CN103758361B - 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法 - Google Patents

既有建筑后增短肢墙和钢拉杆的抗震加固施工方法 Download PDF

Info

Publication number
CN103758361B
CN103758361B CN201410007472.XA CN201410007472A CN103758361B CN 103758361 B CN103758361 B CN 103758361B CN 201410007472 A CN201410007472 A CN 201410007472A CN 103758361 B CN103758361 B CN 103758361B
Authority
CN
China
Prior art keywords
pull rod
wall
reinforcing pull
reinforcing
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410007472.XA
Other languages
English (en)
Other versions
CN103758361A (zh
Inventor
董有
甄进平
吴保光
郑方吴遐
李薇
杨娜茵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhuo Xiu Construction Co., Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201410007472.XA priority Critical patent/CN103758361B/zh
Publication of CN103758361A publication Critical patent/CN103758361A/zh
Application granted granted Critical
Publication of CN103758361B publication Critical patent/CN103758361B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种既有建筑后增短肢墙和钢拉杆的抗震加固施工方法,属于抗震加固技术领域。具体方法为:在既有砌筑建筑横墙外侧架设钻孔设备在拟设钢拉杆部位通过在墙体内长距离水平钻孔,然后孔内穿钢筋,然后在孔内注聚合物砂浆形成钢拉杆约束杆件增强后增短肢墙加固砌筑建筑整体性。地震时将约束墙体裂缝开展,增强墙体整体性,减少地震力对上部结构造成的破坏。本发明不入户实现对砌体抗震性能较大提高而且施工简单,造价低,且应用范围广泛,适用于实心砖墙、多孔砖墙、空斗砖墙、空心砌块墙、条石砌筑墙、毛石墙。

Description

既有建筑后增短肢墙和钢拉杆的抗震加固施工方法
技术领域
本发明涉及一种抗震加固施工方法,特别是一种既有建筑后增短肢墙和钢拉杆的抗震加固施工方法,属于抗震加固技术领域。
背景技术
目前,中国既有住宅、农宅抗震加固开始启动,在既有居住建筑加固期间,百姓不愿意让入户施工,这使得目前部分工程所设计的外套加固技术(外墙外侧对横墙增加附加钢筋混凝土短肢墙)所需穿楼钢拉杆等需入户加固施工技术难以实现,钢拉杆的缺失严重影响外套加固技术的整体性。
发明内容
为了解决上述问题,本发明提出了一种墙体内后增钢拉杆抗震加固技术-既有建筑后增短肢墙和钢拉杆的抗震加固施工方法。其无需破坏外貌、室内装饰,无需入户施工,全部外部作业形成外套加固技术所需钢拉杆杆件,保证既有砌筑建筑外套加固整体性效果,能够大幅提高既有建筑的抗震性能,且避免了传统钢拉杆占用室内空间、影响美观、室内操作等一系列为住户所不愿意接受的问题。
本发明的技术方案如下:
一种既有建筑后增短肢墙和钢拉杆的抗震加固施工方法,包括原纵墙和原横墙,在所述原横墙中设置有通长水平钻孔,所述钻孔内穿设有钢拉杆,所述钢拉杆与所述通长水平钻孔间灌注有聚合物砂浆;所述原横墙的两端向外延伸设置有后增短肢钢筋混凝土墙,所述钢拉杆两端伸出通长水平钻孔外并锚固在后增短肢钢筋混凝土墙内,采用如下步骤:
步骤一:对既有建筑原纵墙和原横墙进行鉴定,设计钻孔位置、孔径大小、钻孔距离以及钢拉杆的规格直径、及内部聚合物砂浆强度,钢拉杆选取位置靠近楼板,现场测量标记钻孔位置;
步骤二:搭设脚手架后搭设施工平台,选择钻孔设备,由顶层开始由上至下逐层进行钻孔施工;
步骤三:顶层钻孔完毕后穿入钢拉杆,将钢拉杆架立居中,将钢拉杆端部锚固部分架立支撑;
步骤四:在钻孔两端封口,架设高压注浆机向钻孔内注聚合物砂浆,水平注聚合物砂浆时应注意两端不要漏浆,注聚合物砂浆完毕后对注浆口处进行封堵;
步骤五:待聚合物砂浆终凝后进行下一层钻孔、穿入钢拉杆、注聚合物砂浆施工;
步骤六:待所有层施工完毕后开始进行后增短肢钢筋混凝土墙的钢筋绑扎,钢拉杆与后增短肢钢筋混凝土墙的钢筋连接,所有钢拉杆端部与后增短肢钢筋混凝土墙钢筋连接完毕后进行支模、浇筑混凝土;
步骤七:所有工程完毕后对施工内容进行验收。
进一步地,所述钻孔直径为40mm至150mm。
进一步地,所述钢拉杆位于钻孔横截面正中,所述钻孔位于原横墙横向居中位置。
进一步地,所述钢拉杆为钢筋或钢绞线,特别是,所述钢筋钢拉杆之间的连接采用搭接或焊接的形式。
其中,孔内注聚合物砂浆,聚合物砂浆采用高压注浆泵注入,需孔内饱满,聚合物砂浆强度根据设计选取。同时,钻孔位置及截面大小根据设计确定,且钢筋或钢绞线规格型号由设计确定。
有益效果:
本发明能增强砌筑建筑外套加固整体性效果和实现远距离免入户构件间拉结。地震时将约束墙体裂缝开展,增强墙体整体性,减少地震力对上部结构造成的破坏。本发明不入户实现对砌体抗震性能较大提高而且施工速度快,施工简单,造价低。本发明应用范围适用于实心砖墙、多孔砖墙、空心砌块墙、空斗砖墙、条石砌筑墙、毛石墙。本发明实施具有较高的经济效益和社会效益。
附图说明
图1为本发明后增短肢墙免入户钢拉杆布置平面图;
图2为图1的剖视图;
图3为图1的剖视图;
图4为图2的处放大图;
图5为图3的处放大图。
图中,1、后增短肢钢筋混凝土墙;2、钢拉杆;5、聚合物砂浆;6、原纵墙;7、原横墙;8、楼板。
具体实施方式
一种既有建筑后增短肢墙和钢拉杆的抗震加固施工方法,参见图1至5所示,包括原纵墙6、原横墙7,原横墙7中设置通长水平钻孔、孔内穿钢拉杆2、孔内注聚合物砂浆5,在既有建筑外部架设钻孔设备在拟设钢拉杆2部位通过在原横墙7内长距离水平钻孔,然后孔内穿钢拉杆2,然后在孔内注聚合物砂浆5形成钢拉杆2约束杆件增强砌体建筑整体性的抗震加固技术。水平钻孔采用专用设备,钻孔位置位于原横墙7横向居中,钻孔大小需根据设计确定,在40mm至150mm之间。孔内穿钢拉杆2,若使用钢筋则采用搭接或焊接,长度为与孔纵向长度相同,钢拉杆2位于钻孔横截面正中。孔内注聚合物砂浆5,聚合物砂浆5采用高压注浆泵注入,需孔内饱满,聚合物砂浆5强度根据设计选取。最后形成钢拉杆2约束杆件增强砌体建筑整体性的抗震加固技术。该技术作为后增短肢钢筋混凝土墙1加固砌筑建筑的辅助技术措施,避免了传统钢拉杆占用室内空间、影响美观、室内操作等一系列为住户所不愿意接受的问题,所述钢拉杆2位于原横墙7横向居中,参见图3和图5,所述钢拉杆2为钢筋或钢绞线。钢拉杆2端部锚固于后增短肢钢筋混凝土墙1内,其锚固长度依据设计而定,参见图4。
上述既有建筑后增短肢墙和钢拉杆的抗震加固施工方法,具体采用如下步骤:
步骤一:对既有建筑原纵墙6和原横墙7进行鉴定,设计钻孔位置、孔径大小、钻孔距离以及钢拉杆2的规格直径、及内部聚合物砂浆5强度,钢拉杆2选取位置靠近楼板8,现场测量标记钻孔位置;
步骤二:搭设脚手架后搭设施工平台,选择钻孔设备,由顶层开始由上至下逐层进行钻孔施工:
步骤三:顶层钻孔完毕后穿入钢拉杆2,将钢拉杆2架立居中,将钢拉杆2端部锚固部分架立支撑;
步骤四:在钻孔两端封口,架设高压注浆机向钻孔内注聚合物砂浆5,水平注聚合物砂浆5时应注意两端不要漏浆,注聚合物砂浆5完毕后对注浆口处进行封堵;
步骤五:待聚合物砂浆5终凝后进行下一层钻孔、穿入钢拉杆2、注聚合物砂浆5施工;
步骤六:待所有层施工完毕后开始进行后增短肢钢筋混凝土墙1的钢筋绑扎,钢拉杆2与后增短肢钢筋混凝土墙1的钢筋连接,所有钢拉杆2端部与后增短肢钢筋混凝土墙1钢筋连接完毕后进行支模、浇筑混凝土;
步骤七:所有工程完毕后对施工内容进行验收。
以上是本发明的一典型实施方式,本发明的具体实施不限于此。

Claims (1)

1.一种既有建筑后增短肢墙和钢拉杆的抗震加固施工方法,包括原纵墙(6)和原横墙(7),在所述原横墙(7)中设置有通长水平钻孔,所述钻孔内穿设有钢拉杆(2),所述钢拉杆(2)与所述通长水平钻孔间灌注有聚合物砂浆(5);所述原横墙(7)的两端向外延伸设置有后增短肢钢筋混凝土墙(1),所述钢拉杆(2)两端伸出通长水平钻孔外并锚固在后增短肢钢筋混凝土墙(1)内,其特征在于:采用如下步骤:
步骤一:对既有建筑原纵墙(6)和原横墙(7)进行鉴定,设计钻孔位置、孔径大小、钻孔距离以及钢拉杆(2)的规格直径、及内部聚合物砂浆(5)强度,钢拉杆(2)选取位置靠近楼板(8),现场测量标记钻孔位置;
步骤二:搭设脚手架后搭设施工平台,选择钻孔设备,由顶层开始由上至下逐层进行钻孔施工;
步骤三:顶层钻孔完毕后穿入钢拉杆(2),将钢拉杆(2)架立居中,将钢拉杆(2)端部锚固部分架立支撑;
步骤四:在钻孔两端封口,架设高压注浆机向钻孔内注聚合物砂浆(5),水平注聚合物砂浆(5)时应注意两端不要漏浆,注聚合物砂浆(5)完毕后对注浆口处进行封堵;
步骤五:待聚合物砂浆(5)终凝后进行下一层钻孔、穿入钢拉杆(2)、注聚合物砂浆(5)施工;
步骤六:待所有层施工完毕后开始进行后增短肢钢筋混凝土墙(1)的钢筋绑扎,钢拉杆(2)与后增短肢钢筋混凝土墙(1)的钢筋连接,所有钢拉杆(2)端部与后增短肢钢筋混凝土墙(1)钢筋连接完毕后进行支模、浇筑混凝土;
步骤七:所有工程完毕后对施工内容进行验收;
其中,所述钻孔直径为40mm至150mm;所述钢拉杆(2)位于钻孔横截面正中,所述钻孔位于原横墙(7)横向居中位置;所述钢拉杆(2)为钢筋或钢绞线;所述钢筋钢拉杆(2)之间的连接采用搭接或焊接的形式。
CN201410007472.XA 2014-01-06 2014-01-06 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法 Active CN103758361B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410007472.XA CN103758361B (zh) 2014-01-06 2014-01-06 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410007472.XA CN103758361B (zh) 2014-01-06 2014-01-06 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法

Publications (2)

Publication Number Publication Date
CN103758361A CN103758361A (zh) 2014-04-30
CN103758361B true CN103758361B (zh) 2015-12-09

Family

ID=50525667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410007472.XA Active CN103758361B (zh) 2014-01-06 2014-01-06 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法

Country Status (1)

Country Link
CN (1) CN103758361B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560944A (zh) * 2018-05-03 2018-09-21 东南大学 一种加强古城墙整体性的加固结构及其施工方法
CN109505422B (zh) * 2018-12-10 2021-04-09 浙江安地建筑规划设计有限公司 一种古建筑墙体的加固方法
CN111101730A (zh) * 2019-12-31 2020-05-05 中震(北京)工程检测股份有限公司 一种预制楼板预留孔采用穿钢拉杆加固砌体结构及其施工方法
CN111779304A (zh) * 2020-07-03 2020-10-16 中震(北京)工程检测股份有限公司 墙体内采用纵、横向钻孔植筋外加钢垫板组合提高砌体结构韧性及其施工方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168458A (zh) * 2010-07-28 2011-08-31 上海同华加固工程有限公司 一种新型抗震加固钢拉杆设置
CN201908448U (zh) * 2010-07-28 2011-07-27 上海同华加固工程有限公司 一种新型抗震加固钢拉杆
KR20130082265A (ko) * 2012-01-11 2013-07-19 스키너스 주식회사 조적벽체 내진보강 구조
CN202866314U (zh) * 2012-10-11 2013-04-10 北京筑福建设工程有限责任公司 一种横墙加扁钢拉杆加固砌体结构体系
CN102864945B (zh) * 2012-10-11 2016-08-17 北京筑福国际工程技术有限责任公司 一种砂浆锚杆砌体加固结构及其加固方法
CN102852343B (zh) * 2012-10-15 2014-12-17 胡卫军 Sp板装配式古城墙加固结构及施工方法
KR101301030B1 (ko) * 2013-06-04 2013-08-28 주식회사 동일구조 가압판을 이용한 조적조 내진 보강 구조물 및 방법
CN103352581B (zh) * 2013-07-09 2015-12-09 北京筑福国际工程技术有限责任公司 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法

Also Published As

Publication number Publication date
CN103758361A (zh) 2014-04-30

Similar Documents

Publication Publication Date Title
CN103758362B (zh) 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法
CN103498574B (zh) 砌筑墙体内后增芯柱抗震加固方法
CN103758361B (zh) 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法
CN103352582B (zh) 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法
CN103510510A (zh) 一种增强型长螺旋钻孔压灌混凝土桩及施工方法
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN104563147B (zh) 适用于岩溶区的组合结构桩基础及其施工方法
CN104294823B (zh) 一种预应力管桩抗浮桩筏结构的施工方法
CN105714678B (zh) 一种复合式重力锚碇
CN103498567B (zh) 砌筑墙体内后增暗圈梁抗震加固方法及其加固结构
CN204662494U (zh) 一种公路挡土墙加固结构
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN102220764B (zh) 深基坑支护体系的施工方法
CN203594023U (zh) 一种增强型长螺旋钻孔压灌混凝土桩
CN204112318U (zh) 一种提高cfg压灌桩承载力的技术装置
CN204401627U (zh) 对拉式预应力管桩基坑支护结构
CN106245641A (zh) Phc管桩后压浆施工工艺及phc管桩复合桩
CN103741961A (zh) 既有建筑预制圆孔板后增销键暗梁抗震加固方法
CN204780943U (zh) 一种h型预制混凝土桩及基坑支护装置
CN103572756A (zh) 灌注桩桩套管及其施工方法
CN104652420A (zh) 一种沉管取土现浇矩形支护桩地连墙及其施工方法
CN103758122A (zh) 一种环保型模块化混凝土管柱及其施工方法
CN203603519U (zh) 砌筑墙体内后增芯柱抗震加固结构
CN102433882A (zh) 一种混凝土桩墙与旋喷锚桩组合形成基坑支护的施工方法及锚筋结构件
CN201649355U (zh) 约束煤矸石多孔砖砌体

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171204

Address after: 225300 Jiangsu Taizhou high port district port street port community

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xu Xiujiang

Inventor before: Dong You

Inventor before: Zhen Jinping

Inventor before: Wu Baoguang

Inventor before: ZHENG-FANG HAOXIA

Inventor before: Li Wei

Inventor before: Yang Nayin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180510

Address after: 528200 -1108 room 1107, 4 building, Chuang Yue cultural and creative garden, 61 Guicheng Road, Nanhai District, Foshan, Guangdong.

Patentee after: Guangdong Zhuo Xiu Construction Co., Ltd.

Address before: 225300 port area of Taizhou port city, Jiangsu Province

Patentee before: Beijing Yong Bo Science and Technology Ltd.