CN103774758A - Connecting method and connecting structure for box-type steel pipe column and shear wall end post - Google Patents
Connecting method and connecting structure for box-type steel pipe column and shear wall end post Download PDFInfo
- Publication number
- CN103774758A CN103774758A CN201410055509.6A CN201410055509A CN103774758A CN 103774758 A CN103774758 A CN 103774758A CN 201410055509 A CN201410055509 A CN 201410055509A CN 103774758 A CN103774758 A CN 103774758A
- Authority
- CN
- China
- Prior art keywords
- shear wall
- shear
- steel pipe
- pipe column
- newel post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a connecting method and a connecting structure for a box-type steel pipe column and a shear wall end post. The connecting method comprises the following steps: the box-type steel pipe column is provided; a plurality of shear resisting connecting bonds are fixedly connected onto one side of the box-type steel pipe column; a rebar structure for bonding a shear wall end post enables the vertical rebar part of the shear wall end post to be arranged in the shear resisting connecting bonds in a penetrating manner; form erecting is performed and the shear wall end post is poured. A row of shear resisting connecting bonds is fixed at a side part of the box-type steel pipe column, the vertical rebar part of the shear wall end post is arranged into the shear resisting connecting bonds in a penetrating manner, and a plurality of composition steel bars are arranged in the shear wall end post in a matching manner, so the shear wall end post is tightly buckled onto the shear resisting connecting bonds, and meanwhile, a reliable connection effect of shear resisting and pulling resisting between shear resisting connecting bonds and the shear wall end post can be played. The connecting strength between the box-type steel pipe column and the shear wall end post can be enhanced, the entire anti-seismic property of the structure is enhanced, and compared with a like method, the method provided by the invention has the advantages that the on-site construction difficulty is low, the construction quality is high, the working period is shortened and the cost is reduced.
Description
Technical field
The present invention relates to engineering construction field, relate in particular to a kind of method of attachment and syndeton being applicable between cast-in-place reinforced concrete composite structure raising middle flask shaped steel tubing string and shear wall newel post.
Background technology
The anti-seismic performance of shear wall structure has vital effect for the safe and reliable of highrise building, but the shortcoming of concrete shear force wall is that concrete wall ductility is poor.Although the use of box steel pipe column has improved the performance of structure, between itself and concrete shear force wall, how effectively to connect, make the two co-ordination, become a difficult problem.Between box steel pipe column and concrete shear force wall newel post, connected node is many, and difficulty of construction is large.Traditional steel box column is all to rely on welding or sleeve to be connected with the connection of shear wall newel post stirrup.Traditional shear wall newel post stirrup or horizontal bar when adopting sleeve to be connected on box steel pipe column, cannot be rotated in place, and difficulty of construction is large.Adopt suitable strong connecting key, can effectively improve steel pipe concrete frame and be connected cooperative performance with shear wall.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of method of attachment and syndeton connecting between box steel pipe column and shear wall newel post reliable, that can strengthen structural entity anti-seismic performance.
For realizing above-mentioned technique effect, the invention discloses the method for attachment between a kind of box steel pipe column and shear wall newel post, described method of attachment comprises the following steps:
One box steel pipe column is provided;
A side in described box steel pipe column is fixedly connected with multiple shear connectors;
The bar construction of colligation one shear wall newel post on described shear connector, is arranged in the vertical reinforcement part of described shear wall newel post in described shear connector;
Install the template of described shear wall newel post, in described template, build described shear wall newel post concrete.
Described method of attachment further improves and is, in the time of the bar construction of shear wall newel post described in colligation, many distributing bars of colligation in described bar construction, described distributing bar wears and is resisted against in described shear connector along the inner side of described shear connector, makes described shear wall newel post be snapped at described shear connector.
The invention also discloses the syndeton between a kind of box steel pipe column and shear wall newel post, comprise a box steel pipe column and a shear wall newel post, in one side of the corresponding described shear wall of described box steel pipe column newel post, be fixedly connected with multiple shear connectors, and between the sidepiece of described shear connector and described box steel pipe column, form multiple sealing connection space, the vertical reinforcement part of described shear wall newel post is arranged in described sealing connection space.
Described syndeton is further improved and is, described shear connector is " U " shape, comprises a blind end and an openend, and described openend is fixedly connected on the sidepiece of described box steel pipe column.
Described syndeton is further improved and is, in described shear wall newel post, be vertically installed with many distributing bars, described distributing bar is arranged in described sealing connection space, and described distributing bar is resisted against the blind end of described shear connector, make described shear wall newel post be snapped at described shear connector.
The present invention is owing to having adopted above technical scheme, making it have following beneficial effect is: by a row " U " shape shear connector is set at the sidepiece of box steel pipe column, and the vertical reinforcement part of shear wall newel post is arranged in " U " shape shear connector, and in shear wall newel post, be equipped with many distributing bars, shear wall newel post is closely snapped to shear connector, has played shearing resistance between shear connector and shear wall newel post and the reliable connection function of resistance to plucking simultaneously.Strengthened the bonding strength between box steel pipe column and shear wall newel post, strengthened the anti-seismic performance of structural entity, with same class methods comparison, site operation difficulty is little, and construction quality is high, saves duration and cost.
Accompanying drawing explanation
Fig. 1 is the facade structures schematic diagram of the syndeton between a kind of box steel pipe column of the present invention and shear wall newel post.
Fig. 2 is the structure top view of the syndeton between a kind of box steel pipe column of the present invention and shear wall newel post.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the present invention is further detailed explanation.
Consult shown in Fig. 1 and Fig. 2, syndeton between a kind of box steel pipe column of the present invention and shear wall newel post, comprise a box steel pipe column 11 and a shear wall newel post 12, a side of the corresponding shear wall of box steel pipe column 11 newel post 12 is fixedly connected with row's shear connector 13 from top to bottom.As shown in Figure 2, shear key 13 is " U " shape, comprise a blind end 131 and an openend 132, openend 132 is fixedly connected on the sidepiece of box steel pipe column 11, between the sidepiece of the row's of making shear connector 13 and box steel pipe column 11, form multiple sealing connection space 14, interior vertical reinforcement 15 parts near box steel pipe column 11 1 sides of shear wall newel post 12 are arranged in sealing connection space 14, the interior horizontal reinforcement 16 near box steel pipe column 11 1 sides of shear wall newel post 12 is linked to be respectively level " [ " shape in end, do not weld with box steel pipe column 11, and pass between the vertical reinforcement 15 in shear connector 13 and box steel pipe column 11, shearing resistance between shear connector 13 and shear wall newel post 12 and the reliable connection function of resistance to plucking have been played simultaneously.Because this shear connector 13 can weld in advance in factory and box steel pipe column 11, the bar construction of shear wall newel post 12 does not need to be welded on box steel pipe column 11, thereby in the work progress of compound shear wall, greatly reduces difficulty of construction and can reduce the welding job amount of site operation.In order further to strengthen the bonding strength of shear wall newel post 12 and shear connector 13, at the interior vertical fixing many distributing bars 17 of shear wall newel post 12, to seal vertical reinforcement 15 in connection space 14 corresponding with being arranged in shear wall newel post 12 for the quantity of distributing bar 17 and specification, distributing bar 17 is arranged in sealing connection space, and distributing bar 17 is resisted against the blind end 131 of shear connector 13, make shear wall newel post 12 closely be snapped at shear connector 13, thereby strengthen the bonding strength of shear wall newel post 12 and shear connector 13.When making box steel pipe column 11 and the 12 better co-ordination of concrete shear force wall newel post, reduce difficulty of construction.
The Specific construction flow process of the method for attachment between a kind of box steel pipe column of the present invention and shear wall newel post is as follows:
One box steel pipe column 11 is provided;
Short transverse along box steel pipe column 11 is fixedly connected with row's shear connector 13 in a side of box steel pipe column 11;
The bar construction of colligation one shear wall newel post 12 on shear connector 13, is arranged in the vertical reinforcement of shear wall newel post 12 15 parts in shear connector 13;
Many distributing bars of colligation 17 in the bar construction of shear wall newel post 12, the inner side that distributing bar 17 is close to shear connector 13 wears and is resisted against in shear connector 13, makes shear wall newel post 12 closely be snapped at shear connector 13;
Install the template of shear wall newel post 12, in template, build described shear wall newel post concrete.
Economic benefit and social benefit that method of attachment between box steel pipe column of the present invention and shear wall newel post has are as follows:
1, economic benefit: as adopted sleeve connecting box shaped steel tubing string and shear wall newel post, each sleeve welding is by 20 yuan of calculating, floor height by 4200mm, wall thickness by 600mm, horizontal bar 4 arrange, horizontal bar considers apart from 100mm between the upper and lower, need at least 168 sleeves of welding, horizontal bar also needs 168, processed filament head, eachly press 0.8 yuan of consideration, workman needs reinforcing bar is connected to sleeve, approximately 150 yuan of labour costs at least 0.5 work day.Each steel column needs: 168 × 20+168 × 0.8+150=3644.4 unit.
Calculate by weight expense and weld shear connector 13 on box steel pipe column 11, the shear connector 13 spacing 300mm of every layer, pressing floor height 4200mm calculates, 14 every layer, each weight is (0.4m+0.2m × 2) × 0.1m × 0.016m × 7.85T/m=0.010048T, the shear connector 13 totally 0.141 ton of calculating in each shear wall newel post 12, and production costs is by 10000 yuan/ton of calculating, cost with 1410 yuan, each shear wall newel post 12 can cost saving 3644.4-1410=2234.4 unit.Take this engineering as example, this engineering has 50 layers, and every layer has 7 these type of shear wall newel posts 12, and this engineering can be reduced expenses 78.204 ten thousand yuan altogether.
2, duration benefit: operation easier significantly reduces, shear connector 13 can factory in batch machining, be directly welded on box steel pipe column 11 and dispatch from the factory with member, reduce on-the-spot work installation; According to on-site actual situations, every box steel pipe column 11 reduces 1 work day of labour, and every layer of box steel pipe column 11 can be saved duration half a day, duration remarkable benefit.
3, social benefit: this kind of process quality is easy to control, simple to operate, greatly facilitates construction, provide can experience for reference in the processing of category node for this reason.
Below embodiment has been described in detail the present invention by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thereby some details in embodiment should not form limitation of the invention, the present invention by the scope defining using appended claims as protection scope of the present invention.
Claims (5)
1. the method for attachment between box steel pipe column and shear wall newel post, is characterized in that described method of attachment comprises the following steps:
One box steel pipe column is provided;
A side in described box steel pipe column is fixedly connected with multiple shear connectors;
The bar construction of colligation one shear wall newel post on described shear connector, is arranged in the vertical reinforcement part of described shear wall newel post in described shear connector;
Install the template of described shear wall newel post, in described template, build described shear wall newel post concrete.
2. method of attachment as claimed in claim 1, it is characterized in that: in the time of the bar construction of shear wall newel post described in colligation, many distributing bars of colligation in described bar construction, described distributing bar wears and is resisted against in described shear connector along the inner side of described shear connector, makes described shear wall newel post be snapped at described shear connector.
3. the syndeton between a box steel pipe column and shear wall newel post, comprise a box steel pipe column and a shear wall newel post, it is characterized in that: in a side of the corresponding described shear wall of described box steel pipe column newel post, be fixedly connected with multiple shear connectors, and between the sidepiece of described shear connector and described box steel pipe column, form multiple sealing connection space, the vertical reinforcement part of described shear wall newel post is arranged in described sealing connection space.
4. syndeton as claimed in claim 3, is characterized in that: described shear connector is " U " shape, comprises a blind end and an openend, and described openend is fixedly connected on the sidepiece of described box steel pipe column.
5. syndeton as claimed in claim 4, it is characterized in that: in described shear wall newel post, be vertically installed with many distributing bars, described distributing bar is arranged in described sealing connection space, and described distributing bar is resisted against the blind end of described shear connector, make described shear wall newel post be snapped at described shear connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410055509.6A CN103774758B (en) | 2014-02-19 | 2014-02-19 | Method of attachment between box steel pipe column and shear wall newel post and syndeton |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410055509.6A CN103774758B (en) | 2014-02-19 | 2014-02-19 | Method of attachment between box steel pipe column and shear wall newel post and syndeton |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103774758A true CN103774758A (en) | 2014-05-07 |
CN103774758B CN103774758B (en) | 2016-03-09 |
Family
ID=50567465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410055509.6A Active CN103774758B (en) | 2014-02-19 | 2014-02-19 | Method of attachment between box steel pipe column and shear wall newel post and syndeton |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103774758B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436907A (en) * | 2016-11-22 | 2017-02-22 | 广州市设计院 | Inserting type connecting method and connecting structure for tower crown steel and shear wall bar construction |
CN107989190A (en) * | 2017-12-15 | 2018-05-04 | 北京万兴建筑集团有限公司 | A kind of H profile steel beam and the connecting node and the practice of circular section profile steel concrete column |
