CN103779861A - 配电网主动重构策略及其预防控制方法 - Google Patents

配电网主动重构策略及其预防控制方法 Download PDF

Info

Publication number
CN103779861A
CN103779861A CN201310755765.1A CN201310755765A CN103779861A CN 103779861 A CN103779861 A CN 103779861A CN 201310755765 A CN201310755765 A CN 201310755765A CN 103779861 A CN103779861 A CN 103779861A
Authority
CN
China
Prior art keywords
distribution network
power distribution
active
reconstruct
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310755765.1A
Other languages
English (en)
Other versions
CN103779861B (zh
Inventor
贾宏杰
穆云飞
靳小龙
余晓丹
王明深
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201310755765.1A priority Critical patent/CN103779861B/zh
Publication of CN103779861A publication Critical patent/CN103779861A/zh
Application granted granted Critical
Publication of CN103779861B publication Critical patent/CN103779861B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及主动配电网安全运行及预防控制技术,为通过网络结构的优化施行预防性控制以实时满足配电网运行的安全裕度要求,有效提高配电网运行的可靠性,同时,指导配电网的运行以及短期规划,达成较好的经济效益和社会效益,为此,本发明采用的技术方案是,配电网主动重构策略及其预防控制方法,包括如下步骤:首先构建适用于主动配电网的最大供电能力评估指标;当配电网最大供电能力指标低于系统安全警戒线时,则以最大供电能力指标提升和网络重构开关操作次数最小为多目标进行配电网主动重构;若当前运行方式下配电网的最大供电能力指标低于预定安全警戒线,则启动主动重构模块进行网络优化重构。本发明主要应用于配电网安全运行及预防控制。

Description

配电网主动重构策略及其预防控制方法
技术领域
本发明涉及主动配电网安全运行及预防控制技术,具体讲,涉及配电网主动重构策略及其预防控制系统。 
背景技术
近年来,随着分布式电源以及各类新型用电负荷(如电动汽车等)在配电网层面的大量接入,配电网面临着前所未有的不确定性外部环境。由此导致配电网的规划和运行方式变得愈加复杂;配电网保护装置的运行和故障处理也带来了一定程度的影响,给配电网的安全运行带来前所未有的挑战[1-2]。 
然而,随着配电管理和配电自动化系统的不断完善,使得配电网具有随着外部环境的不断变化[3](负荷、间歇性分布式电源等)动态选择经济、可靠的运行方式的能力[4],具有了主动性的特征。主动配电网[5]是一种新型的、区别于微网的大规模分布式电源接入配电网的方式,一方面可以协调控制包括分布式电源、储能装置、可控负荷、需求侧管理等在内的多种分布式能源[6],加大配电网对可再生能源的接纳能力,提升配电网的资产利用率;另一方面可以满足更加高级的配电自动化应用,可以动态选择经济、可靠的运行方式、拓扑结构,呈现出比传统的配电网更加灵活的运行特征。为此,欧盟提出将自动化、通信以及先进的电力电子等技术引入到配电网的主动管理(Active Distribution Network Management,ADM)之中,主导了ADM相关示范工程[7];美国在主动配电网及其相关领域也开展了大量的研究工作;在我国由国网公司牵头实施的国家高技术研究发展计划(863计划)“主动配电网关键技术研究及示范”也正在开展针对主动配电网条件下的协同优化调度、交互控制技术等方面的研究。 
利用主动配电网的灵活性可对不断变化的配电网运行状态进行实时监控及评估,以给出当前运行方式下配电网的最大供电能力指标,在到达配网运行安全裕度警戒线时采取相应的控制措施,及时调整运行方式,可以极大的提高网络运行的安全性。在所有控制策略中,配电网络重构可根据系统运行状况实时调整网络拓扑结构,具有重要现实意义。国内外已有针对配电网重构的大量研究:在正常的运行状态下配电网重构往往是以网损最小[8-10]或者负荷平衡[11-12]为目标;在紧急状态下,配电网重构往往作为故障恢复的一种手段,以开关操作次数最小[13-14]或者以最大限度负荷供电恢复[15-16]等为目标。 
然而,当前的配电网重构策略具有以下不足: 
·无论是正常运行状态下的网络优化重构[9-13]还是紧急状态下的故障恢复重构[14-17]往往是被动的,无法对系统运行安全性情况起到充分的预警作用,不符合当今主动配电网的发展需求; 
·当前的配电网重构目标单一,无法充分计及配电网运行时大量外部不确定因素,进而引发系统运行中的潜在安全性隐患。 
发明内容
本发明旨在解决克服现有技术的不足,通过网络结构的优化施行预防性控制以实时满足配电网运行的安全裕度要求,有效提高配电网运行的可靠性,同时,指导配电网的运行以及短期规划,达成较好的经济效益和社会效益,为此,本发明采用的技术方案是,配电网主动重构策略及其预防控制方法,包括如下步骤:首先构建适用于主动配电网的最大供电能力评估指标,并通过变步长的重复潮流算法对其进行在线监测,以实时评估配电网的最大供电能力;当配电网最大供电能力指标低于系统安全警戒线时,则以最大供电能力指标提升和网络重构开关操作次数最小为多目标进行配电网主动重构,在系统出现紧急状况前,通过网络结构的优化施行预防性控制以实时满足配电网运行的安全裕度要求;同时,主动重构策略应用于配电网在线安全预防控制系统,全天候监测配电网的安全运行状况,若当前运行方式下配电网的最大供电能力指标低于预定安全警戒线,则启动主动重构模块进行网络优化重构。 
最大供电能力评估指标的构建具体步骤为: 
配电网最大供电能力指标(power supply capability Index,PSCI)数学模型表述如下: 
PSCI = max S = Σ j = 1 N S ini , j + Σ j ∈ D kS d , j - - - ( 1 )
式中:S为评估区域所能供给的最大负荷量;Sini,j为节点j的当前实际负荷;N为负荷节点总数,所以目标函数中的第一项即为当前实际负荷;Sd,j为负荷增长区域中节点j的负荷增长基数,取Sd,j=Sini,j;k为负荷增长系数;D为进行供电能力评估的区域; 
(1)的约束条件包括潮流约束、节点电压约束及导线的容量约束,即: 
Ai=I   (2) 
Vk≥VLk   (3) 
il≤ilmax  (4) 
式中:A为节点/支路关联矩阵;i为所有支路的复电流矢量;I为所有节点的复电流注入矢量;Vk,VLk分别为节点k的电压及其下限;il,ilmax分别为各支路流过的电流和允许的最大载流量; 
为了方便计算并且直观反应配电网的供电能力,引入最大供电倍数K,当目标函数中S达到最大值的时候,对应的k就为kmax,此时K=1+kmax;K可用来表征配电网的最大供电能力; 
面向最大供电能力提升的配电网主动重构策略具体为: 
1)目标函数与约束条件 
max PSCI   (5) 
min Σ i = 1 N s | x i - x i 0 | - - - ( 6 )
式(5)中:PSCI为上节介绍过的配电网的最大供电能力指标,即使配电网的最大供电能力指标最大;式(6)中:NS为配电网中可操作开关的总数,包括分段开关和联络开关;xi为重构后开关i的状态,包括联络开关和分段开关的状态通过二进制“0”和“1”来表示:“0”表示开关打开,“1”表示开关闭合;xi0为重构前开关i的状态;所以式(6)的目标是配电网主动重构过程中的开关操作次数最小; 
主动重构的约束条件包括潮流约束、节点电压约束及线路的容量约束,与最大供电能 
力指标数学模型的约束条件(2)-(4)相同; 
2)决策空间与优化算法 
采用二进制粒子群算法来进行寻优重构,开关的状态通过二进制“0”和“1”来表示,基于配电网最大供电能力的主动重构策略等同于在配电网每个环路中选择一个开关打开,在满足配电网辐射状运行的同时寻优达到最大的PSCI;配电网的环路是指的配电网所有开关都闭合时所形成的的环路,(7)表示该优化问题的搜索空间: 
Ω=[Ω12,…,ΩNloop]   (7) 
其中,Nloop表示当配电网所有开关闭合时的环路总数;Ωi是第i个环路打开的开关编号从而保证配电网辐射状运行;不同的开关组合构成了不同的重构方案,所有的这些方案组成了最大PSCI的寻优搜索决策空间。 
本发明的技术特点及效果: 
本发明的仿真结果显示经过两次主动重构可以保证配电网全天的K值都高于安全警戒线,实现预防控制,保证配电网全天都运行在安全状态。同时,在进行主动重构时综合考虑了最大供电倍数和最小开关操作次数,不仅可以根据配电网实时运行状态动态经济选择不同的主动重构方案,同时可以根据负荷预测结果离线制定配电网的运行方案,为运行调度人员提供科学决策,最大限度的保证了配电网运行的经济性和安全性。 
本发明既可以用于配电网运行安全的实时在线监测,为配电网的运行提供实时的指导方案;也可以作为离线计算平台,利用配电网运行的历史数据以及预测的负荷水平,离线计算出配电网的安全经济运行方式,以指导配电网的运行以及短期规划。 
附图说明
图1配电网主动重构优化策略流程图。 
图2主动配电网预防控制系统示意图。 
图3IEEE-33节点拓扑图。 
图4整个配电网最大PSCI迭代曲线。 
图5对应整个配电网最大PSCI的重构方案。 
图6四个局部区域的最大PSCI迭代曲线。 
图7四个局部区域对应最大PSCI的重构方案。 
图8四个局部区域重构前后最大供电倍数对比。 
图9三种不同类型的典型负荷增长曲线。 
图10基于配电网最大供电能力的预防控制系统计算。 
图11预防控制系统第一次主动重构方案。 
图12预防控制系统第二次主动重构方案。 
图13考虑开关操作次数的预防控制系统第一次主动重构多目标寻优结果。 
图14考虑开关操作次数的预防控制系统第一次主动重构后各种方案对应的最大供电能力。 
图15第一次主动重构开关操作次数为2对应的第二次主动重构多目标寻优结果。 
图16第一次主动重构开关操作次数为2对应的第二次主动重构各种方案对应的最大供电能力。 
图17基于最大供电能力和最小开关操作次数的多目标重构优化的预防控制系统仿真结果。 
具体实施方式
针对当前配电网重构技术存在的不足,发明一种面向最大供电能力提升的配电网主动重构策略:首先构建适用于主动配电网的最大供电能力评估指标,并通过变步长的重复潮流算法对其进行在线监测,以实时评估配电网的最大供电能力;当配电网最大供电能力指标低于系统安全警戒线时,则以最大供电能力指标提升和网络重构开关操作次数最小为多目标进行配电网主动重构,在系统出现紧急状况前,通过网络结构的优化施行预防性控制以实时满足配电网运行的安全裕度要求,有效提高配电网运行的可靠性;同时,主动重构策略应用于配电网在线安全预防控制系统,可全天候监测配电网的安全运行状况,若当前运行方式下配电网的最大供电能力指标低于预定安全警戒线,则启动主动重构模块进行网络优化重构。该系统既可以用于配电网运行安全的实时在线监测,为配电网提供实时的拓扑优化指导方案,也可以作为离线评估系统,利用配电网运行的历史数据以及预测的负荷水平,离线计算配电网的安全经济运行方式,以指导配电网的运行以及短期规划,具有较好的经济效益和社会效益。 
本发明采取的技术方案是: 
1、主动配电网最大供电能力指标 
配电网的最大供电能力是指配电网在满足支路功率约束和节点电压约束的条件下所能供给的最大负荷,它由配电网的拓扑结构、负荷水平以及负荷增长模式所决定,而不考虑稳定性约束。配电网最大供电能力指标(power supply capability Index,PSCI)数学模型表述如下: 
PSCI = max S = Σ j = 1 N S ini , j + Σ j ∈ D kS d , j - - - ( 1 )
式中:S为评估区域所能供给的最大负荷量;Sini,j为节点j的当前实际负荷;N为负荷节点总数,所以目标函数中的第一项即为当前实际负荷;Sd,j为负荷增长区域中节点j的负荷增长基数,取Sd,j=Sini,j;k为负荷增长系数;D为进行供电能力评估的区域; 
(1)的约束条件包括潮流约束、节点电压约束及导线的容量约束,即: 
Ai=I   (2) 
Vk≥VLk   (3) 
il≤ilmax   (4) 
式中:A为节点/支路关联矩阵;i为所有支路的复电流矢量;I为所有节点的复电流注入矢量;Vk,VLk分别为节点k的电压及其下限;il,ilmax分别为各支路流过的电流和允许的最大载流量; 
为了方便计算并且直观反应配电网的供电能力,引入最大供电倍数K,当目标函数中S达到最大值的时候,对应的k就为kmax,此时K=1+kmax;K可用来表征配电网的最大供电能力; 
2、面向最大供电能力提升的配电网主动重构策略 
1)目标函数与约束条件 
max PSCI   (5) 
min Σ i = 1 N s | x i - x i 0 | - - - ( 6 )
式(5)中:PSCI为上节介绍过的配电网的最大供电能力指标,即使配电网的最大供电能力指标最大;式(6)中:NS为配电网中可操作开关的总数,包括分段开关和联络开关;xi为重构后开关i的状态,包括联络开关和分段开关的状态通过二进制“0”和“1”来表示:“0”表示开关打开,“1”表示开关闭合;xi0为重构前开关i的状态;所以式(6)的目标是配电网主动重构过程中的开关操作次数最小; 
主动重构的约束条件包括潮流约束、节点电压约束及线路的容量约束,与最大供电能力指标数学模型的约束条件(2)-(4)相同; 
2)决策空间与优化算法 
本发明采用二进制粒子群算法来进行寻优重构,具体的流程如图1所示。开关的状态通过二进制“0”和“1”来表示。基于配电网最大供电能力的主动重构策略等同于在配电网每个环路中选择一个开关打开,在满足配电网辐射状运行的同时寻优达到最大的PSCI;配电网的环路是指的配电网所有开关都闭合时所形成的的环路。(7)表示该优化问题的搜索空间。 
Ω=[Ω12,…,ΩNloop]   (7) 
其中,Nloop表示当配电网所有开关闭合时的环路总数;Ωi是第i个环路打开的开关编号从而保证配电网辐射状运行;不同的开关组合构成了不同的重构方案,所有的这些方案组成了最大PSCI的寻优搜索决策空间。 
3、配电网最大供电能力的预防控制系统 
基于前述面向最大供电能力提升的配电网主动重构策略,提出考虑配电网最大供电能力的预防控制系统,如图2所示。在配电网管理系统的统一管理调度下,正在运行的配电网将当前运行方式下的拓扑结构、负荷水平以及负荷增长模式等信息传送到预防控制模块进行重复潮流计算以得到当前的最大供电倍数K。然后进入安全预警判别模块,如果K值高于预先设定的安全警戒线kcir,则返回当前配网的供电能力信息计算;如果低于kcir值,进入主动重构模块,基于最大供电能力提升和最少开关操作次数最小的多目标进行主动优化重构,重构优化后将新的拓扑结构也即重构方案传送到正在运行的配电网管理系统,以供系统运行人员决策使用,待通过决策后,利用高级配电自动化系统进行网络优化重构。 
该系统既可以用于配电网运行安全的实时在线监测,为配电网的运行提供实时的指导方案;也可以作为离线计算平台,利用配电网运行的历史数据以及预测的负荷水平,离线计算出配电网的安全经济运行方式,以指导配电网的运行以及短期规划。 
下面结合附图和具体实施方式进一步详细说明本发明。 
本发明利用IEEE-33节点配电系统进行计算仿真来说明本发明的有益效果。IEEE-33节点配电网络拥有32条线路,5条联络开关支路(25–29,8–21,12–22,9–15和18–33),基准电压为12.66kV。将IEEE-33节点配电网分为如下四个区域:区域1支路电流上限取595A, 区域2支路电流上限取160A,区域3支路电流上限取325A,区域4支路电流上限取460A,节点电压下限取为0.9[23]。算例初始网络拓扑结构如图3所示。 
为全面分析本发明提出的面向最大供电能力提升的配电网主动重构策略及其预防控制系统,从三个角度进行算例仿真分析: 
1)首先基于某一个时刻点的负荷水平(整个网络总负荷为3715+j2300kVA),分别评估整个配电网和局部区域的供电能力,并首先以最大供电能力指标为优化目标,进行主动重构优化计算得到对应的网络拓扑结构以及其所能达到的最大供电倍数; 
2)随后基于一个典型的全天负荷增长曲线进行整个配电网最大供电倍数的全天在线评估,当K值低于算例仿真中设定的Kcir值时,先不考虑开关操作次数,以最大供电能力指标为目标进行重构,从而体现主动配电网的预防控制系统的应用; 
3)最后在第二部分工作的基础上,在重构过程中考虑开关操作次数目标,进行多目标的重构优化。 
1、基于最大供电能力的配电网主动优化重构算例 
1)整个配电网的最大供电能力评估与重构 
约束条件(2)-(4)起作用为止。仿真结果如表1所示,采用二进制粒子群优化算法的重构优化最优个体适应度值,即最大PSCI值,如图4所示,该PSCI值所对应的重构网络拓扑见图5,图中加粗母线为该重构方案达到最大PSCI值时对应的电压越限母线。 
2)配电网局部区域供电能力评估与主动重构 
以局部区域最大供电能力指标为目标进行优化重构:只有评估区域的负荷成比例地持续增加,其他区域的负荷保持不变,直到约束条件起作用为止。仿真结果如表2所示,最大PSCI值见图6,最大PSCI值对应的重构网络拓扑见图7。 
2、配电网最大供电能力的预防控制系统仿真算例 
本节验证第4节中所提配电网最大供电能力的预防控制系统,基于典型的日负荷增长曲线,针对全天的不同负荷水平和负荷增长趋势进行最大供电能力指标的评估。当K值低于本文设定的kcir值(本文kcir值设定为2)时,先不考虑开关操作次数,以最大供电能力指标为目标进行重构,从而实现了主动配电网的预防控制策略。 
仿真算例仍采用图3的IEEE-33节点分区域配电系统,其中区域2负荷增长模趋势为居民负荷,区域3负荷增长趋势为工业负荷,区域4负荷增长趋势为商业负荷,区域1负荷增长趋势为混合负荷,即不同的负荷节点采用不同的负荷增长趋势。典型的不同负荷类型的日增长曲线见图9。 
基于配电网最大供电能力的预防控制系统仿真结果见图10。从仿真计算结果可以看出,系统初始供电能力曲线在12.5h这一时刻低于本文设定的kcir值,所以要在12.5h这一时刻进行第一次主动重构,经过第一次重构后配电网的最大供电倍数有了大幅度的提升,但是在18.5h这一时刻再次出现了低于kcir值的情况,所以要进行第二次主动重构,经过第二次主动重构后可以保证配电网全天的最大供电倍数都高于安全警戒线。图中虚线圆形框为系统的K值低于安全警戒线的时刻,即需要进行主动重构的时刻。 
从仿真结果可以看到,算例系统在K值低于本文设定的kcir值时能够进行主动优化重构, 实现预防控制,经过两次主动重构,保证配电网全天都运行在安全状态。预防控制系统进行的两次主动重构对应的重构方案分别见图11和图12。 
3、考虑配电网最大供电能力和最小开关操作次数的多目标重构优化的预防控制系统仿真计算 
本节在上一节的基础上,在进行主动重构优化计算时综合考虑了最大供电倍数和最小开关操作次数,得到多目标的最主动优重构方案。 
1)考虑开关操作次数的第一次主动重构多目标仿真结果 
在预防控制系统进行第一次主动重构时,综合考虑最大供电倍数和最小开关操作次数的多目标重构结果见图13。从仿真结果可以看到,第一次主动重构的最优边界包括开关操作次数10、8、6、4、2次,每个开关操作次数都对应了在当前开关操作次数下所能达到的最大供电倍数。与上节的不考虑开关操作次数的主动重构结果相比,本节的预防控制系统可以提供多种方案选择,如图13所示,如果运行人员要求最大供电倍数不低于2.5,则根据仿真结果可以选择开关操作次数为最小的6时的重构方案。 
