CN103790162A - 同步式钢板桩桩孔填充装置 - Google Patents

同步式钢板桩桩孔填充装置 Download PDF

Info

Publication number
CN103790162A
CN103790162A CN201410037197.6A CN201410037197A CN103790162A CN 103790162 A CN103790162 A CN 103790162A CN 201410037197 A CN201410037197 A CN 201410037197A CN 103790162 A CN103790162 A CN 103790162A
Authority
CN
China
Prior art keywords
steel plate
steel sheet
sheet pile
filling
filling tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410037197.6A
Other languages
English (en)
Other versions
CN103790162B (zh
Inventor
肖玉成
陈斌
朱小友
王超雄
万凯军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN201410037197.6A priority Critical patent/CN103790162B/zh
Publication of CN103790162A publication Critical patent/CN103790162A/zh
Application granted granted Critical
Publication of CN103790162B publication Critical patent/CN103790162B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

同步式钢板桩桩孔填充装置,包括:填充管(1),填充管(1)的一侧通过连接板(2)与钢板桩(3)相连,填充管(1)下端两侧削去部分后与端板(4)连接。其优点是:结构简单,可在施工现场自行制作,成本低,操作简便,可用于注浆或喷射砼或喷射砂石等填充基坑支护工程中钢板桩被拔出后留下的孔洞;对地层无特殊要求,实用性强,振动、锤击或静压钢板桩时,与钢板桩同步进入土层内,拔出钢板桩过程中,边拔边压力注浆或喷射砼或喷射砂石等,完成对桩孔的填充;实践证明,填充钢板桩桩孔的成功率达100%,可确保地下室周边的地面及管线等的安全。

Description

同步式钢板桩桩孔填充装置
技术领域
本发明涉及深基坑支护工程技术领域,具体的说是一种同步式钢板桩桩孔填充装置。
背景技术
基于低碳环保的设计理念,钢板桩作为一种可回收并多次使用的支护结构,在深基坑支护工程中有着广泛的应用前景。但是,在地下室回填后钢板桩在拔出过程或全部拔出后,原钢板桩的桩周土岩受到扰动会松动,且钢板桩的拔出会在原桩位处残留细小而深的孔洞,采用常规方法回填时无法回填密实,由此会对地下室周边的地面及管线等造成不利影响。
发明内容
本发明的目的是设计一种能与钢板桩同时被进入岩土层内、且在钢板桩拔出过程中能边拔边填充桩孔的同步式钢板桩桩孔填充装置。 
本发明同步式钢板桩桩孔填充装置,包括:填充管,填充管的一侧通过连接板与钢板桩相连,填充管下端两侧削去部分后与端板连接。
所述的填充管为无缝钢管或焊接钢管,外径50~120mm,壁厚3~8mm;且填充管下端为两侧各削去一个弓形截面的部分圆管,弓形截面的拱高≤填充管外径的1/4,起削点到填充管下端的距离为50~300mm。
所述的连接板为厚度8~16mm的钢板,宽80~100mm,高200~300mm,竖向间距500~1000mm。                            
所述的钢板桩为单一截面的钢板桩或者多种截面组合的组合钢板桩。
所述的端板为厚度10~30mm的方钢板,钢板宽度等同于填充管的外径,为50~120mm。           
钢板桩上的填充管的数量依据地层状况可连续设置,也可间隔设置,连接方式还可直接将填充管间隔点焊于钢板桩侧;或将连接板改为间断套管,或间隔的活扣套管,在钢板桩最上端的套管设置限位卡,防止沉桩时填充管活动;用活扣套管在拔桩时可逐个解扣,使拔桩后填充管还可放置于岩土层中,不仅方便注浆或喷射砼或喷射砂石施工,还可用于二次填充使用;此装置还可以在钢板桩沉桩困难时辅助注液助沉。
钢板桩也可以是可以回收的钢管桩,此时填充管预埋在钢管桩内外侧均可,一般采用直接间断焊接在桩侧壁上,也一样可以在沉桩困难时辅助注液助沉。
本发明同步式钢板桩桩孔填充装置是这样实现的:钢板桩打入、振入或压入土层前,先将填充管下端两侧削去部分后与端板焊接,然后将填充管的一侧通过连接板与钢板桩焊接牢固,再采用振动、锤击或静压法将钢板桩和同步式钢板桩桩孔填充装置压入土体内,待地下室回填后,采用液压千斤顶边拔桩边压力注入水泥砂浆或粘土砂浆或直接接上砼喷射管边拔桩边喷射细石混凝土、砂、砂与细石混合体等填充孔洞,用履带吊车缓缓提升钢板桩,直到桩端露出地面,桩孔填充完毕。
 本发明同步式钢板桩桩孔填充装置的优点是:结构简单,可在施工现场自行制作,成本低,操作简便,可用于注浆或喷射砼或喷射砂石等填充基坑支护工程中钢板桩被拔出后留下的孔洞;对地层无特殊要求,实用性强,振动、锤击或静压钢板桩时,与钢板桩同步进入土层内,拔出钢板桩过程中,边拔边压力注浆或喷射砼或喷射砂石等,完成对桩孔的填充;实践证明,填充钢板桩桩孔的成功率达100%,可确保地下室周边的地面及管线等的安全。
附图说明
图1为本发明同步式钢板桩桩孔填充装置的俯视图。
图2为本发明同步式钢板桩桩孔填充装置的正视图。
图3为本发明同步式钢板桩桩孔填充装置的侧视图。
具体实施方式
根据图1、图2、图3所示,一种同步式钢板桩桩孔填充装置,包括:填充管1,填充管1的一侧通过连接板2与钢板桩3相连,填充管1下端两侧削去部分后与端板4连接。
所述的填充管1为无缝钢管或焊接钢管,外径50~120mm,壁厚3~8mm;填充管1下端为两侧各削去一个弓形截面的部分圆管,弓形截面的拱高为填充管1外径的1/4,起削点到填充管1下端的距离为50~300mm。
所述的连接板2为厚度8~16mm的钢板,宽80~100mm,高200~300mm,竖向间距500~1000mm。                   
所述的钢板桩3为单一截面的钢板桩或者多种截面组合的组合钢板桩。
所述的端板4为厚度10~30mm的方钢板,钢板宽度等同于填充管的外径,为50~120mm。

Claims (5)

1.一种同步式钢板桩桩孔填充装置,包括:填充管(1);其特征在于:填充管(1)的一侧通过连接板(2)与钢板桩(3)相连,填充管(1)下端两侧削去部分后与端板(4)连接。
2.根据权利要求1所述的同步式钢板桩桩孔填充装置,其特征在于:所述的填充管(1)为无缝钢管或焊接钢管,外径50~120mm,壁厚3~8mm;填充管(1)下端为两侧各削去一个弓形截面的部分圆管,弓形截面的拱高≤填充管(1)外径的1/4,起削点到填充管(1)下端的距离为50~300mm。
3.根据权利要求1所述的同步式钢板桩桩孔填充装置,其特征在于:所述的连接板(2)为厚度8~16mm的钢板,宽80~100mm,高200~300mm,竖向间距500~1000mm。
4.根据权利要求1所述的同步式钢板桩桩孔填充装置,其特征在于:所述的钢板桩(3)为单一截面的钢板桩或者多种截面组合的组合钢板桩。
5.根据权利要求1所述的同步式钢板桩桩孔填充装置,其特征在于:所述的端板(4)为厚度10~30mm的方钢板,钢板宽度等同于填充管的外径,为50~120mm。
CN201410037197.6A 2014-01-26 2014-01-26 同步式钢板桩桩孔填充装置 Active CN103790162B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410037197.6A CN103790162B (zh) 2014-01-26 2014-01-26 同步式钢板桩桩孔填充装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410037197.6A CN103790162B (zh) 2014-01-26 2014-01-26 同步式钢板桩桩孔填充装置

Publications (2)

Publication Number Publication Date
CN103790162A true CN103790162A (zh) 2014-05-14
CN103790162B CN103790162B (zh) 2017-01-04

Family

ID=50666182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410037197.6A Active CN103790162B (zh) 2014-01-26 2014-01-26 同步式钢板桩桩孔填充装置

Country Status (1)

