CN103774153A - Novel sacrificial anode structure of steel pipe pile and mounting method thereof - Google Patents

Novel sacrificial anode structure of steel pipe pile and mounting method thereof Download PDF

Info

Publication number
CN103774153A
CN103774153A CN201410047079.3A CN201410047079A CN103774153A CN 103774153 A CN103774153 A CN 103774153A CN 201410047079 A CN201410047079 A CN 201410047079A CN 103774153 A CN103774153 A CN 103774153A
Authority
CN
China
Prior art keywords
steel pipe
sacrificial anode
anchor ear
semicircle anchor
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410047079.3A
Other languages
Chinese (zh)
Other versions
CN103774153B (en
Inventor
程明山
刘永柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Sunrui Marine Environment Engineering Co Ltd
Original Assignee
Qingdao Sunrui Marine Environment Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Sunrui Marine Environment Engineering Co Ltd filed Critical Qingdao Sunrui Marine Environment Engineering Co Ltd
Priority to CN201410047079.3A priority Critical patent/CN103774153B/en
Publication of CN103774153A publication Critical patent/CN103774153A/en
Application granted granted Critical
Publication of CN103774153B publication Critical patent/CN103774153B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Prevention Of Electric Corrosion (AREA)

Abstract

The invention relates to a novel sacrificial anode structure of a steel pipe pile and a mounting method thereof, wherein semicircular hoops are mounted on the underwater steel pipe pile, every two semicircular hoops are butted together and then mounted on the steel pipe pile through bolts, an iron core support on which a sacrificial anode is fixed is welded to the semicircular hoops, and one end of a round steel is welded to the semicircular hoops, while the other end of the round steel extends to be above water and is welded with the steel pipe pile. The novel sacrificial anode structure of the steel pipe pile has the advantages that the welding point of the sacrificial anode and the steel pipe pile is transferred to be above water from under water, so that the quality of welding and the construction efficiency can be improved, the quality of welding can be monitored and detected conveniently, and moreover, the labor intensity can be reduced and the cost can be saved, and in the meantime, the damaged part of a coating is located above water so that the damaged part, caused by welding, of the coating of the steel pipe pile can be repaired conveniently.

Description

A kind of Novel steel pile tube sacrificial anode structure and installation method thereof
Technical field
The present invention relates to belong to metallic substance protection against corrosion field, relate to steel pipe piling and sacrificial anode mounting structure and method thereof.
 
Background technology
The steel pipe pile foundation of beach harbour and bridge spanning the sea, in the time carrying out galvanic anode protection, need to be welded on the iron pin of sacrificial anode on steel pipe piling, and prior art is: under water sacrificial anode iron pin and steel pipe piling are carried out to blind weldering welding by frogman.
Existing sacrificial anode underwater welding method, has larger drawback: the reliability of (1) Underwater Welding is not high, and underwater visibility is lower, the diving welder modes that adopt blind weldering more, and weldquality is uneven.(2) during to Underwater Welding, the supervision of weld seam welding quality is larger with inspection difficulty.(3) steel pipe piling destroying because of welding under water coating is difficult to good reparation, and especially in the situation of water turbidity, coating coating difficulty is very large under water under water.(4) blind weldering is high to operating personnel's technical requirements under water, and Underwater Welding is large to operating personnel's labour intensity.
 
Summary of the invention
For overcoming the defect of prior art, the invention provides a kind of Novel steel pile tube sacrificial anode structure and installation method thereof, to realize sacrificial anode and steel pipe piling welds more than the water surface, improve the reliability of welding, reduce labor intensity, make more than coating damage is in the water surface, to be convenient to coating well to repair simultaneously.
Technical scheme of the present invention is: a kind of Novel steel pile tube sacrificial anode structure, by sacrificial anode and steel pipe piling weld by the water surface with more than being displaced downwardly to the water surface, semicircle anchor ear is installed on the steel pipe piling below the water surface, every two semicircle anchor ear docking are together bolted on steel pipe piling later, the iron core bracket of sacrificial anode is welded on semicircle anchor ear on land in advance, described semicircle anchor ear and steel pipe piling weld together by a round steel, one end of round steel is welded on semicircle anchor ear on land in advance, the other end extends to the water surface above and steel pipe piling welding.
Weld on adjacent semicircle anchor ear respectively at the two ends of described iron core bracket, and described sacrificial anode and steel pipe piling be arranged in parallel, and form spacing.
The weld of weld, iron core bracket and the semicircle anchor ear of described round steel and the weld of steel pipe piling, round steel and semicircle anchor ear all passes through rotproofing.
Described semicircle anchor ear, iron core bracket, round steel all carry out rotproofing in advance.
An installation method for Novel steel pile tube sacrificial anode structure, comprises the following steps:
(1) on land the two ends of the iron core bracket of sacrificial anode are welded on respectively on the semicircle anchor ear of adjacent setting;
(2) on the semicircle anchor ear that is welded with iron core bracket, weld round steel, the other end of round steel is upwards guided to the position more than water surface;
(3) by frogman, semicircle anchor ear is fixedly mounted on steel pipe piling, after every two semicircle anchor ear docking, passes through bolt tightening;
(4) the other end of round steel is welded on the steel pipe piling more than the water surface.
 
