CN103803017A - Method for rapidly establishing and combining combined high-speed naval ship - Google Patents

Method for rapidly establishing and combining combined high-speed naval ship Download PDF

Info

Publication number
CN103803017A
CN103803017A CN201410048182.XA CN201410048182A CN103803017A CN 103803017 A CN103803017 A CN 103803017A CN 201410048182 A CN201410048182 A CN 201410048182A CN 103803017 A CN103803017 A CN 103803017A
Authority
CN
China
Prior art keywords
module
power module
navigating power
deck
deck module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410048182.XA
Other languages
Chinese (zh)
Other versions
CN103803017B (en
Inventor
姜明
霍刚
陈卫国
姜鹏
朱惠芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Hengsen Composite Materials Technology Co ltd
Original Assignee
JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co Ltd filed Critical JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co Ltd
Priority to CN201410048182.XA priority Critical patent/CN103803017B/en
Publication of CN103803017A publication Critical patent/CN103803017A/en
Application granted granted Critical
Publication of CN103803017B publication Critical patent/CN103803017B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention provides a method for rapidly establishing and combining a combined high-speed naval ship. The naval ship is divided into a deck module and navigation power modules and the deck module and the navigation power modules are connected through V-shaped groove structures. In terms of design of the deck module, ship-mounted weapons for different fighting purposes are configured according to different ship types; in terms of design of the navigation power modules, independent ship design is adopted and the navigation power modules are used for supplying navigation power and electric energy to the deck module. Different numbers of navigation power modules are configured and rapidly combined with the deck module, so that high-speed naval ships with different water discharging amounts and different fighting functions are established. The establishing and combining method comprises a method for establishing a workflow type dock, a method for establishing the deck module, a method for establishing the navigation power modules, a method for combining the deck module and the navigation power modules and a method for repairing and replacing the navigation power modules.