CN111535498A (en) * | 2020-07-02 | 2020-08-14 | 中国船舶重工集团国际工程有限公司 | Prefabricated stiff concrete shear wall plate with steel beam connecting keys, assembled stiff concrete shear wall and manufacturing method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH094057A (en) * | 1995-06-20 | 1997-01-07 | Nkk Corp | Post/beam connecting structure of steel concrete composite framework and joining method |
CN101824878A (en) * | 2010-04-16 | 2010-09-08 | 北京工业大学 | Multi-cavity steel tube concrete superposed column and preparation method thereof |
CN102102396A (en) * | 2010-12-28 | 2011-06-22 | 哈尔滨工业大学 | Node connection method for circular steel tube concrete column and reinforced concrete shear wall |
CN203782888U (en) * | 2014-02-19 | 2014-08-20 | 中国建筑第八工程局有限公司 | Connection structure between box-type steel pipe post and shear wall end post |
-
2014
- 2014-02-19 CN CN201410055509.6A patent/CN103774758B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH094057A (en) * | 1995-06-20 | 1997-01-07 | Nkk Corp | Post/beam connecting structure of steel concrete composite framework and joining method |
CN101824878A (en) * | 2010-04-16 | 2010-09-08 | 北京工业大学 | Multi-cavity steel tube concrete superposed column and preparation method thereof |
CN102102396A (en) * | 2010-12-28 | 2011-06-22 | 哈尔滨工业大学 | Node connection method for circular steel tube concrete column and reinforced concrete shear wall |
CN203782888U (en) * | 2014-02-19 | 2014-08-20 | 中国建筑第八工程局有限公司 | Connection structure between box-type steel pipe post and shear wall end post |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436907A (en) * | 2016-11-22 | 2017-02-22 | 广州市设计院 | Inserting type connecting method and connecting structure for tower crown steel and shear wall bar construction |
CN106436907B (en) * | 2016-11-22 | 2023-12-29 | 广州市设计院 | Tower crown steel and shear wall reinforced bar structure plug-in connection method and connection structure |
CN107989190A (en) * | 2017-12-15 | 2018-05-04 | 北京万兴建筑集团有限公司 | A kind of H profile steel beam and the connecting node and the practice of circular section profile steel concrete column |
CN111535498A (en) * | 2020-07-02 | 2020-08-14 | 中国船舶重工集团国际工程有限公司 | Prefabricated stiff concrete shear wall plate with steel beam connecting keys, assembled stiff concrete shear wall and manufacturing method |
CN111535498B (en) * | 2020-07-02 | 2020-10-16 | 中国船舶重工集团国际工程有限公司 | Prefabricated stiff concrete shear wall plate with steel beam connecting keys, assembled stiff concrete shear wall and manufacturing method |
Also Published As
Publication number | Publication date |
---|---|
CN103774758B (en) | 2016-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (en) | Built-in positioning prefabricated component reinforced concrete shear wall and construction method | |
CN102493603B (en) | Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method | |
CN204151692U (en) | A kind of modular assembly formula connection system for guide rail | |
CN201474292U (en) | Midsize template assembled large template | |
WO2016062224A1 (en) | Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof | |
CN105937274B (en) | The prefabricated horizontal piece channel steel of shear wall is welded to connect device and connection method | |
CN102296754A (en) | Precast member horizontal steel reinforcement jointing element and jointing construction method | |
CN104314095B (en) | A kind of shaped steel buttress for the construction of super thick raft plate and valve plate and construction method | |
CN104878854A (en) | Prefabricated shear wall horizontal abutted seam buckle welding built-up connection device | |
CN205712590U (en) | A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post | |
CN103774758B (en) | Method of attachment between box steel pipe column and shear wall newel post and syndeton | |
CN106400982A (en) | Stirrup-densified splicing joint for fabricated reinforced concrete columns | |
CN103669720A (en) | Precast beam and reinforced concrete structure with tenon anchor system | |
CN206752693U (en) | A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node | |
CN203271106U (en) | Profile steel anchoring device of cantilever scaffold | |
CN206844316U (en) | A kind of assembled steel reinforced concrete column with well and post splicing node | |
CN203782888U (en) | Connection structure between box-type steel pipe post and shear wall end post | |
CN205712571U (en) | Prefabricated shear wall horizontal piece channel-section steel is welded to connect device | |
CN202520017U (en) | Construction structure of variable cross-section prestress overhanging type folding beam for stand | |
CN106760228A (en) | The method of precast shear wall wall Vertical bar connection | |
CN203795608U (en) | Prefabricated reinforced concrete beam and steel pipe column connecting joint | |
CN205977241U (en) | A steel shotcrete for native tunnel | |
CN204570997U (en) | The horizontal piece linkage of a kind of fabricated shear wall | |
CN103397661A (en) | Construction technology of underground combined profile steel-concrete outer wall structure | |
CN210597742U (en) | Shear wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |