CN103790558A CN201210432495.6A CN201210432495A CN103790558A CN 103790558 A CN103790558 A CN 103790558A CN 201210432495 A CN201210432495 A CN 201210432495A CN 103790558 A CN103790558 A CN 103790558A
Authority
CN
China
Prior art keywords
production
oil reservoir
oil
water
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210432495.6A
Other languages
Chinese (zh)
Other versions
CN103790558B (en
Inventor
崔玉海
古光明
丁晓芳
孟永
杨勇
徐福海
马来增
刘晋伟
李蓉
赵天浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co filed Critical China Petroleum and Chemical Corp
Priority to CN201210432495.6A priority Critical patent/CN103790558B/en
Publication of CN103790558A publication Critical patent/CN103790558A/en
Application granted granted Critical
Publication of CN103790558B publication Critical patent/CN103790558B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The invention provides a layered water injection production linkage coupling method. The method includes the steps of firstly, selecting a water flooding well and a producing well; secondly, dividing oil reservoir layers according to the conditions of the water injection well and the producing well penetrating an oil reservoir; thirdly, when the oil reservoir layers are judged to be stable in energy and yield, injecting water while producing; fourthly, collecting oil reservoir exploitation indexes; fifthly, when oil production amount needs to be changed according to the oil reservoir exploitation indexes, adjusting oil producing equipment to control and adjust oil producing amount. By the method, the defects of independent layered water injection and independent oil production can be overcome effectively, corresponding layer communication conditions and water containing conditions can be learned about through monitoring and regulation and control, powerful technical support is provided for oil reservoir researches, and each layer of the oil reservoir can be exploited efficiently.

Description

Demixing injection-production interlock coupling process method
Technical field
The present invention relates to oil-field flooding and oil production technology technology, particularly relate to a kind of demixing injection-production interlock coupling process method.
Background technology
Demixing injection-production technology is the important development approach of oil reservoir with multiple series of strata, and traditional method is well water filling, well recovery, and seperated layer water injection, oil production by layer are all implemented separately, and seperated layer water injection and oil production by layer do not build close links.As patent: CN201020280845.8 selective flow string can be realized the in the situation that of motionless full well flow string, complete and look in water blockoff layering or close layer and produce or selectively change producing zone position, and this selective flow string simplicity of design, operation are reliable, cost of production and labour intensity low.The method of adjustment of patent CN200710144495.5 oil field injection and extraction system in ultra-high water-containing period: injection and extraction system is optimized to adjustment, between noting between employing metaideophone, the end hole of the row of adopting forms the injection-production method of horizontal linear injection pattern, or metaideophone corner well forms the injection-production method of five-spot areal well pattern, or the end hole of metaideophone oil recovery well array forms the injection-production method of vertical linear injection pattern, or interval metaideophone corner well forms the injection-production method of block water filling unit, or the end hole of interval metaideophone oil recovery well array forms longitudinal two row's water injection wells and presss from both sides three mining oil wells, the injection-production method of the ranks shape injection pattern of adopting between middle ware note, it is between 160~190m that well spacing is adjusted to average distance.Patent CN200510043317.4 oil well: after conventional waterflooding technique shutoff high permeability zone, then take to inject bubble Lei Xier and maybe can improve the method for the expansion-resisting agent of earth formation, with less permeable layer water-taking efficiency in improving.Patented technology CN200910083119.9: be a kind of method that improves water drive recovery factor of thick positive rhythm reservoir, be specifically related to a kind of horizontal well gel deep flooding fluid and turn to and improve positive rhythm thick formation reservoir water drive method; At the high permeability zone horizontal well drilling of positive rhythm thick formation, inject gel by horizontal well to high permeability zone, in high permeability zone, set up the checkdam consistent with high permeability zone height.These technology are all only for water injection well or producing well, and the major defect of its existence is: seperated layer water injection, oil production by layer design separately, implement, and correlation is poor; Seperated layer water injection and oil production by layer, it is poor that note is adopted correspondence; Be unfavorable for understanding oil reservoir situation; Be unfavorable for balanced exploitation; Be unfavorable for supplementing stratum energy, affect oil recovery.We have invented a kind of new demixing injection-production interlock coupling process method for this reason, have solved above technical problem.
Summary of the invention
The object of this invention is to provide one and can implement efficiently to regulate and control the Technology of Layered Water Injection, can implement the demixing injection-production interlock coupling process method of selective layering oil production technology technology.
Object of the present invention can be achieved by the following technical measures: demixing injection-production interlock coupling process method, and this demixing injection-production interlock coupling process method comprises: step 1, choose water injection well and producing well; Step 2, the oil reservoir situation of passing according to this water injection well and this producing well, divides reservoir layer position; Step 3, when according to this oil reservoir layer position, while being judged as the layer of energy stabilization, stable yield, water filling on one side, on one side exploitation; Step 4, gathers oil reservoir development index; And step 5, when according to this oil reservoir development index, when judgement need to change oil production, regulate oil production equipment oil production is controlled and regulated.
Object of the present invention also can be achieved by the following technical measures:
This water injection well and this producing well are respectively through one or more oil recoveries, water filling layer position, these one or more oil recoveries, water filling layer position and this water injection well and the mutual UNICOM of this producing well.
In step 3, when according to this oil reservoir layer position, be judged as that height oozes, when high moisture, ultra-high water-containing layer, stop production, stop note.
In step 3, when according to this oil reservoir layer position, when the low pressure layer that be judged as energy shortage, yields poorly, the water filling makeup energy that builds the pressure.
In step 3, when according to this oil reservoir layer position, while being judged as energy abundance, pressure is high, output is high layer, carry out pressure release exploitation.
This oil reservoir development index comprises oilfield injection-production ratio, the strata pressure of oil reservoir, oil reservoir UNICOM situation and reservoir characteristics parameter.
In step 5, when according to this oil reservoir development index, when judgement need to change water injection rate, regulate water volume control device that should reservoir layer position is changed to water injection rate.
In step 5, when according to this oil reservoir development index, when judgement need to change water drive direction, change the water filling situation of this water injection well, change flow field state.
Demixing injection-production interlock coupling process method in the present invention, the result of studying according to oil reservoir and oil reservoir are to demixing injection-production technique requirement, seperated layer water injection and layering oil production technology are carried out to the method for integral process design and implementation, really realizing multilayer alternately notes and adopts coupling linkage, change flow location form, slow down water logging speed, reduce longitudinal interlayer interference, improve plane water drive swept volume.Demixing injection-production interlock coupling process method key is to realize every development parameters by demixing injection-production tubing string or demixing injection-production regulation and control tubing string: water injection pressure, water injection rate, oil production, formation pressure etc., grasp to greatest extent oil reservoir situation, expand injected water swept volume, realize stratum energy and supplement, improve reservoir withdrawal, improve oil recovery.The present invention compared with prior art tool has the following advantages: 1, realize the reservoir water raising stratum energy that builds the pressure; 2, realize pressure release exploitation; 3, understand the connection situation of the corresponding series of strata of oil-water well; 4, understand reservoir water status; 5, control implanted layer interlayer difference, realize interlayer and inject balanced; 6, production control interlayer difference, realizes producing zone balanced production; 7, change flow location form, improve note and adopt corresponding rate; 8, improve effective water injection rate, reduce invalid water injection rate; 9, realize multilayer and alternately note and adopt interlock, improve recovery ratio.Demixing injection-production interlock coupling process method in the present invention is by integrated design, at any time according to the change of oil reservoir situation, thereby change simultaneously the mode of production realize multilayer alternately note adopt coupling linkage, change flow location form, slow down water logging speed, reduce longitudinal interlayer interference, improve plane water drive swept volume.
 
Accompanying drawing explanation
Fig. 1 is the flow chart of a specific embodiment of demixing injection-production interlock coupling process method of the present invention.
The specific embodiment
For above and other object of the present invention, feature and advantage can be become apparent, cited below particularly go out preferred embodiment, and coordinate appended graphicly, be described in detail below.
As shown in Figure 1, Fig. 1 is the flow chart of a specific embodiment of demixing injection-production interlock coupling process method of the present invention.
In step 101, choose water injection well and producing well.In one embodiment, according to oil reservoir scheme, beat water injection well and producing well or select water injection well and the producing well developed.Water injection well and producing well are respectively through one or more oil recoveries, water filling layer position, and each layer of position may be all mutual UNICOM with water injection well and producing well.Flow process enters into step 102.
In step 102, the oil reservoir situation of passing according to water injection well and producing well, divides reservoir layer position.Distinguish for the reservoir layer position in different development phases or different physical property, generally can be divided into following four kinds of situations: for height ooze, high moisture, ultra-high water-containing layer, do not possess the layer of economic worth, flow process enters into step 103; For energy shortage, the low pressure layer that yields poorly, flow process enters into step 104; For the layer of energy stabilization, stable yield, flow process enters into step 105; For energy abundance, pressure is high, output is high layer, flow process enters into step 106.
In step 103, for height ooze, high moisture, ultra-high water-containing layer, do not possess the layer of economic worth, stop production, stop to note.Flow process enters into step 107.
In step 104, carry out the water filling makeup energy that builds the pressure for energy shortage, the low pressure layer that yields poorly, improve strata pressure, and do not produce, after reaching certain requirement, exploits again energy.Flow process enters into step 107.
In step 105, for carried out one side water filling of energy stabilization, stable yield, exploitation on one side, realizes balanced production.Flow process enters into step 107.
In step 106, for energy abundance, pressure is high, output is high layer, carry out pressure release exploitation.Flow process enters into step 107.
In step 107, gather oil reservoir development index.After same working system a period of time, or according to water injection well, the manufacturing parameter test of producing well, can recognize the situation of change of reservoir pressure, oil reservoir UNICOM situation, reservoir characteristics parameter (oil-containing, moisture etc.), and oilfield injection-production ratio, the strata pressure of oil reservoir, oil reservoir UNICOM situation, reservoir characteristics parameter (oil-containing, moisture etc.) etc., along with the progress of oil reservoir development, these development index can constantly be adjusted, at this moment will adjust at any time water injection rate and oil production, simultaneously in order better to reach oil-water displacement efficiency, may change water drive direction (especially many wells are adopted the situation of note), oil is driven to producing well to greatest extent.When according to oil reservoir development index, when judgement need to be adjusted water injection rate, flow process enters into step 108.When according to oil reservoir development index, when judgement need to be adjusted oil production, flow process enters into step 109.When according to oil reservoir development index, judge and need to adjust while changing water drive direction, flow process enters into step 110.
In step 108, change water injection rate, change water injection rate by the water volume control device that regulates corresponding reservoir layer position;
In step 109, change oil production, by regulating oil production equipment can oil production be controlled and be regulated.
In step 110, change water drive direction, adopt two notes, adopt three notes, two and adopt two notes, two and adopt many well groups such as three notes and close the situation that note is adopted for one, the water filling situation that can change water injection well (refers to the described situation of step 103-106,4 kinds of situations can be changed mutually), change flow field state.

Claims (8)

1. demixing injection-production interlock coupling process method, is characterized in that, this demixing injection-production interlock coupling process method comprises:
Step 1, chooses water injection well and producing well;
Step 2, the oil reservoir situation of passing according to this water injection well and this producing well, divides reservoir layer position;
Step 3, when according to this oil reservoir layer position, while being judged as the layer of energy stabilization, stable yield, water filling on one side, on one side exploitation;
Step 4, gathers oil reservoir development index; And
Step 5, when according to this oil reservoir development index, when judgement need to change oil production, regulates oil production equipment oil production is controlled and regulated.
2. demixing injection-production interlock coupling process method according to claim 1, it is characterized in that, this water injection well and this producing well are respectively through one or more oil recoveries, water filling layer position, these one or more oil recoveries, water filling layer position and this water injection well and the mutual UNICOM of this producing well.
3. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in step 3, when according to this oil reservoir layer position, is judged as that height oozes, when high moisture, ultra-high water-containing layer, stops production, stops note.
4. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in step 3, and when according to this oil reservoir layer position, when the low pressure layer that be judged as energy shortage, yields poorly, the water filling makeup energy that builds the pressure.
5. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in step 3, when according to this oil reservoir layer position, while being judged as energy abundance, pressure is high, output is high layer, carries out pressure release exploitation.
6. demixing injection-production interlock coupling process method according to claim 1, is characterized in that, this oil reservoir development index comprises oilfield injection-production ratio, the strata pressure of oil reservoir, oil reservoir UNICOM situation and reservoir characteristics parameter.
7. demixing injection-production according to claim 1 interlock coupling process method, is characterized in that, in step 5, when according to this oil reservoir development index, when judgement need to change water injection rate, regulates water volume control device that should reservoir layer position is changed to water injection rate.
8. demixing injection-production interlock coupling process method according to claim 1, is characterized in that, in step 5, when according to this oil reservoir development index, when judgement need to change water drive direction, changes the water filling situation of this water injection well, changes flow field state.
CN201210432495.6A 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method Expired - Fee Related CN103790558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210432495.6A CN103790558B (en) 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210432495.6A CN103790558B (en) 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method

Publications (2)

Publication Number Publication Date
CN103790558A true CN103790558A (en) 2014-05-14
CN103790558B CN103790558B (en) 2016-04-20

Family

ID=50666570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210432495.6A Expired - Fee Related CN103790558B (en) 2012-11-02 2012-11-02 Demixing injection-production interlock coupling process method

Country Status (1)

Country Link
CN (1) CN103790558B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234673A (en) * 2014-07-30 2014-12-24 中国石油大学 Stratified injection allocation method considering interlayer interference for multilayer oil reservoir
CN106801596A (en) * 2015-11-26 2017-06-06 中国石油化工股份有限公司 The new method that marine water injection well water filling interval is divided
CN107869332A (en) * 2016-09-22 2018-04-03 中国石油化工股份有限公司 A kind of oil well monitor control system and method
CN108316898A (en) * 2018-01-04 2018-07-24 中国石油天然气股份有限公司 Oil field horizontal well segmented free corresponding control oil extraction process
CN110872942A (en) * 2019-10-24 2020-03-10 中国石油化工股份有限公司 Research method for contribution of different acting forces to recovery ratio in oil reservoir injection-production coupling mode
CN111088969A (en) * 2018-10-23 2020-05-01 中国石油天然气股份有限公司 Method and device for determining separate injection scheme of water injection well and storage medium
CN111749657A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Well pattern layered mining method and device
CN112112617A (en) * 2019-06-04 2020-12-22 中国石油化工股份有限公司 Method for developing thick-layer conglomerate oil reservoir by ectopic energy storage fracturing
CN113464098A (en) * 2021-07-01 2021-10-01 中国科学院武汉岩土力学研究所 CO (carbon monoxide)2Geological sequestration method and system thereof
CN113969770A (en) * 2020-07-23 2022-01-25 中国石油化工股份有限公司 High-pressure energy storage-body-to-body release type volume water drive development method for water body of edge water reservoir
CN117744897A (en) * 2024-02-21 2024-03-22 中国石油大学(华东) Layered injection and production interval combination and interval injection and production allocation integrated optimization method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2203405C1 (en) * 2002-07-29 2003-04-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of development of oil field
CN201209417Y (en) * 2008-04-28 2009-03-18 中国石油新疆油田公司采油工艺研究院 Concentric double tube zonal injection wellhead device
CN102213087A (en) * 2010-04-12 2011-10-12 北京大学 Throughout and displacement combined microbial oil recovery method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2203405C1 (en) * 2002-07-29 2003-04-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method of development of oil field
CN201209417Y (en) * 2008-04-28 2009-03-18 中国石油新疆油田公司采油工艺研究院 Concentric double tube zonal injection wellhead device
CN102213087A (en) * 2010-04-12 2011-10-12 北京大学 Throughout and displacement combined microbial oil recovery method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘永胜: "注水井分层智能联动调配系统", 《石油仪器》, vol. 21, no. 1, 28 February 2007 (2007-02-28) *
隋春艳: "不动管柱交替注采耦合技术的实验", 《石油天然气学报》, vol. 34, no. 9, 30 September 2012 (2012-09-30) *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234673A (en) * 2014-07-30 2014-12-24 中国石油大学 Stratified injection allocation method considering interlayer interference for multilayer oil reservoir
CN104234673B (en) * 2014-07-30 2015-12-30 中国石油大学(华东) Consider the stratified reservoir multi-zone flow regulating method of interlayer interference
CN106801596A (en) * 2015-11-26 2017-06-06 中国石油化工股份有限公司 The new method that marine water injection well water filling interval is divided
CN107869332A (en) * 2016-09-22 2018-04-03 中国石油化工股份有限公司 A kind of oil well monitor control system and method
CN108316898A (en) * 2018-01-04 2018-07-24 中国石油天然气股份有限公司 Oil field horizontal well segmented free corresponding control oil extraction process
CN111088969B (en) * 2018-10-23 2022-03-29 中国石油天然气股份有限公司 Method and device for determining separate injection scheme of water injection well and storage medium
CN111088969A (en) * 2018-10-23 2020-05-01 中国石油天然气股份有限公司 Method and device for determining separate injection scheme of water injection well and storage medium
CN111749657A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Well pattern layered mining method and device
CN112112617A (en) * 2019-06-04 2020-12-22 中国石油化工股份有限公司 Method for developing thick-layer conglomerate oil reservoir by ectopic energy storage fracturing
CN112112617B (en) * 2019-06-04 2024-03-01 中国石油化工股份有限公司 Method for developing thick-layer sand conglomerate oil reservoir by ectopic energy storage fracturing
CN110872942B (en) * 2019-10-24 2021-09-28 中国石油化工股份有限公司 Research method for contribution of different acting forces to recovery ratio in oil reservoir injection-production coupling mode
CN110872942A (en) * 2019-10-24 2020-03-10 中国石油化工股份有限公司 Research method for contribution of different acting forces to recovery ratio in oil reservoir injection-production coupling mode
CN113969770A (en) * 2020-07-23 2022-01-25 中国石油化工股份有限公司 High-pressure energy storage-body-to-body release type volume water drive development method for water body of edge water reservoir
CN113464098A (en) * 2021-07-01 2021-10-01 中国科学院武汉岩土力学研究所 CO (carbon monoxide)2Geological sequestration method and system thereof
CN117744897A (en) * 2024-02-21 2024-03-22 中国石油大学(华东) Layered injection and production interval combination and interval injection and production allocation integrated optimization method
CN117744897B (en) * 2024-02-21 2024-05-10 中国石油大学(华东) Layered injection and production interval combination and interval injection and production allocation integrated optimization method

Also Published As

Publication number Publication date
CN103790558B (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN103790558B (en) Demixing injection-production interlock coupling process method
CN103174403B (en) Gravity and steam flooding combined mining method for thick-layer interlayer-containing common heavy oil reservoir
CN102278103B (en) Method for improving deep super heavy oil reservoir recovery ratio by gravity drainage assisted steam flooding
CN107664031B (en) Method for improving recovery efficiency by determining steam flooding well pattern form of horizontal well
CN102852496B (en) Medium-deep heavy oil reservoir exploitation method
CN102606129B (en) Method and system for thin interbed oilfield development
CN113738317A (en) Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal
CN103046910B (en) Water drive development method for oil reservoir in ultrahigh water cut period
CN101876241B (en) Method for improving water drive recovery ratio of positive rhythm thick oil layer
CN104141481A (en) Horizontal well spacing method for ultra-low permeability tight reservoir
CN109209306B (en) Horizontal well CO injection for ultra-low permeability tight oil reservoir2Asynchronous throughput energy supplementing method
CN206174945U (en) Three branch U type well multiple spot well pattern mining system are adopted altogether to three gas
CN106437674A (en) Imitation horizontal well waterflooding well pattern adapting method
CN105672978A (en) Horizontal moving type five-point horizontal well three-dimensional well pattern well spacing method
CN102493788A (en) Drainage gas recovery method for high-coal-rank coal bed gas well
CN101818620A (en) Mining method for maximum reservoir contact well and maximum reservoir contact well structure
CN107269255B (en) Method and device for exploiting compact oil through inter-cluster oil displacement
CN105089584A (en) Method for improving recovery ratio of sealed small fault-block oil reservoir through alternate coupling injection and production of oil-water well
CN108915649A (en) A kind of oil reservoir pressure is stifled to drive technology pattern preferred method
CN201763308U (en) Fishbone well type structure
CN104033137A (en) Method for improving fault block oil reservoir recovery efficiency by utilizing oilfield wastewater
US20240117714A1 (en) Method for increasing crude oil production by co2 storage in aquifer and dumpflooding
CN109281642A (en) A method of improving postpolymer flood stratified reservoir development effectiveness
CN103628848B (en) Multidirectional interlayer displacement in flooding oil production method and system
CN207315337U (en) Well pattern structure for layered low-permeability reservoir development

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20201102

CF01 Termination of patent right due to non-payment of annual fee