Description

The fast construction combined method on a kind of combined high-speed naval vessel
Technical field
The present invention relates to a kind of large-scale marine military equipment, specifically a kind of the fast construction combined method on combined high-speed naval vessel.
Background technology
As everyone knows, naval vessel is naval warfare platform movably, naval vessel is mainly take carrier-borne aircraft as attack weapon, the nuclear ship technology of the little tonnage of Made in China is ripe, numerous atomic submarine is on duty in war preparedness, but large-tonnage water surface naval vessel especially nuclear power source water surface naval vessel China does not also have, therefore to make in conjunction with the Chinese national conditions absorption U.S. experience on naval vessel, creatively build the large-tonnage naval vessel or the nuclear ship that are applicable to China's actual conditions, although China has grasped the technology of the nuclear reactor of building cheap low-enrichment uranium, if build large-scale naval vessel with low-enrichment uranium, just mean, make scrap soon fast, use cost is high, lose more than gain, the naval vessel part of scrapping because change reactor core is formally the important one deck section in top, naval vessel, the process of changing reactor core is exactly the process of tearing deck open, the cost that changes a reactor core is equivalent to build a new ship.If caught up with and surpassed the world's advanced levels at displacement with on service life, just must solve the gordian technique threshold that uses cheap low-enrichment uranium not scrap whole naval vessel with changing reactor core.
Summary of the invention
The object of this invention is to provide one the fast construction combined method on combined high-speed naval vessel.
The object of the invention is to realize in the following manner, comprising: deck module, navigating power module, build process is as follows:
Naval vessel is resolved into deck module and navigating power module, between deck module and navigating power module, connect by V-shaped groove structure, in the design of deck module, configure the shipborne weapon of different operation purposes according to different warship kinds, in the design of navigating power module, adopt independently hull design, function is to provide navigating power and electric energy for deck module, by the navigating power module of configuration varying number and the Rapid Combination of deck module, build the high speed of a ship or plane naval vessel of the different fight functions of different displacement;
Construction combined method comprises: the construction of procedural style dock method, deck module construction method, navigating power module construction method, the combination of deck module and navigating power module method andthe maintenance of navigating power module and replacing method, wherein:
The method of construction of procedural style dock: comprise building berth and groove dock on the ground, building berth and groove dock are cascaded on the ground, deck module is built on building berth on the ground, navigating power module is built in groove dock, ground building berth at least bar is made up of two trapezoidal slideways, the trapezoidal joint geometry at the section form of trapezoidal slideway and navigating power module top matches, the length of trapezoidal slideway is at least suitable with the length of deck module, the spacing of the V-shaped groove interface of the spacing of trapezoidal slideway and deck module bottom matches, the end of trapezoidal slideway connects groove dock, the length of the length of groove dock and navigating power module is suitable, the bottom of groove dock is provided with bottom land building berth, bottom land building berth is parallel with the trapezoidal slideway on the building berth of ground, trapezoidal slideway on building berth and the bottom land building berth in groove dock are designed to pits rampway structure on the ground, the height that the degree of depth of groove dock equals navigating power module adds the height of bottom land building berth,
the method of construction of deck module, from bow to stern, press tower structure layer and section monolithic construction and combine rear for subsequent use;
While building binary naval vessel, two navigating power modules of at least parallel connection of V-shaped groove interface of deck module two bottom sides, in
Between V-shaped groove interface in the middle of be provided with the alongside supply of sealing hatch door for submarine; While building trisome naval vessel, two navigating power modules of at least parallel connection of V-shaped groove interface of deck module two bottom sides, the front portion of a middle V-shaped groove interface at least connects a navigating power module, and middle V-shaped groove interface rear portion is provided with the alongside supply of sealing hatch door for submarine;
the method of construction of navigating power module is as follows:
Navigating power module is except providing electric energy for deck module, radical function is to provide navigating power for deck module, structure is identical with the hull section separation structure of normal conventional power naval vessel or nuclear ship, top arranges trapezoidal joint, fore and aft, sectional construction overall package is together for subsequent use, trapezoidal slideway parallel alignment on the trapezoidal blank area on requirement navigating power module top and on the ground building berth, and the ramp angles of the trapezoidal slideway of angle of inclination and on the ground building berth is coherent coincide, to facilitate deck module to shift to sliding in navigating power module;
the assemble method of deck module and navigating power module is as follows:
Use draw gear traction deck module in navigating power module, to slide transfer along trapezoidal slideway, until deck module is transferred on the trapezoidal joint of navigating power module, lock by lockout mechanism, modularization separate assembling ship construction combines successfully, to water filling in groove dock, after navigating power module and deck module together float, can roll that procedural style dock carries out the interior and exterior finishes of hull and the installation of on-board equipment is supporting away from;
the maintenance of navigating power module and replacing method are as follows:
Modularized combination type naval vessel in use, if needing repairing, a certain navigating power module changes or system upgrade, first be consistent by the draft of two navigating power modules of ballast tank adjustment, the navigating power module of again needs being changed is utilized the power of self or is driven traction to skid off by gear-rack drive mechanism along the V-shaped groove interface of deck module bottom, another navigating power module is slided into along the V-shaped groove interface of deck module bottom, take over the navigating power module skidding off, the energy cabin module of taking over is fixed by blocking device after sliding into and putting in place, Renewal process all can be changed in dock or in alongside base, naval vessel or the process of executing the task.
excellent effect of the present invention is: this compound type naval vessel mainly has three advantages, 1) adopt modular combination, simplify and make warship technique, reduce construction difficulty, accelerate to make warship speed, although do not build the technical merit on large displacement naval vessel, by adopting split type combination can accelerate to catch up with and surpass the world's large displacement ship construction level yet; 2) adopt the superfluous design of navigating power module power source, can increase substantially the speed of a ship or plane and supply load, significantly promote the overall combat effectiveness on naval vessel; 3) take into account submarine base function, for submarine provides marine hidden and motor-driven supply, the collaborative three-dimensional striking capabilities of air-sea that builds of naval vessel and submarine.
Large displacement naval vessel is resolved into deck module and navigating power module, reduce ship construction difficulty, between deck module and navigating power module, connect by V-shaped groove structure, according to the naval vessel of the different operation purposes of the different tonnages of the combination fast construction of module, even if navigating power module needs repairing or upgrades, do not affect deck module operational performance yet, especially use nuclear navigating power module, effect is particularly outstanding, just to change tire the same simple and convenient with automobile for Renewal process, adopt above-mentioned design, will make safety performance and the fighting efficiency on large-tonnage naval vessel increase substantially,
In the design of navigating power module, adopt many redundancies independence hull design, by the complicated simplification of large-tonnage ship construction technique, normalisation, modularization and procedure, can significantly accelerate Chinese domestic ship construction speed; Navigating power functions of modules is for deck module provides navigating power and electric energy, and the navigating power module of varying number and the combination of deck module can be built the naval vessel of the different fight functions of different displacement.In oceangoing voyage process, even if surplus next navigating power module also can drive ship navigation.Navigating power module can entirety split replacing, for the repair and upgrade on naval vessel provides convenience, can guarantee on the whole service life and the war preparedness efficiency on duty on naval vessel;
Leading design concept is as follows:
One, navigating power module redundancy configuration, can adopt powered by conventional energyly, also can adopt nuclear power source, the naval vessel of different performance purposes, the navigating power module of flexible reasonable disposition varying number, there are at most four oar propelling units on the monomer naval vessel of prior art, adopts compound type naval vessel, catamaran hull is 8 oar propelling units, trimaran is 12 oar propelling units, and four hulls are exactly 16 oar propelling units, thereby hull is many, propelling unit is many, and route speed will increase substantially;
Two, each hull calculates by a nuclear reactor configuration, multimode combination, and the electric energy of generation is also to increase exponentially, has had huge electric energy, just can support large being equipped on naval vessel of all power consumptions such as magnetic artillery, laser gun to use;
Three, navigating power module is if standard nuclear power source unit, can build in large quantity deposit as standard naval vessel accessory, except being used for wartime the naval vessel of the different tonnages of fast assembling, army ground is dual-purpose, can be used as at ordinary times civilian marine nuclear power plant uses, send coastal various places and island, for base, harbour or local economic construction provide electric energy, set up at any time naval vessel wartime, navigating power module is throughout the year in coastal waters alongside, do not take land area, be not afraid of tsunami and typhoon yet, even if also can making civilian nuclear power plant, retired nuclear power installation uses, by a large amount of construction navigating power modules, can not only promote the electric energy generated of nuclear power plant, can also catch up with and surpass fast in quality west.
In sum, compound type of the present invention naval vessel, have multi-functional, high-mobility, multipurpose, wheeled vehicle, not only there are all functions of the Waterborne movable optimal in structure that conventional ship has, also there is the function of marine submarine base, the bottom of deck module arranges submarine berth, convoy submarine can be stopped supply under naval vessel, the huge volume storage function that relies on naval vessel provides the logistics support the same with base, land for convoy submarine, and there is good disguise, owing to there being sheltering of naval vessel above, stop and the supply of retinue submarine can secret be carried out below naval vessel, satellite cannot capture the whereabouts of submarine, not only for providing failure-free logistics support with the naval warfare of boat submarine, and greatly improve the overall fighting capacity of fleet.
The specific embodiment
Compound type of the present invention naval vessel is described in detail below.
The method of construction on compound type of the present invention naval vessel, that surface vessel is resolved into deck module 1 and navigating power module 2, between deck module and navigating power module, connect by V-shaped groove structure, in the design of deck module, flying-off deck and landing deck layering are separated, but landing can take into account mutually with the function of taking off, and shape adopts the upper ministerial standard deck shape on Ford level naval vessel, all adopts through type deck and through type runway;
In the design of navigating power module, adopt independently hull design, function is for deck module provides navigating power and electric energy, by the naval vessel of the navigating power module of varying number and the different fight functions of the different displacement of combination fast construction of deck module;
Compound type naval vessel comprises: deck module, navigating power module, wherein:
Described deck module, it is exactly the part more than water surface, employing frame steel structure is built, the V-shaped groove interface matching with the trapezoidal joint in navigating power module top is set on the flat-bottom structure of deck module, deck module is connected and combines with navigating power module top by V-shaped groove interface, every V-shaped groove interface at least connects a navigating power module, in the middle of every V-shaped groove interface, at least arrange a sealing hatch door for the alongside supply of navigating power module or convoy submarine;
In the time of binary ship construction, three V-shaped groove interfaces of deck module bottom, two the navigating power modules that at least be arranged in parallel, a middle V-shaped groove interface is for the alongside supply of the submarine that escorts;
In the time of trisome ship construction, three V-shaped groove interfaces of deck module bottom at least connect three navigating power modules, a middle navigating power module of the anterior connection of a V-shaped groove interface, and rear portion is for the alongside supply of large-scale convoy submarine;
The top of described navigating power module is provided with trapezoidal joint, together with the V-shaped groove interface sliding plug of trapezoidal joint and deck module bottom with the combination that realizes both with separate, when binary ship design, the V-shaped groove interface length of the trapezoidal joint length at navigating power module top and laminated deck module bottom both sides matches, and two navigating power modules are connected with the V-shaped groove interface of deck module two bottom sides; When trisome ship design, navigating power module is arranged by " product " font in deck module bottom;
Navigating power module is except providing electric energy for deck module, radical function is to provide navigating power for deck module, the top of navigating power module is crewman's accommodation, and the bottom of navigating power module arranges fuel storage, fresh water ballast tank and cabin powered by conventional energy or nuclear power source cabin;
the construction combined method on modularization separate assembling naval vessel, comprise the method for construction of procedural style dock, method of construction, method of construction, deck module and the navigating power module combined method of navigating power module and maintenance and the replacing method of navigating power module of deck module: wherein:
The method of construction of procedural style dock: comprise building berth and groove dock on the ground, building berth and groove dock are cascaded on the ground, deck module is built on building berth on the ground, navigating power module is built in groove dock, on building berth, design on the ground at least trapezoidal slideway of bar, the trapezoidal joint geometry at the section form of trapezoidal slideway and navigating power module top matches, the length of trapezoidal slideway is at least suitable with the length of deck module, the spacing of the V-shaped groove interface of the spacing of trapezoidal slideway and deck module bottom matches, the end of trapezoidal slideway connects groove dock, the length of the length of groove dock and navigating power module is suitable, the bottom of groove dock is provided with bottom land building berth, bottom land building berth is parallel with the trapezoidal slideway on the building berth of ground, trapezoidal slideway on building berth and the bottom land building berth in groove dock are designed to pits rampway structure on the ground, the height that the degree of depth of groove dock equals navigating power module adds the height of bottom land building berth,
The method of construction of navigating power module, structure is identical with the under body structure of normal conventional power naval vessel or nuclear ship, the trapezoidal joint of upper deployment, fore and aft, sectional construction overall package is together for subsequent use, require the trapezoidal slideway parallel alignment on the trapezoidal blank area on navigating power module top and building berth on the ground, and angle of inclination and coherent the coincideing of ramp angles of the trapezoidal slideway of building berth on the ground, to facilitate deck module to the transfer of sliding in navigating power module;
The assemble method of deck module 1 and navigating power module:
Method one: use draw gear traction deck module to slide transfer along trapezoidal slideway in navigating power module, until deck module is transferred on the trapezoidal joint of navigating power module, lock by lockout mechanism, modularization separate assembling ship construction combines successfully, to water filling in groove dock, after navigating power module and deck module together float, can roll that procedural style dock carries out the interior and exterior finishes of hull and the installation of on-board equipment is supporting away from;
Method two
Use draw gear traction sectional construction deck module in navigating power module, to slide transfer along trapezoidal slideway, until each break deck module is all transferred on the trapezoidal joint of navigating power module, then be welded into entirety, lock by lockout mechanism, modularization separate assembling ship construction combines successfully, to water filling in groove dock, after navigating power module and deck module together float, can roll that procedural style dock carries out the interior and exterior finishes of hull and the installation of on-board equipment is supporting away from;
The maintenance of navigating power module and replacing method:
Modularized combination type naval vessel in use, if needing repairing, a certain navigating power module changes or system upgrade, first be consistent by the draft of two navigating power modules of ballast tank adjustment, the navigating power module of again needs being changed is utilized the power of self or is driven traction to skid off by gear-rack drive mechanism along the V-shaped groove interface of deck module bottom, another navigating power module is slided into along the V-shaped groove interface of deck module 1 bottom, take over the navigating power module skidding off, the energy cabin module of taking over is fixed by blocking device after sliding into and putting in place, Renewal process needn't need to lie up, in alongside base, naval vessel or the process of executing the task, all can change.
About ground building berth and groove dock structure, the shape of bow stern, the interior layout of cabin and on-board equipment layout, also has the concrete shape of deck module, in manufacture process, adjust according to naval vessel kind purposes, can not describe specially it at this, other relevant devices can be made warship technical design by tradition and build, and in ship construction process, can be not limited to content disclosed in this invention.
Except the technical characterictic described in specification sheets, be the known technology of those skilled in the art.

Claims (1)

1. one kind the fast construction combined method on combined high-speed naval vessel, it is characterized in that, naval vessel is resolved into deck module and navigating power module, between deck module and navigating power module, connect by V-shaped groove structure, in the design of deck module, configure the shipborne weapon of different operation purposes according to different warship kinds, in the design of navigating power module, adopt independently hull design, function is to provide navigating power and electric energy for deck module, by the navigating power module of configuration varying number and the Rapid Combination of deck module, build the high speed of a ship or plane naval vessel of the different fight functions of different displacement, construction combined method comprises: the construction of procedural style dock method, deck module construction method, navigating power module construction method, the combination of deck module and navigating power module method andthe maintenance of navigating power module and replacing method, wherein:
The method of construction of procedural style dock: comprise building berth and groove dock on the ground, building berth and groove dock are cascaded on the ground, deck module is built on building berth on the ground, navigating power module is built in groove dock, ground building berth at least bar is made up of two trapezoidal slideways, the trapezoidal joint geometry at the section form of trapezoidal slideway and navigating power module top matches, the length of trapezoidal slideway is at least suitable with the length of deck module, the spacing of the V-shaped groove interface of the spacing of trapezoidal slideway and deck module bottom matches, the end of trapezoidal slideway connects groove dock, the length of the length of groove dock and navigating power module is suitable, the bottom of groove dock is provided with bottom land building berth, bottom land building berth is parallel with the trapezoidal slideway on the building berth of ground, trapezoidal slideway on building berth and the bottom land building berth in groove dock are designed to pits rampway structure on the ground, the height that the degree of depth of groove dock equals navigating power module adds the height of bottom land building berth,
the method of construction of deck module, from bow to stern, press tower structure layer and section monolithic construction and combine rear for subsequent use;
While building binary naval vessel, two navigating power modules of at least parallel connection of V-shaped groove interface of deck module two bottom sides, are provided with the alongside supply of sealing hatch door for submarine in the middle of a middle V-shaped groove interface;
While building trisome naval vessel, two navigating power modules of at least parallel connection of V-shaped groove interface of deck module two bottom sides, the front portion of a middle V-shaped groove interface at least connects a navigating power module, and middle V-shaped groove interface rear portion is provided with the alongside supply of sealing hatch door for submarine;
the method of construction of navigating power module is as follows:
Navigating power module is except providing electric energy for deck module, radical function is to provide navigating power for deck module, structure is identical with the hull section separation structure of normal conventional power naval vessel or nuclear ship, top arranges trapezoidal joint, fore and aft, sectional construction overall package is together for subsequent use, trapezoidal slideway parallel alignment on the trapezoidal blank area on requirement navigating power module top and on the ground building berth, and the ramp angles of the trapezoidal slideway of angle of inclination and on the ground building berth is coherent coincide, to facilitate deck module to shift to sliding in navigating power module;
the assemble method of deck module and navigating power module is as follows:
Use draw gear traction deck module in navigating power module, to slide transfer along trapezoidal slideway, until deck module is transferred on the trapezoidal joint of navigating power module, lock by lockout mechanism, modularization separate assembling ship construction combines successfully, to water filling in groove dock, after navigating power module and deck module together float, can roll that procedural style dock carries out the interior and exterior finishes of hull and the installation of on-board equipment is supporting away from;
the maintenance of navigating power module and replacing method are as follows:
Modularization separate assembling naval vessel in use, if needing repairing, a certain navigating power module changes or system upgrade, first be consistent by the draft of two navigating power modules of ballast tank adjustment, the navigating power module of again needs being changed is utilized the power of self or is driven traction to skid off by gear-rack drive mechanism along the V-shaped groove interface of deck module bottom, another navigating power module is slided into along the V-shaped groove interface of deck module bottom, take over the navigating power module skidding off, the energy cabin module of taking over is fixed by blocking device after sliding into and putting in place, Renewal process all can be changed in dock or in alongside base, naval vessel or the process of executing the task.
CN201410048182.XA 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel Active CN103803017B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410048182.XA CN103803017B (en) 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410048182.XA CN103803017B (en) 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel

Publications (2)

Publication Number Publication Date
CN103803017A true CN103803017A (en) 2014-05-21
CN103803017B CN103803017B (en) 2016-04-06

Family

ID=50700512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410048182.XA Active CN103803017B (en) 2014-02-12 2014-02-12 A kind of fast construction combined method of combined high-speed naval vessel

Country Status (1)

Country Link
CN (1) CN103803017B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1652178A2 (en) * 1987-11-23 1991-05-30 Предприятие П/Я А-1290 Method of ship building using module units
CN101100217A (en) * 2007-06-12 2008-01-09 烟台来福士海洋工程有限公司 Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same
KR20090007920A (en) * 2007-07-16 2009-01-21 대우조선해양 주식회사 Ship assembling and launching method using divided land and marine construction
CN101356091A (en) * 2006-12-29 2009-01-28 现代重工业株式会社 Inundation method used in tandem shipbuilding process
TW201136804A (en) * 2010-04-28 2011-11-01 rui-feng Xie Manufacturing method of hollow blow molding box and mold structure thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1652178A2 (en) * 1987-11-23 1991-05-30 Предприятие П/Я А-1290 Method of ship building using module units
CN101356091A (en) * 2006-12-29 2009-01-28 现代重工业株式会社 Inundation method used in tandem shipbuilding process
CN101100217A (en) * 2007-06-12 2008-01-09 烟台来福士海洋工程有限公司 Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same
KR20090007920A (en) * 2007-07-16 2009-01-21 대우조선해양 주식회사 Ship assembling and launching method using divided land and marine construction
TW201136804A (en) * 2010-04-28 2011-11-01 rui-feng Xie Manufacturing method of hollow blow molding box and mold structure thereof

Also Published As

Publication number Publication date
CN103803017B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
US3934531A (en) Ocean going cargo transport system
CN107867372A (en) Can be dived carrier
CN201686008U (en) Deep-sea tourism submarine
CN102079380A (en) Navigation submarine ship with hydrofoil power cabins
CN102079379A (en) Multipurpose anti-attack submarine depot boat
Roberts British Warships of the Second World War: Detailed in the Original Builders' Plans
CN103803039B (en) A kind of combined high-speed aircraft carrier with wind-tunnel help-fly system and method for construction thereof
Stille Imperial Japanese Navy Aircraft Carriers 1921–45
Williamson Wolf Pack: The Story of the U-Boat in World War II
CN103803017B (en) A kind of fast construction combined method of combined high-speed naval vessel
RU2371350C1 (en) Water craft for armoured vehicles
CN104139840B (en) A kind of modularized combination type high speed aircraft carrier and construction method thereof
US20030033967A1 (en) STOVL joint strike fighter carrier
CN207510664U (en) The unmanned guard boat of hydraulic jet propulsion double-vane
CN206231598U (en) A kind of multifunctional water surface naval vessels
CN107585264A (en) The unmanned guard boat of hydraulic jet propulsion double-vane
RU2424487C1 (en) Air trooping method of armoured equipment to combat zone with provision of self-protection and safety of flotation
Fontenoy Aircraft carriers: an illustrated history of their impact
Lardas World War I seaplane and aircraft carriers
Sgarlato et al. Secret Projects of the Kriegsmarine: Unseen Designs of Nazi Germany's Navy
CN201516913U (en) Floating platform at sea
Jordan Warship 2015
CN204037878U (en) A kind of high-speed patrol boat
Curley War at Sea and in the Air
Henshaw Town Class Destroyers: A Critical Assessment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Jiang Ming

Inventor after: Li Changhong

Inventor before: Jiang Ming

Inventor before: Huo Gang

Inventor before: Chen Weiguo

Inventor before: Jiang Peng

Inventor before: Zhu Huifen

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160715

Address after: 102600, No. ten, 1009 street, Haidian District, Beijing, 1 floor, 10

Patentee after: Beijing air navigation aerial instrument measuring and Testing Technology Co.,Ltd.

Patentee after: JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Address before: 250014 Shandong Province, Lixia District of Ji'nan city by ten Road No. 12588 MINI District 202 room mansion celebrities heights

Patentee before: JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

CB03 Change of inventor or designer information

Inventor after: Wei Mingming

Inventor before: Jiang Ming

Inventor before: Li Changhong

CB03 Change of inventor or designer information
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170906

Address after: Anhui province Huainan city 232000 National Road, tianjia'an District Nishimura Qing national garden room 3-1-8

Patentee after: Wei Mingming

Address before: 102600, No. ten, 1009 street, Haidian District, Beijing, 1 floor, 10

Co-patentee before: JINAN HUANTAI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Patentee before: Beijing air navigation aerial instrument measuring and Testing Technology Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20180712

Address after: 225700 Zhao Jia village, Dai Nan Town, Xinghua City, Taizhou, Jiangsu province (Zhao Jiaduan)

Patentee after: Taizhou WIP Testing Technology Co.,Ltd.

Address before: 232000 3-1-8, National Day garden, Ching Xi village, National Day Road, Tian Jia An District, Huainan, Anhui

Patentee before: Wei Mingming

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: Room 1,020, Nanxun Science and Technology Pioneering Park, No. 666 Chaoyang Road, Nanxun District, Huzhou City, Zhejiang Province, 313000

Patentee after: Huzhou You Yan Intellectual Property Service Co.,Ltd.

Address before: 225700 Zhao Jia village, Dai Nan Town, Xinghua City, Taizhou, Jiangsu province (Zhao Jiaduan)

Patentee before: Taizhou WIP Testing Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211207

Address after: 264200 No. 369-11, Shuangdao Road, Weihai high district, Weihai City, Shandong Province

Patentee after: Weihai Regional Innovation Center Co.,Ltd.

Address before: 313000 room 1020, science and Technology Pioneer Park, 666 Chaoyang Road, Nanxun Town, Nanxun District, Huzhou, Zhejiang.

Patentee before: Huzhou You Yan Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230919

Address after: 802, No. 307-2, Shichang Avenue, Torch High tech Industrial Development Zone, Weihai City, Shandong Province, 264200

Patentee after: Weihai Hengsen Composite Materials Technology Co.,Ltd.

Address before: 264200 No. 369-11, Shuangdao Road, Weihai high district, Weihai City, Shandong Province

Patentee before: Weihai Regional Innovation Center Co.,Ltd.

TR01 Transfer of patent right