第一次主动重构后各种方案对应的最大供电倍数曲线计算结果见图14。通过第一次重构的仿真结果可以看到,不管是采取10、8、6、4或者是2次开关操作的重构方案,K值都是在18.5h这一时刻小于kcir值,低于本文所设定的安全警戒线,所以不管选择哪种重构方案都需要在18.5h这一时刻做第二次主动重构以保证配网全天运行的安全性,第一次重构不同方案的选择,决定了第二次重构的多重方案。 
2)考虑开关操作次数的第二次主动重构多目标仿真结果 
第一次重构不同方案的选择,决定了第二次重构的多重方案,由于第二次重构方案众多,本小节选取第一次主动重构选择开关操作次数为2的方案所对应的第二次主动重构进行仿真计算,计算结果见图15。第一次主动重构开关操作次数为2对应的第二次重构不同方案计算得到的最大供电倍数曲线见图16。 
从仿真结果可以看到,第一次重构选择开关操作次数2对应的第二次重构多目标寻优的结果开关操作次数最优前沿解只有8、6、4和2,仿真计算结果给出了保证供电倍数高于安全警戒线下的多种重构方案,以供调度人员决策使用。 
基于配电网最大供电能力和最小开关操作次数的多目标重构优化的预防控制系统仿真计算结果见图17。从仿真计算结果可以看出系统的初始最大供电倍数曲线在12.5h这一时刻的K值低于本文设定的kcir值,所以要在12.5h这一时刻进行第一次主动重构。同时考虑最大供电能力和最小开关操作次数的重构可以提供多种方案选择,在18.5h这一时刻再次出现了低于kcir值的情况,所以要进行第二次主动重构,第一次重构和第二次重构都有多重方案的选择。图中红色虚线圆形框为系统的K值低于kcir值的时刻,即需要进行主动重构的时刻。 
仿真结果显示经过两次主动重构可以保证配电网全天的K值都高于安全警戒线,实现预防控制,保证配电网全天都运行在安全状态。同时,在进行主动重构时综合考虑了最大供电倍数和最小开关操作次数,不仅可以根据配电网实时运行状态动态经济选择不同的主动重构方案,同时可以根据负荷预测结果离线制定配电网的运行方案,为运行调度人员提供科学决策,最大限度的保证了配电网运行的经济性和安全性。 
本发明首先提出一种以配电网最大供电能力指标为目标的配电网主动重构策略,接着基于该主动重构策略,提出了相应的主动配电网预防控制系统,实现对配电网供电能力的实时监控,以有效评估配电网当前运行状态的安全水平,当配电网由于外界环境变化运行至安全预警边界时,能够主动选择合适的重构方案。得到如下结论: 
1)通过基于配电网最大供电能力指标的主动优化重构可以大幅提高配网运行的安全水平; 
2)提出的基于最大供电能力指标的预防控制系统,在线应用时能够根据当前配网的拓扑结构、负荷水平以及负荷增长模式,实时评估配电网的供电能力,同时能够根据当前的实际情况给出对应不同开关操作次数的方案,在满足安全性的同时兼顾经济性;离线应用时,可以利用配电网运行的历史数据以及预测的负荷水平,离线计算出配电网的安全经济运行方式,以指导配电网的运行以及短期规划; 
3)提出的基于配电网最大供电能力的预防控制策略,符合主动配电网的发展需求,能够灵活主动选择经济可靠的运行方式; 
4)提出的主动配电网预防控制系统可以集成到配电管理系统中,作为紧急控制前的一个预防控制优化手段,有效提高配电网实时运行状态和脆弱状态之间的安全距离,增大了系统的安全裕度,可以为配电管理系统的预防控制和恢复控制提供科学的决策依据。 
表1整个配网最大PSCI计算及对应的重构方案 
Figure BDA0000450069820000081
参考文献 
[1]Mu Yunfei,Wu Jianzhong,Ekanayake Janaka,et al.Primary Frequency Response From Electric Vehicles in the Great BritainPower System[J].IEEE Transactions on Smart Grid,2013,4(2):1142-1150. 
[2]Mu Yunfei,Jia Hongjie.An approach to determining the local boundaries of voltage stability region with wind farms in powerinjection space[J].SCIENCE CHINA Technological Sciences,2010,53(12):3232-3240. 
[3]Jia Hongjie,Qi Yan,Mu Yunfei.Frequency response of autonomous microgrid based on family-friendly controllable loads[J].SCIENCE CHINA Technological Sciences,56(3):693-702. 
[4]Liang Wei,Jin Xiaolong,Mu Yunfei,et al.A novel reconfiguration strategy for active distribution network consideringmaximum power supply capability[J].Applied Mechanics and Materials,2013,448:2747-2752. 
[5]曾博,刘念,张玉莹,等.促进间歇性分布式电源高效利用的主动配电网双层场景规划方法[J].电工技术学报,2013,28(9):155-163. 
Zeng Bo,Liu Nian,Zhang Yuying,et al.Bi-level scenario programming of active distribution network for promoting intermittent distributed generation utilization[J].Transactions of China Electrotechnical Society,2013,28(9):155-163. 
[6]Jia Hongjie,Mu Yunfei,Qi Yan.A statistical model to determine the capacity of battery–supercapacitor hybrid energy storage system in autonomous microgrid[J].International Journal of Electrical Power&Energy Systems,2014,54:516-524. 
[7]Samuelsson O,Repo S,Jessler R,et al.Active distribution network-demostration projection ADINE[C]//Proceedings of the 2010IEEE PES Innovative Smart Grid Technologies Conference Europe,October11-13,2010,Gothenburg,Sweden:8p. 
[8]Kim H,Ko Y,Jung H.Artificial neural-network based feeder reconfiguration for loss reduction in distribution systems[J].IEEE Transaction on Power Delivery,1993,8(3):1356–1366. 
[9]Goswami S K,Basu S K.A new algorithm for the reconfiguration of distribution feeders for loss minimization[J].IEEE Transaction on Power Delivery,1992,7(3):1481–1491. 
[10]王林川,梁栋,于冬皓,等.基于遗传算法和禁忌搜索混合算法的配电网重构[J].电力系统保护与控制,2009,37(6):27-31. 
Wang Linchuan,Liang Dong,Yu Donghao,et al.Distribution network reconfiguration based on genetic/tabu search hybrid algorithm[J].Power System Protection and Control,2013,28(9):155-163. 
[11]Baran M E,Wu F F.Network reconfiguration in distribution systems for loss reduction and load balancing[J].IEEE Transaction on Power Delivery,1989,4(2):1401–1409. 
[12]邹必昌,龚庆武,李勋.基于负荷平衡的配电网重构遗传算法研究[J].电力系统保护与控制,2011,39(6):80-83. 
Zou Bichang,Gong Qingwu,Li Xun.Research on network reconfiguration GA in distribution system based on load balancing[J].Power System Protection and Control,2011,39(6):80-83. 
[13]Kim H,Ko Y,Jung H.Algorithm of transferring the load of the faulted substation transformer using the best-first search method[J].IEEE Transaction on Power Delivery,1992,7(3):1434–1442. 
[14]巩伟峥,房鑫炎.基于混合编码方式的配电网故障恢复算法研究[J].电力系统保护与控制,2012,40(6):104-108. 
Gong Weizheng,Fang Xinyan.Research of distribution system service restoration algorithm based on hybrid encoding[J].Power System Protection and Control,2012,40(6):104-108. 
[15]张浩,和敬涵,薄志谦,等.基于动态规划算法的故障恢复重构[J].电工技术学报,2011,26(12):162-167. 
Zhang Hao He Jinghan,Bo Zhiqian,et al.Service restoration based on dynamic programming[J].Transactions of China Electrotechnical Society,2011,26(12):162-167. 
[16]徐玉琴,张丽,王增平,等.基于多智能体遗传算法并考虑分布式电源的配电网大面积断电供电恢复算法[J].电工技术学报,2010,25(4):135-141. 
Xu Yuqin,Zhang Li,Wang Zengping,et al.Algorithm of service restoration for large area blackout in distribution network with distributed generators[J].Transactions of China Electrotechnical Society,2010,25(4):135-141。 

