CN103790599A - End die plate of tunnel secondary lining trolley - Google Patents

End die plate of tunnel secondary lining trolley Download PDF

Info

Publication number
CN103790599A
CN103790599A CN201410061316.1A CN201410061316A CN103790599A CN 103790599 A CN103790599 A CN 103790599A CN 201410061316 A CN201410061316 A CN 201410061316A CN 103790599 A CN103790599 A CN 103790599A
Authority
CN
China
Prior art keywords
steel plate
tunnel
lining chassis
hanger bar
end head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410061316.1A
Other languages
Chinese (zh)
Other versions
CN103790599B (en
Inventor
许�鹏
田晖
张海红
赵元科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU TRAFFIC SCIENCE TESEARCH INSTITUTE Co Ltd
Original Assignee
GANSU TRAFFIC SCIENCE TESEARCH INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU TRAFFIC SCIENCE TESEARCH INSTITUTE Co Ltd filed Critical GANSU TRAFFIC SCIENCE TESEARCH INSTITUTE Co Ltd
Priority to CN201410061316.1A priority Critical patent/CN103790599B/en
Publication of CN103790599A publication Critical patent/CN103790599A/en
Application granted granted Critical
Publication of CN103790599B publication Critical patent/CN103790599B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides an end die plate of a tunnel secondary lining trolley. The end die plate comprises standard blocks, an adjustment block, an end steel plate, a secondary trolley inner film and a fixing bolt. The end steel plate is composed of two vertical plates, one face of the secondary trolley inner film is connected to one outer side face of the end steel plate, and the other outer side face of the end steel plate is connected with the standard blocks. A water stop is arranged on the opposite face of the other face of the secondary trolley inner film and connected to the ends of the standard blocks, and the space between the secondary trolley inner film and the water stop is filled with concrete used for secondary lining. The end die plate of the tunnel secondary lining trolley is practical and convenient and rapid to use, reduces wood consumption and labor intensity of workers, improves working efficiency and is convenient to popularize, use, assemble and disassemble.

Description

Tunnel Second Lining chassis end head formwork
Technical field
The present invention relates to a kind of Tunnel Second Lining chassis end head formwork, belong to construction of tunnel technical field.
Background technology
It is that internal mold, plank are end head formwork that freeway tunnel conventionally adopts secondary lining chassis in the time performing Tunnel Second Lining.Secondary lining chassis is customized in manufacturing firm according to skeleton layout drawing in tunnel by unit in charge of construction conventionally, and end head formwork is that site operation personnel fix the plank cutting by the steel pipe welding on secondary lining chassis.In two track Tunnel Second Lining, profile radius is about 5.5m, and the girth more than springing line is about 17m, makes end head formwork take the wide plank as 30cm, approximately needs 60.Using plank as end head formwork, timber use amount is large, and workman's workload is large, and it is long that operation performs the time, and template is installed, removes loaded down with trivial details, and wood consumption is large.
Summary of the invention
The invention provides a kind of secondary lining end head formwork, this device and secondary lining chassis connect as one, practical and convenient, quick, have reduced wood consumption, have facilitated template to install and dismounting, have reduced workman and have worked slightly, have improved operating efficiency.
For solving above technical problem, the invention provides following technical scheme: a kind of Tunnel Second Lining chassis end head formwork, comprise calibrated bolck, adjustment block, termination steel plate, two lining chassis inner membrance and dead bolts, termination steel plate is that two vertical panels form, the one side of two lining chassis inner membrances is connected in lateral surface of termination steel plate, another lateral surface connection standard piece of termination steel plate; The opposite face of two lining chassis inner membrance another sides is provided with waterstop, and waterstop is connected to the end of calibrated bolck, and two serve as a contrast between chassis inner membrances and waterstop for filling the concrete for secondary lining; Described dead bolt is mainly made up of oil pressure a thousand pieces of gold top, pressure-bearing steel plate, hanger bar and propulsion arm; Calibrated bolck is arranged and is connected in tunnel concrete wall, and adjustment block is arranged in the space between calibrated bolck; Described calibrated bolck is provided with locator slide, on locator slide, connect one end of hanger bar for braking hanger bar, the other end of hanger bar is connected in propulsion arm, and between hanger bar and propulsion arm, for being rotationally connected, propulsion arm is controlled and moved up and down by the top of hydraulic jack; Described hydraulic jack base and secondary lining chassis termination vertical being connected of steel plate, the oil hydraulic system on oil pressure a thousand pieces of gold top is connected with the oil hydraulic system on secondary lining chassis; Between the fore-set of every two hydraulic jacks, connect pressure-bearing steel plate, the contraction control that push up by oil pressure a thousand pieces of gold in the gap between pressure-bearing steel plate and secondary lining chassis termination steel plate.
Further, the tail end of described calibrated bolck is provided with waterstop.
Further, the skin of described waterstop has waterproofing course.
Further, described locator slide is mainly made up of two opposed battens, relatively has bar-shaped trough on batten, and bar-shaped trough connects brake bar; Between two battens, bottom has multiple sawtooth of arranging step by step, and sawtooth is used for stoping brake bar to front slide.
Further, described sawtooth is triangle sawtooth.
Further, described brake bar vertically connects hanger bar, and between hanger bar for being rotationally connected.
Further, described hanger bar two ends have connecting hole, and propulsion arm is through the connecting hole of hanger bar one end.
This Tunnel Second Lining chassis end head formwork the present invention relates to, the length of calibrated bolck and width are adjusted according to Tunnel Second Lining thickness, this end head formwork and secondary lining chassis connect as one, practical and convenient, quick, reduce wood consumption, facilitated template to install and dismounting, reduced workman and worked slightly, improve operating efficiency, be convenient to promote the use of.
Accompanying drawing explanation
Fig. 1 is Tunnel Second Lining chassis end head formwork structural representation of the present invention;
Elevation when Fig. 2 is Tunnel Second Lining chassis end head formwork work of the present invention;
The sectional view when work of Fig. 3 Tunnel Second Lining chassis of the present invention end head formwork;
Fig. 4 is Tunnel Second Lining chassis end head formwork calibrated bolck structural representation of the present invention;
Fig. 5 is Tunnel Second Lining chassis end head formwork calibrated bolck side view of the present invention;
Fig. 6 is Tunnel Second Lining chassis end head formwork dead bolt connection diagram of the present invention;
Description of reference numerals:
1-calibrated bolck; 2-adjustment block; 3-dead bolt; 4-locator slide; 5-hanger bar; 6-propulsion arm; 7-hydraulic jack; 8-pressure-bearing steel plate; 9-termination steel plate; 10-waterstop; 11-bis-serves as a contrast chassis internal mold; 12-concrete; 13-waterproofing course; 14-brake bar.
The specific embodiment
The principle of this end head formwork design is as shown in Fig. 1-Fig. 6, calibrated bolck 1 is provided with locator slide 4, the length of described calibrated bolck 1 and width can be adjusted according to Tunnel Second Lining thickness, on locator slide 4, connect hanger bar, hanger bar 5 can make calibrated bolck fix, dead bolt 3 is made up of oil pressure a thousand pieces of gold top 7, pressure-bearing steel plate 8 and propulsion arm 6, hydraulic jack 7 is provided with multiple, every two hydraulic jacks 7 connect by pressure-bearing steel plate 8, wherein, the length of pressure-bearing steel plate 8 can be determined according to bearing pressure size, and then the quantity of definite hydraulic jack 7.Gap between pressure-bearing steel plate 8 and secondary lining termination steel plate 9 can be obtained and be controlled by the piston rod movement on oil pressure a thousand pieces of gold top 7.Hanger bar 5 is connected with propulsion arm 6, and hydraulic jack 7 one end are connected with secondary lining chassis termination steel plate 9, and the oil hydraulic system on oil pressure a thousand pieces of gold top 7 is connected with the oil hydraulic system on secondary lining chassis, and adjustment block 2 need specifically be made according to void size in work progress.
The skin of waterstop 10 has waterproofing course 13.
Locator slide 4 is mainly made up of two opposed battens, relatively has bar-shaped trough on batten, and bar-shaped trough connects brake bar; Between two battens, bottom has multiple sawtooth of arranging step by step, and sawtooth is used for stoping brake bar to front slide.
Sawtooth is triangle sawtooth.
Brake bar 14 is vertical connects hanger bar 5, and between hanger bar 5 for being rotationally connected.
Hanger bar 5 two ends have connecting hole, and propulsion arm 6 is through the connecting hole of hanger bar one end.
Erection stage, unit in charge of construction can be according to the quantity of required calibrated bolck 1 and the quantity of hydraulic jack under profile radius primary Calculation in tunnel, when concrete 12 is built, the pressure of arch crown part is little, the interval design of hydraulic jack can suitably strengthen, abutment wall site pressure is large, and the interval of hydraulic jack can suitably reduce.First should be according to the position of determining that hydraulic jack is marked in interval on the steel plate of secondary lining chassis termination, the line of the center on oil pressure a thousand pieces of gold top 7 should be parallel with tunnel inner outline.Then hydraulic jack 7 bases are welded on the position of having demarcated, then pressure-bearing steel plate 8 are soldered on the fore-set of hydraulic jack.Then the hanger bar of calibrated bolck 1 is connected with the propulsion arm on pressure-bearing steel plate 8, and propulsion arm 6 is soldered on pressure-bearing steel plate 8, one end of calibrated bolck 1 is put into the space of pressure-bearing steel plate 8 and secondary lining chassis termination steel plate 9, installation work has just completed.When use, secondary lining chassis is carried out to assigned address, from a side wall in tunnel, a mobile calibrated bolck pushes up to waterstop 10 its one end, depress hanger bar 5, fixed standard piece 1, then mobile another calibrated bolck 1 makes it be close to previous calibrated bolck fixing, successively fixed standard piece 1 until all calibrated bolcks fixedly complete, then make adjustment block 2 with plank, according to the size of each jack position shortcoming template, according to its size, plank is cut and is embedded in corresponding position, then shrink hydraulic jack 7, oil pressure a thousand pieces of gold top 7 pressure that provide make calibrated bolck 1 and the adjustment block cannot mobile fixing compact, propulsion arm makes it press closer waterstop to hanger bar to the power of waterstop direction simultaneously, formwork work completes, can concreting.In the time of detachable template, extend hydraulic jack and make pressure-bearing steel plate disengage calibrated bolck, hammering, vibrations calibrated bolck make it depart from concrete 12, remove adjustment block.This device is forever connected on lining trolley, need not manually transport.
The specific embodiment of the present invention does not form the restriction to the application's scope; every within the spirit and principle of the present invention design, any modification that one of skill in the art can make, be equal to and replace and within improvement etc. all should be included in protection scope of the present invention.

Claims (7)

1. a Tunnel Second Lining chassis end head formwork, it is characterized in that, described end head formwork comprises calibrated bolck, adjustment block, termination steel plate, two lining chassis inner membrance and dead bolts, termination steel plate is that two vertical panels form, the one side of two lining chassis inner membrances is connected in lateral surface of termination steel plate, another lateral surface connection standard piece of termination steel plate; The opposite face of two lining chassis inner membrance another sides is provided with waterstop, and waterstop is connected to the end of calibrated bolck, and two serve as a contrast between chassis inner membrances and waterstop for filling the concrete for secondary lining; Described dead bolt is mainly made up of oil pressure a thousand pieces of gold top, pressure-bearing steel plate, hanger bar and propulsion arm; Calibrated bolck is arranged and is connected in tunnel concrete wall, and adjustment block is arranged in the space between calibrated bolck; Described calibrated bolck is provided with locator slide, on locator slide, connect one end of hanger bar for braking hanger bar, the other end of hanger bar is connected in propulsion arm, and between hanger bar and propulsion arm, for being rotationally connected, propulsion arm is controlled and moved up and down by the top of hydraulic jack; Described hydraulic jack base and secondary lining chassis termination vertical being connected of steel plate, the oil hydraulic system on oil pressure a thousand pieces of gold top is connected with the oil hydraulic system on secondary lining chassis; Between the fore-set of every two hydraulic jacks, connect pressure-bearing steel plate, the contraction control that push up by oil pressure a thousand pieces of gold in the gap between pressure-bearing steel plate and secondary lining chassis termination steel plate.
2. according to a kind of Tunnel Second Lining chassis end head formwork described in right 1, it is characterized in that, the tail end of described calibrated bolck is provided with waterstop.
3. according to a kind of Tunnel Second Lining chassis end head formwork described in right 1, it is characterized in that, the skin of described waterstop has waterproofing course.
4. according to a kind of Tunnel Second Lining chassis end head formwork described in right 1, it is characterized in that, described locator slide is mainly made up of two opposed battens, relatively has bar-shaped trough on batten, and bar-shaped trough connects brake bar; Between two battens, bottom has multiple sawtooth of arranging step by step, and sawtooth is used for stoping brake bar to front slide.
5. according to a kind of Tunnel Second Lining chassis end head formwork described in right 4, it is characterized in that, described sawtooth is triangle sawtooth.
6. according to a kind of Tunnel Second Lining chassis end head formwork described in right 4, it is characterized in that, described brake bar vertically connects hanger bar, and between hanger bar for being rotationally connected.
7. according to a kind of Tunnel Second Lining chassis end head formwork described in right 1, it is characterized in that, described hanger bar two ends have connecting hole, and propulsion arm is through the connecting hole of hanger bar one end.
CN201410061316.1A 2014-02-24 2014-02-24 Tunnel Second Lining chassis end head formwork Expired - Fee Related CN103790599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410061316.1A CN103790599B (en) 2014-02-24 2014-02-24 Tunnel Second Lining chassis end head formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410061316.1A CN103790599B (en) 2014-02-24 2014-02-24 Tunnel Second Lining chassis end head formwork

Publications (2)

Publication Number Publication Date
CN103790599A true CN103790599A (en) 2014-05-14
CN103790599B CN103790599B (en) 2016-06-15

Family

ID=50666610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410061316.1A Expired - Fee Related CN103790599B (en) 2014-02-24 2014-02-24 Tunnel Second Lining chassis end head formwork

Country Status (1)

Country Link
CN (1) CN103790599B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06294298A (en) * 1993-04-09 1994-10-21 Konoike Constr Ltd Device for lining tunnel with concrete
WO2002031316A2 (en) * 2000-10-10 2002-04-18 Robert Planinc Tunnel lining made of prefabricated reinforced concrete elements and process for its manufacturing and installing
KR20070079997A (en) * 2006-02-06 2007-08-09 한미란 Support structure for hunch
CN201896621U (en) * 2010-11-24 2011-07-13 王瑜 Hinge type end steel formwork of tunnel lining trolley
CN202187778U (en) * 2011-05-04 2012-04-11 中铁三局集团有限公司 Push-pull type end template
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN102877859A (en) * 2012-09-28 2013-01-16 广东省长大公路工程有限公司 End mould structure for tunnel secondary lining and mounting method thereof
CN203702174U (en) * 2014-02-24 2014-07-09 甘肃省交通科学研究院有限公司 Tunnel secondary lining trolley end template

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06294298A (en) * 1993-04-09 1994-10-21 Konoike Constr Ltd Device for lining tunnel with concrete
WO2002031316A2 (en) * 2000-10-10 2002-04-18 Robert Planinc Tunnel lining made of prefabricated reinforced concrete elements and process for its manufacturing and installing
KR20070079997A (en) * 2006-02-06 2007-08-09 한미란 Support structure for hunch
CN201896621U (en) * 2010-11-24 2011-07-13 王瑜 Hinge type end steel formwork of tunnel lining trolley
CN202187778U (en) * 2011-05-04 2012-04-11 中铁三局集团有限公司 Push-pull type end template
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN102877859A (en) * 2012-09-28 2013-01-16 广东省长大公路工程有限公司 End mould structure for tunnel secondary lining and mounting method thereof
CN203702174U (en) * 2014-02-24 2014-07-09 甘肃省交通科学研究院有限公司 Tunnel secondary lining trolley end template

Also Published As

Publication number Publication date
CN103790599B (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN203307840U (en) Integral horizontal moving type formwork construction device for strip-shaped constant-cross-section concrete structure
CN103821087A (en) Precast bridge deck space steel pipe concrete truss composite beam and construction method
CN102392536A (en) Construction method for long-span hanging vestibule type template support system
CN103225444A (en) Large and light-weight stereo type construction temporary boundary wall and construction method thereof
CN204041080U (en) General formula needle beam lining trolley in a kind of
CN110117933B (en) Cast-in-situ movable formwork for pier top of segmental beam
CN106638686A (en) Comprehensive pipe gallery with corrugated steel plate shear walls and construction method of comprehensive pipe gallery
CN103266623B (en) Integral horizontally moving type traveling shuttering construction device for long-strip-shaped uniform section concrete structure
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN203702174U (en) Tunnel secondary lining trolley end template
CN203419675U (en) Traveling track for girder crane
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN204825945U (en) A fixture for fixing buried bolt in advance
CN204386608U (en) A kind of tunnel invert construction tool
CN103790599A (en) End die plate of tunnel secondary lining trolley
CN102605967A (en) Steel plate pressurizing device and method thereof
CN103967332A (en) Construction method of building site barrier
CN104074275A (en) Prefabricated concrete column connecting joint structure
CN202659267U (en) Integral graded spanning-type walking bracket
CN204418666U (en) A kind of building site is with there being side wall stair template
CN203559909U (en) Height-adjustable lining trolley
CN204532374U (en) The multi-functional chassis of metro station construction
CN203891906U (en) Temporary support device for open-off cut tunneling of fully mechanized mining face of steep coal seam
CN104675415A (en) Lining trolley with adjustable height

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20190224

CF01 Termination of patent right due to non-payment of annual fee