Country Link
CN (1) CN103790162B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086328A (zh) * 2017-11-15 2018-05-29 上海建工集团股份有限公司 一种动态止水、自回灌的装配式围护结构及其施工方法
CN110886317A (zh) * 2019-12-10 2020-03-17 中国十七冶集团有限公司 一种城市综合管廊钢板桩支护结构基槽土方回填施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB486407A (en) * 1937-12-16 1938-06-02 Dortmund Hoerder Huetten Ver A Improvements in sheet pile structures
JPS57108318A (en) * 1980-12-25 1982-07-06 Giken Seisakusho:Kk Improvement of ground when drawing out steel sheet pile
CN87105352A (zh) * 1987-08-07 1988-01-20 中国建筑科学研究院地基基础研究所 异型灌注桩及其成桩设备
CN102535439A (zh) * 2011-11-24 2012-07-04 东南大学 一种钢板桩锁口结构
CN203808074U (zh) * 2014-01-26 2014-09-03 中冶集团武汉勘察研究院有限公司 同步式钢板桩桩孔填充装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB486407A (en) * 1937-12-16 1938-06-02 Dortmund Hoerder Huetten Ver A Improvements in sheet pile structures
JPS57108318A (en) * 1980-12-25 1982-07-06 Giken Seisakusho:Kk Improvement of ground when drawing out steel sheet pile
CN87105352A (zh) * 1987-08-07 1988-01-20 中国建筑科学研究院地基基础研究所 异型灌注桩及其成桩设备
CN102535439A (zh) * 2011-11-24 2012-07-04 东南大学 一种钢板桩锁口结构
CN203808074U (zh) * 2014-01-26 2014-09-03 中冶集团武汉勘察研究院有限公司 同步式钢板桩桩孔填充装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086328A (zh) * 2017-11-15 2018-05-29 上海建工集团股份有限公司 一种动态止水、自回灌的装配式围护结构及其施工方法
CN110886317A (zh) * 2019-12-10 2020-03-17 中国十七冶集团有限公司 一种城市综合管廊钢板桩支护结构基槽土方回填施工方法

Also Published As

Publication number Publication date
CN103790162B (zh) 2017-01-04

Similar Documents

Publication Publication Date Title
CN104234055B (zh) 一种预制桩后注浆装置及其工艺
CN202689031U (zh) 深基坑支护挡墙
KR20100068597A (ko) 아치형 강판파일과 H-Pile을 이용한 흙막이공법
CN103882869A (zh) 一种用于基坑围护的斜向支撑桩结构及其施工方法
CN102605773B (zh) 注浆成型扩底钻孔灌注桩的施工方法及其挤扩装置
CN203256729U (zh) 一种沉井施工的拉森钢板桩围护装置
CN102852141A (zh) 一种桩芯灌注混凝土桩侧静压注浆的嵌岩管桩基础及其施工方法
CN103114595A (zh) 支护桩预留核心土双支墩斜内撑基坑支护方法及装置
CN103742157A (zh) 用顶管法在地下新建地下空间的方法
CN105625430A (zh) 一种狭小施工区域高压水切割土体拔桩方法
CN203716046U (zh) 一种基坑土方运输钢栈桥
CN114033388B (zh) 富水粉砂层地下隧道顶管用竖井施工方法
CN103911993B (zh) 一种pha锚杆及其施工方法
CN201704688U (zh) 一种隔离桩土接触的钻孔灌注桩双套管
CN203808074U (zh) 同步式钢板桩桩孔填充装置
CN204959787U (zh) 一种新型塔吊组合式基础
CN203768914U (zh) 一种用于基坑围护的斜向支撑桩结构
CN101586341B (zh) 一种土木工程地基的止水方法
CN103790162A (zh) 同步式钢板桩桩孔填充装置
CN101575855A (zh) 非取土引孔预应力管桩或预制方桩沉桩工艺
CN102418348A (zh) 利用咬合桩形成地下连续墙的施工工艺
CN208472716U (zh) 裂隙地质防漏浆钻孔灌注桩结构
CN104074195A (zh) 一种通过水平注浆控制基坑外地面沉降的方法
KR100834920B1 (ko) 흙막이 시공 파일용 피막시트 및 이를 이용한 흙막이시공방법
CN202787275U (zh) 新型气动冲击锚管式土钉墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant