of different displacement;
Construction combined method comprises: the construction of procedural style dock method, deck module construction method, navigating power module construction method, deck module and navigating power block combiner method andthe maintenance of navigating power module and replacing options, wherein:
The method of construction of procedural style dock: comprise building berth and groove dock on the ground, building berth and groove dock are cascaded on the ground, deck module on the ground building berth is built, navigating power module is built in groove dock, ground building berth at least bar is made up of two trapezoidal slideways, the section form of trapezoidal slideway and the trapezoidal joint geometry of navigating power module top match, the length of trapezoidal slideway is at least suitable with the length of deck module, the spacing of the V-shaped groove interface bottom the spacing of trapezoidal slideway and deck module matches, the end of trapezoidal slideway connects groove dock, the length of groove dock is suitable with the length of navigating power module, the bottom of groove dock is provided with bottom land building berth, bottom land building berth is parallel with the trapezoidal slideway on the building berth of ground, trapezoidal slideway on the ground on building berth and the bottom land building berth in groove dock are designed to pits rampway structure, the height that the degree of depth of groove dock equals navigating power module adds the height of bottom land building berth,
the method of construction of deck module, for subsequent use press the combination of tower structure layer and section monolithic construction from bow to stern after;
When building binary naval vessel, at least parallel connection of V-shaped groove interface two navigating power modules of deck module two bottom sides, in
Between V-shaped groove interface in the middle of be provided with the alongside supply of sealing hatch door for submarine; When building three body naval vessels, the at least parallel connection of V-shaped groove interface two navigating power modules of deck module two bottom sides, the front portion of a middle V-shaped groove interface at least connects a navigating power module, and middle V-shaped groove interface rear portion is provided with the alongside supply of sealing hatch door for submarine;
the method of construction of navigating power module is as follows:
Navigating power module is except providing electric energy for deck module, radical function is for deck module provides navigating power, structure is identical with the hull section separation structure of normal conventional power naval vessel or nuclear ship, top arranges trapezoidal joint, fore and aft, sectional construction overall package is together for subsequent use, require the trapezoidal blank area on navigating power module top and the trapezoidal slideway parallel alignment on the building berth of ground, and angle of inclination coincide with the ramp angles of the on the ground trapezoidal slideway of building berth is coherent, to slide in navigating power module transfer to facilitate deck module;
the assemble method of deck module and navigating power module is as follows:
Draw gear traction deck module is used in navigating power module, to slide transfer along trapezoidal slideway, until deck module is transferred on the trapezoidal joint of navigating power module, locked by lockout mechanism, modularization separate assembling ship construction combines successfully, water filling in groove dock, after navigating power module and deck module are together floated, can rolling procedural style dock away from, to carry out the installation of the interior and exterior finishes of hull and on-board equipment supporting;
maintenance and the replacing options of navigating power module are as follows:
Modularized combination type naval vessel in use, replacing or system upgrade if a certain navigating power module needs repairing, the draft first adjusting two navigating power modules by ballast tank is consistent, to the V-shaped groove interface of navigating power module bottom deck module changed be needed to utilize the power of self or drive traction to skid off by gear-rack drive mechanism again, the V-shaped groove interface of another navigating power module bottom deck module is slided into, take over the navigating power module skidded off, fixed by blocking device after the energy cabin module taken over slides into and puts in place, Renewal process all can be changed in dock or in alongside base, naval vessel or process of executing the task.
excellent effect of the present invention is: this compound type naval vessel mainly has three advantages, 1) adopt modular combination, simplify and make warship technique, reduce construction difficulty, accelerate to make warship speed, although do not build the technical merit on large displacement naval vessel, also can accelerate to catch up with and surpass the world's large displacement ship construction level by adopting split type combination; 2) adopt the superfluous design of the navigating power modular power energy, the speed of a ship or plane and supply load can be increased substantially, significantly promote the overall combat effectiveness on naval vessel; 3) take into account submarine base function, for submarine provides marine hidden and motor-driven supply, naval vessel and submarine are worked in coordination with and are built the three-dimensional striking capabilities of air-sea.
Large displacement naval vessel is resolved into deck module and navigating power module, reduce ship construction difficulty, by V-shaped groove anatomical connectivity between deck module and navigating power module, according to the naval vessel of the different operation purposes of the different tonnage of the combination fast construction of module, even if navigating power module needs repairing or upgrades, deck module operational performance is not affected yet, especially nuclear navigating power module is used, effect is particularly outstanding, it is the same simple and convenient that Renewal process just changes tire with automobile, adopt above-mentioned design, the safety performance on large-tonnage naval vessel and fighting efficiency will be made to increase substantially,
In the design of navigating power module, adopt many redundancies independence hull design, by the large-tonnage ship construction process simplification of complexity, normalisation, modularization and procedure, significantly can accelerate Chinese domestic ship construction speed; Navigating power functions of modules is for deck module provides navigating power and electric energy, and the navigating power module of varying number can build the naval vessel of the different fight function of different displacement from the combination of deck module.In oceangoing voyage process, even if surplus next navigating power module, also ship navigation can be driven.Navigating power module overallly can split and change, and the repair and upgrade for naval vessel provides conveniently, can ensure service life and the war preparedness efficiency on duty on naval vessel on the whole;
Advance design theory is as follows:
One, navigating power module redundancy configuration, can adopt powered by conventional energy, also can adopt nuclear power source, the naval vessel of different performance purposes, the navigating power module of flexible reasonable disposition varying number, there are at most four oar propelling units on the monomer naval vessel of prior art, adopts compound type naval vessel, catamaran hull is 8 oar propelling units, trimaran is 12 oar propelling units, and four hulls are exactly 16 oar propelling units, and thus hull is many, propelling unit is many, and route speed will increase substantially;
Two, each hull calculates by a nuclear reactor configuration, and multimode combines, and the electric energy of generation is also increase exponentially, has had huge electric energy, just can support that large being equipped on naval vessel of all power consumptions such as magnetic artillery, laser gun uses;
Three, navigating power module is if standard nuclear power source unit, deposit can be built in large quantity as standard naval vessel accessory, except being used for the naval vessel of fast assembling different tonnage wartime, army ground is dual-purpose, can be used as civilian marine nuclear power plant at ordinary times to use, send coastal various places and island, for base, harbour or local economic construction provide electric energy, wartime sets up naval vessel at any time, navigating power module is throughout the year in coastal waters alongside, do not take land area, tsunami and typhoon is not afraid of yet, retired nuclear power installation uses even if also can make civilian nuclear power plant, by building navigating power module in a large number, the electric energy generated of nuclear power plant can not only be promoted, west can also be caught up with and surpassed fast in quality.
In sum, compound type naval vessel of the present invention, have multi-functional, high-mobility, multipurpose, wheeled vehicle, not only there are all functions of the Waterborne movable optimal in structure that conventional ship has, also there is the function of marine submarine base, the bottom of deck module arranges submarine berth, convoy submarine can stop supply under naval vessel, the huge volume on naval vessel storage function is relied on to provide the logistics support the same with base, land for convoy submarine, and there is good disguise, owing to there being sheltering of naval vessel above, stop and the supply of retinue submarine secret can be carried out below naval vessel, satellite cannot capture the whereabouts of submarine, the naval warfare be not only with boat submarine provides failure-free logistics support, and substantially increase the overall fighting capacity of fleet.
Detailed description of the invention
Compound type naval vessel of the present invention is described in detail below.
The method of construction on compound type naval vessel of the present invention, surface vessel is resolved into deck module 1 and navigating power module 2, by V-shaped groove anatomical connectivity between deck module and navigating power module, in the design of deck module, flying-off deck and landing deck layering are separated, but landing can take into account mutually with the function of taking off, shape adopts the upper ministerial standard deck shape on Ford level naval vessel, all adopts through type deck and through type runway;
In the design of navigating power module, adopt independently hull design, function is for deck module provides navigating power and electric energy, by the naval vessel of the navigating power module of varying number from the different fight function of the different displacement of combination fast construction of deck module;
Compound type naval vessel comprises: deck module, navigating power module, wherein:
Described deck module, it is exactly the part of more than the water surface, employing frame steel structure is built, the flat-bottom structure of deck module arranges the V-shaped groove interface matched with the trapezoidal joint of navigating power module top, deck module is combined by V-shaped groove interface and navigating power module top Connecting groups, every bar V-shaped groove interface at least connects a navigating power module, at least arranges a sealing hatch door for the alongside supply with navigating power module or convoy submarine in the middle of every bar V-shaped groove interface;
When binary ship construction, three V-shaped groove interfaces bottom deck module at least be arranged in parallel two navigating power modules, and a middle V-shaped groove interface is for the alongside supply of the submarine that escorts;
When three body ship constructions, three V-shaped groove interfaces bottom deck module at least connect three navigating power modules, and a middle V-shaped groove interface front portion connects a navigating power module, and rear portion is used for the alongside supply of large-scale convoy submarine;
The top of described navigating power module is provided with trapezoidal joint, trapezoidal joint and the V-shaped groove interface sliding plug bottom deck module together with the combination both realizing be separated, during binary ship design, the trapezoidal joint length of navigating power module top and the V-shaped groove interface length of laminated deck module bottom both sides match, and two navigating power modules are connected with the V-shaped groove interface of deck module two bottom sides; During three body ship design, navigating power module arranges by triangle disposition bottom deck module;
Navigating power module is except providing electric energy for deck module, radical function is for deck module provides navigating power, the top of navigating power module is the accommodation of crewman, and the bottom of navigating power module arranges fuel storage, fresh water ballast tank and cabin powered by conventional energy or nuclear power source cabin;
the construction combined method on modularization separate assembling naval vessel, comprise the method for construction of procedural style dock, the method for construction of deck module, the method for construction of navigating power module, the maintenance of deck module and navigating power block combiner method and navigating power module and replacing options: wherein:
The method of construction of procedural style dock: comprise building berth and groove dock on the ground, building berth and groove dock are cascaded on the ground, deck module on the ground building berth is built, navigating power module is built in groove dock, on the ground building berth designs at least trapezoidal slideway of bar, the section form of trapezoidal slideway and the trapezoidal joint geometry of navigating power module top match, the length of trapezoidal slideway is at least suitable with the length of deck module, the spacing of the V-shaped groove interface bottom the spacing of trapezoidal slideway and deck module matches, the end of trapezoidal slideway connects groove dock, the length of groove dock is suitable with the length of navigating power module, the bottom of groove dock is provided with bottom land building berth, bottom land building berth is parallel with the trapezoidal slideway on the building berth of ground, trapezoidal slideway on the ground on building berth and the bottom land building berth in groove dock are designed to pits rampway structure, the height that the degree of depth of groove dock equals navigating power module adds the height of bottom land building berth,
The method of construction of navigating power module, structure is identical with the under body structure of normal conventional power naval vessel or nuclear ship, trapezoidal joint is put on top, fore and aft, sectional construction overall package is together for subsequent use, require the trapezoidal blank area on navigating power module top and the trapezoidal slideway parallel alignment on the ground building berth, and angle of inclination coincide with the ramp angles of the trapezoidal slideway of building berth is on the ground coherent, to slide in navigating power module transfer to facilitate deck module;
The assemble method of deck module 1 and navigating power module:
Method one: use draw gear traction deck module to slide transfer along trapezoidal slideway in navigating power module, until deck module is transferred on the trapezoidal joint of navigating power module, locked by lockout mechanism, modularization separate assembling ship construction combines successfully, water filling in groove dock, after navigating power module and deck module are together floated, can rolling procedural style dock away from, to carry out the installation of the interior and exterior finishes of hull and on-board equipment supporting;
Method two
Draw gear traction sectional construction deck module is used in navigating power module, to slide transfer along trapezoidal slideway, until each break deck module is all transferred on the trapezoidal joint of navigating power module, then entirety is welded into, locked by lockout mechanism, modularization separate assembling ship construction combines successfully, water filling in groove dock, after navigating power module and deck module are together floated, can rolling procedural style dock away from, to carry out the installation of the interior and exterior finishes of hull and on-board equipment supporting;
The maintenance of navigating power module and replacing options:
Modularized combination type naval vessel in use, replacing or system upgrade if a certain navigating power module needs repairing, the draft first adjusting two navigating power modules by ballast tank is consistent, to the V-shaped groove interface of navigating power module bottom deck module changed be needed to utilize the power of self or drive traction to skid off by gear-rack drive mechanism again, the V-shaped groove interface of another navigating power module bottom deck module 1 is slided into, take over the navigating power module skidded off, fixed by blocking device after the energy cabin module taken over slides into and puts in place, Renewal process does not necessarily lie up, all can change in alongside base, naval vessel or process of executing the task.
About ground building berth and groove dock structure, the shape of bow stern, the interior layout of cabin and on-board equipment layout, also has the concrete shape of deck module, adjust according to naval vessel kind purposes in manufacture process, can not describe specially it at this, other relevant devices can be made warship technical design by tradition and build, and can be not limited to content disclosed in this invention in ship construction process.
Except the technical characteristic described in specification sheets, be the known technology of those skilled in the art.

Claims (1)

1. one kind the fast construction combined method on combined high-speed naval vessel, it is characterized in that, naval vessel is resolved into deck module and navigating power module, by V-shaped groove anatomical connectivity between deck module and navigating power module, in the design of deck module, the shipborne weapon of different operation purposes is configured according to different warship kind, in the design of navigating power module, adopt independently hull design, function is for deck module provides navigating power and electric energy, by the configuration navigating power module of varying number and the Rapid Combination of deck module, build the high speed of a ship or plane naval vessel of the different fight function of different displacement, construction combined method comprises: the construction of procedural style dock method, deck module construction method, navigating power module construction method, deck module and navigating power block combiner method andthe maintenance of navigating power module and replacing options, wherein:
The method of construction of procedural style dock: comprise building berth and groove dock on the ground, building berth and groove dock are cascaded on the ground, deck module on the ground building berth is built, navigating power module is built in groove dock, ground building berth at least bar is made up of two trapezoidal slideways, the section form of trapezoidal slideway and the trapezoidal joint geometry of navigating power module top match, the length of trapezoidal slideway is at least suitable with the length of deck module, the spacing of the V-shaped groove interface bottom the spacing of trapezoidal slideway and deck module matches, the end of trapezoidal slideway connects groove dock, the length of groove dock is suitable with the length of navigating power module, the bottom of groove dock is provided with bottom land building berth, bottom land building berth is parallel with the trapezoidal slideway on the building berth of ground, trapezoidal slideway on the ground on building berth and the bottom land building berth in groove dock are designed to pits rampway structure, the height that the degree of depth of groove dock equals navigating power module adds the height of bottom land building berth,
the method of construction of deck module, for subsequent use press the combination of tower structure layer and section monolithic construction from bow to stern after;
When building binary naval vessel, at least parallel connection of V-shaped groove interface two navigating power modules of deck module two bottom sides, are provided with the alongside supply of sealing hatch door for submarine in the middle of a middle V-shaped groove interface;
When building three body naval vessels, the at least parallel connection of V-shaped groove interface two navigating power modules of deck module two bottom sides, the front portion of a middle V-shaped groove interface at least connects a navigating power module, and middle V-shaped groove interface rear portion is provided with the alongside supply of sealing hatch door for submarine;
the method of construction of navigating power module is as follows:
Navigating power module is except providing electric energy for deck module, radical function is for deck module provides navigating power, structure is identical with the hull section separation structure of normal conventional power naval vessel or nuclear ship, top arranges trapezoidal joint, fore and aft, sectional construction overall package is together for subsequent use, require the trapezoidal blank area on navigating power module top and the trapezoidal slideway parallel alignment on the building berth of ground, and angle of inclination coincide with the ramp angles of the on the ground trapezoidal slideway of building berth is coherent, to slide in navigating power module transfer to facilitate deck module;
the assemble method of deck module and navigating power module is as follows:
Draw gear traction deck module is used in navigating power module, to slide transfer along trapezoidal slideway, until deck module is transferred on the trapezoidal joint of navigating power module, locked by lockout mechanism, modularization separate assembling ship construction combines successfully, water filling in groove dock, after navigating power module and deck module are together floated, can rolling procedural style dock away from, to carry out the installation of the interior and exterior finishes of hull and on-board equipment supporting;
maintenance and the replacing options of navigating power module are as follows:
Modularization separate assembling naval vessel in use, replacing or system upgrade if a certain navigating power module needs repairing, the draft first adjusting two navigating power modules by ballast tank is consistent, to the V-shaped groove interface of navigating power module bottom deck module changed be needed to utilize the power of self or drive traction to skid off by gear-rack drive mechanism again, the V-shaped groove interface of another navigating power module bottom deck module is slided into, take over the navigating power module skidded off, fixed by blocking device after the energy cabin module taken over slides into and puts in place, Renewal process all can be changed in dock or in alongside base, naval vessel or process of executing the task.
CN201410048182.XA 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel Active CN103803017B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410048182.XA CN103803017B (en) 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410048182.XA CN103803017B (en) 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel

Publications (2)

Publication Number Publication Date
CN103803017A CN103803017A (en) 2014-05-21
CN103803017B true CN103803017B (en) 2016-04-06

Family

ID=50700512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410048182.XA Active CN103803017B (en) 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel

Country Status (1)

Country Link
CN (1) CN103803017B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1652178A2 (en) * 1987-11-23 1991-05-30 Предприятие П/Я А-1290 Method of ship building using module units
KR100796410B1 (en) * 2006-12-29 2008-01-21 현대중공업 주식회사 Inundation method using tandem construction method
CN100537348C (en) * 2007-06-12 2009-09-09 烟台来福士海洋工程有限公司 Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same
KR20090007920A (en) * 2007-07-16 2009-01-21 대우조선해양 주식회사 Ship assembling and launching method using divided land and marine construction
TW201136804A (en) * 2010-04-28 2011-11-01 rui-feng Xie Manufacturing method of hollow blow molding box and mold structure thereof

Also Published As

Publication number Publication date
CN103803017A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN107867372A (en) Can be dived carrier
CN201686008U (en) Deep-sea tourism submarine
CN102079380A (en) Navigation submarine ship with hydrofoil power cabins
CN102079379A (en) Multipurpose anti-attack submarine depot boat
Stille Imperial Japanese Navy Aircraft Carriers 1921–45
CN103803039B (en) A kind of combined high-speed aircraft carrier with wind-tunnel help-fly system and method for construction thereof
Roberts British Warships of the Second World War: Detailed in the Original Builders' Plans
Williamson Wolf Pack: The Story of the U-Boat in World War II
CN103803017B (en) A kind of fast construction combined method of combined high-speed naval vessel
CN104139840B (en) A kind of modularized combination type high speed aircraft carrier and construction method thereof
RU2371350C1 (en) Water craft for armoured vehicles
US20030033967A1 (en) STOVL joint strike fighter carrier
CN107585264B (en) Water-jet propulsion double-wing unmanned patrol boat
CN206231598U (en) A kind of multifunctional water surface naval vessels
RU2424487C1 (en) Air trooping method of armoured equipment to combat zone with provision of self-protection and safety of flotation
CN205022815U (en) Multipurpose tender
Sgarlato et al. Secret Projects of the Kriegsmarine: Unseen Designs of Nazi Germany's Navy
Fontenoy Aircraft carriers: an illustrated history of their impact
CN201516913U (en) Floating platform at sea
Jordan Warship 2015
CN204037878U (en) A kind of high-speed patrol boat
Henshaw Town Class Destroyers: A Critical Assessment
Lardas American Heavy Frigates 1794–1826
CN1333163A (en) Submarine capable of quick lifting/lowering without water charging/discharging
Koop et al. Battleships of the Bismarck Class: Bismarck and Tirpitz: Culmination and Finale of German Battleship Construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Jiang Ming

Inventor after: Li Changhong

Inventor before: Jiang Ming

Inventor before: Huo Gang

Inventor before: Chen Weiguo

Inventor before: Jiang Peng

Inventor before: Zhu Huifen

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160715

Address after: 102600, No. ten, 1009 street, Haidian District, Beijing, 1 floor, 10

Patentee after: Beijing air navigation aerial instrument measuring and Testing Technology Co.,Ltd.

Patentee after: JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Address before: 250014 Shandong Province, Lixia District of Ji'nan city by ten Road No. 12588 MINI District 202 room mansion celebrities heights

Patentee before: JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

CB03 Change of inventor or designer information

Inventor after: Wei Mingming

Inventor before: Jiang Ming

Inventor before: Li Changhong

CB03 Change of inventor or designer information
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170906

Address after: Anhui province Huainan city 232000 National Road, tianjia'an District Nishimura Qing national garden room 3-1-8

Patentee after: Wei Mingming

Address before: 102600, No. ten, 1009 street, Haidian District, Beijing, 1 floor, 10

Co-patentee before: JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Patentee before: Beijing air navigation aerial instrument measuring and Testing Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180712

Address after: 225700 Zhao Jia village, Dai Nan Town, Xinghua City, Taizhou, Jiangsu province (Zhao Jiaduan)

Patentee after: Taizhou WIP Testing Technology Co.,Ltd.

Address before: 232000 3-1-8, National Day garden, Ching Xi village, National Day Road, Tian Jia An District, Huainan, Anhui

Patentee before: Wei Mingming

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: Room 1,020, Nanxun Science and Technology Pioneering Park, No. 666 Chaoyang Road, Nanxun District, Huzhou City, Zhejiang Province, 313000

Patentee after: Huzhou You Yan Intellectual Property Service Co.,Ltd.

Address before: 225700 Zhao Jia village, Dai Nan Town, Xinghua City, Taizhou, Jiangsu province (Zhao Jiaduan)

Patentee before: Taizhou WIP Testing Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211207

Address after: 264200 No. 369-11, Shuangdao Road, Weihai high district, Weihai City, Shandong Province

Patentee after: Weihai Regional Innovation Center Co.,Ltd.

Address before: 313000 room 1020, science and Technology Pioneer Park, 666 Chaoyang Road, Nanxun Town, Nanxun District, Huzhou, Zhejiang.

Patentee before: Huzhou You Yan Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230919

Address after: 802, No. 307-2, Shichang Avenue, Torch High tech Industrial Development Zone, Weihai City, Shandong Province, 264200

Patentee after: Weihai Hengsen Composite Materials Technology Co.,Ltd.

Address before: 264200 No. 369-11, Shuangdao Road, Weihai high district, Weihai City, Shandong Province

Patentee before: Weihai Regional Innovation Center Co.,Ltd.