Claims (3)

1.一种配电网主动重构策略及其预防控制方法,其特征是,包括如下步骤:首先构建适用于主动配电网的最大供电能力评估指标,并通过变步长的重复潮流算法对其进行在线监测,以实时评估配电网的最大供电能力;当配电网最大供电能力指标低于系统安全警戒线时,则以最大供电能力指标提升和网络重构开关操作次数最小为多目标进行配电网主动重构,在系统出现紧急状况前,通过网络结构的优化施行预防性控制以实时满足配电网运行的安全裕度要求;同时,主动重构策略应用于配电网在线安全预防控制系统,全天候监测配电网的安全运行状况,若当前运行方式下配电网的最大供电能力指标低于预定安全警戒线,则启动主动重构模块进行网络优化重构。
2.如权利要求1所述的配电网主动重构策略及其预防控制方法,其特征是,最大供电能力评估指标的构建具体步骤为:
配电网最大供电能力指标(power supply capability Index,PSCI)数学模型表述如下:
PSCI = max S = Σ j = 1 N S ini , j + Σ j ∈ D kS d , j - - - ( 1 )
式中:S为评估区域所能供给的最大负荷量;Sini,j为节点j的当前实际负荷;N为负荷节点总数,所以目标函数中的第一项即为当前实际负荷;Sd,j为负荷增长区域中节点j的负荷增长基数,取Sd,j=Sini,j;k为负荷增长系数;D为进行供电能力评估的区域;
(1)的约束条件包括潮流约束、节点电压约束及导线的容量约束,即:
Ai=I  (2)
Vk≥VLk  (3)
il≤ilmax  (4)
式中:A为节点/支路关联矩阵;i为所有支路的复电流矢量;I为所有节点的复电流注入矢量;Vk,VLk分别为节点k的电压及其下限;il,ilmax分别为各支路流过的电流和允许的最大载流量;
为了方便计算并且直观反应配电网的供电能力,引入最大供电倍数K,当目标函数中S达到最大值的时候,对应的k就为kmax,此时K=1+kmax;K可用来表征配电网的最大供电能力。
3.如权利要求1所述的配电网主动重构策略及其预防控制方法,其特征是,面向最大供电能力提升的配电网主动重构策略具体为:
1)目标函数与约束条件
max PSCI   (5)
min Σ i = 1 N s | x i - x i 0 | - - - ( 6 )
式(5)中:PSCI为上节介绍过的配电网的最大供电能力指标,即使配电网的最大供电能力指标最大;式(6)中:NS为配电网中可操作开关的总数,包括分段开关和联络开关;xi为重构后开关i的状态,包括联络开关和分段开关的状态通过二进制“0”和“1”来表示:“0”表示开关打开,“1”表示开关闭合;xi0为重构前开关i的状态;所以式(6)的目标是配电网主动重构过程中的开关操作次数最小;
主动重构的约束条件包括潮流约束、节点电压约束及线路的容量约束,与最大供电能力指标数学模型的约束条件(2)-(4)相同;
2)决策空间与优化算法
采用二进制粒子群算法来进行寻优重构,开关的状态通过二进制“0”和“1”来表示,基于配电网最大供电能力的主动重构策略等同于在配电网每个环路中选择一个开关打开,在满足配电网辐射状运行的同时寻优达到最大的PSCI;配电网的环路是指的配电网所有开关都闭合时所形成的的环路,(7)表示该优化问题的搜索空间:
Ω=[Ω1,Ω2,…,ΩNloop]   (7)
其中,Nloop表示当配电网所有开关闭合时的环路总数;Ωi是第i个环路打开的开关编号从而保证配电网辐射状运行;不同的开关组合构成了不同的重构方案,所有的这些方案组成了最大PSCI的寻优搜索决策空间。
CN201310755765.1A 2013-12-30 2013-12-30 配电网主动重构策略及其预防控制方法 Expired - Fee Related CN103779861B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310755765.1A CN103779861B (zh) 2013-12-30 2013-12-30 配电网主动重构策略及其预防控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310755765.1A CN103779861B (zh) 2013-12-30 2013-12-30 配电网主动重构策略及其预防控制方法

Publications (2)

Publication Number Publication Date
CN103779861A true CN103779861A (zh) 2014-05-07
CN103779861B CN103779861B (zh) 2016-08-17

Family

ID=50571830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310755765.1A Expired - Fee Related CN103779861B (zh) 2013-12-30 2013-12-30 配电网主动重构策略及其预防控制方法

Country Status (1)

Country Link
CN (1) CN103779861B (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123684A (zh) * 2014-08-04 2014-10-29 国家电网公司 一种计及网损和可靠性的配电网经济性重构方法
CN104268694A (zh) * 2014-09-26 2015-01-07 国家电网公司 一种主动配电网控制系统评价方法及主动配电网规划方法
CN104362623A (zh) * 2014-11-10 2015-02-18 国家电网公司 一种适用于主动配电网的多目标网络重构方法
CN105117517A (zh) * 2015-07-28 2015-12-02 中国电力科学研究院 一种基于改进粒子群算法的配网重构方法
WO2015196745A1 (zh) * 2014-06-25 2015-12-30 国家电网公司 主动配电网的重构方法和装置
CN105449675A (zh) * 2015-12-29 2016-03-30 吉林大学 优化分布式能源接入点和接入比例的电力网络重构方法
CN105634117A (zh) * 2014-10-28 2016-06-01 南京理工大学 一种基于多目标的智能配电网重构方法
CN106451429A (zh) * 2016-10-19 2017-02-22 合肥工业大学 一种基于博弈论的含电动汽车入网的配电网重构方法
CN106684854A (zh) * 2015-11-06 2017-05-17 中国电力科学研究院 一种基于节点等效的有源配电网电压越限风险分析方法
CN107393365A (zh) * 2017-07-07 2017-11-24 积成电子股份有限公司 基于可行度的配电网故障仿真培训评价方法
CN109245096A (zh) * 2018-10-19 2019-01-18 天津大学 一种主动配电网最大供电能力计算方法
CN109390971A (zh) * 2018-11-07 2019-02-26 国家电网有限公司 一种基于门当户对遗传算法的配电网多目标主动重构方法
CN111049132A (zh) * 2019-12-17 2020-04-21 国网冀北电力有限公司张家口供电公司 主动配电网大面积断电动态孤岛恢复方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013106374A (ja) * 2011-11-10 2013-05-30 Shimizu Corp 需要電力制御装置および需要電力制御方法
CN103457263A (zh) * 2013-09-17 2013-12-18 国家电网公司 一种基于最大供电能力的智能主动配电网重构方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013106374A (ja) * 2011-11-10 2013-05-30 Shimizu Corp 需要電力制御装置および需要電力制御方法
CN103457263A (zh) * 2013-09-17 2013-12-18 国家电网公司 一种基于最大供电能力的智能主动配电网重构方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马龙等: "中压配电网接线模式的N-1准则评估分析", 《电力科学与工程》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015196745A1 (zh) * 2014-06-25 2015-12-30 国家电网公司 主动配电网的重构方法和装置
CN104123684A (zh) * 2014-08-04 2014-10-29 国家电网公司 一种计及网损和可靠性的配电网经济性重构方法
CN104123684B (zh) * 2014-08-04 2017-02-15 国家电网公司 一种计及网损和可靠性的配电网经济性重构方法
CN104268694A (zh) * 2014-09-26 2015-01-07 国家电网公司 一种主动配电网控制系统评价方法及主动配电网规划方法
CN104268694B (zh) * 2014-09-26 2017-08-25 国家电网公司 一种主动配电网控制系统评价方法及主动配电网规划方法
CN105634117A (zh) * 2014-10-28 2016-06-01 南京理工大学 一种基于多目标的智能配电网重构方法
CN104362623A (zh) * 2014-11-10 2015-02-18 国家电网公司 一种适用于主动配电网的多目标网络重构方法
CN104362623B (zh) * 2014-11-10 2017-05-24 国家电网公司 一种适用于主动配电网的多目标网络重构方法
CN105117517B (zh) * 2015-07-28 2018-11-09 中国电力科学研究院 一种基于改进粒子群算法的配网重构方法
CN105117517A (zh) * 2015-07-28 2015-12-02 中国电力科学研究院 一种基于改进粒子群算法的配网重构方法
CN106684854B (zh) * 2015-11-06 2019-04-19 中国电力科学研究院 一种基于节点等效的有源配电网电压越限风险分析方法
CN106684854A (zh) * 2015-11-06 2017-05-17 中国电力科学研究院 一种基于节点等效的有源配电网电压越限风险分析方法
CN105449675A (zh) * 2015-12-29 2016-03-30 吉林大学 优化分布式能源接入点和接入比例的电力网络重构方法
CN106451429B (zh) * 2016-10-19 2018-11-06 合肥工业大学 一种基于博弈论的含电动汽车入网的配电网重构方法
CN106451429A (zh) * 2016-10-19 2017-02-22 合肥工业大学 一种基于博弈论的含电动汽车入网的配电网重构方法
CN107393365A (zh) * 2017-07-07 2017-11-24 积成电子股份有限公司 基于可行度的配电网故障仿真培训评价方法
CN107393365B (zh) * 2017-07-07 2020-04-10 积成电子股份有限公司 基于可行度的配电网故障仿真培训评价方法
CN109245096A (zh) * 2018-10-19 2019-01-18 天津大学 一种主动配电网最大供电能力计算方法
CN109390971A (zh) * 2018-11-07 2019-02-26 国家电网有限公司 一种基于门当户对遗传算法的配电网多目标主动重构方法
CN109390971B (zh) * 2018-11-07 2021-02-26 国家电网有限公司 一种基于门当户对遗传算法的配电网多目标主动重构方法
CN111049132A (zh) * 2019-12-17 2020-04-21 国网冀北电力有限公司张家口供电公司 主动配电网大面积断电动态孤岛恢复方法
CN111049132B (zh) * 2019-12-17 2021-10-26 国网冀北电力有限公司张家口供电公司 主动配电网大面积断电动态孤岛恢复方法

Also Published As

Publication number Publication date
CN103779861B (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
CN103779861A (zh) 配电网主动重构策略及其预防控制方法
Mazumder et al. A review of current research trends in power-electronic innovations in cyber–physical systems
Li et al. Optimal control and management of a large-scale battery energy storage system to mitigate fluctuation and intermittence of renewable generations
Huang et al. The future renewable electric energy delivery and management (FREEDM) system: the energy internet
CN107134787B (zh) 基于分布式馈线自动化的切负荷控制系统和切负荷方法
CN101594002B (zh) 城市电网运行的自愈控制方法
CN101630840B (zh) 微电网能量智能控制系统
CN101710711B (zh) 一种平滑风电系统输出功率的储能装置的监控系统
Elgenedy et al. Smart grid self-healing: Functions, applications, and developments
CN102270837B (zh) 适用于飞机分布式配电系统的网络故障重构方法
CN105391179A (zh) 一种基于多智能体的环形直流微电网协调控制方法
CN102118061A (zh) 一种区域电网集中控制方法及系统
CN103872775A (zh) 一种智能微网监控系统及监控方法
CN109598377A (zh) 一种基于故障约束的交直流混合配电网鲁棒规划方法
Rodriguez et al. Synchrophasor based monitoring system for grid interactive energy storage system control
CN107181321A (zh) 一种基于电网拓扑结构实现快速拉荷的方法
Mohagheghi et al. Inductive power transfer for electric vehicles: Potential benefits for the distribution grid
CN104158206A (zh) 一种计及风电不确定性的电网安全稳定控制方法
CN102185372B (zh) 基于ems的备自投控制模型的生成方法及装置
CN112799363B (zh) 一种分层分区能源站智能电气监控管理系统
Skok et al. System integrity protection schems for future power transmission system using synchrophasors
Stein et al. Enel's large scale demonstration project inside GRID4EU: the challenge of RES integration in the MV network
Min-jie et al. The study of distribution grid distributed self-healing under dynamic operating modes
Wang Risk Control Cyber Physical System for Active Distributed Network
Torkzadeh et al. Synchrophasor Measurements for Control of Grid Interactive Energy Storage System Design alternatives for monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20201230