CN101818620A - Mining method for maximum reservoir contact well and maximum reservoir contact well structure - Google Patents

Mining method for maximum reservoir contact well and maximum reservoir contact well structure Download PDF

Info

Publication number
CN101818620A
CN101818620A CN 201010154444 CN201010154444A CN101818620A CN 101818620 A CN101818620 A CN 101818620A CN 201010154444 CN201010154444 CN 201010154444 CN 201010154444 A CN201010154444 A CN 201010154444A CN 101818620 A CN101818620 A CN 101818620A
Authority
CN
China
Prior art keywords
well
fish
bone
oil reservoir
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010154444
Other languages
Chinese (zh)
Other versions
CN101818620B (en
Inventor
许宁
任芳祥
徐萍
龚姚进
周万山
邱林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
徐萍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐萍 filed Critical 徐萍
Priority to CN 201010154444 priority Critical patent/CN101818620B/en
Publication of CN101818620A publication Critical patent/CN101818620A/en
Application granted granted Critical
Publication of CN101818620B publication Critical patent/CN101818620B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention provides a mining method for the maximum reservoir contact(MRC) well and a maximum reservoir contact well structure, wherein the well structure comprises straight wells, horizontal wells, high-inclination horizontal wells and herringbone wells; the straight wells are communicated with the high-inclination horizontal wells and the herringbone wells; the high-inclination horizontal wells run through cracks indifferent layers; a plurality of high-inclination horizontal wells and horizontal wells, which are in layered arrangement, are both arranged in massive or thick layer-typed reservoirs, and multiple rows of horizontal wells or high-inclination horizontal wells are arranged in each layer, well planes of the horizontal wells or high-inclination horizontal wells in adjacent rows are in parallel and staggered arrangement, and the horizontal wells or high-inclination horizontal wells in adjacent layers are in vertical and staggered arrangement; a plurality of herringbone wells are arranged in the bottom layer of reservoirs, and also arranged in rows on the plane, and planes of the wells in adjacent rows are in parallel and staggered arrangement and are all on the same plane; and a plurality of high-inclination horizontal wells and herringbone wells form a vertical well network structure of planar crossing and vertical lamination and crossing. The technical scheme solves the problems of common low well yield, quick decrease and undesirable exploitation effect existing in the prior art due to the fact that most reservoirs are exploited by straight wells.

Description

A kind of maximum oil reservoir contact well type exploitation method and well structure thereof
Technical field
The invention belongs to the oil reservoir development field, relate to bulk or thick-layer shape reservoir development, especially a kind of maximum oil reservoir contact (MRC (Maximum Reservoir Contact)) well type United Technologies that are applicable to the massive oil pool exploitation are specially a kind of maximum oil reservoir contact (MRC) well type exploitation method and well structure thereof.
Background technology
Straight well is widely used in all kinds of oil reservoirs as the main well type of oil reservoir development, and it has understanding and control reservoir, reduces and dispose risk, the advantage of drilling period weak point, easy operating and adjustment.Can be used for the water filling early test simultaneously and return oil recovery on the later stage.Early stage exploration phase of oil reservoir and reservoir evaluation stage are all adopted the straight well exploitation.Well spacing is mainly considered plane well pattern design, as square or triangular pattern.These present straight well areal well patterns are more suitable for the thin layer oil reservoir, belong to two-dimentional well pattern structure design.When yet this well pattern designed for the massive oil pool multiple-zone production, have following defective: compare with the horizontal well well pattern, the oil reservoir longitudinal difference caused producing degree of reservoir low, and required well number is many; Initial potential of oil-well is low and production decline is fast; It is slow that oil reservoir is built product speed; Low and the flood effectiveness difference of rate of oil production etc.Also exist the crack to bore the problem that encountering rate is low, difficulty is selected in the well site for fractured reservoir.The OX-heart of the Liaohe Oil Field buried hill oil pool that sticks together adopts the straight well exploitation, the development scheme of straight well bottom water filling.Choose degree of depth layer position water filling under Production Wells well section, because straight well finishing drilling degree of depth difference, reservoir development degree inequality can't form unified oil-water interfaces simultaneously, causes that nearly well water floods, well water filling far away is ineffective.
Horizontal well technology has become one of main focus of World Oil Industry development, has been applied to water fault block oil reservoir at the bottom of the limit, fractured reservoirs, self-contained highly aqueous Tibetan, thin interbed oil reservoir, glutenite oil reservoir, low-permeability oil deposit etc. at present.Be widely used in that old filed is taped the latent power, newly developed area production capacity construction.In moisture second and third time of old filed oil recovery stage of height, excavate the thin difference of remaining oil potentiality and economical and effective exploitation reservoir, improve the recovery ratio aspect and play a part very important.Utilize the horizontal wells oil sheet, can improve reserves producing status, percolation ability and development effectiveness than straight well.Along with the drilling technology especially development of geosteering technology, the horizontal well design is shifted to oil sheet, thin interbed by thick-layer.Under the situation less and less of thick oil pay horizontal well screening position, a slice frontier has been opened in the success of oil sheet horizontal well.The breakthrough of super horizontal well drilling technique in thin reservoir becomes a reality the thin sand reservoir development.
Fish-bone well drilling technology grows up on the horizontal well drilling technology basis, is meant the left and right sides or one-sided a kind of drilling well new technology of creeping into two or more branch well holes again at the horizontal well horizontal segment.The Multilateral Wells technique functions comes from the 1950's, and first Multilateral Wells starts from the Russia and the Ukraine area of the former Soviet Union, and second batch of Multilateral Wells spudded in the area, Siberia of the former Soviet Union in nineteen sixty-eight.After nineteen ninety-five, along with the development of horizontal well completion technology and popularizing of 3-D seismics technology, fish-bone well technology has just obtained development rapidly.This technology is compared with the conventional levels well, and the fish-bone well helps to formulate rational development plan, effectively develops the multilayered reservoir oil reservoir with lower cost, out-of-shape oil reservoir, hypotonic, viscous crude, thin layer, exhausted oil reservoir and crack oil reservoir etc.
But, because well type optimal design only is confined to the single type research in planar space in same oil reservoir at present, the space optimization of many wells type and arrangement mode still beyond example can be sought, straight well, single horizontal well or fish-bone well have been difficult to solve the practical problem of massive oil pool exploitation, how to use the space spread of many wells type coupling and three-dimensional well pattern structure, rational and effective exploitation oil reservoir needs to be resolved hurrily.
Summary of the invention
For overcoming above shortcoming, solve the practical problem that the exploitation of thick-layer or massive oil pool exists, in existing literature research only is the well pattern form of straight well and horizontal well combination, and lack on the research basis of disposing by the MRC well development, this patent has proposed the technology of a kind of bulk or the design of thick-layer shape oil reservoir well structure, this technology contacts the theory of (MRC (Maximum ReservoirContact)) based on maximum oil reservoir, the design that maximum oil reservoir contact (MRC) well type of proposition in same oil reservoir developed jointly, and to comprising the relative position of MRC well type, horizontal section length, fish-bone divides number, the fish-bone branch length, parameters such as fish-bone branched angulation are further studied.
According to the first aspect of technical solution of the present invention, a kind of maximum oil reservoir contact (MRC) well type exploitation method is provided, it may further comprise the steps:
(1) early stage at oil reservoir development, for reducing development risk, oil reservoir adopts the straight well exploitation to be used for understanding and control oil reservoir; Well spacing mainly considers to belong to the plane well pattern design of two-dimentional well pattern structure design; Straight well is used for the water filling early test simultaneously and returns oil recovery on the later stage;
(2) oil reservoir enters the natural energy development phase, adopts horizontal well, comprises high-inclination horizontal well in the exploitation of oil reservoir main body section, is used to improve the crack and bores encountering rate and oil reservoir brill chance thickness, increases producing degree of reservoir and oil well output; Weakened planes contradiction, overcome interlayer contradiction, improve rate of oil production and recovery ratio;
(3) in the energy supplement stage, oil reservoir adopts the fish-bone well in the oil reservoir bottom, does the exploitation of water injection well type; The fish-bone well can further improve the crack on the one hand and bore encountering rate, and oil well output further improves; Second aspect is increased to the wire water filling of horizontal well from the spot flooding of straight well, further expands the pattern water flooding of fish-bone well to, increases the water drive swept volume, improves waterflood injection rate and water injection intensity; The third aspect, because water injection intensity strengthens, reservoir thermal crack(ing effect strengthens, thereby improves flood effectiveness
Wherein, in the whole well pattern of implementing maximum oil reservoir contact (MRC) well type exploitation method, straight well is communicated with high-inclination horizontal well and fish-bone well, high-inclination horizontal well drills different intervals crack, the high-inclination horizontal well of many mouthfuls of layered arrangement, horizontal well all are set at the inside of bulk or thick-layer shape oil reservoir, and comprise many drainings horizontal well or high-inclination horizontal well in every layer of well, horizontal well among the adjacent row or high-inclination horizontal well well plane parallel interlaced arrangement, horizontal well in the adjacent layer or the vertical interlaced arrangement of high-inclination horizontal well well; Many mouthfuls of fish-bone wells are distributed in the bottom oil reservoir and planar become to arrange shapes more and distribute, each the well plane parallel interlaced arrangement among the adjacent row, and be in the same horizontal plane; Many mouthfuls of high-inclination horizontal wells and fish-bone well constitute that heave in the plane, vertical stacked staggered three-dimensional well pattern structure.