Advantage of the present invention is: sacrificial anode and steel pipe piling weld are waterborne by transferring under water, can improve welding quality and operating efficiency, the supervision of welding quality is more directly perceived with inspection, can reduce in addition labour intensity, cost-saving, make more than coating damage is in the water surface, repair at the steel pipe piling coating damage place being conducive to causing because of welding simultaneously.
 
Accompanying drawing explanation
Fig. 1 is agent structure schematic diagram of the present invention;
Fig. 2 is the vertical view of Fig. 1.
 
Embodiment
Further describe the present invention below in conjunction with specific embodiment, advantage and disadvantage of the present invention will be more clear along with description.But these embodiment are only exemplary, scope of the present invention are not formed to any restriction.It will be understood by those skilled in the art that lower without departing from the spirit and scope of the present invention and can the details of technical solution of the present invention and form be modified or be replaced, but these modifications and replacement all fall within the scope of protection of the present invention
Referring to Fig. 1 and Fig. 2, the Design of Steel-tube Piles of the present embodiment is installed 3 sacrificial anodes, more than sacrificial anode and steel pipe piling weld are guided to the water surface by round steel; The installation quantity of sacrificial anode decides according to factors such as steel pipe piling protected area, the protection time limits, installs according to real needs.
A kind of Novel steel pile tube sacrificial anode structure, comprise steel pipe piling 5 and cushion cap 6, described steel pipe piling 5 bottoms are squeezed into below mud face, its top is cushion cap 6, the part of steel pipe piling 5 in water is provided with semicircle anchor ear 4, every two semicircle anchor ears 4 are bolted on steel pipe piling 5 after docking together, the iron core bracket 7 of sacrificial anode 3 is welded on semicircle anchor ear 4 on land in advance, one end of round steel 1 is welded on semicircle anchor ear 4 on land in advance, the other end extends to the water surface above and steel pipe piling 5 welds, guaranteeing that sacrificial anode is in water stability, realize the electric connection of sacrificial anode and steel pipe piling, weld is waterborne by transferring under water.
Weld on adjacent semicircle anchor ear 4 respectively at the two ends of described iron core bracket 7, and described sacrificial anode 3 be arranged in parallel with steel pipe piling 5, and form spacing.
Described round steel 1 all passes through rotproofing with weld 2, the iron core bracket 7 of semicircle anchor ear 4 with the weld of semicircle anchor ear 4 with the weld of steel pipe piling 5, round steel 1, has guaranteed the not extra cathode area that increases of whole cathodic protection system.
Described semicircle anchor ear 4, iron core bracket 7, round steel 1 all carry out rotproofing in advance (routine techniques), and anticorrosion grade is not less than anti-corrosion of steel pipe pile grade.The anticorrosion grade of weld is with the anticorrosion grade of pile tube.
Installation method of the present invention is:
(1) on land the two ends of the iron core bracket of sacrificial anode 37 are welded on respectively on the semicircle anchor ear 4 of adjacent setting;
(2) on the semicircle anchor ear 4 that is welded with iron core bracket 7, weld round steel 1, the other end of round steel 1 is upwards guided to the position more than water surface;
(3) treat that semicircle anchor ear and round steel sink to designed elevation, frogman is fixedly mounted on the semicircle anchor ear 4 that is welded with round steel 1 on the steel pipe piling 5 below the water surface, tight by bolt after every two semicircle anchor ear 4 docking;
(4) the other end of round steel 1 is welded on the above steel pipe piling 5 of the water surface, then butt welding point place carries out protective system coating processing.

Claims (5)

1. a Novel steel pile tube sacrificial anode structure, it is characterized in that, by sacrificial anode and steel pipe piling weld by the water surface with more than being displaced downwardly to the water surface, semicircle anchor ear is installed on the steel pipe piling below the water surface, every two semicircle anchor ear docking are together bolted on steel pipe piling later, the iron core bracket of sacrificial anode is welded on semicircle anchor ear on land in advance, described semicircle anchor ear and steel pipe piling weld together by a round steel, one end of round steel is welded on semicircle anchor ear on land in advance, the other end extends to the water surface above and steel pipe piling welding.
2. Novel steel pile tube sacrificial anode structure according to claim 1, is characterized in that, weld on adjacent semicircle anchor ear respectively at the two ends of described iron core bracket, and described sacrificial anode and steel pipe piling be arranged in parallel, and forms spacing.
3. Novel steel pile tube sacrificial anode structure according to claim 1, is characterized in that, the weld of weld, iron core bracket and the semicircle anchor ear of described round steel and the weld of steel pipe piling, round steel and semicircle anchor ear all passes through rotproofing.
4. Novel steel pile tube sacrificial anode structure according to claim 1, is characterized in that, described semicircle anchor ear, iron core bracket, round steel all carry out rotproofing in advance.
5. an installation method for Novel steel pile tube sacrificial anode structure, is characterized in that, comprises the following steps:
(1) on land the two ends of the iron core bracket of sacrificial anode are welded on respectively on the semicircle anchor ear of adjacent setting;
(2) on the semicircle anchor ear that is welded with iron core bracket, weld round steel, the other end of round steel is upwards guided to the position more than water surface;
(3) by frogman, semicircle anchor ear is fixedly mounted on steel pipe piling, after every two semicircle anchor ear docking, passes through bolt tightening;
(4) the other end of round steel is welded on the steel pipe piling more than the water surface.
CN201410047079.3A 2014-02-11 2014-02-11 A kind of Novel steel pile tube sacrificial anode structure and installation method thereof Active CN103774153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410047079.3A CN103774153B (en) 2014-02-11 2014-02-11 A kind of Novel steel pile tube sacrificial anode structure and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410047079.3A CN103774153B (en) 2014-02-11 2014-02-11 A kind of Novel steel pile tube sacrificial anode structure and installation method thereof

Publications (2)

Publication Number Publication Date
CN103774153A true CN103774153A (en) 2014-05-07
CN103774153B CN103774153B (en) 2016-01-13

Family

ID=50566891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410047079.3A Active CN103774153B (en) 2014-02-11 2014-02-11 A kind of Novel steel pile tube sacrificial anode structure and installation method thereof

Country Status (1)

Country Link
CN (1) CN103774153B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104214468A (en) * 2014-07-31 2014-12-17 西安石油大学 Device and method for preventing pipeline inner wall corrosion through adopting external sacrificial anode
CN108457308A (en) * 2016-10-14 2018-08-28 中交天津港湾工程研究院有限公司 A kind of installation method of constructing device for ocean steel-pipe pile cladding corrosion protection system
CN108707908A (en) * 2018-08-09 2018-10-26 上海勘测设计研究院有限公司 A kind of adjustable mounting assembly of offshore wind turbine foundation sacrificial anode block and J-type pipe
CN110409484A (en) * 2019-06-19 2019-11-05 中广核如东海上风力发电有限公司 A kind of novel fan basis sacrificial anode installation method
CN112378967A (en) * 2020-11-24 2021-02-19 青岛双瑞海洋环境工程股份有限公司 Guide rail type underwater steel pipe pile electrode probe and mounting device
CN112779911A (en) * 2020-12-29 2021-05-11 威海立达尔机械股份有限公司 Ground screw using sacrificial anode

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2729149Y (en) * 2004-06-04 2005-09-28 中国海洋大学 Circulation connection suspension wolding sacrifice anode for anticorrosion of steel pipe pile
CN200955067Y (en) * 2006-08-23 2007-10-03 中国科学院金属研究所 Dog for fixing steel-pipe tubular pile sacrificial anode
CN101130874A (en) * 2006-08-23 2008-02-27 中国科学院金属研究所 Method for fixing sacrificial anode of steel pipe pile
CN202865872U (en) * 2012-09-14 2013-04-10 江苏海力风电设备科技有限公司 Steel pipe pile for wind power generation foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2729149Y (en) * 2004-06-04 2005-09-28 中国海洋大学 Circulation connection suspension wolding sacrifice anode for anticorrosion of steel pipe pile
CN200955067Y (en) * 2006-08-23 2007-10-03 中国科学院金属研究所 Dog for fixing steel-pipe tubular pile sacrificial anode
CN101130874A (en) * 2006-08-23 2008-02-27 中国科学院金属研究所 Method for fixing sacrificial anode of steel pipe pile
CN202865872U (en) * 2012-09-14 2013-04-10 江苏海力风电设备科技有限公司 Steel pipe pile for wind power generation foundation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104214468A (en) * 2014-07-31 2014-12-17 西安石油大学 Device and method for preventing pipeline inner wall corrosion through adopting external sacrificial anode
CN108457308A (en) * 2016-10-14 2018-08-28 中交天津港湾工程研究院有限公司 A kind of installation method of constructing device for ocean steel-pipe pile cladding corrosion protection system
CN108457308B (en) * 2016-10-14 2020-02-18 中交天津港湾工程研究院有限公司 Installation method of construction device for marine steel pipe pile coating anticorrosion system
CN108707908A (en) * 2018-08-09 2018-10-26 上海勘测设计研究院有限公司 A kind of adjustable mounting assembly of offshore wind turbine foundation sacrificial anode block and J-type pipe
CN108707908B (en) * 2018-08-09 2024-06-11 上海勘测设计研究院有限公司 Adjustable installation device of offshore wind turbine foundation sacrificial anode block and J-shaped tube
CN110409484A (en) * 2019-06-19 2019-11-05 中广核如东海上风力发电有限公司 A kind of novel fan basis sacrificial anode installation method
CN112378967A (en) * 2020-11-24 2021-02-19 青岛双瑞海洋环境工程股份有限公司 Guide rail type underwater steel pipe pile electrode probe and mounting device
CN112779911A (en) * 2020-12-29 2021-05-11 威海立达尔机械股份有限公司 Ground screw using sacrificial anode

Also Published As

Publication number Publication date
CN103774153B (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN103774153B (en) A kind of Novel steel pile tube sacrificial anode structure and installation method thereof
CN104278277A (en) Sacrificial anode heap for rapidly repairing cathode protection
CN104631602A (en) Construction method of pipeline in sea area for sewage deep sea disposal engineering
CN105345223B (en) A kind of automatic welding restorative procedure for anode steel claw head
CN103060815A (en) Jacket platform far anode type corrosion control device and use method thereof
CN102277580A (en) Impressed current cathode protection method for jacket platform
CN102268679A (en) Corrosion protection system for offshore steel structures and a method for its application
CN202201980U (en) Sacrificial anode string for protecting cathode of marine structure
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN111893491B (en) Jacket tensioning type anti-corrosion system and installation method
CN104308355A (en) Method and equipment for underwater welding of sacrificial anode based on friction stud welding
CN101870028A (en) Method for assembling and welding propeller base of cylindrical marine work platform
CN103060819A (en) Installing device of remote site type auxiliary anode
CN2729149Y (en) Circulation connection suspension wolding sacrifice anode for anticorrosion of steel pipe pile
CN102537518A (en) Flange catcher
CN103966612A (en) Offshore wind power foundation sacrificial anode mounting device
CN103806006A (en) Remote site suspension impressed current auxiliary anode device and usage thereof
CN204211830U (en) Anti-trawl type impressed current supplementary anode
CN203096179U (en) Mounting device of impressed current cathodic protection system for marine platform
CN219010463U (en) Cathode protection device and temporary anti-corrosion structure for steel pipe pile
CN106759207B (en) Steel tubular bank protection structure splash zone antiseptic concrete tooling construction method
CN101609060B (en) Anticorrosive device of oil storage tank during testing seawater pressure
CN109403361A (en) A kind of over-water construction stake bucket and its application
CN204266127U (en) Large sections hoisting mechanism
CN206447948U (en) The sacrificial anode device of drive buffering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant