CN102605967A - Steel plate pressurizing device and method thereof - Google Patents

Steel plate pressurizing device and method thereof Download PDF

Info

Publication number
CN102605967A
CN102605967A CN2012101018130A CN201210101813A CN102605967A CN 102605967 A CN102605967 A CN 102605967A CN 2012101018130 A CN2012101018130 A CN 2012101018130A CN 201210101813 A CN201210101813 A CN 201210101813A CN 102605967 A CN102605967 A CN 102605967A
Authority
CN
China
Prior art keywords
steel plate
affixing
bolt
shaped suspension
suspension arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101018130A
Other languages
Chinese (zh)
Inventor
阎卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Transportation Research Institute Co Ltd
Original Assignee
Jiangsu Transportation Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Transportation Research Institute Co Ltd filed Critical Jiangsu Transportation Research Institute Co Ltd
Priority to CN2012101018130A priority Critical patent/CN102605967A/en
Publication of CN102605967A publication Critical patent/CN102605967A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a steel plate pressurizing device and a method thereof. The technical scheme includes that the steel plate pressurizing device consists of a plurality of U-shaped hanging devices, each U-shaped hanging device consists of two side steel plates and a bottom steel plate, the two side steel plates and the bottom steel plate of each U-shaped hanging device are welded to form a U-shaped structure, and bolt holes are arranged on the side steel plates and the bottom steel plate of each U-shaped hanging device. The steel plate pressurizing device and the method thereof simplify the structure, bring convenience for construction, and save materials, labor and machinery equipment.

Description

Steel plate water booster system and method thereof
Technical field
The invention belongs to the civil structure field, be specifically related to be used for the steel plate water booster system and the pressure method of works steel-bonded reinforcement.
Background technology
Existing works need regularly carry out the inspection and maintenance maintenance in the interim damage that all can occur in various degree of operation, need carry out reinforcement and strengthening in case of necessity.Affixing steel plate reinforcement is a kind of application works maintenance and reinforcement method the most widely, all can adopt the steel bonding method to carry out reinforcement and strengthening for works bending resistance or the not enough position of shearing resistance, and effect is remarkable.The affixing steel plate reinforcement general flow is location → boring → clear hole → steel plate eliminate rust → smear adhesive → plant bolt → curing, protection → check.
The stickup of steel-bonded reinforcement worker method light plate is crucial.Method in common is on the works basal plane after surface of steel plate and the cleaning, to smear adhesive; Simultaneously open anchor hole at surface of steel plate and works basal plane; After hanging on the lead screw to the hole steel plate hole then; The nut that screws up with a wrench carries out the anchoring extrusion forming to steel plate, makes steel plate closely connected on concrete surface.
This steel plate is pasted pressuring method and is applicable to beam slab top or the local small size affixing steel plate of works usually.For large-area beam slab bottom or side steel-bonded reinforcement, only there is very big limitation through the bolt pressurization, also be infeasible in the practice of construction.Striding footpath T beam elongated affixing steel plate reinforcement at the bottom of beam with 20m is example, both can be with having divided block plate to paste at the bottom of the beam and integrally welded again after the nut pressurization, also can be earlier with dividing block plate to be welded as a whole again through smearing at the bottom of the pressurization of adhesive and bolt pastes beam.A kind of method needs overhead welding before the employing, and difficulty is bigger, and adhesive is flammable, and welding can cause the adhesive burning and the forfeiture effect again after piecemeal at the bottom of the beam is pasted; Adopting a kind of method in back to need to weld good elongated steel plate is lifted at the bottom of the beam; Steel plate weight is big, and is flexible big, needs very big manpower and machinery; And a limited number of bolts can't be born the steel plate effect of estimating one's own ability before adhesive solidifies; Also just can't realize pressurization, usually cause the steel plate obscission, the forfeiture consolidation effect steel plate.Therefore, research and develop a kind of effectively, be suitable for and the steel plate water booster system being convenient to construct has important practical significance and promotional value remarkable in economical benefits to development affixing steel plate reinforcement worker's method and works maintenance and reinforcement.
. summary of the invention
The present invention is directed in the present affixing steel plate reinforcement process; But the shortcoming that is pressed in the existence of application property aspect is pasted, added to steel plate; From simplified construction; Convenient construction, the quickening progress is saved steel plate water booster system and pressure method that aspects such as material, manpower and plant equipment have proposed a kind of U-shaped suspended structure thing steel-bonded reinforcement.
A technical scheme that realizes the object of the invention is:
The steel plate water booster system is made up of several U-shaped suspension arrangements, and each U-shaped suspension arrangement is made up of steel plate at the bottom of two blocks of side steel plates and, and steel plate is welded into the U type at the bottom of two blocks of side steel plates and one, on side steel plate and end steel plate, is provided with bolt hole.
U-shaped suspension arrangement structural form is following:
Adopt three bar steel plates to be welded into U-shaped, equal prepared screw-bolt hole on base and side steel plate.End steel plate length is not less than the width of pasting the position, and the side steel plate length should satisfy welding and smear the working space of adhesive.
As further improvement of the present invention; Said plurality of U-shaped suspension arrangement is along the length direction of beam, be installed at the bottom of the beam equally spacedly; Leave the space between the concrete surface at the bottom of steel plate of the said end and the beam; Said two blocks of side steel plates are located at the both sides of beam bottom respectively, are fixedly connected with the beam bottom through the bolt at bolt hole.
Steel plate water booster system among the present invention has simple structure, and it is convenient to construct, the characteristics that applicability is wide.Have stronger validity and economy.
Another technical scheme that realizes the object of the invention is:
The steel plate pressure method comprises the following steps:
Step 1) along the length direction of beam, be installed at the bottom of the beam equally spacedly, leaves space between end steel plate and the soffit with the plurality of U-shaped suspension arrangement, and two blocks of side steel plates are located at the both sides of beam bottom respectively, through bottom the bolt of bolt hole and beam, being fixedly connected;
Step 2) some affixing steel plates are positioned on the end steel plate of U-shaped device, affixing steel plate is provided with prepared screw-bolt hole, is welded as a whole after each affixing steel plate assembly unit;
Step 3) is smeared adhesive at concrete surface and affixing steel plate upper surface, affixing steel plate integral body is raised to beam at the bottom of, tighten on the affixing steel plate nut of anchor bolt in the prepared screw-bolt hole, affixing steel plate and concrete surface are fitted;
The nut of tightening in prepared screw-bolt hole bolt of step 4) on steel plate at the bottom of the U-shaped suspension arrangement makes bolt compress affixing steel plate, accomplishes the stickup and the pressurization of affixing steel plate;
Step 5) treats that adhesive solidifies the back and removes the U-shaped suspension arrangement.
Beneficial effect of the present invention is:
(1) welding is easier: compare with traditional affixing steel plate reinforcement; After adopting this device; Can after dividing block plate to be assembled on the U-shaped suspension arrangement, weld, steel plate is connected as one, avoid the flammable characteristics of overhead welding or adhesive; Simplify construction, be easy to guarantee the effect of welding quality and steel plate reinforcement;
(2) steel plate paste more convenient: big block plate welds and smears adhesive on U-shaped suspension arrangement at the bottom of the beam, only can be raised to beam then through manual work at the bottom of, reduced the lifting distance greatly.Manpower and plant equipment have been saved;
(3) pressurization better effects if: only compare through the pressurization of steel plate self erection bolt with traditional affixing steel plate reinforcement; This U-shaped suspension arrangement has increased on the base bolt to the secondary pressurization of steel plate; Therefore the better effects if of pressurizeing, the steel plate sticking effect is better, has effectively shortened adhesive hardening time.
(4) traffic vibration effect is little on the bridge: traditional steel plate strengthening with external bonding construction requirement is forbidden vehicle pass-through on the bridge in the adhesive curing time, and purpose is to reduce colloid to solidify the influence that receives.After adopting the U-shaped suspension arrangement, strengthened adhesive curing time effect, shortened the duration, can shift to an earlier date open to traffic the steel plate pressurization; And after the enhancing of pressurization effect, even there is traffic on the bridge, the influence of its vibration also reduces greatly.Therefore adopt affixing steel plate reinforcement behind the U-shaped suspension arrangement also to can be applicable to the bridge that can't suspend traffic.Make that steel plate strengthening with external bonding applicability is wider.
Description of drawings
Fig. 1 is the steel plate water booster system structural representation of the embodiment of the invention 1;
The U-shaped suspension arrangement structural representation of Fig. 2 embodiment of the invention 1;
Fig. 3 is the embodiment of the invention 2 steel plate pressure method steps 2) the construction sketch map;
Fig. 4 is the I-I sectional view of Fig. 3;
Fig. 5 is the embodiment of the invention 2 a steel plate pressure method step 4) construction sketch map;
Fig. 6 is the II-II sectional view of Fig. 5;
Fig. 7 is the embodiment of the invention 2 a steel plate pressure method step 5) construction sketch map;
Fig. 8 is the III-III sectional view of Fig. 7.
1-U shape suspension arrangement among the figure, 2-side steel plate, steel plate at the bottom of the 3-, 4-bolt, 5-beam, 6-affixing steel plate, 7-anchor bolt, 8-prepared screw-bolt hole, 10-steel plate water booster system.
The specific embodiment
Embodiment 1
Further specify below in conjunction with accompanying drawing and embodiment.
Embodiment 1
As shown in Figure 1; Steel plate water booster system 10; Be made up of several U-shaped suspension arrangements 1, plurality of U-shaped suspension arrangement 1 leaves the space between the concrete surface 7 at the bottom of end steel plate 3 and the beam along the length direction of beam 5, be installed at the bottom of the beam equally spacedly; Two blocks of side steel plates 2 are located at the both sides of beam 5 respectively, and the bolt through prepared screw-bolt hole 4 is fixedly connected with beam 5 bottoms.
As shown in Figure 2, each U-shaped suspension arrangement 1 is made up of steel plate 3 at the bottom of two blocks of side steel plates 2 and, and steel plate 3 is welded into the U type at the bottom of two blocks of side steel plates 2 and one, on side steel plate 2 and end steel plate 3, is provided with bolt hole 8.
Stride with the 20m standard that to paste the long steel plate reinforcement of the wide 18m of 18cm at the bottom of the T beam beam rib of footpath be example.
As shown in Figure 2, when strengthening construction preparation was carried out, field machining U-shaped suspension arrangement 1 was welded into U-shaped with 3 bar steel plates, end steel plate 2 and side steel plate 3 equal prepared screw-bolt holes 8.
After beam 5 base concrete basal planes polishing cleaning and boring are accomplished, by the 50cm spacing several U-shaped suspension arrangements 1 are hung on 5 ends of beam, and tighten bolt on the side steel plate, make U-shaped suspension arrangement 1 be fixed in 5 ends of beam, like Fig. 3 and shown in Figure 4.
The steel plate that cuts (having held prepared screw-bolt hole successfully) piecemeal is placed on 1 end of the U-shaped suspension arrangement steel plate, and the long affixing steel plate 6 of the 16m that is welded as a whole is like Fig. 5 and shown in Figure 6.
Smear adhesive at concrete stickup basal plane and surface of steel plate; After affixing steel plate 6 holes that 16m is long hang on the screw rod to the hole; The nut 4 on the steel plate at the bottom of affixing steel plate and the U-shaped device that screws up with a wrench carries out the anchoring extrusion forming to affixing steel plate, makes affixing steel plate closely connected on concrete surface.
Treat that adhesive solidifies the back and removes U-shaped suspension type steel plate water booster system, like Fig. 7 and shown in Figure 8.

Claims (3)

1. steel plate water booster system; It is characterized in that this device is made up of several U-shaped suspension arrangements, each U-shaped suspension arrangement is made up of steel plate at the bottom of two blocks of side steel plates and; Steel plate is welded into the U type at the bottom of two blocks of side steel plates and one, on side steel plate and end steel plate, is provided with bolt hole.
2. steel plate water booster system according to claim 1; It is characterized in that; Said plurality of U-shaped suspension arrangement is along the length direction of beam, be installed at the bottom of the beam equally spacedly; Leave the space between the concrete surface at the bottom of steel plate of the said end and the beam, said two blocks of side steel plates are located at the both sides of beam bottom respectively, are fixedly connected with the beam bottom through the bolt at bolt hole.
3. the steel plate pressure method is characterized in that, this method comprises the following steps:
Step 1) along the length direction of beam, be installed at the bottom of the beam equally spacedly, leaves space between end steel plate and the soffit with the plurality of U-shaped suspension arrangement, and two blocks of side steel plates are located at the both sides of beam bottom respectively, through bottom the bolt of bolt hole and beam, being fixedly connected;
Step 2) some affixing steel plates are positioned on the end steel plate of U-shaped device, affixing steel plate is provided with prepared screw-bolt hole, is welded as a whole after each affixing steel plate assembly unit;
Step 3) is smeared adhesive at concrete surface and affixing steel plate upper surface, affixing steel plate integral body is raised to beam at the bottom of, tighten on the affixing steel plate nut of anchor bolt in the prepared screw-bolt hole, affixing steel plate and concrete surface are fitted;
The nut of tightening in prepared screw-bolt hole bolt of step 4) on steel plate at the bottom of the U-shaped suspension arrangement makes bolt compress affixing steel plate, accomplishes the stickup and the pressurization of affixing steel plate;
Step 5) treats that adhesive solidifies the back and removes the U-shaped suspension arrangement.
CN2012101018130A 2012-04-01 2012-04-01 Steel plate pressurizing device and method thereof Pending CN102605967A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101018130A CN102605967A (en) 2012-04-01 2012-04-01 Steel plate pressurizing device and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101018130A CN102605967A (en) 2012-04-01 2012-04-01 Steel plate pressurizing device and method thereof

Publications (1)

Publication Number Publication Date
CN102605967A true CN102605967A (en) 2012-07-25

Family

ID=46523696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101018130A Pending CN102605967A (en) 2012-04-01 2012-04-01 Steel plate pressurizing device and method thereof

Country Status (1)

Country Link
CN (1) CN102605967A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201725A (en) * 2017-06-28 2017-09-26 杭州伟业建设集团有限公司 A kind of steel box-girder decoration hanging scaffold and its construction method
CN107700868A (en) * 2017-11-14 2018-02-16 重庆市公安消防总队 A kind of new crab-bolt steel plate reinforcement refractory system and its reinforcement means
CN111622130A (en) * 2020-04-22 2020-09-04 山东大学 Bridge reinforcing device, bridge reinforcing method and obtained bridge
CN113338658A (en) * 2021-06-25 2021-09-03 贵州桥梁建设研究院有限公司 Reinforcing system and reinforcing method for T-shaped beam web

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2918475B2 (en) * 1995-03-02 1999-07-12 株式会社巴コーポレーション Pier construction method, pier dismantling method and lift-up / rotation device
JP2000110364A (en) * 1998-10-02 2000-04-18 Ps Corp Reinforcing method and reinforcing wire winding equipment for columnar structure
CN1301905A (en) * 1999-12-24 2001-07-04 武汉巨成加固实业有限公司 Strengthening method with viscous steel to enlarge section
CN101457592A (en) * 2008-11-20 2009-06-17 江苏广宇建设集团有限公司 Concrete structure affixing steel plate reinforcement method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2918475B2 (en) * 1995-03-02 1999-07-12 株式会社巴コーポレーション Pier construction method, pier dismantling method and lift-up / rotation device
JP2000110364A (en) * 1998-10-02 2000-04-18 Ps Corp Reinforcing method and reinforcing wire winding equipment for columnar structure
CN1301905A (en) * 1999-12-24 2001-07-04 武汉巨成加固实业有限公司 Strengthening method with viscous steel to enlarge section
CN101457592A (en) * 2008-11-20 2009-06-17 江苏广宇建设集团有限公司 Concrete structure affixing steel plate reinforcement method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中华人民共和国建设部: "《建筑结构加固工程施工质量验收规范》", 31 December 2010, article "钢板粘贴施工" *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201725A (en) * 2017-06-28 2017-09-26 杭州伟业建设集团有限公司 A kind of steel box-girder decoration hanging scaffold and its construction method
CN107700868A (en) * 2017-11-14 2018-02-16 重庆市公安消防总队 A kind of new crab-bolt steel plate reinforcement refractory system and its reinforcement means
CN111622130A (en) * 2020-04-22 2020-09-04 山东大学 Bridge reinforcing device, bridge reinforcing method and obtained bridge
CN111622130B (en) * 2020-04-22 2021-09-28 山东大学 Concrete bridge prestress distributed anchoring device and method
CN113338658A (en) * 2021-06-25 2021-09-03 贵州桥梁建设研究院有限公司 Reinforcing system and reinforcing method for T-shaped beam web

Similar Documents

Publication Publication Date Title
CN204546759U (en) Prestressed concrete mortar leakage prevention device
CN102605967A (en) Steel plate pressurizing device and method thereof
CN203640304U (en) Concrete leveling work head
CN104405041A (en) Assembly type prefabricated floor slab connecting piece for steel structure building and mounting method thereof
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN207538502U (en) A kind of novel reinforced concrete frame beam column reinforcing joint
CN211846865U (en) Device for hoisting corrugated pipe
CN104801911A (en) Anti-deformation fixture for steel beam structure plate
CN106975881A (en) A kind of welding box beam fixing device
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN105317056A (en) Reinforced inspection well cover plate
CN209682499U (en) Big joint angle demoulds power assisting device on the hydraulic gliding model end of T beam
CN203702174U (en) Tunnel secondary lining trolley end template
CN207672429U (en) A kind of cast-in-place guardrail activity tool car of highway bridge
CN104532743A (en) Tower girder fixed-connection mechanism, corresponding cable-stayed bridge and building method of cable-stayed bridge
CN205077855U (en) Surbase steel mould is led to constructional steel
CN103374882B (en) Rigid pavement construction on steel deck and construction method thereof
CN205822580U (en) Plate body for stock ground partition wall
CN204097841U (en) A kind of pavement concrete plucking easy device
CN204174936U (en) A kind of template support structure of outer wall of basement
CN204711461U (en) Steel construction supporting beam apparatus for welding and positioning
CN214530648U (en) Anchor rod for highway slope construction
CN212288132U (en) Prestress tensioning support capable of effectively protecting hydraulic jack
CN103498483B (en) Combined type movable platform base of gantry crane walking rail
CN103143907A (en) Method for installing heavy horizontal equipment in nuclear power station and positioning tooling for installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20120725

C20 Patent right or utility model deemed to be abandoned or is abandoned