Second aspect according to technical solution of the present invention, a kind of maximum oil reservoir contact (MRC) well structure is provided, it is except that straight well, comprise horizontal well, high-inclination horizontal well and fish-bone well, straight well is communicated with high-inclination horizontal well and fish-bone well, high-inclination horizontal well drills different intervals crack, the high-inclination horizontal well of many mouthfuls of layered arrangement, horizontal well all is set at the inside of bulk or thick-layer shape oil reservoir, and comprise many drainings horizontal well or high-inclination horizontal well in every layer of well, horizontal well among the adjacent row or high-inclination horizontal well well plane parallel interlaced arrangement, horizontal well in the adjacent layer or the vertical interlaced arrangement of high-inclination horizontal well well; Many mouthfuls of fish-bone wells are distributed in the bottom oil reservoir and planar become to arrange shapes more and distribute, each the well plane parallel interlaced arrangement among the adjacent row, and be in the same horizontal plane; Many mouthfuls of high-inclination horizontal wells and fish-bone well constitute that heave in the plane, vertical stacked staggered three-dimensional well pattern structure.
Wherein said fish-bone well is distributed in the oil reservoir bottom, and is in the same horizontal plane, and the branch number of every mouthful of fish-bone well is 2~5; Each branch length of fish-bone well is identical or different, and each branch length is 150 meters~400 meters; Angle between the fish-bone branch of fish-bone well and the fish-bone well main pipe is for being 10 °~50 °.
Preferably, many mouthfuls of fish-bone wells are arranged in the oil reservoir bottom, the branch number of every mouthful of fish-bone well is 3; Each branch length is 168 meters or 210 meters or 280 meters or 400 meters; Branch's angle can be 15 ° or 25 ° or 35 ° or 45 °.
Use technical solutions according to the invention, solved straight well areal well pattern exploitation in the prior art, longitudinal difference causes producing degree of reservoir low, and required well number is many; Individual layer horizontal wells oil reservoir, the oil and gas reserves development degree is low; Straight well or the pattern flooding of individual layer horizontal well, the problem that the water drive sweep efficiency is low.
Brief Description Of Drawings
Fig. 1 is varying level segment length's day produce oil and a moisture content correlation curve schematic diagram;
Fig. 2 is a fish-bone well well structure schematic diagram;
Fig. 3 is the oil reservoir ultimate recovery correlation curve of different branch's angles of fish-bone well and horizontal well;
Fig. 4 is the different oil reservoir ultimate recovery correlation curves that divide number and horizontal well of fish-bone well;
Fig. 5 is the oil reservoir ultimate recovery correlation curve of different branch length of fish-bone well and horizontal well.
The specific embodiment
Below in conjunction with accompanying drawing, to being elaborated according to maximum oil reservoir contact (MRC) well type exploitation method of the present invention and well structure.
1, maximum oil reservoir contact (MRC) well type exploitation method
Realize that by the following technical solutions it is optimized based on the combination of multiple well type and the well type of different development phases, mainly may further comprise the steps:
(1) early stage at oil reservoir development, for reducing development risk, oil reservoir adopts the straight well exploitation to be used for understanding and control oil reservoir; Well spacing mainly considers to belong to the plane well pattern design of two-dimentional well pattern structure design; Straight well is used for the water filling early test simultaneously and returns oil recovery on the later stage;
(2) oil reservoir enters the natural energy development phase, adopts horizontal well, comprises high-inclination horizontal well in the exploitation of oil reservoir main body section, is used to improve the crack and bores encountering rate and oil reservoir brill chance thickness, increases producing degree of reservoir and oil well output; Weakened planes contradiction, overcome interlayer contradiction, improve rate of oil production and recovery ratio;
(3) in the energy supplement stage, oil reservoir adopts the fish-bone well in the oil reservoir bottom, does the exploitation of water injection well type; The fish-bone well can further improve the crack on the one hand and bore encountering rate, and oil well output further improves; Second aspect is increased to the wire water filling of horizontal well from the spot flooding of straight well, further expands the pattern water flooding of fish-bone well to, increases the water drive swept volume, improves waterflood injection rate and water injection intensity; The third aspect, because water injection intensity strengthens, reservoir thermal crack(ing effect strengthens, thereby improves flood effectiveness
Wherein, in the whole well pattern of implementing maximum oil reservoir contact (MRC) well type exploitation method, straight well is communicated with high-inclination horizontal well and fish-bone well, high-inclination horizontal well drills different intervals crack, the high-inclination horizontal well of many mouthfuls of layered arrangement, horizontal well all are set at the inside of bulk or thick-layer shape oil reservoir, and comprise many drainings horizontal well or high-inclination horizontal well in every layer of well, horizontal well among the adjacent row or high-inclination horizontal well well plane parallel interlaced arrangement, horizontal well in the adjacent layer or the vertical interlaced arrangement of high-inclination horizontal well well; Many mouthfuls of fish-bone wells are distributed in the bottom oil reservoir and planar become to arrange shapes more and distribute, each the well plane parallel interlaced arrangement among the adjacent row, and be in the same horizontal plane; Many mouthfuls of high-inclination horizontal wells and fish-bone well constitute that heave in the plane, vertical stacked staggered three-dimensional well pattern structure.
2. horizontal well and fish-bone well construction parameter optimization
(1) horizontal well horizontal segment reasonable length research
The horizontal segment length of horizontal well chooses 600 meters, 800 meters and 1000 meters respectively, and simulation mining is 30 years during given injection production pressure difference 10 MPas.
Varying level segment length's day produce oil and moisture content correlation curve, as shown in Figure 1.
Among Fig. 1, the oval tab area of representing, 1 represent one group day the produce oil curve, 2 represent one group of plot of water cut.
1000 meters of horizontal segment lengths horizontal well day produce oil apparently higher than 800 meters, 600 meters minimum, moisture content changes that then to be that 600 meters of horizontal segment lengths' horizontal well rises the slowest, secondly is 800 meters, 1000 meters risings are the fastest.The oil reservoir exploitation is after 30 years, and the recovery ratio of 800 meters horizontal wells is higher by 1.4% than 800 meters horizontal wells than the recovery ratio of 600 meters high 8.42%, 1000 meter horizontal wells.Because horizontal segment is long more, be subjected to horizontal segment frictional head loss etc., edge effect serious more, when horizontal segment surpasses 800 meters, continue to increase horizontal segment length, recovery ratio increases not obvious.Under three-dimensional flooding pattern situation, increase with horizontal segment, the amplitude that crude output and recovery ratio increase reduces gradually.Consider that from flow through oil reservoir and exploitation angle net horizontal section length should strengthen as far as possible; But should be taken into account the restriction of drilling cost and technological level simultaneously, net horizontal section is got about 800 meters and is advisable.
(2) the reasonable branch of fish-bone well angle research
According to actual oil deposit parameter, suppose that it is 3 that the fish-bone well divides number, each branch length is 280 meters.Test different branch's angles, be respectively 15 °, 25 °, 35 ° and 45 °, given injection production pressure difference 10 MPa simulation minings 30 years are seen fish-bone well well structure schematic diagram 2.
Among Fig. 2: 1 represents fish-bone well main hole, and length is l, and 2 represent fish-bone well branch, and length is l1,
L2 represents fish-bone well branch spacing; L3 represents the distance of fish-bone well main hole and branch's end points; θ represents the angle of fish-bone well main hole and branch; A represents fish-bone well well array distance,
A represents fish-bone well entrance; B represents fish-bone well end points.
The oil reservoir ultimate recovery correlation curve of the different branches of fish-bone well angle is as Fig. 3.
Among Fig. 3, the rectangle pillar is represented the oil reservoir ultimate recovery of the different branches of fish-bone well angle, and branches angle is respectively 15 °, 25 °, 35 ° and 45 °.
The branch of fish-bone well extends to the producing well below, compares with the horizontal flood well, annotates shape water from line and expands planar water filling to, has increased injection area, and planar water filling is more conducive to form the waterflooding extraction pattern that end hydrologic(al) budget holder is advanced.Branch's angle becomes 15 °~45 °, all can control whole bottom surface, so development effectiveness is more or less the same.Development effectiveness is best during 25 ° of branch's angles, secondly is 15 °.Because during 15 ° of angles, the disturbing effect between branch and the trunk section is obvious during than 25 °.When 35 ° of branch's angles and 45 °, the phase mutual interference influences flood effectiveness between the adjacent water injection well, and its development effectiveness is slightly poorer during with 25 ° than 15 ° of branch angles.And branch's angle increases, and drilling technology difficulty and drilling cost also can correspondingly increase, and the reasonable branch of Gu Yugujing angle should be got 15 °~25 °.
(3) the fish-bone well rationally divides number and branch length research rationally
Keep the constant situation of branch's length overall:
According to actual oil deposit parameter, fish-bone well branch angle and total branch length are certain, test different branch number and branch length, are respectively 2 branches, 3 branches, 4 branches and 5 branches, given injection production pressure difference 10 MPa simulation minings 30 years.
The different oil reservoir ultimate recovery correlation curves that divide number and horizontal well of fish-bone well are as Fig. 4.
Among Fig. 4, the rectangle pillar is represented the different oil reservoir ultimate recoveries that divide number and horizontal well of fish-bone well, divides number to be respectively 2 branches, 3 branches, 4 branches and 5 branches.
The recovery ratio of fish-bone well water filling is better than the horizontal well water filling, because the fish-bone well is planar water filling, and injector producer distance is less than the horizontal well water filling, and producing well can be faster with the oily extraction in the oil reservoir.When between oil reservoir serious heterogeneity, injection-production well, having the hyposmosis band, adopt fish-bone well waterflooding extraction, guarantee development effectiveness.But under the same branches length overall situation, branch is many more, and corresponding drilling cost is high more, so adopt the fish-bone well water filling of 3 branches.
Keep dividing number constant situation:
Fish-bone well branch angle and branch number are certain, test different branch length, are respectively 168 meters, 210 meters, 280 meters and 400 meters, given injection production pressure difference 10 MPas, simulation mining 30 years.
The oil reservoir ultimate recovery correlation curve of different branch head of fish-bone well and horizontal well is as Fig. 5.
Among Fig. 5, the rectangle pillar is represented the oil reservoir ultimate recovery of different branch head of fish-bone well and horizontal well, and branch head is respectively 168 meters, 210 meters, 280 meters and 400 meters.
The recovery ratio of fish-bone well water filling is better than the horizontal well water filling, because the fish-bone well is planar water filling, and injector producer distance is less than the horizontal well water filling, and producing well can be faster with the oily extraction in the oil reservoir.280 meters development effectiveness of fish-bone well branch are best.Because during 280 meters of branch head, fish-bone well water filling branch just extends under the producing well, water injection well can be controlled whole bottom surface; 168 meters and 210 meters of branch head, the water injection well control area is less relatively; And during 400 meters of branch head, have the phase mutual interference between the branch of adjacent water injection well, also can influence waterflooding development effect.So when adopting the fish-bone well water filling of 3 branches, branch length is advisable for 280 meters.
Industrial applicibility:
Use technical scheme of the present invention, can improve oil well output and oil recovery effectively.
The MRC technology is preferably to design to the well parameter optimization from the well type, has carried out successful test at prosperous platform buried hill oil pool and has used.Based on metamorphic rock, the prosperous platform Archaean group buried hill oil pool that is distributed with magmatic rock that interts, buried depth is at-2355~-4500 meters, the oil-containing amplitude surpasses 2000 meters, by many reverse fault clampings of the high angle normal fault in the north and south, have the oil reservoir of complicated inside story structure.In the research, determined vertically to go up the branch band of oil reservoir according to lithology and oil reservoir distribution characteristics, pressure and production characteristics etc., in conjunction with the consideration of artificial recharge development scheme, proposed the MRC well pattern in the vertical with the plane on design.Comprise the characteristics of high-inclination horizontal well and fish-bone well at straight well, horizontal well, propose, to reduce development risk, adapt to development scheme, to obtain peak-production and longer stable yields time method in oil reservoir different development phases, the preferred well type of diverse location.And the branched angulation of the length of the MRC well horizontal segment after preferred, fish-bone well, divide number, branch length to study.76 mouthfuls of MRC test wells disposing wherein have 33 mouthfuls of wells to put into production.After test was gone into operation, the oil reservoir rate of oil production had improved 28 times, 80.5 tons/day of average individual well initial stage daily oil productioies, be 3.0 times of straight well output, wherein the initial production of fish-bone well reaches 97 tons/day, is 3.6 times of straight well output, the expense of drilling well has only increased by 68%, and operating cost has saved 75%.
The more important thing is that exploration of prosperous platform buried hill and reservoir evaluation stage are adopted straight well always, played positive role at aspects such as abundant materials admission means, expansion oil reservoir understanding scope, reduction exploration risks.Yet, along with intensification to the oil reservoir awareness, for reservoir thickness surpass that 2000 meters, non-homogeneity are strong, the crack is based on the oil reservoir of high angle seam, continues to adopt the straight well exploitation will have following several respects problem:
(1) the well number is many, drill footage big, investment is high.Consider that straight well will adopt pressure break to go into operation, perforation length generally is controlled in 50 meters, and straight well is disposed in the leeway of returning production in the reservation, expectation can be disposed 221 mouthfuls, be 2.6 times of MRC well number, corresponding drill footage straight well is 2.1 times (the upper strata straight well does not get into lower floor, to save drilling depth) of MRC well.
(2) single well controlled reserves is low, and straight well on average has only 14.3 ten thousand tons, and the MRC well on average reaches 600,000 tons.
(3) brill encountering rate in crack is low, rate of oil production is low.
Calculate according to theory based on the netted seam of middle high angle in the crack, buried hill, and when identical fracture spacing, fracture aperture, brill chance equal length oil reservoir, straight well bores the bar number of meeting the crack and has only 1/3rd of MRC well, and output is also corresponding lower.9 mouthfuls of straight wells of statistics pilot production, average day at initial stage 26.9 tons/day of produce oils, and output descend fast, drilling period is long, so the oil reservoir rate of oil production is lower always.And the MRC well has improved the crack and has bored encountering rate and core intersection, the crude output height, average day at initial stage 88.8 tons/day of produce oils.
(4) production decline is fast.There is not primary pneumatic jack in oil reservoir, even exist end water below-4500 meters, natural energy is inadequate, the fast quick depletion of straight well oil production.The average year lapse rate up to 70.2%/year, and have only 1 mouthful of well to occur successively decreasing in 15 mouthfuls of wells that the stability test of MRC well is produced, annual decline rate is 25.4%/year, be much better than straight well.
Use maximum oil reservoir contact (MRC) well type exploitation method and well structure to address the above problem well.And solved straight well areal well pattern exploitation in the prior art, longitudinal difference causes producing degree of reservoir low, and required well number is many; Individual layer horizontal wells oil reservoir, the oil and gas reserves development degree is low; Straight well or the pattern flooding of individual layer horizontal well, the problem that the water drive sweep efficiency is low; Improve oil reservoir rate of oil production and recovery ratio, reduced development cost simultaneously.
As above-mentioned, the clear technical scheme that has described the present invention's proposition in detail.Although the present invention is described and explained to the preferred embodiments of the present invention in detail, but this area those skilled in the art be appreciated that, under the situation of the spirit and scope of the present invention that do not deviate from the claims definition, can in form and details, make multiple modification.

Claims (6)

1. a maximum oil reservoir contacts (MRC) well type exploitation method, and it may further comprise the steps:
(1) early stage at oil reservoir development, for reducing development risk, oil reservoir adopts the straight well exploitation to be used for understanding and control oil reservoir; Well spacing mainly considers to belong to the plane well pattern design of two-dimentional well pattern structure design; Straight well is used for the water filling early test simultaneously and returns oil recovery on the later stage;
(2) oil reservoir enters the natural energy development phase, adopts horizontal well, comprises high-inclination horizontal well in the exploitation of oil reservoir main body section, is used to improve the crack and bores encountering rate and oil reservoir brill chance thickness, increases producing degree of reservoir and oil well output; Weakened planes contradiction, overcome interlayer contradiction, improve rate of oil production and recovery ratio;
(3) in the energy supplement stage, oil reservoir adopts the fish-bone well in the oil reservoir bottom, does the exploitation of water injection well type; The fish-bone well can further improve the crack on the one hand and bore encountering rate, and oil well output further improves; Second aspect is increased to the wire water filling of horizontal well from the spot flooding of straight well, further expands the pattern water flooding of fish-bone well to, increases the water drive swept volume, improves waterflood injection rate and water injection intensity; The third aspect, because water injection intensity strengthens, reservoir thermal crack(ing effect strengthens, thereby improves flood effectiveness.
2. maximum oil reservoir contact (MRC) well structure that in method described in the claim 1, uses, it is except that straight well, comprise horizontal well, high-inclination horizontal well and fish-bone well, straight well is communicated with high-inclination horizontal well and fish-bone well, high-inclination horizontal well drills different intervals crack, the high-inclination horizontal well of many mouthfuls of layered arrangement, horizontal well all is set at the inside of bulk or thick-layer shape oil reservoir, and comprise many drainings horizontal well or high-inclination horizontal well in every layer of well, horizontal well among the adjacent row or high-inclination horizontal well well plane parallel interlaced arrangement, horizontal well in the adjacent layer or the vertical interlaced arrangement of high-inclination horizontal well well; Many mouthfuls of fish-bone wells are distributed in the bottom oil reservoir and planar become to arrange shapes more and distribute, each the well plane parallel interlaced arrangement among the adjacent row, and be in the same horizontal plane; Many mouthfuls of high-inclination horizontal wells and fish-bone well constitute that heave in the plane, vertical stacked staggered three-dimensional well pattern structure.
3. according to maximum oil reservoir contact (MRC) well structure described in the claim 2, wherein said fish-bone well is distributed in the oil reservoir bottom, and is in the same horizontal plane, and the branch number of every mouthful of fish-bone well is 2~5; Each branch length of fish-bone well is identical or different, and each branch length is 150 meters~400 meters; Angle between the fish-bone branch of fish-bone well and the fish-bone well main pipe is for being 10 °~50 °.
4. according to maximum oil reservoir contact (MRC) well structure described in the claim 3, the branch number of wherein said fish-bone well is 3.
5. according to maximum oil reservoir contact (MRC) well structure described in the claim 3, the fish-bone branch length of wherein said fish-bone well is 168 meters or 210 meters or 280 meters or 400 meters.
6. according to maximum oil reservoir contact (MRC) well structure described in the claim 3, the fish-bone branch angle of wherein said fish-bone well can be 15 ° or 25 ° or 35 ° or 45 °.
CN 201010154444 2010-04-26 2010-04-26 Mining method for maximum reservoir contact well Active CN101818620B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010154444 CN101818620B (en) 2010-04-26 2010-04-26 Mining method for maximum reservoir contact well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010154444 CN101818620B (en) 2010-04-26 2010-04-26 Mining method for maximum reservoir contact well

Publications (2)

Publication Number Publication Date
CN101818620A true CN101818620A (en) 2010-09-01
CN101818620B CN101818620B (en) 2013-04-10

Family

ID=42653873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010154444 Active CN101818620B (en) 2010-04-26 2010-04-26 Mining method for maximum reservoir contact well

Country Status (1)

Country Link
CN (1) CN101818620B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975050A (en) * 2010-09-17 2011-02-16 北京奥瑞安能源技术开发有限公司 Construction method of coal bed gas horizontal well and vertical drainage well in multi-objective layer geologic environment
CN102767357A (en) * 2012-07-26 2012-11-07 中国石油大学(北京) V-shaped well for gas-cap reservoir
CN104265261A (en) * 2014-08-11 2015-01-07 中国石油天然气股份有限公司 Fishbone-shaped branch horizontal well structure
CN104411911A (en) * 2012-05-31 2015-03-11 界标制图有限公司 Systems and methods for optimal positioning of drilling pads
CN106321056A (en) * 2015-06-17 2017-01-11 中国石油化工股份有限公司 A well arranging method for well factories
CN106593399A (en) * 2016-12-26 2017-04-26 中国石油天然气股份有限公司 Exploiting well pattern used for exploiting ultra-thin reservoir
CN107558985A (en) * 2017-09-14 2018-01-09 吉林大学 A kind of well spacing and reservoir treating method of oil shale in-situ exploitation
CN109978303A (en) * 2017-12-28 2019-07-05 中国石油天然气股份有限公司 The determination method, apparatus and storage medium of the exploitation measure of heavy crude reservoir
CN111350485A (en) * 2018-12-20 2020-06-30 中国石油天然气股份有限公司 Well pattern adjusting method and device
CN112483064A (en) * 2019-09-12 2021-03-12 中国石油天然气股份有限公司 Method, device and equipment for determining well arrangement mode of condensate gas reservoir and storage medium
CN113586021A (en) * 2020-04-30 2021-11-02 中国石油化工股份有限公司 Horizontal well volume fracturing method and system combining radial well with carbon dioxide fracturing
CN113969768A (en) * 2020-07-23 2022-01-25 中国石油化工股份有限公司 Directional enabling-differential releasing type volume water drive method for one-injection multi-production well group
CN114329729A (en) * 2021-12-31 2022-04-12 中国石油大学(北京) Optimized design and well spacing method for three-dimensional development well pattern

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4166501A (en) * 1978-08-24 1979-09-04 Texaco Inc. High vertical conformance steam drive oil recovery method
US6619396B1 (en) * 2000-02-23 2003-09-16 Japan Oil Development Co., Ltd. Method of producing petroleum
CN1651715A (en) * 2005-03-25 2005-08-10 北京奥瑞安能源技术开发有限公司 Method of entering target geologic body and system
CN1884786A (en) * 2006-05-23 2006-12-27 辽河石油勘探局 Fish bone type branch well drilling and completing method
AU2007211917A1 (en) * 1998-11-20 2007-09-13 Exploration International LLC Method and system for accessing subterranean deposits from the surface
CN101122224A (en) * 2006-08-11 2008-02-13 中国石油天然气股份有限公司 Gravity-assisted steam flooding exploitation method for heavy laver common heavy oil reservoir
CN101191407A (en) * 2006-11-30 2008-06-04 新疆石油管理局钻井工艺研究院 Well drilling method for shallow layer thick oil branching well
RU2339801C2 (en) * 2007-01-12 2008-11-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for development of multi-horizon non-uniform oil fields by means of branched horizontal wells

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4166501A (en) * 1978-08-24 1979-09-04 Texaco Inc. High vertical conformance steam drive oil recovery method
AU2007211917A1 (en) * 1998-11-20 2007-09-13 Exploration International LLC Method and system for accessing subterranean deposits from the surface
US6619396B1 (en) * 2000-02-23 2003-09-16 Japan Oil Development Co., Ltd. Method of producing petroleum
CN1651715A (en) * 2005-03-25 2005-08-10 北京奥瑞安能源技术开发有限公司 Method of entering target geologic body and system
CN1884786A (en) * 2006-05-23 2006-12-27 辽河石油勘探局 Fish bone type branch well drilling and completing method
CN101122224A (en) * 2006-08-11 2008-02-13 中国石油天然气股份有限公司 Gravity-assisted steam flooding exploitation method for heavy laver common heavy oil reservoir
CN101191407A (en) * 2006-11-30 2008-06-04 新疆石油管理局钻井工艺研究院 Well drilling method for shallow layer thick oil branching well
RU2339801C2 (en) * 2007-01-12 2008-11-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for development of multi-horizon non-uniform oil fields by means of branched horizontal wells

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《中国优秀硕士学位论文全文数据库 基础科学辑》 20100415 周超 复杂结构井在潜山油藏中的应用研究 A011-72 , 第4期 *
《中外能源》 20080630 高富成等 杜32_兴H309Z鱼骨水平井钻井技术 第13卷, 第3期 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975050B (en) * 2010-09-17 2013-03-06 北京奥瑞安能源技术开发有限公司 Construction method of coal bed gas horizontal well and vertical drainage well in multi-objective layer geologic environment
CN101975050A (en) * 2010-09-17 2011-02-16 北京奥瑞安能源技术开发有限公司 Construction method of coal bed gas horizontal well and vertical drainage well in multi-objective layer geologic environment
CN104411911A (en) * 2012-05-31 2015-03-11 界标制图有限公司 Systems and methods for optimal positioning of drilling pads
CN104411911B (en) * 2012-05-31 2016-08-17 界标制图有限公司 The system and method for the optimum position of drilling platform
CN102767357A (en) * 2012-07-26 2012-11-07 中国石油大学(北京) V-shaped well for gas-cap reservoir
CN104265261B (en) * 2014-08-11 2017-06-13 中国石油天然气股份有限公司 Fish bone well branch horizontal well structure
CN104265261A (en) * 2014-08-11 2015-01-07 中国石油天然气股份有限公司 Fishbone-shaped branch horizontal well structure
CN106321056A (en) * 2015-06-17 2017-01-11 中国石油化工股份有限公司 A well arranging method for well factories
CN106593399B (en) * 2016-12-26 2019-06-11 中国石油天然气股份有限公司 For developing the offtake pattern of ultra-thin oil reservoir
CN106593399A (en) * 2016-12-26 2017-04-26 中国石油天然气股份有限公司 Exploiting well pattern used for exploiting ultra-thin reservoir
CN107558985A (en) * 2017-09-14 2018-01-09 吉林大学 A kind of well spacing and reservoir treating method of oil shale in-situ exploitation
CN107558985B (en) * 2017-09-14 2019-07-09 吉林大学 A kind of well spacing and reservoir treating method of oil shale in-situ exploitation
CN109978303A (en) * 2017-12-28 2019-07-05 中国石油天然气股份有限公司 The determination method, apparatus and storage medium of the exploitation measure of heavy crude reservoir
CN111350485B (en) * 2018-12-20 2022-05-10 中国石油天然气股份有限公司 Well pattern adjusting method and device
CN111350485A (en) * 2018-12-20 2020-06-30 中国石油天然气股份有限公司 Well pattern adjusting method and device
CN112483064A (en) * 2019-09-12 2021-03-12 中国石油天然气股份有限公司 Method, device and equipment for determining well arrangement mode of condensate gas reservoir and storage medium
CN112483064B (en) * 2019-09-12 2023-04-07 中国石油天然气股份有限公司 Method, device and equipment for determining well arrangement mode of condensate gas reservoir and storage medium
CN113586021A (en) * 2020-04-30 2021-11-02 中国石油化工股份有限公司 Horizontal well volume fracturing method and system combining radial well with carbon dioxide fracturing
CN113969768A (en) * 2020-07-23 2022-01-25 中国石油化工股份有限公司 Directional enabling-differential releasing type volume water drive method for one-injection multi-production well group
CN113969768B (en) * 2020-07-23 2024-05-31 中国石油化工股份有限公司 Directional energization-differential release type volume water flooding method for one-injection multi-production well group
CN114329729A (en) * 2021-12-31 2022-04-12 中国石油大学(北京) Optimized design and well spacing method for three-dimensional development well pattern
CN114329729B (en) * 2021-12-31 2024-06-07 中国石油大学(北京) Optimal design and well distribution method for three-dimensional development well pattern

Also Published As

Publication number Publication date
CN101818620B (en) 2013-04-10

Similar Documents

Publication Publication Date Title
CN101818620B (en) Mining method for maximum reservoir contact well
CN201763308U (en) Fishbone well type structure
CN102606129B (en) Method and system for thin interbed oilfield development
CN105239990B (en) A kind of Oil in Super-low Permeability compact oil reservoir intends the lateral displacement horizontal well well-arranging procedure of this well
CN107435535B (en) A method of exploitation high dip angle heavy crude reservoir is driven using plane gravity
CN102777157B (en) CO2 drive oil-gas-water separate well injecting oil reservoir mixing drive development method
CN105672978A (en) Horizontal displacement type five-point horizontal well three-dimensional well pattern distributing method
CN102071922B (en) Low permeable oil deposit virtual horizontal well development method
CN107975357B (en) The well pattern structure and oil production method of super-heavy oil deposit
CN106593400A (en) Volume fracturing directional well arranging method for ultra-low permeability dense reservoir
CN113738317A (en) Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal
CN105822284B (en) Triangle horizontal well patterns well-arranging procedure
CN101876241A (en) Method for improving water drive recovery factor of thick positive rhythm reservoir
CN105298452A (en) Oil reservoir three-dimensional gas injection method and well pattern structure
CN106437642A (en) Fractured reservoir horizontal well injection-production asynchronous exploitation method
CN206860155U (en) Coal-series gas U-shaped well drilling and fracturing structure
CN110259421A (en) A kind of broken up compact oil reservoir water filling supplement ENERGY METHOD
RU2474678C1 (en) Development method of oil deposit with horizontal wells
CN102364041B (en) Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture
CN103628848B (en) Multidirectional interlayer displacement in flooding oil production method and system
CN207315337U (en) Well pattern structure for the exploitation of stratiform LOW PERMEABILITY RESERVOIR
CN206513360U (en) A kind of three-dimensional well pattern structure
CN203463093U (en) Gas injection stereo well pattern structure for double medium storage layer
CN208057104U (en) The well pattern structure of deep layer bulk fractured reservoir is developed for gas drive
RU2513962C1 (en) Oil deposit development method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ren Fangxiang

Inventor after: Qiu Lin

Inventor after: Zhang Fangli

Inventor after: Xu Ning

Inventor after: Yin Wanquan

Inventor after: Sun Yan

Inventor after: Gong Yaojin

Inventor after: Xu Ping

Inventor after: Zhao Suiguang

Inventor after: Zhou Wanshan

Inventor before: Xu Ning

Inventor before: Ren Fangxiang

Inventor before: Xu Ping

Inventor before: Gong Yaojin

Inventor before: Zhou Wanshan

Inventor before: Qiu Lin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU NING REN FANGXIANG XU PING GONG YAOJIN ZHOU WANSHAN QIU LIN TO: REN FANGXIANG ZHANG FANGLI XU NING YIN WANQUAN SUN YAN GONG YAOJIN XU PING ZHAO SUIGUANG ZHOU WANSHAN QIU LIN

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160429

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee after: China Petroleum & Natural Gas Co., Ltd.

Address before: 124010 No. 95, oil street, Xinglongtai District, Liaoning, Panjin

Patentee before: Xu Ping